Document

advertisement
Afghanistan’s Urban Development Program
Pre-Fabricated & Modular Building Solutions
Dubai, United Arab Emirates
February 7, 2016
Presentation Goals
Minister of Urban Development Mr. Naderi
The Government of Afghanistan (GoA) would like to:

Create a shared Vision: We will discuss GoA’s vision for the infrastructure sector
and the development of the construction sector in Afghanistan

Obtain feedback: We would like to obtain feedback from all interested companies
on the components of the program and the structure of the RFI & RFP

Move forward with implementation: Finally, we are looking to move quickly
forward and invite discussion on how we can created shared value quickly
Infrastructure Vision for Afghanistan
Advisor to the President on Infrastructure: H.E. Dr. Qayoumi
The Government of Afghanistan is expanding its focus on infrastructure investments
throughout the country
Type of Projects
 Regional Integration
 Power
 Urban
 Railways
 Natural Gas
Trade Routes
Railroad Northern Corridor Line
 Feasibility studies have already been completed
 Construction is set to begin during 2016
Chabahar Port
Urban Development Program: Summary of Opportunities
Minister Naderi
Vision: MUDA is now responsible for developing policy and implementing all
urban infrastructure projects
Project Overview: Construction of prefabrication facilities able to produce 1-2
million+ square meters of floor space per year
The opportunities include:
 Schools
 Government Housing
 Military Barracks
 Government Offices
 Higher Education Classrooms
The Financial Opportunity
Ajmal Ahmady
 The Opportunity: The opportunity to work with the GoA to implement priority
projects across five priority sectors
 Government Resources: Afghanistan has identified the financial resources to
fund our urban development priorities. These funds include budgetary
resources, as well as international development and private funding
 Financing: We can work with qualified firms identify sources of funding (e.g.
IFC) and to help insure project risks (e.g. MIGA/private insurance)
 Process: The Ministry of Finance will ensure that the GoA implements rigorous
budgetary controls, milestones & targets. We will adhere to the highest
policies to prevent fraud and corruption
Program Technical Components
Jonathon Baxter
Specification, Construction, Seismic Design & Performance to comply with
international standards, typically ISO / DIN / BS / ASTM / EN-Eurocode 8
+Seismic data http://pubs.usgs.gov/fs/2005/3038/508fs3038.html
 Avoiding complexity
 Seasonal Resilience
 Method Statement
Foundation restrictions limit height
All-year-round erection & installation
Train & supervise transporters & installers
 Insurance requirements and implications of collateral design warranties
 Compliance with Afghan Procurement Law
Procurement Process Overview
Process & Steps from RFP to Award
WEEKS
Issue Request for Proposals
Respond to Request For Proposals
Evaluation & Feedback
Pre-Selection of Acceptable Systems
**Confirmation of (initial) Approvable Designs
Request for Proof of Concept - Live Test - Import & Construct
Delivery and completion of Test Buildings
Evaluation of constructed Time/Cost/Quality (iterative)
Estimation of factory & establishment costs, etc.
Bid : Financial Offer, Method Statement, Programme
**Evaluation & Report to National Procurement Council
Selection of Approved Manufacturers
Awards
MUDA
FABCo's
MUDA / ICE / FABCo's
MUDA
ICE
FABCo's / MUDA Co-ordination
MUDA / ICE / FABCo's
FABCo's
FABCo's
MUDA / ICE
MUDA/NPC
MUDA
2
2
2
12
2
2
1
2
1
PROVISION
Resources
Building Design Standards : Seismic Resilience to accord with EN-Eurocode 8
or similar
Code Description
http://www.eurocode-online.eu/en/eurocode-content/eurocode-8
Applicable Sections
http://www.eurocodeonline.eu/blob/29990/60186e3a31085db7270120726ee3d789/eurocode8-data.pdf
Some practical worked examples : Designing RC buildings in accordance with Eurocode 8.…
http://eurocodes.jrc.ec.europa.eu/doc/WS_335/report/EC8_Seismic_Design_of_BuildingsWorked_examples.pdf
Afghan Procurement Law
http://www.ppu.gov.af/Documents/ProcurementLaw/English/Procurment%20Law%20incop
orated%20Jan%202009.pdf
Additional Resources
AFGHAN FDI
World Bank Ranking
http://www.doingbusiness.org/data/exploreeconomies/afghanistan/
UK Investment Overview
https://www.gov.uk/government/publications/exporting-to
-afghanistan/doing-business-in-afghanistan-afghanistan-trade-and-export-guide
US Investment Overview
http://kabul.usembassy.gov/doing-business-local.html
US Investment Climate Report 2013
http://www.state.gov/e/eb/rls/othr/ics/2013/205289.htm
Afghan Investment Support Agency. Licensing, Procedures, Registration, etc.
http://www.aisa.org.af/en/page/services/company-startup-procedure
AFGHAN FDI
Lloyds City Risk Index
http://www.lloyds.com/cityriskindex/locations/city/kabul
Accountancy & Tax (Baker Tilly FDI Guide for AFG Oct 2015)
http://www.bakertillyinternational.com/media/1957512/doing-business-in-afghanistan.pdf
Legal Perspectives (World Bank summary of Afghan Laws)
http://www.doingbusiness.org/law-library/afghanistan
Q&A from US perspective
http://kabul.usembassy.gov/business-faq.html
Building Design Standards: Seismic Resilience
In accordance with EN-Eurocode 8
Code Description
http://www.eurocode-online.eu/en/eurocode-content/eurocode-8
Applicable Sections
http://www.eurocodeonline.eu/blob/29990/60186e3a31085db7270120726ee3d789/eurocode8-data.pdf
Some practical worked examples : Designing RC buildings in accordance with Eurocode 8.…
http://eurocodes.jrc.ec.europa.eu/doc/WS_335/report/EC8_Seismic_Design_of_BuildingsWorked_examples.pdf
Afghan Procurement Law
http://www.ppu.gov.af/Documents/ProcurementLaw/English/Procurment%20Law%20incop
orated%20Jan%202009.pdf
Transport Infrastructure & Economic Development
http://iranrail.net/network.php
http://www.carecprogram.org/index.php?page=carec-corridors
CHINA / IRAN : shipping already commenced via Bandar Abbas January 2016
http://financialtribune.com/articles/economy-domestic-economy/35588/new-china-iran-shipping-route
AFGHAN / IRAN : Joint commission for Chabahar Port
http://ariananews.af/latest-news/afghan-iran-officials-to-form-joint-commission-for-chabahr-port/
CAREC CORRIDORS 5 & 6 : $860m Provision in ASIAN DEVELOPMENT BANK’S current business plan
http://www.adb.org/sites/default/files/institutional-document/177136/cobp-afg-2016-2018.pdf
Northern Corridor Line Status : Canarail Feasibility Studies for ADB
http://canarail.com/en-CA/home/projects/
Q&A
Foreign Direct Investment
Brief Summary of Private Sector Considerations Pre-Entry
Governance
Infrastructure
Facilities
Market Demand
Economy
Market Access
Security
Legal Framework & Rule of Law, Compliance, Anti-Corruption, ImpEx Predictability
Business Services & Support, Establishment, Insurances, Accounting, Tax & ImpEx Duty Frameworks
Land, Buildings, Utilities, Human Resources
Products, Locations, Volumes, Values, Indentification of End-Users
Currency Stability, Growth, Cost & Price Inflation
Physical Transportation, Voice & Data Comm's
Facilities, Human Resources, Transportation, Payments
Pre-Fabrication Design & Construction : Standard Risk Mitigations
**Design
Installation
Materials (conc)
Materials (steel)
Collateral Warranty
Independent Consulting Engineer (ICE) confirms design standards + seismic + functional brief
ICE checks and confirms using geo-located photographic records on sites as built
Mechanical batching plants + test cubes + core samples to independent laboratory
Welding and rebar certification record submissions
Insurance (aggregating the four points above)
Administrative Provinces
Download