Michigan Department Of Environmental Quality - Air Quality Division Rev. 3/21/16 Title V Renewable Operating Permit (ROP) Public Notice Documents HOME 30 DAY PUBLIC COMMENT The Department of Environmental Quality is seeking comment on the following Renewable Operating Permit (ROP) actions: Please note that if a particular application cannot be opened or is not available, it is because that application was submitted using older customized software that is not readable by the public. Michigan Sugar Company – Bay City Factory – SRN B1493 The Department is holding a public comment period from March 21, 2016 until April 20, 2016 on a draft ROP renewal. Public Notice Staff Report Draft ROP ROP Renewal Application Day International Inc. – SRN B2014 The Department is holding a public comment period from March 21, 2016 until April 20, 2016 on a draft ROP renewal. Public Notice Staff Report Draft ROP ROP Renewal Application DTE Energy Company – Monroe Power Plant – SRN B2816 The Department is holding a public comment period from March 21, 2016 until April 20, 2016 on a draft ROP renewal. Public Notice Staff Report Draft ROP ROP Renewal Application Magna Mirrors, Inc. – SRN N5056 The Department is holding a public comment period from March 21, 2016 until April 20, 2016 on a draft ROP renewal. Public Notice Staff Report Draft ROP ROP Renewal Application Malfunction Abatement Plan Compliance Assurance Monitoring Plan Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/) Michigan Public Power Agency – Kalkaska CT Project - SRN N7113 The Department is holding a public comment period from March 21, 2016 until April 20, 2016 on a draft ROP renewal. Public Notice Staff Report Draft ROP ROP Renewal Application DTE Electric Company- SRN: B2811 This public notice meets public participation requirements for both Permit to Install and future ROP administrative amendments. Public Notice Cadillac Renewable Energy – SRN: N1395 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Staff Report Draft ROP CMS Generation – Kalamazoo River Generating Station – SRN: N6731 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Staff Report Draft ROP CMS Generation - Livingston Generating Station – SRN: N6526 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Staff Report Draft ROP CMS Generation - TES Filer City Station – SRN: N1685 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Staff Report Draft ROP Consumers Energy Company –Karn/Weadock– SRN: B2840 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Staff Report Draft ROP Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/) Consumers Energy - Jackson Generating Station – SRN: N6626 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Staff Report Draft ROP Consumers Energy - J.H. Campbell Plant – SRN: B2835 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Staff Report Draft ROP New Covert Generating Company, LLC – SRN: N6767 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Staff Report Draft ROP Detroit Edison –St. Clair/Belle River Power Plant – SRN: B2796 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Staff Report Draft ROP Detroit Public Lighting Department - Mistersky Power Station – SRN: B2185 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Staff Report Draft ROP DTE Energy - Renaissance Power Plant – SRN: N6873 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Staff Report Draft ROP DTE Pontiac North, LLC – SRN: N7786 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Staff Report Draft ROP Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/) Grayling Generating Station – SRN: N2388 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Staff Report Draft ROP Holland Board of Public Works – 48th Street Peaking Station– SRN: N2586 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Staff Report Draft ROP Holland Board of Public Works Generation Station – SRN: B2357 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Staff Report Draft ROP Marquette Board of Light and Power – Shiras Steam Plant – SRN: B1833 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Staff Report Draft ROP Michigan Power Limited Partnership – SRN: N4975 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Staff Report Draft ROP Midland Cogeneration Venture – SRN: B6527 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Staff Report Draft ROP Sumpter Generation Plant – SRN: M4854 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Public Notice Staff Report Draft ROP Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/) Zeeland Generating Station – SRN: N6521 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP reopening. Public Notice Staff Report Draft ROP Great Lakes Gas Transmission LP – SRN N3760 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP renewal. Public Notice Staff Report Draft ROP ROP Renewal Application Great Lakes Gas Transmission LP – SRN N2168 The Department is holding a public comment period from March 7, 2016 until April 6, 2016 on a draft ROP renewal. Public Notice Staff Report Draft ROP ROP Renewal Application Hemlock Semiconductor Corporation and Praxair Inc. – SRN: B2644 The Department is holding a public comment period from February 22, 2016 until March 23, 2016 on a draft ROP renewal. Public Notice Staff Report Draft ROP ROP Renewal Application Warren Waste Water Treatment Plant – SRN: B1792 The Department is holding a public comment period from February 8, 2016 until March 9, 2016 on a draft ROP renewal. Public Notice Staff Report Draft ROP ROP Renewal Application Louisiana Pacific Corporation – Newberry Plant– SRN: N0780 The Department is holding a public comment period from January 25, 2016 until February 24, 2016 on a draft ROP renewal. Public Notice Staff Report Draft ROP ROP Renewal Application Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/) St. Marys Cement, Inc. (US)- SRN: B1559 This public notice meets public participation requirements for both Permit to Install and future ROP administrative amendments. Public Notice AK Steel Dearborn Works- SRN: A8640 This public notice meets public participation requirements for both Permit to Install and future ROP administrative amendments. Public Notice Marathon Petroleum Company LP- SRN: A9831 This public notice meets public participation requirements for both Permit to Install and future ROP administrative amendments. Public Notice L'Anse Warden Electric Company, LLC - SRN: B4260 The Department is holding a public comment period from August 10, 2015 until November 6, 2015 on a draft ROP renewal. THE PUBLIC HEARING (WHICH WAS SCHEDULED FOR OCTOBER 29, 2015) HAS BEEN POSTPONED. **PRESS RELEASE REGARDING HEARING POSTPONEMENT** Staff Report Draft ROP ROP Renewal Application CISWI Applicability Determination PTI No. 168-07D Tilden Mining Company, LC - SRN: B4885 The Department is holding a public comment period from June 29, 2015 until July 29, 2015 on a draft ROP renewal. Public Notice Staff Report Draft ROP ROP Renewal Application MACT Fugitive Dust Plan MACT Operation & Maintenance Plan MACT Start-up, Shutdown & Malfunction Plan U.S. Steel Great Lakes Works - SRN: A7809 The Department is holding a public comment period from May 5, 2014 until July 11, 2014 on a draft ROP renewal. A public hearing will be held on June 11, 2014. Refer to the Public Notice below for details. Public Notice Staff Report Draft ROP MACT Operation and Maintenance Plan MACT O&M Appendices Malfunction Abatement Plan MACT Subpart FFFFF O&M Plan Hydrogen Sulfide Plan Hydrogen Sulfide Abatement Plan ROP Renewal Application Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/) Detroit Edison Trenton Channel Power Plant - SRN: B2811 The Department held a public comment period from May 23, 2011 until June 22, 2011 on a draft ROP renewal. Public Notice Staff Report Draft ROP ROP Renewal Application Compliance Assurance Monitoring Plan 45 DAY EPA REVIEW The public comment period for initial or renewal ROPs has ended and the Department of Environmental Quality has proposed the following Renewable Operating Permits to the U.S. Environmental Protection Agency for approval: Those individuals who commented on initial or renewal draft ROPs during the 30 day public notice period may send comments to the U.S. Environmental Protection Agency, Region 5, Permits and Grants Section, Mail Code AR 18J, 77 West Jackson Boulevard, Chicago, Illinois, 60604. The time period provided to petition the permit to EPA ends 60 days after EPA's 45-day review period ends (i.e., 105 calendar days after the specified start date of the EPA review). See AQD's Rule 214(8) for further information. Information is also provided below regarding proposed actions that have gone directly to EPA review for modifications to existing ROPs. CWC Textron– SRN: B1909 A minor modification ROP (EPA review began 3/16/16). Staff Report Proposed ROP Lear Corporation EEDS & Interiors – Renosol Seating Facility – SRN: B7294 A minor modification ROP (EPA review began 3/14/16). Staff Report Proposed ROP Noron Composite Technologies – SRN: N1864 A Proposed ROP renewal (EPA Review began 3/14/16). Staff Report Proposed ROP ROP Renewal Application Real Alloy Recycling, Inc. – SRN: N5957 A minor modification ROP (EPA review began 3/14/16). Staff Report Proposed ROP Martin Marietta Magnesia Specialites, LLC – A3900 A minor modification ROP (EPA review began 3/9/16). Staff Report Proposed ROP Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/) Vector Pipeline L.P.– Athens Compressor Station – SRN: N8151 A proposed ROP renewal. (EPA review began 3/3/16). Staff Report Proposed ROP ROP Renewal Application Preventative Maintenance Plan Graphic Packaging International – SRN: B1534 A proposed ROP renewal. (EPA review began 3/3/16). Staff Report Proposed ROP ROP Renewal Application Neenah Paper Michigan, Inc. – B1470 A minor modification ROP (EPA review began 2/18/16). Staff Report Proposed ROP Orchard Hill Sanitary Landfill and Granger Electric of Watervliet, LLC – N5719 A minor modification ROP (EPA review began 2/17/16). Staff Report Proposed ROP Decorative Panels International – SRN: B1476 A minor modification ROP (EPA review began 2/16/16). Staff Report Proposed ROP Quantum Composites – SRN: N6874 A proposed ROP renewal (EPA review began 2/16/16). Staff Report Proposed ROP ROP Renewal Application Michigan South Central Power Agency – SRN: B6611 A proposed ROP renewal (EPA review began 2/10/16). Staff Report Proposed ROP ROP Renewal Application Fugitive Dust Plan MAP DTE Gas Company – Alpena Compressor Station – N5935 A minor modification ROP (EPA review began 2/5/16). Staff Report Proposed ROP Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/) General Motors – Milford Proving Grounds – SRN: A5262 A proposed initial ROP (EPA review began 2/3/16). Staff Report Proposed ROP ROP Initial Application General Motors - Saginaw Metal Casting Operation – B1991 A minor modification ROP (EPA review began 2/2/16). Staff Report Proposed ROP General Motors – Flint Metal Center – SRN: B1608 A proposed ROP renewal (EPA review began 1/27/16). Staff Report Proposed ROP ROP Renewal Application Toyota Motor Engineering and Manufacturing – SRN: N2915 A minor modification ROP (EPA review began 11/6/15). Staff Report Proposed ROP BASF Automotive R&D Campus - SRN: N1336 A proposed ROP renewal (EPA comment began 07/07/15). Staff Report Proposed ROP Severstal Dearborn, LLC - SRN: A8640 A proposed ROP renewal (EPA review began 03/02/12). Staff Report Proposed ROP FINAL TITLE V/ROP PERMITS The Department of Environmental Quality has recently made final decisions on the following Renewable Operating Permit Actions: The time period provided to petition an initial or renewal ROP to EPA ends 60 days after EPA's 45-day review period ends, (i.e., 105 calendar days after the specified start date of the EPA review). See AQD's Rule 214(8) for further information. All plans referenced in final ROPs can be obtained from the appropriate AQD District Office. Ford Motor Company - Research & Engineering Center – SRN B6230 A minor modification ROP (EPA review began 1/19/16). Staff Report Final ROP Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/) General Motors LLC, Orion Assembly – SRN: B7227 An administrative amendment ROP (3/15/16). Staff Report Final ROP Metal Technologies – Ravenna Ductile - SRN: N5866 A minor modification ROP (EPA review began 1/21/16). Staff Report Final ROP DTE Gas Company - Columbus Compressor Station - SRN: B6480 A minor modification ROP (EPA review began 1/21/16). Staff Report Final ROP The Weyerhaesuer Company - SRN: B7302 A ROP renewal (EPA review began 12/22/15). Staff Report Final ROP Buckeye Terminals - River Rouge - SRN: B2987 A ROP renewal (EPA review began 12/23/15). Staff Report Final ROP Sekisui Voltek, LLC - SRN: B8786 A minor modification ROP (EPA review began 1/12/16). Staff Report Final ROP DTE Gas Company - Belle River Mills Compressor Station - SRN: B6478 A ROP renewal (EPA review began 1/15/16). Staff Report Final ROP Forest Lawn Landfill – SRN: N2407 A ROP renewal (EPA review began 1/12/16). Staff Report Final ROP Eagle Industries, Inc. - SRN: N7578 A minor modification ROP (EPA review began 1/8/16). Staff Report Final ROP Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/) Escanaba Paper Company - SRN: A0884 A ROP renewal (EPA review began 1/4/16). Staff Report Final ROP Global Engine Manufacturing Alliance – N7228 An administrative amendment ROP (2/2/16). Staff Report Final ROP Ameresco Woodland Meadows Romulus LLC – P0317 An administrative amendment ROP (2/2/16). Staff Report Final ROP Edward C. Levy Company Plant 6 - SRN: B4243 A ROP renewal (EPA review began 12/1/15). Staff Report Final ROP Delta Solid Waste Management Authority - SRN: N6035 A minor modification ROP (EPA review began 12/8/15). Staff Report Final ROP General Motors Pontiac North Campus - SRN: B4032 An administrative amendment ROP (1/22/16). Staff Report Final ROP DTE Gas Company - Milford Compressor Station - SRN: B7221 An administrative amendment ROP (EPA review began 07/02/15). Staff Report Proposed ROP Roush Industries - SRN: M4780 A ROP renewal (EPA review began 11/23/15). Staff Report Final ROP DTE Gas Company-Alpena Compressor Station - SRN: N5935 A minor modification ROP (EPA review began 11/24/15). Staff Report Final ROP Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/) Great Lakes Gas Transmission LP – SRN: N3818 A ROP renewal (EPA review began 11/20/15). Staff Report Final ROP Consumers Energy – Jackson Generating Station - SRN: N6626 An administrative amendment ROP (12/22/15). Staff Report Final ROP Gentex Corporation - SRN: N1888 An initial ROP (EPA review began 11/19/15). Staff Report Final ROP Zeeland Farm Services – SRN: M4204 A minor modification ROP (EPA review began 11/10/15). Staff Report Final ROP Lafarge Midwest Inc. – SRN: B1477 A minor modification and an administrative amendment ROP (EPA review began 11/6/15). Staff Report Final ROP WestRock California, Inc. (Rock Tenn Company) - SRN: B4072 An administrative amendment ROP (12/18/15). Staff Report Final ROP Decorative Panels International & American Process Incorporated - SRN: B1476 A ROP renewal (EPA review began 11/5/15). Staff Report Final ROP Detroit Water and Sewage Department - SRN: B2103 An administrative amendment ROP (12/15/15). Staff Report Final ROP DTE Electric Company -St. Clair / Belle River Power Plant – B2796 A minor modification ROP (EPA review began 11/4/15) Staff Report Final ROP Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/) Lansing Board of Water & Light Erickson Station - SRN: B4001 A ROP renewal (EPA review began 10/23/15). Staff Report Final ROP Dow Agrosciences, LLC - SRN: B4942 A ROP renewal (EPA review began 10/19/15). Staff Report Final ROP NJT Enterprises, LLC - SRN: N1316 A ROP renewal (EPA review began 10/22/15). Staff Report Final ROP Albar Industries, Inc. - SRN: N0802 A ROP renewal (EPA review began 10/09/15). Staff Report Final ROP Edward C. Levy Company, Plant 3 - SRN: B4364 A ROP renewal (EPA review began 10/08/15). Staff Report Final ROP DTE - River Rouge Power Plant - SRN: B2810 A minor modification ROP (EPA comment began 10/16/15). Staff Report Final ROP Dafter Sanitary Landfill, Inc. - SRN: N6033 A ROP renewal (EPA comment began 10/08/15). Staff Report Final ROP Waste Management of Michigan, Inc. d.b.a. Eagle Valley Recycle and Disposal Facility - SRN: N3845 A ROP renewal (EPA comment began 10/07/15). Staff Report Final ROP FCA US LLC - Mac Avenue Engine Plant - SRN: M4085 A minor modification ROP (EPA comment began 10/02/15). Staff Report Final ROP Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/) Hutchinson Antivibration Systems, Inc. - SRN: E5094 A minor modification ROP (EPA review began 10/02/15). Staff Report Final ROP ANR Reed City Compressor Station - SRN: B3721 A ROP reopening (EPA review began 10/01/15). Staff Report Final ROP Nexteer Automotive Corporation - SRN: A6175 A minor modification ROP (EPA review began 09/22/15). Staff Report Final ROP Ajax Metal Processing Inc. - SRN: B5830 A ROP renewal (EPA review began 09/23/15). Staff Report Final ROP EJ USA, Inc. - SRN: A0767 A ROP renewal (EPA review began 09/10/15). Staff Report Final ROP Howell Compressor Station - SRN: N5572 A ROP renewal (EPA review began 09/04/15). Staff Report Final ROP Ox Paperboard of Michigan, LLC - SRN: B2013 A ROP renewal (EPA review began 09/14/15). Staff Report Final ROP Hanson Brick – Michigan Plant - SRN: A6497 A ROP renewal (EPA review began 09/10/15). Staff Report Final ROP Mahle Engine Components USA, LLC - SRN: A4302 A ROP renewal (EPA review began 09/14/15). Staff Report Final ROP Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/) Waste Management of Michigan, Inc. – Autumn Hills RDF - SRN: N6006 An administrative amendment ROP (10/27/15). Staff Report Final ROP Brent Run Landfill/Granger Electric - SRN: N5987 A ROP renewal (EPA review began 08/27/15). Staff Report Final ROP Venice Park RDF - SRN: N5910 A ROP renewal (EPA review began 09/01/15). Staff Report Final ROP Ford Motor Company - Research & Engineering Center - SRN: B6230 A minor modification ROP (EPA review began 09/02/15). Staff Report Final ROP Harland's Sanitary Landfill Inc. - SRN: N3634 A ROP renewal (EPA review began 09/02/15). Staff Report Final ROP City Environmental Services, Inc. of Waters - SRN: N5988 A ROP renewal (EPA review began 09/02/15). Staff Report Final ROP Glen's Sanitary Landfill - SRN: N3261 A ROP renewal (EPA review began 09/02/15). Staff Report Final ROP The Reserve Group, Great Lakes Casting LLC - SRN: A3934 A ROP renewal (EPA review began 09/02/15). Staff Report Final ROP Detroit Wastewater Treatment Plant - SRN: B2103 A minor modification ROP (EPA review began 08/31/15). Staff Report Final ROP Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/) Hutchinson Antivibration Systems, Inc. - SRN: A9364 A minor modification ROP (EPA review began 09/02/15). Staff Report Final ROP General Motors LLC, Saginaw Metal Casting - SRN: B1991 A ROP renewal (EPA review began 08/05/15). Staff Report Final ROP Lansing Board of Water & Light, Eckert Station - SRN: B2647 A minor modification ROP (EPA review began 08/26/15). Staff Report Final ROP Dart Container - SRN: D8065 A minor modification ROP (EPA review began 08/28/14). Staff Report Final ROP Ford Motor Company - SRN: A8648 A ROP renewal (EPA review began 08/17/15). Staff Report Final ROP Access Business Group - SRN: A2402 A minor modification ROP (EPA review began 08/24/15). Staff Report Final ROP Knauf Insulation Inc. - SRN: B7205 A minor modification ROP (EPA comment began 08/24/15). Staff Report Final ROP Graymont Western Lime, Inc. - SRN: N7362 A ROP renewal (EPA review began 08/13/15). Staff Report Final ROP Veolia Energy Grand Rapids - SRN: B2838 A ROP renewal (EPA review began 08/13/15). Staff Report Final ROP Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/) General Motors LLC - Orion Assembly Plant - SRN: B7227 An administrative amendment ROP (EPA review began 08/14/15). Staff Report Final ROP Cargill Salt - Hersey - SRN: N2954 A minor modification ROP (EPA review began 08/12/15). Staff Report Final ROP Western Michigan University - SRN: K2131 A minor modification ROP (EPA review began 07/31/15). Staff Report Final ROP Entergy Nuclear Palisades LLP, Palisades Nuclear Plant - SRN: B2934 A minor modification ROP (EPA review began 07/22/15). Staff Report Final ROP Wolverine Power, Gaylord Generating Station - SRN: N6833 A ROP renewal (EPA review began 07/20/15). Staff Report Final ROP GM Technical Center - SRN: B4049 A significant modification ROP (EPA review began 07/16/15). Staff Report Final ROP Ventra Travel Holdings Corporation, Ventra Evart, LLC - SRN: A5764 A minor modification ROP (EPA review began 07/08/15). Staff Report Final ROP Nylok LLC - SRN: N5656 A minor modification ROP (EPA review began 07/07/15). Staff Report Final ROP Michigan Automotive Compressor - SRN: N1966 A ROP renewal (EPA comment began 06/30/15). Staff Report Final ROP Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/) Federal-Mogul Powertrain - SRN: N6327 A ROP renewal (EPA comment began 07/02/15). Staff Report Final ROP Blue Water Recyclables, LLC - SRN: P0262 A significant modification ROP (EPA review began 07/02/15). Staff Report Final ROP CMS Generation - Kalamazoo River Generating Station - SRN: N6731 A ROP renewal (EPA review began 07/02/15). Staff Report Final ROP Packaging Corporation of America - Filer City Mill - SRN: B3692 A minor modification ROP (EPA review began 07/02/15). Staff Report Final ROP Metal Technologies Ravenna Ductile Iron - SRN: N5866 A minor modification ROP (EPA review began 06/22/15). Staff Report Final ROP ANR Pipeline - Goodwell Compressor Station - SRN: N5576 A ROP renewal (EPA comment began 06/18/15). Staff Report Final ROP Consumers Energy Tetford - SRN: B2918 A ROP renewal (EPA comment began 06/09/15). Staff Report Final ROP DTE Gas Company - Taggart Compressor Station - SRN: N3392 A ROP renewal (EPA comment began 06/08/15). Staff Report Final ROP Republic Services of Michigan I, LLC - Carleton Farms Landfill and Sumpter Energy Associates - SRN: N5986 A ROP renewal (EPA comment began 06/05/15). Staff Report Final ROP Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/) BASF Corporation - Plastics Plant - SRN: M4777 A ROP renewal (EPA comment began 06/05/15). Staff Report Final ROP CONTACTS Contacts: AQD District Offices and/or Clean Air Assistance Program at 1-800-662-9278 Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)