30 DAY PUBLIC COMMENT
The Department of Environmental Quality is seeking comment on the following
Renewable Operating Permit (ROP) actions:
Please note that if a particular application cannot be opened or is not available, it is because that
application was submitted using older customized software that is not readable by the public.
The Weyerhaesuer Company - SRN: B7302
The Department is holding a public comment period from November 2, 2015 until December 2, 2015 on a
draft ROP.






Public Notice
Staff Report
Draft ROP
ROP Application
Fugitive Dust Plan
MAP
The Andersons, Inc. - SRN: B8570
This public notice meets public participation requirements for both Permit to Install and future ROP
administrative amendments.

Public Notice
Gentex Corporation - SRN: N1888
The Department is holding a public comment period from October 19, 2015 until November 18, 2015 on a
draft ROP.




Public Notice
Staff Report
Draft ROP
ROP Application
DTE Gas Company - Belle River Mills Compressor Station - SRN: B6478
The Department is holding a public comment period from October 19, 2015 until November 18, 2015 on a
draft ROP.




Public Notice
Staff Report
Draft ROP
ROP Application
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Roush Industries - SRN: M4780
The Department is holding a public comment period from October 19, 2015 until November 18, 2015 on a
draft ROP.




Public Notice
Staff Report
Draft ROP
ROP Application
Great Lakes Gas Transmission LP - SRN: N3818
The Department is holding a public comment period from October 19, 2015 until November 18, 2015 on a
draft ROP.




Public Notice
Staff Report
Draft ROP
ROP Application
Decorative Panels International & American Process Incorporated - SRN: B1476
The Department is holding a public comment period from September 21, 2015 until October 21, 2015 on
a draft ROP.













Public Notice
Staff Report
Draft ROP
#1 Biofilter PM-MAP
#3 Biofilter PM-MAP
API Initial ROP Application
DPI Renewal ROP Application
Boiler PM MAP
Ducon MAP
GHG Calculations
MAP (04/30/12)
Odor Management Plan (04/30/12)
RCO PM-MAP
Escanaba Paper Company - SRN: A0884
The Department is holding a public comment period from September 21, 2015 until October 21, 2015 on
a draft ROP.




Public Notice
Staff Report
Draft ROP
ROP Application
L'Anse Warden Electric Company, LLC - SRN: B4260
The Department is holding a public comment period from August 10, 2015 until November 6, 2015 on a
draft ROP. THE PUBLIC HEARING (WHICH WAS SCHEDULED FOR OCTOBER 29, 2015) HAS
BEEN POSTPONED.






**PRESS RELEASE REGARDING HEARING POSTPONEMENT**
Staff Report
Draft ROP
ROP Renewal Application
CISWI Applicability Determination
PTI No. 168-07D
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Edward C. Levy Company Plant 6 - SRN: B4243
The Department is holding a public comment period from July 13, 2015 until August 12, 2015 on a draft
ROP.




Public Notice
Staff Report
Draft ROP
ROP Renewal Application
Tilden Mining Company, LC - SRN: B4885
The Department is holding a public comment period from June 29, 2015 until July 29, 2015 on a draft
ROP.







Public Notice
Staff Report
Draft ROP
ROP Renewal Application
MACT Fugitive Dust Plan
MACT Operation & Maintenance Plan
MACT Start-up, Shutdown & Malfunction Plan
Buckeye Terminals - River Rouge - SRN: B2987
The Department is holding a public comment period from April 6, 2015 until May 6, 2015 on a draft ROP.




Public Notice
Staff Report
Draft ROP
ROP Renewal Application
U.S. Steel Great Lakes Works - SRN: A7809
The Department is holding a public comment period from May 5, 2014 until July 11, 2014 on a draft ROP
renewal. A public hearing will be held on June 11, 2014. Refer to the Public Notice below for details.










Public Notice
Staff Report
Draft ROP
MACT Operation and Maintenance Plan
MACT O&M Appendices
Malfunction Abatement Plan
MACT Subpart FFFFF O&M Plan
Hydrogen Sulfide Plan
Hydrogen Sulfide Abatement Plan
ROP Renewal Application
Detroit Edison Trenton Channel Power Plant - SRN: B2811
The Department held a public comment period from May 23, 2011 until June 22, 2011 on a draft renewal
of the ROP.





Public Notice
Staff Report
Draft ROP
ROP Renewal Application
Compliance Assurance Monitoring Plan
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
45 DAY EPA REVIEW
The public comment period for initial or renewal ROPs has ended and the
Department of Environmental Quality has proposed the following Renewable
Operating Permits to the U.S. Environmental Protection Agency for approval:
Those individuals who commented on initial or renewal draft ROPs during the 30 day public notice period
may send comments to the U.S. Environmental Protection Agency, Region 5, Permits and Grants
Section, Mail Code AR 18J, 77 West Jackson Boulevard, Chicago, Illinois, 60604. The time period
provided to petition the permit to EPA ends 60 days after EPA's 45-day review period ends (i.e., 105
calendar days after the specified start date of the EPA review). See AQD's Rule 214(8) for further
information. Information is also provided below regarding proposed actions that have gone directly to
EPA review for modifications to existing ROPs.
Lansing Board of Water & Light Erickson Station - SRN: B4001
A proposed renewal ROP (EPA review began 10/23/15).


Staff Report
Proposed ROP
NJT Enterprises, LLC - SRN: N1316
A proposed renewal ROP (EPA review began 10/22/15).


Staff Report
Proposed ROP
Dow Agrosciences, LLC - SRN: B4942
A proposed ROP renewal (EPA review began 10/19/15).


Staff Report
Proposed ROP
DTE - River Rouge Power Plant - SRN: B2810
A minor modification ROP (EPA comment began 10/16/15).


Staff Report
Proposed ROP
Albar Industries, Inc. - SRN: N0802
A proposed ROP renewal (EPA review began 10/09/15).


Staff Report
Proposed ROP
Edward C. Levy Company, Plant 3 - SRN: B4364
A proposed ROP renewal (EPA review began 10/08/15).


Staff Report
Proposed ROP
Dafter Sanitary Landfill, Inc. - SRN: N6033
A proposed renewal ROP (EPA comment began 10/08/15).


Staff Report
Proposed ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Waste Management of Michigan, Inc. d.b.a. Eagle Valley Recycle and Disposal
Facility - SRN: N3845
A proposed renewal ROP (EPA comment began 10/07/15).


Staff Report
Proposed ROP
FCA US LLC - Mac Avenue Engine Plant - SRN: M4085
A minor modification ROP (EPA comment began 10/02/15).


Staff Report
Proposed ROP
Hutchinson Antivibration Systems, Inc. - SRN: E5094
A minor modification (EPA review began 10/02/15).


Staff Report
Proposed ROP
ANR Reed City Compressor Station - SRN: B3721
A ROP reopening (EPA review began 10/01/15).


Staff Report
Proposed ROP
Ajax Metal Processing Inc. - SRN: B5830
A ROP renewal (EPA review began 09/23/15).


Staff Report
Proposed ROP
Nexteer Automotive Corporation - SRN: A6175
A minor modification (EPA review began 09/22/15).


Staff Report
Proposed ROP
Ox Paperboard of Michigan, LLC - SRN: B2013
A ROP renewal (EPA review began 09/14/15).


Staff Report
Proposed ROP
EJ USA, Inc. - SRN: A0767
A ROP renewal (EPA review began 09/10/15).


Staff Report
Proposed ROP
Hanson Brick – Michigan Plant - SRN: A6497
A ROP renewal (EPA review began 09/10/15).


Staff Report
Proposed ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Howell Compressor Station - SRN: N5572
A ROP renewal (EPA review began 09/04/15).


Staff Report
Proposed ROP
BASF Automotive R&D Campus - SRN: N1336
A proposed ROP renewal (EPA comment began 07/07/15).


Staff Report
Proposed ROP
DTE Gas Company - Milford Compressor Station - SRN: B7221
A proposed ROP renewal (EPA review began 07/02/15).


Staff Report
Proposed ROP
Severstal Dearborn, LLC - SRN: A8640
A proposed renewal of the ROP (EPA review began 03/02/12).


Staff Report
Proposed ROP
FINAL TITLE V/ROP PERMITS
The Department of Environmental Quality has recently made final decisions on
the following Renewable Operating Permit Actions:
The time period provided to petition an initial or renewal ROP to EPA ends 60 days after EPA's 45-day
review period ends, (i.e., 105 calendar days after the specified start date of the EPA review). See AQD's
Rule 214(8) for further information.
All plans referenced in final ROPs can be obtained from the appropriate AQD District Office.
Mahle Engine Components USA, LLC - SRN: A4302
A ROP renewal (EPA review began 09/14/15).


Staff Report
Final ROP
Waste Management of Michigan, Inc. – Autumn Hills RDF - SRN: N6006
An administrative amendment.


Staff Report
Final ROP
Brent Run Landfill/Granger Electric - SRN: N5987
A ROP renewal EPA review began 08/27/15).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Venice Park RDF - SRN: N5910
A ROP renewal (EPA review began 09/01/15).


Staff Report
Final ROP
Integrated Manufacturing & Assembly, Inc. - SRN: H6303
An initial ROP (EPA review began 08/17/15).


Staff Report
Final ROP
Ford Motor Company - Research & Engineering Center - SRN: B6230
A minor modification (EPA review began 09/02/15).


Staff Report
Final ROP
Harland's Sanitary Landfill Inc. - SRN: N3634
A ROP renewal (EPA review began 09/02/15).


Staff Report
Final ROP
City Environmental Services, Inc. of Waters - SRN: N5988
A ROP renewal (EPA review began 09/02/15).


Staff Report
Final ROP
Glen's Sanitary Landfill - SRN: N3261
A ROP renewal (EPA review began 09/02/15).


Staff Report
Final ROP
The Reserve Group, Great Lakes Casting LLC - SRN: A3934
A ROP renewal (EPA review began 09/02/15).


Staff Report
Final ROP
Detroit Wastewater Treatment Plant - SRN: B2103
A minor modification to the ROP (EPA review began 08/31/15).


Staff Report
Final ROP
Hutchinson Antivibration Systems, Inc. - SRN: A9364
A minor modification (EPA review began 09/02/15).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
General Motors LLC, Saginaw Metal Casting - SRN: B1991
A ROP renewal (EPA review began 08/05/15).


Staff Report
Final ROP
Lansing Board of Water & Light, Eckert Station - SRN: B2647
A minor modification to the ROP (EPA review began 08/26/15).


Staff Report
Final ROP
Dart Container - SRN: D8065
A minor modification (EPA review began 08/28/14).


Staff Report
Final ROP
Ford Motor Company - SRN: A8648
A ROP renewal (EPA review began 08/17/15).


Staff Report
Final ROP
Access Business Group - SRN: A2402
A modification (EPA review began 08/24/15).


Staff Report
Final ROP
Knauf Insulation Inc. - SRN: B7205
A minor modification (EPA comment began 08/24/15).


Staff Report
Final ROP
Graymont Western Lime, Inc. - SRN: N7362
A ROP renewal (EPA review began 08/13/15).


Staff Report
Final ROP
Veolia Energy Grand Rapids - SRN: B2838
A ROP renewal (EPA review began 08/13/15).


Staff Report
Final ROP
General Motors LLC - Orion Assembly Plant - SRN: B7227
An Administrative Amendment (EPA review began 08/14/15).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Cargill Salt - Hersey - SRN: N2954
A minor modification (EPA review began 08/12/15).


Staff Report
Final ROP
Western Michigan University - SRN: K2131
A minor modification (EPA review began 07/31/15).


Staff Report
Final ROP
Entergy Nuclear Palisades LLP, Palisades Nuclear Plant - SRN: B2934
A minor modification (EPA review began 07/22/15).


Staff Report
Final ROP
Wolverine Power, Gaylord Generating Station - SRN: N6833
A ROP renewal (EPA review began 07/20/15).


Staff Report
Final ROP
GM Technical Center - SRN: B4049
A significant modification (EPA review began 07/16/15).


Staff Report
Final ROP
Ventra Travel Holdings Corporation, Ventra Evart, LLC - SRN: A5764
A proposed minor modification (EPA review began 07/08/15).


Staff Report
Final ROP
Nylok LLC - SRN: N5656
A minor modification (EPA review began 07/07/15).


Staff Report
Final ROP
Michigan Automotive Compressor - SRN: N1966
A ROP renewal (EPA comment began 06/30/15).


Staff Report
Final ROP
Federal-Mogul Powertrain - SRN: N6327
A ROP renewal (EPA comment began 07/02/15).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Blue Water Recyclables, LLC - SRN: P0262
A significant modification (EPA review began 07/02/15).


Staff Report
Final ROP
CMS Generation - Kalamazoo River Generating Station - SRN: N6731
A ROP renewal (EPA review began 07/02/15).


Staff Report
Final ROP
Packaging Corporation of America - Filer City Mill - SRN: B3692
A minor modification (EPA review began 07/02/15).


Staff Report
Final ROP
Metal Technologies Ravenna Ductile Iron - SRN: N5866
A minor modification (EPA review began 06/22/15).


Staff Report
Final ROP
ANR Pipeline - Goodwell Compressor Station - SRN: N5576
A ROP renewal (EPA comment began 06/18/15).


Staff Report
Final ROP
Consumers Energy Tetford - SRN: B2918
A ROP renewal (EPA comment began 06/09/15).


Staff Report
Final ROP
DTE Gas Company Taggart Compressor Station - SRN: N3392
A renewal ROP (EPA comment began 06/08/15).


Staff Report
Final ROP
Republic Services of Michigan I, LLC - Carleton Farms Landfill and Sumpter
Energy Associates - SRN: N5986
A renewal ROP (EPA comment began 06/05/15).


Staff Report
Final ROP
BASF Corporation - Plastics Plant - SRN: M4777
A renewal ROP (EPA comment began 06/05/15).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
DTE Electric Company - St. Clair/Belle River Power Plant - SRN: B2796
A renewal ROP (EPA review began 05/21/15).


Staff Report
Final ROP
Consumers Energy Company - St. Clair Compressor Station - SRN: B6637
A renewal ROP (EPA review began 05/21/15).


Staff Report
Final ROP
Brembo North America, Inc. - SRN: N6226
An initial (EPA review began 05/07/15).


Staff Report
Final ROP
Pharmacia & Upjohn Company LLC - SRN: B3610
A minor modification (EPA review began 05/21/15).


Staff Report
Final ROP
DCP Antrim Gas, LLC - SRN: N2940
A renewal ROP (EPA comment began 05/21/15).


Staff Report
Final ROP
General Motors Pontiac North Campus - SRN: B4032
A minor modification (EPA review began 05/21/15).


Staff Report
Final ROP
White Pine Electric Power LLC - SRN: B1966
A minor modification (EPA review began 05/18/15).


Staff Report
Final ROP
Detroit Steel Company - SRN: B2116
A renewal ROP (EPA comment began 05/15/15).


Staff Report
Final ROP
Aquatic Company - SRN: B2025
A renewal ROP (EPA comment began 05/12/15).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Worthen Coated Fabrics - SRN: B4043
A ROP renewal (EPA review began 05/07/15).


Staff Report
Final ROP
Inteva Products, LLC - Adrian Operations - SRN: B6027
A minor modification (EPA review began 05/07/15).


Staff Report
Final ROP
White Pigeon Paper Company Plant - SRN: B2024
A ROP renewal (EPA comment began 04/27/15).


Staff Report
Final ROP
Ventra Fowlerville, LLC - SRN: N7413
An enhanced administrative amendment (EPA review began 05/08/15).


Staff Report
Final ROP
FCA US LLC - Mac Avenue Engine Plant - SRN: M4085
An initial ROP (EPA comment began 05/08/15).


Staff Report
Final ROP
The Dow Chemical Company, Michigan Operations - SRN: A4033
A minor modification (EPA review began 04/30/15).


Staff Report
Final ROP
New Covert Generating - SRN: N6767
An administrative amendment to the ROP.


Staff Report
Final ROP
Empire Iron Mining Partnership - SRN: B1827
A ROP renewal (EPA comment began 04/16/15).


Staff Report
Final ROP
Knauf Insulation LLC - SRN: B7205
A ROP renewal (EPA comment began 04/17/15).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Upper Peninsula Power Company, Portage Generating Station - SRN: B6553
A ROP renewal (EPA comment began 04/13/15).


Staff Report
Final ROP
Presque Isle Power Plant - SRN: B4261
A minor modification (EPA comment began 04/10/15).


Staff Report
Final ROP
Morton Salt, Inc. - SRN: B1824
A ROP renewal (EPA comment began 04/09/15).


Staff Report
Final ROP
DTE Electric Company - Renaissance Power Plant - SRN: N6873
A ROP renewal (EPA comment began 03/30/15).


Staff Report
Final ROP
Michigan Sugar Company - SRN: B1493
An administrative amendment to the ROP.


Staff Report
Final ROP
ANR Winfield Compressor Station - SRN: N5578
An ROP renewal (EPA review began 09/09/14).


Staff Report
Final ROP
Marathon Petroleum Company LP, Niles Terminal - SRN: B9073
A minor modification (EPA review began 03/20/15).


Staff Report
Final ROP
Post Foods, LLC - SRN: B1548
A minor modification (EPA review began 03/20/15).


Staff Report
Final ROP
Guardian Industries Corporation - SRN: B1877
A minor modification (EPA review began 03/20/15).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Nylok LLC - SRN: N5656
An initial ROP (EPA review began 03/18/15).


Staff Report
Final ROP
Consumers Energy, Ray Compressor Station - SRN: B6636
An ROP renewal (EPA review began 03/18/15).


Staff Report
Final ROP
ANR Pipelines Company - Muttonville Compressor Station - SRN: B8337
An ROP renewal (EPA review began 03/16/15).


Staff Report
Final ROP
Ventra Travel Holdings Corporation, Ventra Evart, LLC - SRN: A5764
An ROP renewal (EPA review began 03/12/15).


Staff Report
Final ROP
Packaging Corporation of America - Filer City Mill - SRN: B3692
An ROP renewal (EPA review began 03/12/15).


Staff Report
Final ROP
TES Filer City Station - SRN: N1685
An ROP renewal (EPA review began 03/12/15).


Staff Report
Final ROP
Breitburn Operating LP - Wilderness CO2 CPF - SRN: N5831
A minor modification (EPA review began 03/04/15).


Staff Report
Final ROP
FCA US LLC - Trenton Engine Complex - SRN: B3350
A minor modification (EPA review began 02/27/15).


Staff Report
Final ROP
Breitburn Operating LP Rich Field Gas Plant - SRN: B5462
A minor modification (EPA review began 02/27/15).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Western Michigan University - SRN: K2131
A ROP renewal (EPA review began 02/26/15).


Staff Report
Final ROP
Graphic Packaging International, Inc. - SRN: B1678
A ROP renewal (EPA review began 02/26/15).


Staff Report
Final ROP
Herman Miller, Inc. - SRN: B6001
A minor modification (EPA review began 02/23/15).


Staff Report
Final ROP
Montmorency-Oscoda-Alpena SWMA - SRN: N8248
A ROP renewal (EPA comment began 03/31/15).


Staff Report
Final ROP
Cargill Salt - Hersey - SRN: N2954
A minor modification (EPA review began 02/13/15).


Staff Report
Final ROP
E-T-M Enterprises - SRN: B6202
A ROP renewal (EPA review began 02/04/15).


Staff Report
Final ROP
Oakland Heights Development, Inc. - SRN: N6008
A ROP renewal (EPA review began 02/12/15).


Staff Report
Final ROP
The Andersons, Inc. - SRN: B8570
An initial ROP (EPA review began 01/29/15).


Staff Report
Final ROP
Ada Cogeneration - SRN: N1784
An ROP renewal (EPA review began 01/29/15).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Ypsilanti Community Utilities Authority - SRN: B6237
An initial ROP (EPA review began 01/30/15.


Staff Report
Final ROP
Metal Technologies, Inc., Three Rivers Gray Iron Plant - SRN: B2015
A minor modification (EPA review began 01/21/15).


Staff Report
Final ROP
Real Alloy Recycling, Inc. - SRN: N5857
An administrative amendment.


Staff Report
Final ROP
Chrysler Group LLC - SRN: B7248
A minor modification (EPA review began 01/15/15).


Staff Report
Final ROP
Plastic Plate Kraft - SRN: N7374
An ROP renewal (EPA review began 01/15/15).


Staff Report
Final ROP
R. L. Adams Plastics, Inc. - SRN: N7221
An initial ROP (EPA review began 01/15/15).


Staff Report
Final ROP
Howard Miller Company - SRN: A5937
An ROP renewal (EPA review began 01/15/15).


Staff Report
Final ROP
Holland BPW 48th Street Peaking Station - SRN: N2586
An ROP renewal (EPA review began 01/12/15).


Staff Report
Final ROP
LexaMar Corporation - SRN: N2812
An ROP renewal (EPA review began 01/15/2015)..


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Zeeland Generating Station - SRN: N6521
An ROP renewal (EPA review began 01/06/15).


Staff Report
Final ROP
Kalsec, Inc. - SRN: A1991
An ROP renewal (EPA review began 01/05/15).


Staff Report
Final ROP
Gerdau Special Steel North America - SRN: B4306
An ROP renewal (EPA review began 12/18/14).


Staff Report
Final ROP
North American Natural Resources Inc. - Autumn Hills - SRN: P0264
An administrative amendment (EPA review began 02/10/15).


Staff Report
Final ROP
Romeo Rim - SRN: B5854
An ROP renewal (EPA review began 12/05/14).


Staff Report
Final ROP
New Covert Generating - SRN: N6767
A minor modification (EPA review began 12/08/14).


Staff Report
Final ROP
Axalta Coating Systems, LLC - SRN: A3569
A minor modification (EPA review began 12/03/14).


Staff Report
Final ROP
Marathon Pipe Line LLC - SRN: M2363
An administrative amendment to the ROP.


Staff Report
Final ROP
Lear Corporation EEDS & Interiors - Renosol Seating Facility, LLC - SRN: B7294
A minor modification (EPA review began 12/01/14).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
The Dow Chemical Company, Michigan Operations - SRN: A4033
A minor modification (EPA review began 11/13/14).


Staff Report
Final ROP
Michigan Sugar Company, Caro - SRN: B2875
An ROP renewal (EPA review began 11/24/14).


Staff Report
Final ROP
Hutchinson Antivibration Systems, Inc. - SRN: A9364
An ROP renewal (EPA review began 10/27/14).


Staff Report
Final ROP
Martin Marietta Magnesia Specialties, LLC - SRN: A3900
An ROP renewal (EPA review began 11/25/14).


Staff Report
Final ROP
Intertape Polymer Group - SRN: A6220
A renewal ROP (EPA review began 11/21/14).


Staff Report
Final ROP
DTE Biomass Energy & the City of Riverview - SRN: M4469
An ROP renewal (EPA review began 11/10/14).


Staff Report
Final ROP
Central Michigan University - SRN: K2460
A renewal ROP (EPA review began 11/20/14).


Staff Report
Final ROP
ANR - Eaton Rapids Gas Storage System - SRN: N3022
An ROP renewal (EPA review began 10/31/14).


Staff Report
Final ROP
Asama Coldwater Manufacturing - SRN: N5814
An ROP renewal (EPA review began 08/04/14).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Tiara Yachts - SRN: B6619
An ROP renewal (EPA review began 11/13/14).


Staff Report
Final ROP
Rex Performance Products, LLC - SRN: N6944
An administrative amendment to the ROP.


Staff Report
Final ROP
Steelcase, Inc. - Kentwood Complex - SRN: N0677
An ROP renewal (EPA review began 10/28/14).


Staff Report
Final ROP


Staff Report
Final ROP
Vector Pipeline - Highland - SRN: N6838
A minor modification (EPA review began 10/24/14).


Staff Report
Final ROP
Consumers Energy Muskegon River Compressor Station - Eaton Rapids Gas
Storage System - SRN: N2901
An ROP renewal (EPA review began 10/24/14).


Staff Report
Final ROP
Detroit Public Lighting Department Mistersky Power Station - SRN: B2185
An ROP renewal (EPA review began 10/16/14).


Staff Report
Final ROP
Ventra Fowlerville LLC - SRN: N7413
An ROP renewal (EPA review began 10/10/14).


Staff Report
Final ROP
ANR Storage Company - Cold Springs 1 Compressor Station - SRN: B7198
A minor modification (EPA review began 10/06/14).


Staff Report
Final ROP
Pitsch Sanitary Landfill - SRN: N5619
An ROP renewal (EPA review began 10/06/14).
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)


Staff Report
Final ROP
Eagle Industries, Inc. - SRN: N7578
An administrative amendment.


Staff Report
Final ROP
Day International Inc. - SRN: B2014
A minor modification (EPA review began 09/30/14).


Staff Report
Final ROP
Pioneer Metal Finishing Industrial Hwy - SRN: N5747
A minor modification (EPA review began 10/01/14).


Staff Report
Final ROP
DTE Gas Company - Alpena Compressor Station - SRN: N5935
A renewal ROP (EPA review began 09/29/14).


Staff Report
Final ROP
Chrysler Group LLC - SRN: B7248
An ROP renewal (EPA review began 09/11/14).


Staff Report
Final ROP
Ford Motor Company Elm Street Boilerhouse - SRN: M4764
An ROP (EPA review began 08/27/14).


Staff Report
Final ROP
General Motors Pontiac North Campus - SRN: B4032
A renewal ROP (EPA review began 09/30/14).


Staff Report
Final ROP
Breitburn Operating LP - SRN: B5462
An administrative amendment to the ROP.
Haworth, Inc. - SRN: B7186
A minor modification (EPA review began 09/25/14).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Pharmacia & Upjohn Company - SRN: B3610
A minor modification (EPA review began 09/23/14).


Staff Report
Final ROP
Advanced Fibermolding Inc. - SRN: N6515
A minor modification (EPA review began 09/25/14).


Staff Report
Final ROP
DTE Gas Company, Columbus Compressor Station - SRN: B6480
A minor modificationn (EPA review began 09/25/14).


Staff Report
Final ROP
Consumers Energy Company - Karn/Weadock Facility - SRN: B2840
An ROP renewal (EPA review began 09/24/14).


Staff Report
Final ROP
Merit Energy Company - Kalkaska Gas Plant - SRN: B4292
An ROP renewal (EPA review began 09/25/14).


Staff Report
Final ROP
General Motors LLC - Warren Technical Center - SRN: B4049
An ROP renewal (EPA review began 08/13/14).


Staff Report
Final ROP
Grede, LLC - Iron Mountain - SRN: B1577
An ROP renewal (EPA review began 08/05/14).


Staff Report
Final ROP
Precision Coating - SRN: A5496
An ROP renewal (EPA review began 07/16/14).


Staff Report
Final ROP
Nexteer Automotive Corporation - SRN: A6175
An ROP renewal (EPA review began 07/03/14).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Dart Container - SRN: D8065
An ROP renewal (EPA review began 01/23/14).


Staff Report
Final ROP
Lotus Engineering, Inc. - SRN: N5955
An ROP renewal (EPA review began 09/15/14).


Staff Report
Final ROP
Eagle Industries, Inc. - SRN: N7578
A minor modification to the ROP (EPA review began 09/10/14).


Staff Report
Final ROP
Fairmount Santrol - SRN: A0367
A minor modification (EPA review began 12/12/14).


Staff Report
Final ROP
Post Foods, LLC - SRN: B1548
A minor modification to the ROP (EPA review began 09/04/14).


Staff Report
Final ROP
Lansing Board of Water & Light, Eckert Station - SRN: B2647
A minor modification to the ROP (EPA review began 09/05/14).


Staff Report
Final ROP
Hyundai-Kia America Technical Center - SRN: N7886
An ROP renewal (EPA review began 09/03/14).


Staff Report
Final ROP
New Covert Generating - SRN: N6767
An ROP renewal (EPA review began 08/14/14).


Staff Report
Final ROP
Sekisui Voltek, LLC - SRN: B8786
An ROP renewal (EPA review began 09/05/14).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
North American Natural Resources, Inc. - Autumn Hills - SRN: P0264
A minor modification to the ROP (EPA review began 09/03/14).


Staff Report
Final ROP
General Motors LLC, Flint Assembly - SRN: B1606
An ROP renewal (EPA review began 08/29/14).


Staff Report
Final ROP
Marathon Petroleum Company - SRN: B9073
An ROP renewal (EPA review began 08/21/14).


Staff Report
Final ROP
Cadillac Casting, Inc. - SRN: B2178
An ROP renewal (EPA review began 08/19/14).


Staff Report
Final ROP
Hutchinson Antivibration Systems, Inc. - SRN: E5094
An administrative amendment to the ROP.


Staff Report
Final ROP
Holland BPW - SRN: B2357
An ROP renewal (EPA review began 08/19/14).


Staff Report
Final ROP
MPI Acquisition, LLC - SRN: A6475
An ROP renewal (EPA review began 07/29/14).


Staff Report
Final ROP
Midland Cogeneration Venture - SRN: B6527
An ROP renewal (EPA review began 07/28/14).


Staff Report
Final ROP
Guardian Industries Corporation - SRN: B1877
An ROP renewal (EPA review began 08/15/14).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Cargill Salt - Hersey - SRN: N2954
An administrative amendment to the ROP.


Staff Report
Final ROP
Quantum Resources - SRN: B5462
An ROP renewal (EPA review began 07/31/14).


Staff Report
Final ROP
DTE Electric Fermi Energy Center - SRN: B4321
An administrative amendment to the ROP.


Staff Report
Final ROP
Detroit Renewable Power - SRN: M4148
An administrative amendment.


Staff Report
Final ROP
Grayling Generating Station Limited Partnership - SRN: N2388
An ROP renewal (EPA review began 07/21/14).


Staff Report
Final ROP
William Beaumont Hospital (Royal Oak) - SRN: G5067
An ROP renewal (EPA review began 07/18/14).


Staff Report
Final ROP
St. Marys Cement, Inc. - SRN: B1559
An ROP renewal (EPA review began 06/25/14).


Staff Report
Final ROP
General Motors Corporation LLC Lansing Delta Township - SRN: N6950
An ROP renewal (EPA review began 06/23/14).


Staff Report
Final ROP
Vector Pipeline LP, Washington Compressor Station - SRN: N7624
An ROP renewal (EPA review began 06/27/14).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Consumers Energy - Overisel Compressor Station - SRN: N5792
A minor modification (EPA review began 06/19/14).


Staff Report
Final ROP
DTE Electric Company - Greenwood Energy Center - SRN: B6145
A minor modification to the ROP (EPA review began 06/17/14).


Staff Report
Final ROP
Breitburn Operating, LP - SRN: N5831
An ROP renewal (EPA review began 07/02/14).


Staff Report
Final ROP
Comfort Research - SRN: N1916
An initial ROP (EPA review began 06/17/14).


Staff Report
Final ROP
Hillsdale Board of Public Utilities - SRN: B7536
An ROP renewal (EPA review began 06/05/14).


Staff Report
Final ROP
VCF Films, Inc. - SRN: B2337
An ROP renewal (EPA review began 06/05/14).


Staff Report
Final ROP
ANR Storage Company - SRN: B7198
An ROP renewal (EPA review began 06/05/14).


Staff Report
Final ROP
Lansing BWL - SRN: B2647
A significant modification to the ROP (EPA review began 05/30/14).


Staff Report
Final ROP
Dart Container - SRN: D8065
An ROP renewal (EPA review began 05/28/14).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Haworth, Inc. - SRN: N5569
An ROP renewal (EPA review began 05/12/14).


Staff Report
Final ROP
Dow AgroSciences, LLC - SRN: B4942
A minor modification to the ROP (EPA review began 05/02/14).


Staff Report
Final ROP
Adrian Energy Associates - SRN: P0426
An ROP renewal (EPA review began 05/22/14).


Staff Report
Final ROP
Adrian Landfill - SRN: N2369
An ROP renewal (EPA review began 05/22/14).


Staff Report
Final ROP
Vienna Junction Landfill and Vienna Junction Energy - SRN: N2689
An ROP renewal (EPA review began 05/22/14).


Staff Report
ROP
AVL Powertrain Engineering - SRN: N6989
An ROP renewal (EPA review began 05/08/14).


Staff Report
ROP
Muskegon Development Company Central Production Facility - SRN: N0924
An ROP renewal (EPA review began 05/05/14).


Staff Report
Final ROP
The Dow Chemical Company - SRN: A4033
A minor modification to the ROP (EPA review began 05/02/14).


Staff Report
Final ROP
Occidental Chemical Corporation - SRN: B1846
An ROP renewal (EPA review began 05/14/14).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Herman Miller, Inc. - SRN: B6001
An ROP renewal (EPA review began 05/12/14).


Staff Report
Final ROP
Metal Technologies, Inc., Three Rivers Gray Iron - SRN: B2015
An administrative amendment to the ROP.


Staff Report
Final ROP
Forest Lawn Landfill and CB&I Government Solutions, Inc. - SRN: N2407
An administrative amendment to the ROP.


Staff Report
Final ROP
Detroit Wastewater Treatment Plant - SRN: B2103
A minor modification to the ROP (EPA review began 04/28/14).


Staff Report
Final ROP
Sturgis Municipal Power Plant - SRN: B7287
An ROP renewal (EPA review began 04/25/14).


Staff Report
Final ROP
Pharmacia & Upjohn Company - SRN: B3610
An ROP renewal (EPA review began 04/25/14).


Staff Report
Final ROP
Wolverine Supply Cooperative Vandyke Generating Plant - SRN: B5421
An ROP renewal (EPA review began 04/22/14).


Staff Report
Final ROP
Metal Technologies Ravenna Ductile Iron - SRN: N5866
An ROP renewal (EPA review began 04/15/14).


Staff Report
Final ROP
Consumers Energy Freedom Compressor Station - SRN: N3920
An ROP renewal (EPA review began 04/10/14).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Post Foods - SRN: B1548
An ROP renewal (EPA review began 04/10/14).


Staff Report
Final ROP
Michigan Power Limited Partnership - SRN: N4975
An ROP renewal (EPA review began 03/31/14).


Staff Report
Final ROP
Aztec Producing Company - SRN: B7093
An ROP renewal (EPA review began 03/31/14).


Staff Report
Final ROP
Cadillac Renewable Energy - SRN: N1395
An ROP renewal (EPA review began 03/26/14).


Staff Report
Final ROP
BASF Corporation Labs and Application Centers - SRN: M4808
An ROP renewal (EPA review began 03/18/14).


Staff Report
Final ROP
Howard Finishing - SRN: B2363
An ROP renewal (EPA review began 03/19/14).


Staff Report
Final ROP
The Regents of the University of Michigan - SRN: M0675
An ROP renewal (EPA review began 03/17/14).


Staff Report
Final ROP
Breitburn Operating LP, Elmer Fudd Central Production Facility - SRN: N7463
An ROP renewal (EPA review began 01/30/14).


Staff Report
Final ROP
Detroit Thermal Beacon Heating Plant - SRN: B2814
An ROP renewal (EPA review began 03/05/14).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Warm Rain Corporation - SRN: N0544
An ROP renewal (EPA review began 01/21/14).


Staff Report
Final ROP
Sumpter Generation Plant - SRN: M4854
An ROP renewal (EPA review began 01/17/14).


Staff Report
Final ROP
Vector Pipeline Highland Compressor Station - SRN: N6838
An ROP renewal (EPA review began 01/08/14).


Staff Report
Final ROP
Central Sanitary Landfill - SRN: N2804
An ROP renewal (EPA review began 01/13/14).


Staff Report
Final ROP
City of Midland Utilities Division - SRN: N6004
An ROP renewal (EPA review began 12/04/13).


Staff Report
Final ROP
CMS Generation Michigan Power - Livingston Generating Station - SRN: N6526
An ROP renewal (EPA review began 12/09/13).


Staff Report
Final ROP
ANR Pipeline Company, Reed City Compressor Station - SRN: B3721
An ROP renewal (EPA review began 12/17/13).


Staff Report
Final ROP
Rock Tenn - SRN: B4072
An ROP renewal (EPA review began 12/19/13).


Staff Report
Final ROP
Jackson Power Company - SRN: N6626
An ROP renewal (EPA review began 12/09/13).


Staff Report
Final ROP
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Green Plains Holdings - SRN: N7383
An initial ROP (EPA review began 12/19/13).


Staff Report
Final ROP
North American Natural Resources, Birch Run - SRN: P0415
An ROP renewal (EPA review began 12/11/13).


Staff Report
Final ROP
Waste Management of Michigan People's Landfill - SRN: N5397
An ROP renewal (EPA review began 12/11/13).


Staff Report
Final ROP
Detroit Wastewater Treatment Plant - SRN: B2103
An ROP renewal (EPA review began 12/13/13).


Staff Report
Final ROP
White Pine Electric Power - SRN: B1966
An ROP renewal (EPA review began 11/07/13).


Staff Report
Final ROP
Chrysler Trenton Engine Complex - SRN: B3350
An initial ROP (EPA review began 11/15/13).


Staff Report
Final ROP
CONTACTS
Contacts:
 AQD District Offices and/or Clean Air Assistance Program at 1-800-662-9278
Return to the Michigan Air Permits System Website (http://www.deq.state.mi.us/aps/)
Download