AIMS OF SSA • To provide useful and relevant elementary education for all children in the 6 to 14 age group by 2010. • To bridge social and gender gaps with the active participation of the community in the management of schools. • To allow children to learn about and master their natural environment in a manner that allows fullest harnessing of their human potential both spiritually and mentally. OBJECTIVES OF SSA All the children will be in schools, Education Guarantee Centers or Alternative schools. All the children will complete five years of primary schooling by 2007. All the children will complete eight years of elementary schooling by 2010. Focus on elementary education of satisfactory quality with emphasis on education for life. Bridge all gender and social category gaps at primary stage by 2007 and at elementary level by 2010. Universal retention by 2010. ADMINISTRATIVE UNITS & DEMOGRAPHY OF CUTTACK DISTRICT NO. OF BLOCKS – 14 NO. OF MPL – 1 NO. OF NAC – 2 NO. OF CORPORATION – 1 NO. OF PANCHAYATS – 342 NO. OF VILLAGES – 1949 NO. OF HABITATIONS – 2119 NO. OF CLUSTERS - 238 TOTAL POPULATION – 24,75,010 SEX RATIO – 932 GROWTH RATE OF POPULATION – 14.02 % PERCENTAGE OF SC POPULATION – 18.19% PERCENTAGE OF ST POPULATION – 3.49% LITERACY RATE – 76.13% DISTRICT EDUCATIONAL SCENARIO TOTAL CHILD POPULATION (6 – 14 YRS) – 3,98,152 TOTAL GOVT. SCHOOLS – 2010 (DISE 2003-04) • PRIMARY SCHOOLS – 1,460 • UPPER PRIMARY SCHOOLS - 550 PRIVATE SCHOOLS – 52 PRIVATE AIDED SCHOOLS - 112 NO. OF EGS CENTERS (PRIMARY) – 432 NO. OF EGS CENTERS (UP) – 18 NO. OF ANGAN WADI CENTERS - 1741 TOTAL CHILDREN ENROLLED IN FORMAL SCHOOLS CLASS I –VII – 3,20,880 (DISE 2003-04) CLASS I – V – 2,53,827 CLASS VI – VII – 67,054 AGE 6 – 14 yrs – 3,20,515 NO. OF CHILDREN ENROLLED IN EGS CENTERS – 15359 NO. OF CHILDREN ENROLLED IN AWC – 66,414 NO. OF DISABLED CHILDREN IN THE DISTRICT (6 – 14) – 5,164 NO. OF SCHOOL GOING DISABLED CHILDREN (6 – 14) – 4,668 NO. OF TEACHERS (PS) – 3,554 NO. OF TEACHERS (UP / UGME / NODAL) – 2,671 NO. OF SIKSHYA SAHAYAKS ENGAGED – 1240 NO. OF E.V. (EGS) – 574 NO . OF BRC COORDINATORS IN POSITION (including EFA BRCC) – 32 NO. OF CRC COORDINATORS IN POSITION (including EFA CRCC) – 79 NO OF EDUCATIONAL DISTRICTS – 4 NO. OF DISTRICT INSPECTOR OF SCHOOLS – 4 NO. OF S.I. CIRCLE – 55 TOTAL NO. OF S.I. OF SCHOOLS POSTED – 35 OPERATIONAL FRAME WORK OF OPEPA Chief Minister, President, Governing Body,OPEPA Minister, School & Mass Education Vice President, Governing Body Commissioner-Cum-Secretary, Deptt. Of School & Mass Education, Chairman, OPEPA Director SIEMAT State Project Director, OPEPA Director, Elementary Education Directorate & SCERT District Project Coordinator DIETS D.I.s of Schools S.I.s of Schools B.R.C.C CRCC S C H O O L S DISTRICT LEVEL MANAGEMENT STRUCTURE District SSA Committee Headed by District Collector DIETs/ STs District Project Office with District Project Coordinator D.I. of Schools S.I.s of Schools Block Level:- G.P. Level :- BLOCK RESOURCE CENTRES (BRCs) CLUSTER RESOURCE CENTRES (CRCs) Schools & VECs DISTRICT SSA STRUCTURE Chairman District SSA Committee District Project Coordinator Pedagogy Coordinator Girls Education Coordinator I.E.D. Coordinator Planning Coordinator M.I.S. Programmer Financial Accountant Data Entry Operator Accountant B.R.C. Coordinator Programme assistant C.R.C Coordinator Office Assistant School Education Committee Cashier Senior Technical Consultant Technical Consultant To plan, monitor & implement all types of SSA activities for achieving universalization of Elementary Education. District SSA Committee has been formed with the following members – CONSTITUTION OF SSA COMMITTEE • • • • • • • • • • • • • • Collector All Honourable M.P. & M.L.A.s of the district Circle Inspector of schools All D.I. Of schools Dist. Welfare Officer & Dist. Social Welfare Officer Principal, DIET / Headmaster, HQ S.T. school One representative P.R.I District Project Co-ordinator District Project Engineer B.R.C. Co-ordinator – 1 C.R.C. Co-ordinator – 1 Teacher representative – 2 Women activists – 2 N.G.O. representative – 1 Chairman Members Members Members Member Member Member Member Convener Member Member Member Members Members Member PROGRAMME IMPLEMENTATION STRATEGY (Putting the system in place) District Level Setting up of DPO, MIS, BRC & CRC. Recruitment of staff. Procurement of furniture, equipments. Convergence of services. Formation of Resource pool & their orientation. Sharing workshop on DISE data / House Hold Survey data / Educational Indicators. Review & preparation of plan / estimate of civil works activities & execution on priority basis. District level trainings to BRG members / MTS for different interventions Block-wise-target setting. Block level Locating BRC on temporary basis & appointment of BRCC Induction training to BRCC. Role & responsibility of BRCC / S.Is Formation of BRG & Block level Resource pool & their training. Resource mobilization at block level through convergence. Construction of BRC building. Compilation of BRC profile on the basis of DISE / HH survey. Prioritization & execution of civil work activities. Community awareness programme at block level. Cluster level Strengthening of center school & linkage those with C.R.Cs. Locating the C.R.Cs & appointment of C.R.C.Cs Training of C.R.C.Cs, H.Ms, S.Is. Formation of cluster level resource pool & their orientation. Rejuvenating the monthly teacher’s meeting at center schools. Identification of needs & execution of activities in priority areas. Linking CRC with Grampanchayat. Identifying the community organizer from among the local youth, retired teachers, social activist. Identifying location for new schools / EGS centers & their management along with VEC. Institutional Support System under Sarva Siksha Abhiyan, Cuttack EXISTING LINKAGE (District & Sub district) DIET & Secondary Training Schools District Inspector of Schools District Project Office SSA Block Resource Centers (3 BRCC with Block Resource Group in each Block) Sub Inspectors of Schools (3-4 S.Is in each block) Cluster Resource Centers Center Schools (Center School Headmasters) Primary / Upper Primary Schools With Village Education Committees (Cluster Resource Centers Coordinators) MAJOR INTERVENTIONS UNDER S.S.A. MANAGEMENT INFORMATION SYSTEM (MIS) PEDAGOGICAL IMPROVEMENT SC & ST EDUCATION GIRLS EDUCATION EARLY CHILDHOOD CARE AND EDUCATION (ECCE) COMMUNITY MOBILIZATION AND PARTICIPATION RESEARCH & EVALUATION INTEGRATED EDUCATION FOR DISABLED CHILDREN (IED) ACCESS AND ALTERNATE SCHOOLING PLANNING AND MANAGEMENT COMPUTER AIDED EDUCATION CIVIL WORK FINANCIAL STATEMENT END MIS Collection of data through DISE (District Information System For Education) formats is the measure activity of MIS. DISE ANALYSIS REPORT OF CUTTACK DISTRICT (2003-04) TEACHER ENROLMENT INFRASTRUCTURE QUALITY ASPECT INDICATORS MAIN DISTRICT SCENARIO • • • • • • Pupil Teacher Ratio (PTR) – 41 No. of Primary schools having PTR < 20 – 114 No. of Primary schools having PTR > 60 – 150 No. of UP schools having PTR < 20 – 19 No. of UP schools having PTR > 60 – 64 No. of single teacher schools – 182 BACK SL NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 BLOCK Athagarh Baramba Baranga Banki Banki - Dompara Cuttack Sadar Cuttack MPL Kantapara Mahanga Niali Narsinghpur Nischinta Koili Salipur Tangi - Choudwar Tigiria District Total BACK PTR<20 PS UPS 12 2 3 0 6 1 0 1 4 0 15 1 8 1 6 1 19 1 6 2 4 2 12 3 9 2 10 1 0 1 PTR>60 PS UPS 7 3 16 10 5 1 13 8 11 6 8 1 3 3 3 0 12 3 13 2 8 10 11 1 12 2 18 4 10 10 PTR>40 PS UPS 41 30 58 24 30 15 49 6 38 17 39 16 27 14 20 9 45 30 57 20 44 22 40 17 48 13 65 26 28 16 114 150 629 19 64 275 PUPIL TEACHER RATIO (PTR) OF GOVT. SCHOOLS (2003-04) SL NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 BLOCK Athagarh Baram ba Baranga Banki Banki-Dom para Cuttack Sadar Cuttack MPL Kantapara Mahanga Niali Nars inghpur Nis chinta Koili Salipur Tangi Choudwar Tigiria DISTRICT TOTAL BACK ENROLLM ENT 21192 21501 11248 14505 15373 19866 28245 10835 25333 18578 21580 21560 22433 26515 10971 289735 TOTAL TEACHERS 548 425 281 291 320 516 746 311 658 447 508 577 590 635 198 7051 PTR 39 51 40 50 48 39 38 35 39 42 42 37 38 42 55 41 SINGLE TEACHER / 2 TEACHER / 3 TEACHER SCHOOLS BLOCK CODE BLOCK NAME 01 02 ATHGARH BARAMBA 03 BARANGA 04 BANKI 05 BANKI-DAMPADA 06 CUTTACK SADAR 07 CUTTACK MPL 08 KANTAPADA 09 MAHANGA 10 NIALI 11 NARSINGHPUR 12 NISCHINTAKOILI 13 SALIPUR 14 TANGI-CHOUDWAR 15 TIGIRIA DISTRICT TOTAL BACK NO OF SINGLE TEACHER SCHOOLS NO OF 2 TEACHERS SCHOOL NO OF 3 TEACHERS SCHOOLS PS UPS PS/UPS PS PS 21 0 7 7 10 19 7 3 6 21 20 15 18 9 10 5 0 1 1 0 0 0 0 0 1 1 0 0 0 0 0 0 53 31 0 2 0 0 22 32 4 4 2 1 0 38 3 0 18 4 1 0 30 2 0 16 5 2 0 26 0 0 12 4 1 0 45 1 0 31 4 1 0 19 0 0 16 0 0 0 28 2 0 18 2 2 0 55 3 1 43 1 5 0 64 4 0 25 2 1 0 31 1 0 37 5 1 0 50 3 0 30 2 0 0 74 1 0 36 8 1 0 81 4 0 34 7 2 0 0 27 652 0 26 0 1 9 379 1 53 1 21 178 4 UPS PS/UPS UPS PS/UPS DISTRICT SCENARIO ON ENROLLMENT Total Enrollment – 3,20,880 • Primary – 2,53,827 • Upper primary – 67,054 • 6 – 11 years children – 2,40,877 • 11 –14 years children – 79,638 GER – 81 NER – 81 % ST enrollment • Primary – 5% • Upper primary – 2% % SC enrollment • Primary – 24% • Upper primary – 18% % Repeaters – 7.4% % Disabled children – 1.5% BACK ENROLLMENT IN FORMAL SCHOOLS OF CUTTACK (2003-04) SL NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 PRIM ARY BLOCK Athagarh Baramba Baranga Banki Banki-Dompara Cuttack Sadar Cuttack MPL Kantapara Mahanga Niali Narsinghpur Nischinta Koili Salipur Tangi Choudwar Tigiria DISTRICT TOTAL UPPER PRIM ARY BOYS GIRLS TOTAL BOYS GIRLS TOTAL 9047 8558 17605 2482 2133 9756 8675 18431 2624 4801 4712 9513 6224 6101 6795 GRAND TOTAL BOYS GIRLS TOTAL 4615 11529 10691 22220 2375 4999 12380 11050 23430 1275 1088 2363 6076 5800 11876 12325 1672 1386 3058 7896 7487 15383 6060 12855 1853 1602 3455 8648 7662 16310 8259 7830 16089 2569 2246 4815 10828 10075 20903 17350 17067 34417 5233 4772 10005 22583 21839 44422 4674 4234 8908 1351 1168 2519 6025 5402 11427 10668 10140 20808 2758 2570 5328 13426 12710 26136 8111 7794 15905 1915 1780 3695 10026 9574 19600 9586 9048 18634 2591 2283 4874 12177 11331 23508 9180 8799 17979 2490 2404 4894 11670 11203 22873 9606 9156 18762 2437 2326 4763 12043 11482 23525 11858 10563 22421 2638 2385 5023 14496 12948 27444 4794 4381 9175 1372 1276 2648 6166 5657 11823 130709 123118 253827 35260 31794 67054 165969 154911 BACK 320880 NO. OF CHILDREN IN THE AGE GROUP OF 6 - 14 ENROLLED IN FORMAL SCHOOLS DURING THE YEAR 2003-04 SL NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 BLOCK ATHAGARH BARAMBA BARANGA BANKI BANKI-DOMPARA CUTTACK SADAR CUTTACK MPL KANTAPARA MAHANGA NIALI NARSINGHPUR NISCHINTA KOILI SALIPUR TANGI-CHOUDWAR TIGIRIA DI STRI CT TOTAL BACK 6 - 11 YEARS 11 - 14 YEARS GRAND TOTAL 16388 17503 8944 11373 12427 15427 33380 8368 19577 15355 17351 17100 17741 21137 8806 5907 5788 3391 3953 3879 5781 10948 3161 6208 4231 5911 5656 5535 6192 3097 22295 23291 12335 15326 16306 21208 44328 11529 25785 19586 23262 22756 23276 27329 11903 240877 79638 320515 % OF SC & ST ENROLLMENT PRIM ARY Block Code BOYS Block Name GIRLS % ST % SC UPPER PRIM ARY TOTAL BOYS GIRLS TOTAL % ST % SC % ST % SC % ST % SC % ST % SC % ST % SC 01 ATHGARH 14 18 13 18 14 18 8 15 5 13 7 14 02 BARAMBA 9 21 8 21 8 21 2 16 1 15 2 15 03 BARANGA 5 31 5 32 5 32 3 28 1 25 2 27 04 BANKI 6 17 5 18 6 18 3 18 2 15 3 17 05 BANKI-DAMPADA 10 23 8 23 9 23 6 18 2 17 5 17 06 CUTTACK SADAR 4 31 4 30 4 31 2 23 2 22 2 23 07 CUTTACK MPL 1 21 2 19 2 20 2 14 1 12 1 13 08 KANTAPADA 0 35 0 37 0 36 0 29 1 28 0 28 09 MAHANGA 1 25 1 25 1 25 0 21 0 19 0 20 10 NIALI 2 25 1 25 1 25 0 20 0 17 0 19 11 NARSINGHPUR 6 24 4 26 5 25 3 21 1 20 2 21 12 NISCHINTAKO ILI 0 29 0 28 0 28 0 26 0 23 0 25 13 SALIPUR 2 31 1 30 2 31 1 23 1 21 1 22 14 TANGI-CHO UDWAR 13 20 11 20 12 20 5 16 3 13 4 14 15 TIGIRIA DISTRICT TOTAL 11 6 17 24 10 5 16 24 10 5 17 24 4 3 12 20 2 1 10 17 3 2 11 18 BACK REPEATERS SL NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 BLOCK Athagarh Baramba Baranga Banki Banki-Dompara Cuttack Sadar Cuttack MPL Kantapara Mahanga Niali Narsinghpur Nischintakoili Salipur Tangi Choudwar Tigiria District total BACK FAILURE Class I - V B G 612 602 877 795 428 422 458 466 502 456 620 582 271 233 531 449 892 820 464 426 538 526 799 720 986 767 952 737 435 422 9365 8423 Class VI - VII B G 92 58 27 11 24 15 37 23 60 44 64 31 31 23 37 8 39 29 24 21 79 76 30 25 73 43 51 25 15 3 683 435 LONG ABSENT Class I - V B G 102 88 238 197 44 23 128 92 130 105 201 189 252 223 39 30 59 59 57 46 125 117 55 36 257 211 170 157 101 78 1958 1651 Class VI - VII B G 28 12 28 8 3 3 6 4 3 4 26 17 6 10 10 10 10 7 12 15 15 18 34 29 10 8 24 8 2 3 217 156 GROSS ENROLLMENT RATIO (GER) OF CUTTACK DISTRICT Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Block Name ATHGARH BARAMBA BARANGA BANKI BANKI-DAMPADA CUTTACK SADAR CUTTACK MPL KANTAPADA MAHANGA NIALI NARSINGHPUR NISCHINTAKOILI SALIPUR TANGI-CHOUDWAR TIGIRIA District Total BACK Population Enrollment (6 - 14 yrs) ( I - VII ) 27861 22220 29994 23430 16015 11876 20283 15383 20950 16310 25647 20903 43016 44422 16142 11427 34411 26136 24704 19600 30059 23508 29662 22873 30225 23525 32957 27444 16226 11823 398152 320880 GER 80 78 74 76 78 82 103 71 76 79 78 77 78 83 73 81 NET ENROLLMENT RATIO (NER) OF CUTTACK DISTRICT Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Block Name ATHGARH BARAMBA BARANGA BANKI BANKI-DAMPADA CUTTACK SADAR CUTTACK MPL KANTAPADA MAHANGA NIALI NARSINGHPUR NISCHINTAKOILI SALIPUR TANGI-CHOUDWAR TIGIRIA District Total BACK Population Enrollment (6 - 14 yrs) (6 - 14 yrs) NER 27861 29994 16015 20283 20950 25647 43016 16142 34411 24704 30059 29662 30225 32957 16226 22385 23374 11957 15518 16342 21043 42226 11595 26368 19665 23659 23173 23687 27623 11900 80 78 75 77 78 82 98 72 77 80 79 78 78 84 73 398152 320515 81 DISTRICT SCENARIO ON INFRASTRUCTURES Govt. schools not having own building – 92 Govt. schools having Thatched buildings – 41 Student Class Room Ratio (SCR) in Govt. schools– 39 Highest SCR – 331 Lowest SCR - 3 Govt. schools without black boards – 25 Govt. schools without common toilets – 1442 Govt. schools without girls toilets - 1883 Govt. schools without drinking water facilities – 322 Govt. schools without electricity – 1766 No. of Govt. school buildings require major repair – 1660 BACK PRIMARY & UPPER PRIMARY SCHOOLS NOT HAVING OWN BUILDINGS (DISE 2003-04) SL NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 BACK NAM E OF THE BLOCK Athagarh Baramba Baranga Banki Banki-Dompara Cuttack Sadar Cuttack MPL Kantapara Mahanga Niali Nirsinghpur Nischinta Koili Salipur Tangi Choudwar Tigiria DISTRICT TOTAL NO. OF THE SCHOOLS 4 3 4 1 5 6 29 4 12 4 2 6 5 7 0 92 NO. OF SCHOOLS HAVING THATCHED BUILDING SL NO 1 2 3 4 5 6 7 8 9 BACK BLOCK Athagarh Banki Banki-dompara Baramba Kantapara Mahanga Narsinghpur Salipur Tigiria District Total NO. OF SCHOOLS 5 8 3 6 1 3 5 1 9 41 STUDENT CLASS ROOM RATIO (SCR) OF GOVT. SCHOOLS (2003-04) SL NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 BLOCK Athagarh Baram ba Baranga Banki Banki-Dom para Cuttack Sadar Cuttack MPL Kantapara Mahanga Niali Nars inghpur Nis chinta Koili Salipur Tangi Choudwar Tigiria DISTRICT TOTAL ENROLLM CLASS ENT ROOM S 21192 21501 11248 14505 15373 19866 28245 10835 25333 18578 21580 21560 22433 26515 10971 289735 585 513 335 359 391 534 579 338 623 512 565 593 644 652 232 7455 BACK SCR 36 42 34 40 39 37 49 32 41 36 38 36 35 41 47 39 SCHOOLS WITHOUT BLACK BOARDS SL NO C A T EGOR Y E S T A B LI S HM E N T Y EA R B U I LD I N G ST A T U S B LO C K N A M E S C HO O L N A M E 1 BARAMBA KARADA NEW PS Pry. 2003 Rentf ree building 2 BARAMBA KANDA PS Pry. 2003 No building 3 BARAMBA GOVT. GIRLS HIGH SCHOOL UP & HS 1962 Govt 4 BARANGA LALBAHADUR BIDYAPITHA UP SCL UP 1966 No building 5 BANKI MALABIHARPUR PS Pry. 2003 Rentf ree building 6 BANKI-DAMPARA CHAMPATIPUR PS Pry. 2003 No building 7 CUTTACK SADAR AINI NAHARPADA PS Pry. 1962 Govt 8 CUTTACK SADAR KAMARPUR PS Pry. 1963 Govt 9 CUTTACK SADAR CHAMARPADA PS Pry. 2003 No building 10 KANTAPARA NUAGAN SASAN UGME SCL PS & UPS 1858 No building 11 MAHANGA ICHHAPUR PS Pry. 1990 12 MAHANGA DULARPUR PS Pry. 2003 13 MAHANGA SIRIPUR PS Pry. 2003 Govt Rentf ree building Rentf ree building 14 MAHANGA BARO PS Pry. 2003 No building 15 NIALI KULABETENDA PS Pry. 2002 16 NIALI SOUTH KASARDA PS Pry. 1965 Govt Rentf ree building 17 NIALI KAPILESWARPUR PS Pry. 1999 No building 18 NIALI SUTINDA PS Pry. 2003 No building 19 NARSINGHPUR KANSEILO PS Pry. 1972 Govt 20 NARSINGHPUR TANGISAHI PS Pry. 21 NISCHINTA KOILI FATEPUR PS Pry. 2003 Private 22 NISCHINTA KOILI SANAROUTPATI PS 23 NISCHINTA KOILI ACHYUTANANDA VIDYAPITHA 24 SALIPUR RODHAPUR UGME SCHOOL 25 TANGI-CHOUDWAR NAUSADHIPUR PS Govt Pry. 2003 No building UP & HS 1951 No building PS & UPS 1958 Pry. 2003 Govt Rentf ree building BACK SL NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NO. OF SCHOOLS WITHOUT BLOCK ATHAGARH BARAMABA BARANGA BANKI BANKI-DOMPARA CUTTACK SADAR KANTAPARA MAHANGA NIALI NARSINGHPUR NIASCHINTA KOILI SALIPUR TANGICHOUDWAR TIGIRIA CUTTACK MPL BACK COMMON TOILET GIRLS TOILET DRINKING WATER ELECTRICITY 125 84 58 66 78 80 66 165 123 99 120 110 152 51 65 153 115 89 92 88 129 87 193 146 129 167 170 182 59 84 18 17 5 11 13 19 4 34 12 30 35 42 45 7 30 138 102 88 81 85 120 94 189 152 123 148 162 168 49 67 1442 1883 322 1766 CONDITION OF THE CLASS ROOMS SL. NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 BLOCK ATHAGARH BARAMABA BARANGA BANKI BANKI-DOMPARA CUTTACK SADAR KANTAPARA MAHANGA NIALI NARSINGHPUR NIASCHINTA KOILI SALIPUR TANGI-CHOUDWAR TIGIRIA CUTTACK MPL GOOD CONDITION 212 144 168 128 160 265 128 155 296 188 259 264 249 72 217 2905 BACK REQUIRES REQUIRES MAJOR MINOR REPAIR REPAIR 162 208 156 220 82 84 108 144 107 136 73 172 61 141 133 325 71 142 141 247 95 238 158 228 133 253 73 89 107 170 1660 2797 DISTRICT SCENARIO % of schools inspected – 52% % of schools having untrained teachers – 8% % of students repeated due to • Failure – 7% • Long absent – 1% % of students appeared examination – • Class V – 95% • Class VII – 97% % of students secured more than 60% marks • Class V – 20% • Class VII – 14% BACK NO. OF SCHOOLS I NSPECTED DURING THE ACADEMIC YEAR 2002-03 SL NO BLOCK TOTAL NO. OF NO. OF SCHOOL INSPECTED 120 1 ATHGARH SCHOOLS 158 2 BARAMBA 128 67 3 BARANGA 94 63 4 BANKI 102 62 5 BANKI-DOMPARA 98 48 6 CUTTACK SADAR 139 89 7 CUTTACK MPL 133 75 8 KANTAPARA 97 28 9 MAHANGA 204 53 10 NIALI 155 76 11 NARSINGHPUR 145 73 12 NISCHINTA KOILI 171 94 13 SALIPUR 182 115 14 TANGI-CHOUDWAR 196 80 15 TIGIRIA 62 36 2064 1079 BACK NO OF UNTRAINED TEACHERS IN CUTTACK DISTRICT SL NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 BLOCK ATHAGARH BARAMBA BARANGA BANKI BANKI-DOMPARA CUTTACK SADAR CUTTACK MPL KANTAPARA MAHANGA NIALI NARSINGHPUR NISCHINTA KOILI SALIPUR TANGI-CHOUDWAR TIGIRIA DISTRICT TOTAL BACK PS PS & UPS PS, UPS & HS UPS UPS & HS 8 15 21 21 24 24 10 15 15 27 10 13 12 33 5 19 7 18 12 18 13 2 6 23 7 16 26 16 30 1 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 3 1 3 1 1 2 3 7 2 4 5 4 3 3 0 0 1 0 0 0 1 0 0 0 0 0 2 1 0 0 253 214 4 42 5 REPEATERS SL NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 BLOCK Athagarh Baramba Baranga Banki Banki-Dompara Cuttack Sadar Cuttack MPL Kantapara Mahanga Niali Narsinghpur Nischintakoili Salipur Tangi Choudwar Tigiria District total BACK FAILURE Class I - V B G 612 602 877 795 428 422 458 466 502 456 620 582 271 233 531 449 892 820 464 426 538 526 799 720 986 767 952 737 435 422 9365 8423 Class VI - VII B G 92 58 27 11 24 15 37 23 60 44 64 31 31 23 37 8 39 29 24 21 79 76 30 25 73 43 51 25 15 3 683 435 LONG ABSENT Class I - V B G 102 88 238 197 44 23 128 92 130 105 201 189 252 223 39 30 59 59 57 46 125 117 55 36 257 211 170 157 101 78 1958 1651 Class VI - VII B G 28 12 28 8 3 3 6 4 3 4 26 17 6 10 10 10 10 7 12 15 15 18 34 29 10 8 24 8 2 3 217 156 % OF SCHOOLS WITH COMMON TOILETS & GIRLS TOILETS Sl No Name of the block Total Govt. Total % of schools % of schools Total girls Primary common with common with girls toilets Schools toilets toilets toilets 147 13 9 2 1 Tigiria 43 5 12 0 0 3 Banki-Dompara 68 8 12 3 4 4 Niali 119 14 12 5 4 5 Athagarh 108 14 13 0 0 6 Mahanga 142 19 13 3 2 7 Narsinghpur 99 25 25 5 5 8 Nischinta Koili 112 29 26 0 0 9 Kantapara 71 19 27 5 7 10 Baramba 89 27 30 3 3 11 Baranga 68 21 31 3 4 12 Banki 68 22 32 3 4 129 43 33 3 2 97 34 35 18 19 100 39 39 1 1 1460 332 23 54 4 1 Tangi-Choudwar 2 13 Salipur 14 Cuttack MPL 15 Cuttack Sadar District Total % OF SCHOOLS WITH SCR > 60 IN THE YEAR 2003-04 Sl No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Name of the block Athagarh Narsinghpur Baranga Kantapara Cuttack Sadar Banki-Dompara Salipur Niali Banki Nischinta Koili Mahanga Tangi-Choudwar Baramba Tigiria Cuttack MPL District Total SCR > 60 Primary Schools 8 8 6 7 13 9 18 17 10 22 30 36 22 15 34 255 Total Govt. % of Schools Primary with SCR > 60 Schools 108 99 68 71 100 68 129 119 68 112 142 147 89 43 97 1460 7 8 9 10 13 13 14 14 15 20 21 24 25 35 35 17 %OF SINGLE CLASSROOM PRIMARY SCHOOLS (2003-04) Sl Name of the block No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Niali Narsinghpur Baranga Baramba Kantapara Tigiria Cuttack Sadar Tangi-Choudwar Cuttack MPL Athagarh Banki Banki-Dompara Nischinta Koili Salipur Mahanga District Total Single Total % of room Pry. Govt. Pry. single Schools Schools classroom 3 4 3 4 4 3 7 12 11 14 9 9 16 21 28 119 99 68 89 71 43 100 147 97 108 68 68 112 129 142 148 1460 3 4 4 4 6 7 7 8 11 13 13 13 14 16 20 10 % PRIMARY SCHOOLS WITH PTR > 100 (2003-04) SL NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 BLOCK Mahanga Tigiria Narsinghpur Banki Banki-Dompara Tangi Choudwar Baramba Athagarh Baranga Cuttack Sadar Cuttack MPL Kantapara Niali Nischinta Koili Salipur District Total TOTAL GOVT. PS NO. OF GOVT. PS WITH PTR > 100 % SCHOOLS WITH PTR > 100 142 43 99 68 68 147 89 108 68 100 97 71 119 112 129 1460 5 1 2 1 1 2 1 1 0 0 0 0 0 0 0 14 3.52 2.33 2.02 1.47 1.47 1.36 1.12 0.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.96 % SCHOOLS WITH < = 50 STUDENTS IN CLASS I - V (2003-04) SL NO NAME OF THE BLOCK 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 TIGIRIA BARAMBA BANKI KANTAPARA NARSINGHPUR NIALI CUTTACK MPL BARANGA TANGI-CHOUDWAR SALIPUR BANKI-DOMPARA MAHANGA CUTTACK SADAR ATHAGARH NISCHINTA KOILI DISTRICT TOTAL NO. OF TOTAL GOVT. SCHOOLS WITH PRIMARY < = 50 SCHOOLS STUDENTS 43 89 68 71 99 119 97 68 147 129 68 142 100 108 112 1460 3 9 8 10 15 21 18 13 29 26 14 32 23 26 31 278 % SCHOOLS WITH < = %50 STUDENTS 7 10 12 14 15 18 19 19 20 20 21 23 23 24 28 19 % SC & ST GIRLS TO SC & ST ENROLLMENT (2003-04) SL NO NAME OF THE BLOCK TOTAL SC SC GIRLS % SC TOTAL ST ST GIRLS % ST ENROLLMENT ENROLLMENT GIRLS ENROLLMENT ENROLLMENT GIRLS 1 Athagarh 3094 1506 49 2346 1116 48 2 Baramba 3910 1818 46 1509 666 44 3 Baranga 2992 1500 50 504 243 48 4 Banki 2185 1101 50 690 323 47 5 Banki-Dampara 2937 1363 46 1171 500 43 6 Cuttack Sadar 4821 2285 47 641 314 49 7 Cuttack MPL 5000 2495 50 383 202 53 8 Kantapara 3125 1539 49 29 12 41 9 Mahanga 5172 2542 49 144 61 42 10 Niali 3944 1927 49 219 98 45 11 Narsinghpur 4676 2334 50 876 328 37 12 Nischinta Koili 5075 2429 48 67 30 45 13 Salipur 5743 2782 48 282 137 49 14 Tangi-Choudwar 4323 2046 47 2672 1124 42 15 Tigiria 1517 712 47 953 427 45 58514 28379 48 12486 5581 45 BACK ACHIEVEMENTS ON INTEGRATED EDUCATION FOR DISABLED (IED) (2003-04) No. of Disabled children identified – 5164 No. of school going disable children – 4668 No. of DRG & BRG formed – 29 Sensitization of DRG, BRG & District level officers. Observation of World Disabled Day on 3rd December No. of Medical Camp conducted on IED – 11 No. of Theme based Camps organized on IED – 34 No. of Angan Wadi Workers / Supervisors trained on Pre integration skills - 1625 No. of children given Hearing Aids – 59 No. of TLM workshop organized on IED – 01 (at Konark) No.of teachers trained as Master Trainer – 29 No. of mould laboratory and Loop Induction System given to the special school in the district – 05 No. of teachers trained on R.C.I. Foundation course on IED – 38 No. of parents trained on IED – 42 (by teleconference) FUTURE PLAN OF ACTION UNDER I.E.D. Medical camp for rest of the blocks. Aids & Appliance worth 7 lakhs will be distributed freely by NIRTAR in the month of October 7 November. Surgical correction for disabled children. Theme Based Camp will continue up to March 2005 . Parents of disabled children will be trained on IED. Strengthening of Special schools in the district. Opening of AIE Centers for severe disabled children. Teachers training on IED – 640 teachers in 16 batches. Observation of world disabled day. Annual sports meet. MAIN AIMS OF CIVIL WORKS To actualize the composite goals of Universalization of Elementary Education (UEE) • Universal provision of access • Provision for universal retention • Universal achievement of quality education OBJECTIVE OF CIVIL WORK Providing effective facilities for effective education Basic right to education To provide school within 1km distance of a child 1. Schools having beautiful aesthetical looking. 2. Schools matching to the dream of children. Basic right to quality schooling To provide class room having safe & pleasant environment. 1. One room for each 40 students. 2. One room for each class / section 3. One room for each teacher. Basic right to sanitation To provide basic facilities to children 1. Toilet with flush water in vicinity 2. Safe drinking water 3. Hand washing facilities Basic right to healthy environment To provide pleasant surrounding & environment which is central to cognitive & creative development of children 1. Plantation of trees for greenery patches & clean play ground. 2. Compound walls for safe areas. 3. Repairing of existing structures. The school of our dream to be materialized WHERE WE ARE HURDLES FOR ACCESS Schools at far distance to children. Schools without ramp for disabled. HURDLES FOR RETENTION Schools without basic facilities. Drinking water Toilet Hand washing facilities Schools without green surroundings. Schools without play grounds. Schools without compound wall. Schools without composite pits. HURDLES FOR QUALITY EDUCATION Schools having unsafe building. SCOPE OF CIVIL WORK FOR ACCESS Construction of new PS & UPS. Providing building to building less schools. Providing ramp to every school for disabled child. FOR RETENTION Construction of adequate class room. Providing pure drinking water facilities. Providing toilets in hygienic condition. Providing child friendly elements. FOR QUALITY EDUCATION Providing quality monitoring facilities Construction of BRC Construction of CRC Providing teaching learning corner in every class room Providing compound wall Providing electrification Providing ownership to the children to different segments of schools by making “CHOUTARA & BENCHES” WE HAVE TRAVELLED TILL NOW SINCE INCEPTION (Oct. 2003 – July 2004) ACHIEVEMENT OF CIVIL WORKS, CUT T ACK. OCTOBER-2003 to JULY- 2004 A. Reconstruction of School Building Programme(RSBP) SL. No 1 2 Particulars Construction of Buildings Construction of Buildings(stilted) Physical achievement Spill Over Financial achievement Unit Cost in Lakhs Achieved No. Finishing Level Roof Level Plinthlevel finance received Commited Expenditure App. 5 135 48 57 30 4,69,000,00 3,87,90,000 17 Lakhs Each Tender Decided Unit Cost in Lakhs. Achieved No. 1.5 140 15 91 34 20 7 9 4 Work to be started B. CIVIL WORKS UNDER S.S.A SL. No Particulars 1 Additional Class rooms 2 Buildingless P.S 3 3 Building less UPS 3 4 B.R.C 6 5 C.R.C 2 6 Toilet 0.2 7 Water Facility 0.15 Spill Over Finishing Level Roof Level 3 Plinth level finance received Commited Expenditure 3 2,31,86,000 103 8 Boundary Wall 9 Electrification 0.05 10 Upgraded P.S 2.5 75 11 New P.S 3 24 91/RWSS Rs.12,18,000 0.4 C.Eleventh Finance SL. No 1 Particulars Construction of buildings of Cuttack MPL Unit Cost in Lakhs. Achieved No. Finishing Level Roof Level Plinth level 5.00 Lakhs 3.12 Lakhs 2 - - - 4 - - - finance received 8.12 Lakhs Commited Expenditure 8.12 Lakhs D. SRC Grants 1 Construction of 6 Lakhs buildings in highschools 24 Lakhs 4 Lakhs Nuapatna UP school, Tigiria Noda Primary school, Kantapara First step of Baisi Pahacha to Sri Mandir Regeda primary school, Athagarh BLOCK WISE DATA PHYSICAL PROGRESS OF CIVIL WORK No of Not Ground Plinth Lintel Roof Finishing Slno Name of the Block schools Total Estimated Cost Started Level Level Level Level Level takan 1 Athgarh 6,958,000.00 17 0 0 1 2 5 9 2 Baramba 7,590,800.00 18 0 2 2 4 7 3 3 Banki 6,003,000.00 14 0 0 0 5 2 7 4 Banki Dampada 6,502,000.00 15 0 0 2 3 2 8 5 Baranga 6,322,878.00 15 2 0 3 1 3 6 6 Cuttack sadar 19 1 0 3 4 3 8 7,418,317.00 7 Kantapada 9 0 0 2 0 0 7 3,989,361.00 8 Mahanga 25 2 3 2 2 9 7 12,081,220.00 9 Narsinghpur 19 0 2 3 2 1 11 8,569,000.00 10 Niali 7 0 0 0 1 0 6 2,985,458.00 11 Nischintakoili 10 1 0 0 3 2 4 3,591,140.00 12 Salipur 19 4 2 0 3 6 4 7,885,180.00 13 Tangi Choudwar 16 4 0 5 0 3 4 6,896,720.00 14 Tigiria District Total 18 221 0 14 0 9 2 25 4 34 6 49 6 90 2,639,000.00 89,432,074.00 One step ahead towards tomorrow (approved plan of 2004 – 05) SCHEDULE FOR CIVIL WORKS: DIST -CUTTACK(2004-05) SEPTEMBER TO MARCH Sl No Activity Programme as per Unit Cost approved annual September October November December January February March in Lakhs work plan & budget (2004) (2004) (2004) (2004) (2004) (2004) (2004) in number 1 BRC 6 3 2 CRC 2 8 3 Primary School 3 28 3 45 3 27 approval 3 14 Committe e 4 5 6 Upper Primary School Building less P.S Building less UPS 3 8 Site Selection and by SSA 14 Agreem ent with 22 VEC and 10 Funds 7 release 7 Dilapidated Building P.S 3 21 8 Dilapidated Building U.P.S 3 12 12 9 Additional Class room 1.5 145 70 10 Toilet / Urinal 0.2 85 11 Water Facility 0.15 50 12 boundary Wall 0.4 15 13 Separation Wall 14 Electification 0.05 20 15 Child Friendly Element In Convergence with RWSS / SSHE 14 23 17 7 21 75 85 50 15 20 Way ahead by vision of Honorable Collector-cum-Chairman CIVIL WORK SL. NO. ACTIVITIES ALLOWED AMOUNT 20022007 NO AMOUNT IN LAKHS 1 Buildiless PS 34 93.5 2 Buildingless UPS 20 70 3 New PS 56 138 4 New UPS 25 87.5 5 Additional Class Room 1374 1841.25 6 HM Room 172 172 7 Toilet 1658 331.6 8 Drinkig Water 1010 151.5 11 BRC construction 14 84 12 CRC construction 77 154 13 Electrification 1000 50 14 Additional Class Room for class VI I in HS 0 50 15 Others 0 9902.46 16 Repair & Maintenance of schools 11763 588.15 TOTAL 13713.96 COMMITMENT OF COLLECTOR-CUM-CHAIRMAN There will be no – building less schools. No thatched buildings. No unsafe buildings MODE OF OPERATION To mobilize resources by community participation. Departure from contractor driven approaches. Participation of community to have owner ship of school through provision of community owned quality education in a mission mode. Retention of hygienic practices by communities. Repair & maintenance of school infrastructures by funds developed by communities contribution. To strengthen the community by decentralizing the powers. Giving prime role to the community to be in the core group to take the decision. Sensitization of VEC by PRIs Community participation in construction Training to the community to build self-confidence Participation of PRIs ULTIMATE GOAL Provide quality schooling to all eligible children so that they will face the world in the same vision. MAIN ACHIEVEMENTS ON GIRLS EDUCATION • • • • • • District Resource group (DRG) on Girls Education consisting of 12 members has been formed in the district & they have been oriented on different areas related to education of girls. Block Resource Group (BRG) on Girls Education consisting of 8 members has been formed in each block & they have already been oriented at the district level regarding various activities to be taken up under SSA. Mother Teacher Association (MTA) has been formed in all schools in the district. 118 no. of girls toilets have been proposed in the district. 55 nos. of Block Resource Group (BRG) members have been oriented at the District level to impart training to the MTA members. Training of MTA members has been started in the District from 17.08.04. 1490 nos of MTA out of 2037 have already been trained. No of BRG members Sl attended Name of the Block No orientation programme 1 Banki 8 2 Banki-Dompara 7 3 Mahanga 7 4 Tangi Choudwar 6 5 Cuttack Sadar 7 6 Niali 7 7 Nischinta Koili 2 8 Kantapara 8 9 Baranga 2 10 Salipur 3 11 Athagarh 2 12 Tigiria 2 13 Narsinghpur 3 14 Baramba 5 Total 69 FUTURE PLAN OF ACTION UNDER GIRLS EDUCATION Orientation to MTA members to create supportive environment in the village for the enrollment & retention of girls in the school in rest 2 blocks. 12 nos. of Bridge Course Centers & 2 residential schools have been planned to open in the district for adolescent girls, migrants, slum children, child labour & girls from muslim community. Material Development Workshop will be conducted at the district level to develop some awareness, materials, literature, booklets & posters etc. Opening of 10 no. of Model Cluster Schools under NPEGEL scheme in slum area of Cuttack Municipal Corporation. MAIN FUTURE PLAN OF ACTION IN ECCE Training of Anganwadi workers on Pre-school Education. Orientation to DRG / BRG members. Opening of new ECCE Centers (82nos). Monitoring & Supervision of AWCS. STEPS TAKEN UNDER ECCE Master trainers for ECCE consisting of 14 members have been trained on Pre-school activities to impart training to the AWWs. Proposals for opening of 28 nos. of ECCE centers in Cuttack MPL, Sadar & Banki block (9 + 4 + 15) have been submitted by the concerned CDPOs. MAIN AW P & BUDGET FOR THE YEAR 2004 - 05 Sl NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 ACTIVITY New Teachers Salary Teachers Salary Teaching Learning Equipment Teachers Training Community Mobilization Out of School Children Free Text Book Innovative Activity I.E.D S.R.G Management & M.I.S Research & Evaluation S.I.G Teachers Grant New School BRC CRC Civil TOTAL UNIT COST PHYSICAL 0.015 0.015 0.5 0.0007 0.0003 0.11945 0.0085 0 0.012 0.05 0 0.014 0.02 0.005 0 0 0 0 588 904 55 8515 14972 30105 195396 0 5112 3552 0 2392 3552 8515 55 0 0 0 FINANCIAL 105.84 162.72 27.5 119.21 8.98 232.904 166.0866 50 61.344 177.6 130 33.488 71.04 42.575 0 43.61 244.56 724 2401.4576 PROGRESS For the development of educational plans Micro Planning & School Mapping exercise has been done in 4 Grampanchayats of Cuttack district. FUTURE PLAN OF ACTION For the development of educational plan Micro Planning & School Mapping exercise will be made in 35 Grampanchayats of Cuttack district. AWP & Budget for the year 2005-06 will be made to fulfill district specific objectives by analysis data from various sources. Convergence meeting. MAIN ACCESS PROBLEM AREAS From the analysis of data, field surveys, it is come into notice that children are out of school because of the following reasons – Inaccessible areas. Non availability of educational facilities. Lack of interest towards education & classroom situation. Lack of parental motivation. Existence of urban deprived children. Orthodox attitude towards co-education schools. Migration. Existence of child labourers. 1st generation learners. STRATEGIES SUGGESTED Providing educational facility. • Opening of school. • Opening of EGS / AIE centers. Development of class room situation. Parental motivation in weak Grampanchayats. Enrollment drive in educationally backward areas. Distribution of free text books. Provision of mid day meal. Creation of awareness through “Patha Pranta Sabha”, Puppet show etc. ACHIEVEMENTS IN EGS / AIE Total no. of EGS centers running successfully in Cuttack district– 440 • Government run EGS centers – 411 • NGO run EGS centers - 29 Total no. of E.Vs engaged by V.E.Cs in the district – 557 Total no. of children enrolled in EGS centers – 15359 • GOVT. – 14232 • NGO - 1127 Total no. of Govt. managed EGS centers received funds – 335 Total no. of NGOs received funds – 2 84 Primary & 75 Upper Primary schools are opened under SSA in the year of 2003-04. FUTURE PLAN OF ACTION Opening of 55 no. of new Upper Primary schools Opening of EGS / AIE centers 30 days residential training to educational volunteers. Reinforcement training to DRG members. Release of funds to EGS / AIE centers. main ACHIEVEMENTS UNDER PEDAGOGICAL IMPROVEMENT Functioning of Block Resource Centers Block Resource Center is functioning in all the blocks of Cuttack district including the EFA blocks that is Athagarh, Nischintakoili, Cuttack MPL & Mahanga. BRC Coordinators have been deployed in all blocks excluding EFA blocks. In EFA blocks EFA BRC Coordinators are working. The detail position of BRC Coordinators is as follows – SL NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BLOCK Cuttack Sadar Baranga Tangi-Choudwar Banki Banki-Dompara Kantapara Niali Athagarh Baramba Tigiria Narsinghpur Salipur Nischintakoili Mahanga Total REQUIED 3 3 3 3 3 3 3 3 3 3 3 3 3 3 42 PRESENT POSITION OF BRCC 1 3 3 1 3 2 3 2(including EFA BRCC) 1 1 3 3 2 (including EFA BRCC) 2(includingEF A BRCC) 30 Capacity Building of BRC Co-ordinators All BRC Co_ordinators have undergone 7 days training programme by DIET resource persons in the month of December 2003. Formation of Block Resource Group & District Resource Group (BRG & DRG) – BRG & DRG for training of Primary school teachers have been formed & have been trained by DIET resource persons. • No. of District Resource Group members – 27 • No. of Block Resource Group members – 119 Cluster Level Teacher Training Programme – 3307 no of Primary school teachers have been imparted training in phases out of 3340 no. of teachers in position by the BRG members & DRG members during January to March 2004. Functioning of Cluster Resource Center 238 no. of Cluster Resource Centers will be opened in Cuttack district under SSA (17 CRCC in each block). Visioning test for selection of CRC Coordinators have been completed during May 2004 & D.I. of schools have been intimated the selected list for deployment of CRC Coordinators. In the mean while D.I. Of school Banki has already deployed the CRC Coordinators in the respective clusters. Conduct of Common Annual Examination (2004) in Primary Schools – Common Annual Examination in Primary Schools has been conducted in 2575 no. of schools (Primary / UP / Welfare schools / EGS centers / NCLP schools / High schools having Primary sections) during the month of April 2004. Question cum answer sheets have been provided to the schools free of cost for conduct of the examination. Achievement Mapping of Common Annual Examination Result – In order to know the performance level of the learners / schools, BRC Coordinator, S.I. of schools & center school headmasters have been oriented on Achievement Mapping of examination results. All schools have been provided with the formats of achievement mapping who in turn have submitted the filled up formats. Compilation of the result of the examination is in the process & will be completed by 25 / 09 / 2004. Convergence meeting with DIET – A convergence meeting with DIET, Cuttack Dolipur has been conducted for finalization of training schedule for the year 2004 – 2005. Additional Director of teachers training, District Project Coordinators of Jajpur & Cuttack, representatives of Kendrapara & Jagatsinghpur were present in the said meeting.The training schedule for the year 2004-05 was finalized in the said meeting. Formation of District resource group for training of UP school teachers & Swechha Sevi Sikshya Sahayaks – District Resource Group for training of UP school teachers have been formed & trained at DIET Cuttack Dolipur in the month of June 2004. Similarly District Resource Group for training of SSS have been formed & trained at DIET in the month of July 2004. TLM Grant – Teaching Learning Material grant of Rs500.00 has been released to all eligible teachers for preparation of teaching learning materials during the year 2002-2003 & 2003-2004. School Improvement Grant / Repair & Maintenance Grant – School Improvement Grant of Rs2000.00 & Repair & Maintenance Grant of Rs5000.00 has been released to all eligible schools of Cuttack district during the year 2002-2003 & 2003-2004. Training of Upper Primary School teachers under “Uday” package – The 7days training of UP school teachers under ‘Uday’ package is in the progress. All teachers working in UP schools will be trained in 6 phases. The training has been started since 03.09.2004 & 1696 no of teachers have been trained till date. FUTURE PLAN OF ACTION UNDER PEDAGOGICAL IMPROVEMENT 7 days training of the CRC Coordinators. Block level T.L.M workshop. Training of teachers in English Language. 30 days training of the Swechha Sevi Sikshya Sahayaks (Para teachers). Preparation of Resource Directory of teachers. Short term context specific / subject specific training. Sharing experience through exposure visit. STOCK SUMMARY SL. NO. 1 CLASS I RECEIVED 54000 ISSUED 45538 HASAKHELA -II 39288 39288 0 GANITA KHELA HASA KHUSI 51400 61900 50341 56391 1059 5509 ENGLISH 53500 53041 459 GANITA MAZA AMA BHASA AMA SAHITYA 43600 46600 43285 41259 315 5341 JANA AJANA 49000 48649 351 MY ENGLISH BOOK GANITA PATHA 46500 45800 35109 44447 11391 1353 11 AMA KATHA AMA GEETA 42750 42540 210 12 13 BIGYANA AMA SAMAJA 41300 40800 40940 40300 360 500 MY ENGLISH READER 36650 29332 7318 MY ENGLISH READER 36600 36325 275 16 17 MO GANITA AMA SAHITYA 38600 38500 35156 38300 3444 200 18 GYANA BIGYANA 30000 29580 420 19 20 SAMAJIKA PATHA THIK PADHA THIK LEKHA 39500 58500 37301 55733 2199 2767 2 3 4 II 5 6 7 III 8 9 10 IV 14 15 21 V VI BOOK NAME HASA KHELA - 1 BALANCE 8462 ORIYA BYAKARANA 22450 22253 197 22 23 GANITA JYAMITI 'O' BIJAGANITA 22950 26629 22365 26629 585 0 24 BIGYANA 26850 26480 370 25 26 AMA SAHITYA MY ENGLISH READER 26350 26750 25294 26365 1056 385 27 BADA LOKANKA JEEBAN KATHA 25850 25609 241 28 29 ITIHAS 'O' NAGAR BIGYANA BHUGOLA 24950 10250 24554 79 396 10171 HINDI 20250 10040 10210 GANITA PART-I GANITA PART - II 23710 23050 23710 22885 0 165 33 ENGLISH READER 23650 22915 735 34 35 TEN STORIES SAHITYA 20650 24935 20250 24935 400 0 36 MAHAPURUSHA 21075 21075 0 37 38 ORIYA BYAKARANA BHUGOLA 23810 22610 17810 22610 6000 0 39 HINDI 27050 26180 870 40 ITIHAS 'O' NAGAR BIGYANA 24710 24710 0 41 BIGYANA 14315 1377632 14315 1293918 0 83714 30 31 32 VII GRAND TOTAL MAIN SC / ST EDUCATION PROBLEM AREAS ISSUES STRATEGIES • Community Mobilization • High dropouts Programme. • Participation of VEC • Conduct of Jati Mahasabha. in the school is passive • Cluster level SC Coordination Committee. • 1st generation learner • Monthly CRC meetings in tribal areas to deal with local specific issues. • Tribal Convention. • Strengthening VEC. ACHIEVEMENTS Block Resource Group for SC / ST education has already been found. The Pedagogy Block Resource Group will work as resource group for the intervention of SC / ST education in the concerned block. Future Plan of Action CRC level SC Co-ordination Committee in Baranga block. One day Jati Mahasabha in tribal dominated Grampanchayats. Development of organizational climate in Ashram schools. Monthly meeting at CRC level in all CRCCs of Athagarh block, Baranga block & 5 CRCCs of Tangi-Choudwar block to deal with local specific issues. MAIN COMMUNITY MOBILISATION The successful implementation of Sarva Siksha Abhiyan programme at the grass root level depends upon how the community is involved in the process. Community participation is very much essential for universalization of Elementary Education. AIMS & OBJECTIVES To create awareness in the community for UEE. Formation of committees like VEC, MTA & PTA to establish linkage between school & community. Involvement of PRI members, local leaders, NGOs etc. at the grass root level for proper implementation of the programme. PROBLEM AREAS Villages / habitations where the children are first generation learner. Rural / inaccessible / urban slum pockets. Areas where migrants & child labourer etc. are present. ACHIEVEMENTS BRG for training of Village Education Committee members has been formed & trained. • Total no. of BRG members – 56 • No. of BRG members trained - 54 4453 no. of VEC members have been trained under SSA. NO. OF VEC TRAINED IN CUTTACK DISTRICT SL NO 1 2 3 4 5 6 7 8 9 10 11 BLOCK KAN TAPARA N IALI BARAN GA CUTTACK SADAR TAN GI-CHOUDW AR BAN KI BAN KI-DOMPARA SALIPUR TIGIRIA BARAMBA N ARSIN GHPUR NO. OF VEC TRAINED 345 509 362 466 630 269 389 546 189 331 417 4453 FUTURE PLAN Special Enrollment Drive will be conducted in the selected pockets / weak Gram Panchayats during Sept. 2004. MAIN LIST OF SELECTED SCHOOLS FOR COMPUTER AIDED EDUCATION PROGRAMME BLOCK SCHOOL 1 Khuntuni Nodal UP s chool 2 Gobar a Nodal UP s chool 3 M aniabandha Nodal School 4 Banam alipur UGM E s chool 5 Panchagaon UGM E s chool 6 Gadadhar pur Nodal School NARSINGHPUR 7 Jilinda Govt. M E s chool BANKI 8 Anuar y UGM E s chool 9 Char chik a Nodal UP(UGM E) s chool ATHAGARH BARAMBA TIGIRIA BANKI-DOMPARA SALIPUR MAHANGA NISCHINTA KOILI KANTAPARA NIALI TANGI-CHOUDWAR BARANGA CUTTACK SADAR CUTTACK MPL 11 Bis w anath Sr ichandan Nodal UP s chool Rodhapur UP(UGM E) s chool 12 Gopinathpur Nodal UP s chool 13 Ranigoda UP(M E) s chool 14 Lalitagir i UP(M E) s chool 15 Ahm m e d Bux UP(M E) s chool 16 Sas tr im e m or ial UP(M E) s chool 17 Br ahm ana Sailo Nodal UP s chool 18 Gobindpur M E s chool 19 Jallar pur Nodal UP s chool 20 Kapile s w ar Nodal UP s chool 21 Bhatim unda Nodal UP s chool 22 Choudw ar UP s chool 23 Har ianta Bapuji UGM E s chool 24 Br ahm ana Jhar ilo Nodal UP s chool 25 Be lagachhia UGM E s chool 26 Be ntak ar UP s chool 27 Kachar am al Nodal UP s chool 28 Sats anga Nodal UP s chool 29 Dagar apada UGM E s chool 30 Chauliaganj Nodal UP s chool 10 ACHIEVEMENTS UNDER COMPUTER AIDED EDUCATION (CAE) 30 nos. of schools have been selected on the basis of having electricity, RCI roof, safety in the school. The schools were visited by MIS staff & District Manager Aptech Ltd. Electrical installation in the computer room of the schools has completed. Selection of @ two teachers from each school has completed. 3 nos. of computer systems, 3 nos. of UPS & one Dot Matrix printer has already delivered at the school point. State level training of Master Trainers for the teachers training has completed. The Master Trainer includes – Pedagogy Coordinator, MIS Programmer, one DRG member from pedagogy & District manager Aptech Ltd. One day orientation of Head Master & one assistant teacher has completed. MAIN TOTAL POPULATION SL NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 BLOCK ATHAGARH BARAMBA BARANGA BANKI BANKI-DOMPARA CUTTACK SADAR CUTTACK MPL KANTAPARA MAHANGA NIALI NARSINGHPUR NISCHINTA KOILI SALIPUR TANGI-CHOUDWAR TIGIRIA DISTRICT TOTAL POPULATION 148069 141186 88244 120326 90681 136735 634648 85630 171109 138716 145198 178071 183388 132998 80011 2475010 BACK The little feet are not able to measure the long distance to school BACK Teachers do not think children worthy to use it Condition of toilet forced the children not to use it BACK Were not being able to quench the thirst for water what about thirst for knowledge BACK Diamonds are being placed in the garbage BACK The birds of blue sky in the cage BACK CONVERGENCE WITH OTHER PROGRAMMES ICDS • • • • Training of A.W.Ws for strengthening of Pre-school Education. Survey of disabled children by the A.W.Ws. Training of A.W.Ws on pre integrated skill. Community mobilization by the ICDS functionaries. RWSS • Sanitation • Drinking water NSS • Identification of out of school children. • Intensive mobilization in the slum & remote pockets for 100% enrollment & retention. • Beautification / cleaning of school environment by the help of community, VEC, MTA, PTA • Preparation of TLM. Number of Schools in Cuttack District (DISE 2003-04) Sl No Government Name of the Block Pry. U.P.S Pvt. Aided Pvt. Unaided TRW Local Body Total 108 48 4 2 2 4 168 1 Athgarh 2 Baram ba 89 31 2 15 2 5 144 3 Baranga 68 26 1 2 2 2 101 4 Banki 68 28 2 1 6 0 105 5 Banki-Dam pada 68 24 0 1 4 1 98 6 Cuttack Sadar 100 40 4 6 0 3 153 7 Cuttack MPL 97 28 9 40 5 13 192 8 Kantapara 71 24 1 5 1 2 104 9 Mahanga 142 60 9 2 0 0 213 10 Niali 119 35 1 1 1 2 159 11 Nars inghpur 99 40 5 8 3 5 160 12 Nis chintakoili 112 53 9 13 0 0 187 13 Salipur 129 48 3 7 3 1 191 14 Tangi-Choudwar 147 48 1 3 0 2 201 15 Tigiria 43 17 1 6 1 0 68 1460 550 52 112 30 40 2244 DISTRICT TOTAL BACK DISTRICT PROJECT OFFICE SSA,CUTTACK STATEMENT OF INCOME AND EXPENDITURE FROM 1.04.2004 TO 20.09.2004 SL. Particulars No. 2 Opening Balance as on 1.04.2004 Receipt from OPEPA Total Expenditure from 1.04.04 to 20.09.04 Advance from 1.04.04 to 20.09.04 Total Balance as on 20.09.04 3 1644025.00 4 564000.00 5 2208025.00 6 15500.00 7 -1601.00 8 13899.00 9 2194126.00 1 1 EGS 2 Pre Project Activities 314707.00 0.00 314707.00 0.00 0.00 0.00 314707.00 3 Bank Interest 806891.79 1056027.00 1862918.79 0.00 0.00 0.00 1862918.79 4 SIG,SRG,TLM 181000.00 0.00 181000.00 0.00 -287632.00 -287632.00 468632.00 5 Civil Work 30767000.00 2500000.00 33267000.00 0.00 0.00 0.00 33267000.00 6 Salary of SSS -4009000.00 0.00 -4009000.00 0.00 0.00 0.00 -4009000.00 7 Teachers Trg. 2923969.00 0.00 2923969.00 745.00 745.00 2923224.00 8 Project Management Cost 369331.65 900000.00 1269331.65 642384.05 43389.85 685773.90 583557.75 9 Research & Evaluation -70423.00 0.00 -70423.00 504239.00 10482.00 514721.00 -585144.00 0.00 0.00 0.00 0.00 0.00 0.00 10 Text Book 11 IED 156025.00 400000.00 556025.00 0.00 314273.00 314273.00 241752.00 12 ECCE 600000.00 0.00 600000.00 0.00 0.00 0.00 600000.00 13 Girls Education 488727.00 0.00 488727.00 0.00 15100.00 15100.00 473627.00 14 Planning 0.00 35000.00 35000.00 8445.00 17520.00 25965.00 9035.00 15 MTA Trg. 0.00 500000.00 500000.00 0.00 0.00 0.00 500000.00 16 Pedagogy 0.00 840000.00 840000.00 0.00 1312355.00 1312355.00 -472355.00 17 VEC Trg. 0.00 288000.00 288000.00 0.00 835060.00 835060.00 -547060.00 18 Others 0.00 300000.00 300000.00 5320.00 250874.50 256194.50 43805.50 34172253.44 7383027.00 41555280.44 1175888.05 2510566.35 3686454.40 37868826.04 Total back