2803 dundas west

advertisement
2803 Dundas Street West
Avenue Segment
Study
Presentation Outline
1.
2.
3.
4.
5.
6.
Study Area and Proposal
Policy Context
Character Area Response Statement
Precedent Projects
Identification of Potential Soft Sites
Conclusion
Study Area Boundaries
Avenue Segment Area
• Keele Street to the west and Dupont Street to the east
• Comprised of small format low and mid-rise main street buildings
• Inter-mixed with a few larger format buildings
Study Area Boundaries
Secondary Study Area
• Keele Street to the west, CN Rail / GO Transit to the north, Dupont Street to the
east, and Annette Street to the south
• Primarily comprised of single family homes with some secondary commercial, office
and institutional uses
The Proposal
Physical Context
• large site at the southeast corner of
Dundas Street West and Indian Grove
(1,729.5sm)
• Segment is identified as an “Avenue” in
the Official Plan with a Mixed Use
designation
• Accessible by public transit and a range
of community services
• Appropriate site for mid-rise
development
The Proposal
Specifications
• 23 metre (7 storey) mixed use building
• 105 residential units
• Total GFA of 9,093 sm
• 40 vehicular and 79 bicycle parking spaces
• Parking and servicing access provided by
rear lane
The Proposal
Dundas Street West
Indian Grove
At-Grade Condition and Setbacks
• Contains 663 square metres of
retail uses along Dundas Street
West with ground floor height of
5.0 metres
• 7.5 metre rear property setback
allows for lane
• Varying side property setback of
0-2 metres creates transition to
adjacent low-rise residential
dwellings
• Townhomes and live/work units
create active uses along
adjacent street / lane
Lane
The Proposal
Height
• Appropriate height and
massing given surrounding
context
• 5 storey building base (80%)
provides continuous streetwall
• Mechanical features are
wrapped within 7th storey
Massing and Angular Planes
• Generally in keeping with the
intent of the Avenues and MidRise Buildings Study
• Minor extension beyond
prescribed 45 degree angular
plane results in minimal
impact on incremental ground
level shadows
The Proposal
Front Property Stepbacks
• Begin above 5 storey building
base
• In keeping with required
stepback locations for a midrise building
• Terracing diminishes visual
impact at upper levels
• Mitigate potential shadow
impacts
Rear Property Stepbacks
• Begin above the 3rd storey
• Provide appropriate transition
to adjacent low-rise residential
dwellings
Policy Context
Provincial Growth Plan
• Segment is identified as an intensification corridor, which is an area appropriate for
future growth and intensification
Official Plan
• Segment is defined as an Avenue, which is an area appropriate for mid-rise
development and intensification
• Area is generally designated Mixed Use
Avenues and Mid-Rise Buildings Study
• Segment is identified as a Character Area
Zoning By-Law 438-86
• Segment is generally zoned MCR, with total FSI of 2.5, including maximum 1.0
commercial and 2.0 residential
Character Area Response Statement
Character Areas
• Identified the Avenues and Mid-Rise Buildings Study
• Segment is located within the Junction Character Area and the Junction Triangle
Character Area
• Performance standards outlined for these Character Areas include 19D and 19E,
which proposed development generally adheres to
• Proposed development provides a strong precedent for future mid-rise buildings
along the Avenue Segment
Precedent Projects
Ideal Condominiums
• 8 storey building located on south side of
College Street west of Bathurst Street
• Context-sensitive and well-massed
• In keeping with intent and recommendations of
a number of performance standards outlined in
the Avenues and Mid-Rise Buildings Study
• Rear façade is tiered to fit within angular plane
• Front façade steps back after 5th storey
• Façade is well articulated with similar rhythm to
surrounding fabric
• Parking and servicing are provided by a rear
lane
Precedent Projects
Saint James Condominiums
• 8 storey building located on the
southeast corner of King and Jarvis
Streets
• Illustrates appropriate use of stepbacks
• Addresses the streetwall appropriately
• Front façade steps back above the 4th
storey , maintaining an angular plane
• Extends to all property lines
• Parking and servicing are provided by an
interior courtyard
Identification of Potential Soft Sites
Near Term (0-10 Years)
• Four properties (identified as “1” to “4” on next slide) are anticipated for near term
redevelopment
• All are underutilized
• Many contain single storey commercial buildings
• All properties are shallow and are not appropriate for mid-rise buildings
Long Term (10-20 Years)
• One property (identified as “5” on next slide) is anticipated for long term
redevelopment
• Site is underutilized
• Contains single storey commercial building
• Site is deep and is appropriate for a mid-rise building
Identification of Potential Soft Sites
Identification of Potential Soft Sites
Conclusion
•
Proposed development:
– represents an appropriate and positive addition to the neighbourhood
– Respects the principles which govern provincial policy documents
– Conforms to the intent of the Official Plan pertaining to desired form of
development along the Avenues
– Achieves the intent of the performance standards identified in the Avenues and
Mid-Rise Buildings Study
Thank You
Development Scenario
Unit Count
• Projected unit count of approximately
190 new residential units occupying a
GFA of approximately 16,000 square
metres
Population Projection
• Estimated existing population of 630
• Projected total population of
approximately 1,071
Employment Projection
• Projection of 607 new jobs, occupying
approximately 1,350 square metres of
new and replacement retail and office
space
Development Scenario
Shadow Impacts
• Build-out of Avenue Segment will not result
in negative ground level shadow impacts
Design and Streetscape Implications
• Build-out of Avenue Segment will make a
positive contribution to the neighbourhood
• Will bring a more appropriate scale of
development to Dundas Street
• Will further animate the pedestrian realm
• Through development, opportunities will
arise for streetscape enhancements
Active Transportation & Parking
Active Transportation
• 4 bus routes pass through study area with
stops at regular intervals
• Subway access from Dundas West Station
and Keele Subway Station
• GO Transit access to Milton and
Georgetown from Bloor GO Station with
access to planned Air-Rail link
• Dedicated bicycle lanes are provided along
Annette Street and along the eastern edge
of the adjacent CN Rail / GO Transit corridor
Parking
• On-street parking is provided along Dundas
Street, Annette Street, surrounding local
and connector streets
• Large surface parking lots are provided
nearby with access off of Keele Street
Active Transportation & Parking
Community Facilities
•
•
Study area is well serviced by
community facilities including:
– Schools
– Child care facilities
– Parks and open spaces
– Community and recreation centres
– Libraries
– Places of worship
– Social services
The build-out of the Avenue Segment
is expected to have minimal adverse
impacts on these facilities