Slide No 1

R-APDRP Part -A

Karnataka

June 2015

1. R-APDRP & Its Objectives

► Ministry of Power, Govt. of India launched the R-APDRP in the XI Five year

Plan

► Most ambitious initiative in power distribution sector taken by Ministry of

Power; Rs 50000 Crore funded programme is Govt’s renewed attempt to revive power sector reforms

► Power Finance Corporation (PFC) designated as the Nodal Agency

Key Objectives of R-APDRP

► To reduce AT&C losses to 15% in project area across India in all states

► Actual, demonstrable performance in terms of loss reduction; Loss reduction targets at utility level

Success factor: Establishment of reliable & automated systems for sustained collection of accurate base line data

► Adoption of IT in the areas of energy accounting

Slide No 2

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

(R-APDRP), KARNATAKA

2. R-APDRP - Phases & Value Proposition to DISCOMs

R-APDRP scheme has 2 phases – Part A & Part B

Part-A - For establishment of baseline data & IT applications for energy accounting/auditing & better consumer services

Part-B - System improvement, strengthening and augmentation etc.

Key Objectives of R-APDRP

► R- APDRP is distribution reforms program using Information Technology (IT)

► To baseline accurate data for energy flow in the power distribution system

► To take necessary measures for reducing technical & commercial losses

► To bring transparency & accountability in the system by use of IT

Improved customer services in nearly monopolistic electricity distribution biz

► To prepare power sector for adoption of future technologies by bringing all the public power utilities on a level playing field

Slide No 3

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

(R-APDRP), KARNATAKA

3. R-APDRP Key Benefits to Utilities

► Strengthening of sub-transmission & distribution networks in the urban areas

► for enhancement of reliability and efficiency.

► Metering of feeders /distribution transformers / consumers in the urban areas for proper energy accounting and auditing

► bringing transparency and AT&C reduction.

► Continuation of IT enablement of distribution sector & strengthening of distribution network

► for infusing transparency , reliability and efficiency in the distribution network

► help to achieve 24x7 Power supply.

Slide No 4

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

(R-APDRP), KARNATAKA

4. R-APDRP Implementation in Karnataka – An Overview

5 electricity distribution companies in State

► Bangalore Electricity Supply Company (BESCOM)

► Chamundeshwari Electricity Supply Corporation

(CESC)

► Gulbarga Electricity Supply Company (GESCOM)

► Hubli Electricity Supply Company (HESCOM)

► Mangalore Electricity Supply Company (MESCOM)

Area

Consumers

5012 sq. Km

7.2 Million

Distribution Transformers 55,621 Nos.

Cable

Total Assets

672,145 Ckt Km

~60 Million

Slide No 5

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

(R-APDRP), KARNATAKA

5. R-APDRP Part – A Overview in Karnataka

► 17 mandatory modules to be implemented

► Single solution for all ESCOMs

► Each ESCOM project to be treated individually by ITIA – Infosys; Overall guidance & support from the office of the Chairman (ESCOMs)

► DGPS based GIS survey of 57,000 KMs & 72+ lakhs consumers

► AMR Implementation for DTs and HT customers – 65,000+ modems

► Establishment of LAN, MPLS, VPN across 700+ offices in 98 towns

► 1 Customer Call center per ESCOM with toll free number

► Training of approx. 5000+ utility personnel

Data Center : Bangalore

Disaster Recovery Center: Chennai

BESCOM : Bangalore

MESCOM : Shikaripura

HESCOM : Dharwad

CESC : Mandya

GESCOM : Gulbarga

BESCOM : Bangalore

MESCOM : Mangalore

HESCOM : Hubli

CESC : Mysore

GESCOM : Gulbarga

Slide No 6

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

(R-APDRP), KARNATAKA

6. R-APDRP Part- A : 17 modules to be implemented

Other Modules

Disconnection/Dismantling

Network Analysis

MIS

Identity & Access Mgmt

System Security Requirement

Maintenance Management

Slide No 7

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

(R-APDRP), KARNATAKA

7. Module – Metering, Billing & Collection

Objective

Metering - An Effective meter reading system to enhance effectiveness of measurement process, allows accurate metering for all customers & tapping revenue loss through the identification and handing of exceptions

Billing and Collection - ensure the timely and accurate billing and collection

Benefits

► Automatic collection of meter data

► Interfacing with Spot billing devices & MRI data for uploading meter readings incl consumer meter readings

► Meter reading plan generation

► Monitoring meter reading plan

► Monitoring Customer exception

► Automatic Overdue alerts; Bill correction & amendments online

► Integration & flexibility of using SBMs

► Decentralized payment processing & centralized reconciliation; Daily reconciliation of cash and bank

Slide No 8

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

(R-APDRP), KARNATAKA

8. Module – Asset Management (WAMS)

Objective

Accounting & maintaining the vast fixed asset base efficiently, with following features:

► Easy data migration from legacy

► Easy to update asset data as asset base grows dynamically

► Easy to integrate with other applications for accurate data exchange (GIS/Maintenance etc)

► Scalable for growing requirements of utilities

► Billing & Collection

Benefits

► Life cycle analysis

► Manage various depreciation policies

► Manage the budgets for assets

► Manage extensive reporting using built-in reporting tools and business analytics

► Manage the compliance related to process/statutory requirements

► Work Orders

Slide No 9

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

(R-APDRP), KARNATAKA

9. Module – GIS based Integrated Network Analysis

Objective

► Perform several types of analyses on balanced or unbalanced three-phase, two phase and singlephase systems that are operated in radial, looped, meshed or mixed configurations.

Create

"what-if" studies and performing simulations to evaluate the impact of modifications to existing network.

Benefits

► Online Creation and editing of network

► Online Load flow and voltage drop analysis

► Optimization studies like capacitor placement, network reconfiguration, conductor up-gradation, express feeder, load balancing & load allocation etc.

► Network design reports, cost estimates, financial analysis

► Integration with New connection module for checking network capability, augmentation requirement (if any)

► Can generate Single Line Diagrams (SLD) based on GIS

Surveyed Data of Electric Lines & various equipments and it enables HT/ LT network analysis of the system. The SLD depicts the location of pole, transformer, distance between poles and other network features.

Slide No 10

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

(R-APDRP), KARNATAKA

10. Module – Meter Data Acquisition System

Objective

To acquire meter data from

System & Selected consumer meters automatically from remote avoiding any human intervention, important

Monitor distribution parameters, use meter data for accurate billing purposes and generate exceptions and

MIS reports for proper planning, monitoring, decision support and taking corrective actions on the business activities by the management.

Expected Benefits

To provide continuous on line monitoring & logging of parameters on real time basis

► Voltage, Phase to Phase and Phase to Neutral

► Current on each phase, Power factor, Frequency

► Power - Active / reactive / Apparent

► Energy – Active, Reactive and Apparent

To provide continuous on line monitoring & logging of above mentioned parameters & MIS report for

► System outage / downtime feeder wise

► Energy balancing at sub stations

► Daily peak loads feeder / transformer wise

► Peak Load of the Station

► Bus bar profile; Daily Log sheets & required reports

Slide No 11

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

(R-APDRP), KARNATAKA

11. R-APDRP – Outcomes

Slide No 12

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

(R-APDRP), KARNATAKA

12. R-APDRP Phase A – Go-live Status of Karnataka

Scheduled date for Go live / integration of all towns Sep 2015

Town Integration Energy Audit Schedule

Mon th

Up Up Up Up to

Ja n’

13 to

Fe b’

13 to

Ma r’

13 to

Apr

’ 13

Up Up Up Up to

Ma y’

13 to

Jun

’ 13 to

Jul

’ 13 to

Au g’

13

Up Up to

13 to

Sep’

Oct

’ 13

Up to

No v’

13

Up to

Dec

’ 13

Up to

Up to

Jan

’ 14

Feb

’ 14

Up to

Ma r’

14

Up to

Ap r’

Up to

Ma y’

Up Up Up to

Jun

’ 14 to

Jul’

14 to

Au g’

Up to

Sep

’ 14

Up to

Oct

’ 14

14 14 14

Up to

Up to

No v’

14

Dec

’ 14

Up to

Jan

’ 15

Up to

Up to

Feb

’ 15

Ma r’

15

Up to

Ap r’

15

Up to

Ma y’

15

Up to

Jun

’ 15

Targe t

10 18 40 40 50 50 50 50 53 55 75 91 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98

Achi eved

6 10 31 31 46 46 46 46 46 46 46 51 51 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60

ESCOM

BESCOM

CESC

GESCOM

HESCOM

MESCOM

TOTAL

MBC live (100% implementation)

25

12

21

29

11

98

Full Stack with EA

16

6

11

26

1

60

Slide No 13

13. R-APDRP Part – A – Financial Progress

ESCOM

NO.OF

TOWNS

BESCOM 25

MESCOM 11

CESC 12

HESCOM 29

GESCOM 21

TOTAL 98

TOTAL

PROJECT

COST

272.80

38.75

28.94

55.31

35.21

431.01

Rs in Crores

LOAN

SANCTIONED

(Convertible to Grant )

PFC

DISBURSEMEN

T DETAILS

TOTAL EXPENDITURE INCURRED

FROM PFC

FUNDS

FROM

OWN

FUNDS

TOTAL

252.00

146.65

104.16

31.47

135.63

29.05

7.24

7.24

10.63

17.87

28.91

54.66

34.11

398.7

16.64

31.56

19.20

221.29

13.14

28.35

19.20

172.09

0

0

3.19

45.29

13.14

28.35

22.39

217.38

* Rs. 31.47 crores spent for metering out of BESCOM funds, which needs to be approved in the revised DPR by PFC.

Slide No 14

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

(R-APDRP), KARNATAKA

Slide No 15

Thank You