SONY ABRAHAM. sonyabraham1978@gmail.com 919961354236, 919061376079, 00968 94677678 POST APPLIED TO: ELECTRICAL CONSTRUCTION MANAGER / MEP CO ORDINATOR EMPLOYMENT CHRONICLE: Eighteen years of experience in Construction Field, good analysis capability, good communication and interpersonal skills, proven individuality in Building installations and worked with team of professionals. Seeking new challenges in occupation which effectively utilizes my professional experience and commitment to perform quality work. Educational Details: Diploma in Electrical Engineering (Nov. 1996). B. Tech in Electrical Engineering (Course Completed-Awaiting Result). Since Dec 2015 to till date with M/s. Oman United Engineering Services – Muscat, Oman Project: ROP Traffic Head Quarters Client: Royal Oman Police Consultant: National Engineering Office (NEO) Main Contractor: M/s. Oman United Engineering Services Job Title: MEP MANAGER - SITE Since Nov 2011 to June 2015 with M/s. ETA STAR Engineering & Contracting (Saudi) Co. Ltd, K.S.A Project: King Abdullah Financial District (42 Floors + 5 Basements) Client: Riyadh Investment Company. Consultant: M/s. Dar Al Riyadh. Main Contractor: M/s. Saudi Bin Laden Group. Job Title: CONSTRUCTION MANAGER (MEP) Major Assignments: To attend all the technical meeting with Main Contractor, Consultant and Client representatives. To review and Submission of all technical submittal for all Electrical , HVAC, Plumbing and Fire Fighting systems with the assist of respective Site Engineers / Sr. Engineers to Consultant and Client approvals based on the Project specification & performance specification. Coordinating with Manufacturer / Suppliers to get the proper documentations and supporting information’s prior to the submission of technical submittal for material and entire systems and also arrange the drawings if required based on the system finalized. To bring the attention of Project Director / Project manager, if any deviation in design from contract drawings that may constitute a variation. To prepare list of variation order with the assist of respective Site Engineer / Sr. Engineers and QS department, if there is any deviation in design from contract drawings. Review and study the contract, project specification, performance specification & design drawing for smooth consecutively and uninterruptedly of the project. To be coordinate with respective consultants / main contractor to get the approval for material submittal, and also will arrange the meeting with Specialist / supplier to resolve the technical issues or any queries. Review the shop drawings for all MEP systems with the assist of respective Site Engineer / Sr. Engineers before the submission to consultant. Preparation of all MEP systems BOQ’s with the assist of respective Site Engineer / Sr. Engineers and the Indent to be raised accordingly for material order. To check the quality of the delivered material according to the approved material submittal. To see the correct site procurement in materials on due time and inform hierarchy about any drifts in schedule. To coordinate with design department to solve all the technical and other site problems. Give a monthly or weekly basis updated work progress at the site & Schedule of work to complete for next one month based on civil activities. To conduct weekly / monthly meeting with all MEP Sr. Engineers and Site Engineers for getting the site issues and giving the target for completion of work with proper allocation of manpower and also will discuss the shortage of material site. To coordinate with QA/QC department to raise the Inspection request for site activities in proper time. To arrange Manpower Control and Forecast, daily / weekly reports follow up, coordination, administration and total material & manpower management at site. Making Official Correspondence with the Customer till the completion of Project . Since March 2007 – August 2011 with M/s. VERGER ET DELPORTE UAE LTD Project: Client: Consultants: Main Contractor: UAE University new campus project in Al-Ain, U.A.E. (9 Floors) MUBADALA Developers. COX Group, Australia & GHD Sydney. M/s. OGER Abu Dhabi. Job Title: PROJECT ENGINEER. Major Assignments: To abide strictly by the applicable procedure. To take part in Project’s programming through a site expert advice. To organize, implement, control, execution from the specified requirements while reporting Periodically to Construction Manager. To hierarchy the work-in-progress, the assessed needs the encountered problems. To give corresponding assignments to supervisor (if any) foremen, team-leaders and works, while Watching over the necessary logistical support (facilities and accommodations, transport, tools, Uniform.) To attend all sort of meeting pertaining to project. To propose, define, implement and / or control the efficiency (as per hierarchy’s assignment) the remedial, corrective or preventive actions To see the correct site procurement in materials on due time and inform hierarchy about any Drifts in schedule. To carryout pre-commissioning inspection (on request) while performing the actual testing and Commissioning in front of customer with the possible assistance of other section’s representative. To hold possible inspection at supplier’s site (on request of contractually forecasted). To mark up all as-built drawings at the end of each project. To bring the attention of construction manager/project manager ,any deviation in design from Contract drawings that may constitute a variation To attend the technical meeting with Main Contractor and Subcontractors. To submit work inspection request to client and consultant. To coordinate with design to solve all the technical and other site problems. To check the quality of the delivered material according to the approved material submittal. Give a monthly or weekly basis updated work progress at the site. Since September 2005-Februay 2007 with M/s. AL FARA’A GENERAL CONTRACTING COMPANY Position Held : SITE ENGINEER Major Assignments: To study and review the electrical drawings and resolve the technical problems. To coordinate with other activities such as HVAC, Plumbing and Civil. To keep a proper documentation for all the site activities, submittal correspondence drawings. To prepare monthly invoice for the works executed at the site. To submit Work Inspection Request to the Consultant. To prepare operation and maintenance files. To prepare and monitor the Testing and Commissioning Reports. To prepare submittal/ as built drawings and material take off. To arrange Manpower Control and Forecast, daily reports follow up, coordination, administration and total management at site. To attend all sort of meeting pertaining to project. MAJOR JOBS HANDLED. Project Name: King Abdullah Financial District (KAFD) at Riyadh / KSA. Project Name: UAE University at Al Ain / UAE. Project Name: Residential Buildings for 1000 People Senior staffs and Executives for Air Port Police Accommodation – Abu Dhabi /UAE. Project Name: Construction of Terminal Buildings and Civil and MEP Works for Inter-Refineries Pipeline Projects at Mussafa Terminal-Abu Dhabi / UAE. Since March 2000 –August 2005 with M/s. B & S ENGINEERING CONSTRUCTIONS. Position Held : Site Engineer. Major Assignments: Site Supervision of all electrical works, installation of electrical outlets, Fire Alarm System, Public Addressable System, Telecom works. Execute the electrical installation as per the approved shop drawings. Checking the material submittals. Preparing the BOQ for the project electrical materials. Ordering the materials and follow-up the delivery as per the schedule. Coordinate with other trades such as HVAC/Plumbing/Civil. To prepare Work Inspection Request and submit to Client and Consultant. Major Jobs Handled: Project Name: Extension works of Office & Administration Department buildings for Hindustan News print Limited. Since January 1999–February 2000 with M/s. R & S ELECTRICALS (PWD Contractors, Engineers and Designers) Position Held : Site Engineer. Major Assignments: Site Supervision of all electrical works, installation of electrical outlets, Fire Alarm System, Public Addressable System, Telecom works. Execute the electrical installation as per the approved shop drawings. Checking the material submittals. Preparing the BOQ for the project electrical materials. Ordering the materials and follow-up the delivery as per the schedule. To prepare Work Inspection Request and submit to Client and Consultant Since January 1998-Jan 1999 with M/s. KERALA STATE ELECTRICITY BOARD Position Held : Sub Engineer in KSEB (Training). Major Assignments: To familiar with over heads distribution and transmission electrical lines. To familiar with underground cabling (HV and LV system). To familiar with 11KV/33KV sub-stations. Installation of transformers with lightning arrestors with other electrical systems. Document preparation for the new Electrical connections for Housing, Industrial & commercial purpose. Major Jobs Handled Project Name: Field execution and monitoring of Transmission & Distribution line system in Kerala State Electricity Board. Since December 1996- December 1997 with M/s. HINDUSTAN NEWSPRINT LIMITED Position Held : Site Engineer. Major Assignments: Site Supervision of all electrical works instrument works and lighting protection works. Checking the quality of the delivered materials according to the approved material submittals. Coordination with the mechanical works for the pre-commissioning process. Carrying out the testing and commissioning in coordination with the relevant suppliers. Trainings Completed: Attended two days Training Program for Project Management at M/s. Unistar contracting company. Attended two-day Fire and Safety Training at Verger Et Delporte, U.A.E. Attended two days Training Program for Material Management System at M/s. Unistar contracting company. Attended two days Training Program for Personal development skills at M/s. Unistar contracting company. Attended two days Training Program for Contracts Management at M/s. Unistar contracting company. Attended one-week Familiarization Program by National power Training Institute, Naively, Tamil Nadu. Personal Details: Date of birth : 05th May 1978 Nationality : Indian Marital status : Married Visa Status : Unemployed Driving License : UAE, KSA & India Details of Passport:Passport No : N-0780047 Date of issue : 09/07/2015 Validity up to : 08/07/2025 Place of Issue : Cochin, India. Date: 25.01.2016 Sony Abraham