Quality & Supplier Management March 2008 Mike Gillette IPIC Quality Assurance Manager Northrop Grumman Corporation 0 Copyright 2005 Northrop Grumman Corporation Quality & Supplier Management Outline History Early Involvement Proposal ASMB RFP Source Selection SDD Production 1 Copyright 2005 Northrop Grumman Corporation ICBMs – A continuing Success Story 1957 Atlas 1957 1959 1961 1964 1968 Thor Titan MM I MM II MM III 1950s 1960s •Atlas 1st Launch (1957) •Thor 1st Launch (1957) •Titan 1st Launch (1959) •MM I 1st Launch (1961) •MM II 1st Launch (1964) •MM III 1st Launch (1968) A Critical National Asset 1970s •PK Go-Ahead (1972) 1983 PK 1989 SICBM 1980s 1990s •PK 1st Launch (1983) •SICBM Go-Ahead (1983) •PKRG Go-Ahead (1986) •SICBM 1st Launch (1989) •REACT •GRP •PRP •ICBM Prime Award (1997) 2000 MM III SLE 2000+ •MMP •PSRE •SERV •REACT SLEP •ECS •ISMP •ICU Hold Targets at Risk Provide Deterrence Against Attack Rapid Receipt and Response to Emergency Action Messages (EAMs) Flexible Response Against Our Enemies Should Deterrence Fail In An Uncertain World ICBMs Continue To Be Important To Our National Defense 2 Copyright 2005 Northrop Grumman Corporation Supplier Management 13 Objectives No quality escapes to the field Quality is built-in, not inspected-in Results Over 3500 end items delivered to field since 2002 with essentially no quality issues Key Features Benefits Well established process to identify and qualify new vendors Programs executed on plan with no substandard parts or components delivered to field Focus on developing and qualifying vendors to meet our high standards before production starts Understanding of our needs as a customer and sound basis for shared success Monitor suppliers, during design and production, for successful corrective actions addressing variances from plan Ensures timely awareness of difficulties and provides time to correct without impact to customer Multi-tier vendor audits and assessments Reinforces commitment to quality products throughout supply chain Suppliers evaluated for ability to consistently produce quality products Vendor oversight approach adapted to needs of supplier Copyright 2005 Northrop Grumman Corporation Process for Supplier Management Role of Program Manager and Engineers - Production Role of Program Manager and Engineers – Pre Award and Design Conduct program reviews monthly Cost, Schedule, Technical, Risk, and Corrective Actions to Variances Conduct independent technical review for design reviews/audits Establish Weapon System Integration test procedures Monitor progress toward production readiness Acquisition Planning Contract/ Subcontract Awards Conduct program reviews every 6-8 weeks Cost, Schedule, Technical, Risk and Corrective Actions to Variances Approve Class I changes Review Class II changes Attend selected on-site joint reviews of sub-tier suppliers Functional and Physical Configuration Audits Critical Design Review Low Rate Production Full Rate Production Deliver Accepted Products Weapon System Integration Testing Role of Quality Engineers – Pre Award and Design 24 Qualify supplier for specific work scope Monitor supplier processes for compliance Establish and monitor corrective actions when necessary Team with first tier supplier on supply chain monitoring Establish baseline for production qualification As necessary, develop or disqualify supplier prior to production readiness review End Item Data Packet definition to ensure traceability to requirements Production Readiness Reviews Role of Quality Engineers - Production Participate in on-site joint reviews of sub-tier suppliers Conduct on-site inspection of process compliance during each site visit Establish and monitor corrective actions when necessary Conduct three-way (Government, Prime, Supplier) buy-off of products Resolution of material & process discrepancies (MRB) Copyright 2005 Northrop Grumman Corporation Early QA Involvement Proposal Phase Participate in Alpha Negotiations QA Submits a Basis of Estimate Participate in Supplier Proposal Evaluation Approver of Contract Deliverables Definition Participate in the Final Proposal Review 5 Copyright 2005 Northrop Grumman Corporation Early QA Involvement Acquisition Strategy Make Buy (ASMB) SQE is a Signature SEIT is a Participant Request For Proposal (RFP) Contains a Mission Assurance Requirements Document Written by SQE in Concert With MA Team SQE Reviews the Request for Proposal Supplier Selection Pre-award Assessment Participate in Source Selection 6 Copyright 2005 Northrop Grumman Corporation Early QA Involvement Review & approval of Supplier/Subcontractor QA Plans Conduct Sub-tier Supplier Assessment Support Formal Reviews SRR PDR CDR TRR PRR Qualification Testing Support Functional and Physical Configuration Audits Conduct First Article Acceptance Incoming Inspection Verification In-Process Audit and Inspection Verification 7 Copyright 2005 Northrop Grumman Corporation Supplier Development Supplier Monitoring Sub Tier Quality Survey Current Rating Supplier A 1 Date Y G Supplier B 2 Y G 3 R G 3 Y G Subcontractor 2 Y G 3 Y G 3 R G Major Compliance Issues R Mitigation Rating Comment Y Minor Compliance Issues Mitigation Plan ISO Compliant G Supplier Audit IAW ISO9000/AS9100 NGMS Audit Points 6.0 7.0 7.3 7.4 7.5 7.6 8.0 8.3 8.4 8.5 N/A Green Yellow Red 13 2 0 54 43 60 71.7% Management Responsibility 10 6 1 63 43 68 63.2% 6 2 0 30 23 32 71.9% 32 44 72.7% Resource Management 10 1 0 41 6 6 3 54 33 60 55.0% Purchasing 11 3 3 56 42 68 61.8% Production & Service Provision 15 1 2 60 50 72 69.4% 8 1 1 40 27 40 67.5% 16 1 2 71 52 76 68.4% Control of Nonconforming Product 3 2 3 29 16 32 50.0% Analysis of Data 3 0 0 12 9 12 75.0% Improvement 7 2 3 44 28 48 58.3% Foreign Object Elimination 0 0 0 0 0 17 0 1 72 66 72 91.7% 0 0 0 0 0 Product Realization Design and Development Control of Monitoring Measuring Measurement, analysis and improvement ESD Program N/A Supplier Site : NGMS Certification Audit Date Total Possible Points 5.0 Supplier Name : Overview Quality Management System Prime 19160 Form 260 4.0 Section: NGMS Audit Points Supplier Assessment and Certification Revision: Initial Release Date: March 10-11, 2004 Supplier SelfAssessment Points Process Owner Reviews Failure Modes and Effects Analysis (FMEA) Develop/Review Work Instructions Define/Develop/Document Critical Processes Assist in Obtaining ISO Compliance Review and Verification of Audit Results/Findings Software Total Points 554 Scores = Total Points / Total Available Points 90.5% 398 65.0% N/A N/A 612 65.0% Notes: Suppliers Quality Management System has been properly documented in accordance with ISO 9001:2000 standards. Necessary Processes have been identified which pertain to their application throughout the organization. Assessment results indicate several major and minor deficiencies in understanding and meeting requirements, obtaining results of process improvement and effectiveness, and continual improvement of process based on objective measurement. NGMS Approval 8 Copyright 2005 Northrop Grumman Corporation Supplier Monitoring Surveillance Plan Defines the Surveillance Program Enforces the Mission Assurance Requirements Surveillance Includes Mandatory Inspection Points Production Processes Focus on Process Improvement Lean/Six Sigma Quarterly Scorecard Input Corrective Action 9 Copyright 2005 Northrop Grumman Corporation Supplier Surveillance •Surveillance Includes Periodic Audits Periodic Audits Development Production Calibration System S S Tool Control S S Internal/External QA Audit results F F Data Management S F Configuration Management F F Product Identification S S Metrics and Metrics Analysis S F Training Records S F Procurement System F S Corrective Action System F F Supplier Management F F MRB S F F = Frequent 10 S = Seldom Copyright 2005 Northrop Grumman Corporation Supply Chain Management Product Acceptance Verification That All Items Are Being Delivered Hardware, Software, Documentation, Test Results, Spares, Data and Records Verification That All Items Meet Contractual Requirements Item Built IAW the Documented System All Requirements Are Verified Records Are Available As-Built Configuration Is Controlled 11 Copyright 2005 Northrop Grumman Corporation Supply Chain Management Product Acceptance Continued Define Data Package As-Built Configuration (Indentured Parts List) Proof of Traceability Requirements Having Been Met Open Action Items Are Documented Non-Conformances are Properly Corrected Waivers and Deviations are Documented Incorporated ECP’s Are Listed Review Build Paper Recording of Critical Parameters Certificate of Conformance Accompanied With Objective Evidence Incident Reports 12 Copyright 2005 Northrop Grumman Corporation Supplier Management Works at IPIC • •• • ••• •• • •• • • • • ••• •• •• • •• ~ 650 Prime WAWF Sell-offs per year (multiple items & locations) Summary Early Participation in a Program Mission Assurance Requirements Document Accompanies Every RFP Assessments are Accomplished Upfront Surveillance Plans are Defined and Followed Product Acceptance/Delivery is Exhaustive and is Unacceptable Without Objective Evidence Early Recognition of Supplier Development Requirements Manage the Complete Supply Chain Lessons Learned are Liberally Incorporated IPIC SQA Provides High Confidence in Fielded Product 13 Copyright 2005 Northrop Grumman Corporation