Discipline / Competence / Innovation / Transcendence / Sincerity / Harmony End-to-End Electronic Manufacturing Services: Commercial, Industrial, Defense, Automotive and Medical Industries Employees ~ 1200 (San Diego - CCSD, Indiana - CCIN & Reynosa - CCMX) Aerospace & Military Customers: 2 Confidential How does your organization contribute to the immediate success of customer startup operations including first article and early production efforts? How are processes like Advanced Product Quality Planning “APQP” and Production Preparation Process “3P” used to pro-actively ensure value for customers? How are customer’s needs for reduced lead time and high levels of initial quality considered in the startup process? 3 Confidential AS9100 7.0 Product Realization 1.3.1 New Product Start-Up Process [Advanced Product Quality Planning (APQP)] Prototype Program (Development Process) Production Preparation Process 3-P Production Part Approval Process & FAI 4 Confidential “Zero Defects Mentality” QS 9000 CCIN 1999 TS 16949 CCIN 2004 TS 16949 CCSD 2005 TS 16949 CCMX 2005 5 Confidential O I O Partnership Development I I O I O O I Production Manufacturing I O I O O I I 6 Confidential • Advanced Product Quality Planning (APQP) – Start in “Advance” – Customer & Supplier Involvement Early • Partnering to achieve product & process intimacy – Design Quality Into Product & Processes • APQP = Design For Six Sigma (DFSS) Zero Defects • Process Flows – FMEAs – Control Plans – WIs – Production Preparation Process (3P) • Integral to APQP & DFSS – DFL (Design For Lean) 7 Confidential Concept Initiation / Approval Program Approval Prototype Pilot Launch Planning Planning Product Design & Dev. Process Design & Development Product & Process Validation Production Feedback Assessment & Corrective Action Plan & Define Program Product Design & Development Verification Process Design & Development Verification 8 Product & Process Validation Feedback Assessment & Corrective Action Confidential Process Failure Mode Effects Analysis – PFMEA - Design For Six Sigma in Every Way – DFX Design For Manufacturability - DFM Design For Assembly - DFA Design For Test - DFT Design For Serviceability – DFS Mistake-proofing (Poka-yoke) & Process Controls 9 Confidential Design Records, DFMEAs and Special / Key Product Characteristics 10 Confidential Engineers Qualify Master Trainers Using T3 Qualification Master Trainers Deliver Competency-based Training Using 4E Methodology 1.Example (Demonstration) 2.Experience (Effectiveness) 3.Efficiency (Takt Rate) 4.Evaluation (Qualification) 11 Confidential Members of AME (the Association for Manufacturing Excellence) 2004 - 2007 Members of SEA (the Supplier Excellence Alliance) 2008 - 2013 12 Confidential Total Shift Hours = 8 X 60 min. X 60 sec. = 28,800 seconds -2 - 15-minute breaks X 30 min. X 60 sec. = 1,800 seconds -Start-up & Shut-down = 15 min. X 60 sec. = 900 seconds Available Work Time = 26,100 seconds Takt Time = Available Work Time / Customer Demand (units) TAKT TIME = 26,100 Seconds / 50 Units = 522 Seconds TAKT TIME = 522 Seconds / 60 = 8.7 Minutes Build a cell that will produce one unit every 8.7 minutes! 13 Confidential CCA-25000-1101 Trim fixture Depanel 25 up PCBA .3 min Pizza cutter Epoxy magnet to Slide switch 1.0 min R/I to do Reed switch Test .5 min RTV 1st Cable 5.0 min RTV 2nd Cable 5 min RTV Reed Switch 1.75 min FIFO 4 Reed Switch Install Rotory Install Rotory alignment Switch switch knob and insp 1.25 min 1.25 min .5 min RTV Cables X-ray BGA & QFN CCA-25000-1301 RF Depanel 4 up RF Func test aray 5.5 min .3 min Pizza and Dremmel tool CCA-25000-1201 GPS Depanel 4 up array .3 min Apply Epoxy 1.0 min Solder 5 wires 7.min Interim insp 1.0 min Rotory/GPS Wiring FIFO 4 Hand Solder J4, J7 2.0 min Func test 4.4 min Scan GPS and TXC SNs into data base 1.0 min GPS Chassis Install RF Bd test Part 1 4.0 min 4.0 GPS Test/RF Install Instal RF Bd Part 2 2.0 min Final Insp 4.3 min VSWR Test 3.0 min Combo RF/ GPS test 4.3 min Install shield covers 2.0 min 500 units/wk 100 units per day 50 units per shift Ant matching/Remote adp assy Install Matching Cable-RF Bd .5 min Solder 3 ultra caps to flex cable 7.5min GPS/RF PCBAs and chassis insp 1.0 min Solder Reed Switch 2.0 min Transport 1 day Bd insp - GPS/Radome install Full Func Test 2.0 min Battery Cover install 1.0 Interim Insp 1.0 min Top Cover Assy 4.0 min Insp Ultra Cap assy .5 min RTV Flex Cable to Cover 2.2 min FIFO 14 Leak test 2.0 min Seal Screw .5 min Final Insp and Docs 5.0 min Pack out .33 min Shipping Staging Final op pack out Top cover and Final assy Blade Ant VSWR and final test Solder 2 standoffs and 3 resistors to flex 1.5 min Solder ant pin Install Remote Chassis Insp to PCBA Adaptor Assy 1.0 min .5 min 3.0 min Remote Conn assy/insp/cover install Insp/Combo test Install Blade Antenna .5 min Install Ant matching PCBA 1.2 min SEI Final Insp .5 min RF Bd test/final assy GPS Bd test/final assy Install Radome Cover 6.0 FIFO 4 Epoxy Ant reed switch 2.75 min Batt terminal Prep and assy Initial Chassis assy Pizza cutter Install Batt contacts 3.0 min Insp .5 min Insp P/O Chassis insp Insp Contacts .5 min Install slide switch 1.75 min FIFO 14 Hand solder Cable 2.5 min Prep Neg Bat Prep Pos Bat Terminal terminal 1.0 min 1.0 min Trim fixture Assemble Remote Conn Adaptor 5.0 min Insp .5 min Ultra Cap sub assy 14 Confidential TD T T 4 ft GPS Test/RF Install 4 ft Rotory/GPS Wiring T 4 ft Bd insp - GPS/ Radome install S M Depanel 4 ft Ant matching/ Remote adp assy O 10 ft RF Bd test/final assy TD 4 ft Remote Conn assy/insp/cover install S M S 6 ft Insp/Combo test 6 ft Debug Station M T T 10 ft GPS Bd test/final assy T S M T TD 1201 T To Shipping TD 1301 1101 TD 5 ft Blade Ant VSWR and battery cover S 7.88 min 4 ft Final TEST and pack out TD TD TD O 4 ft Batt terminal Prep and assy Hepco FLOW Arbor SSIS CHA MAIN COVER 5 ft Ultra Cap sub assy O 4 ft Initial Chassis assy 3 ft RTV Cables 3ft Top cover, Leak test and Final assy S TD S M O TEST TORQUE DRIVER SOLDERING STATION MANTIS OVEN 15 Confidential Scaling Volume by Adding Shifts # of Shifts Daily # Weekly # Monthly # 1 50 250 1000 2 100 500 2000 3 150 750 3000 16 Confidential Total Shift Hours = 8 X 60 min. X 60 sec. = 28,800 seconds -2 - 15-minute breaks X 30 min. X 60 sec. = 1,800 seconds -Start-up & Shut-down = 15 min. X 60 sec. = 900 seconds Available Work Time = 26,100 seconds Takt Time = Available Work Time / Customer Demand (units) TAKT TIME = 26,100 Seconds / 67 Units = 390 Seconds TAKT TIME = 390 Seconds / 60 = 6.5 Minutes Rebalance the cell to produce one unit every 6.5 minutes! 17 Confidential Epoxy magnet to Slide switch 1.0 min FIFO 55 Trim fixture CCA-25000-1101 Test Reed Switch On/Off with Ohmeter 0.25 min Install Ant Install Batt contacts Assemble Remote matching PCBA and Battery label Conn Adaptor & solder pin 4.0 min 4.0 min 2.0 min 6 hours SEI Paint touch up 1.0 min RTV 2 RF Cable assemblies 3.83 min Install slide switch 1.0 min Install Rotary Switch & Black knob 1.33 min RTV Reed Switch 1.17 min FIFO 19 2 hours 2ND ASSY 1 Slide switch & RTV RF Cables Combo RF/GPS test 4.25 min Install RF bd shield covers 0.33 min Install Blade Antenna .5 min VSWR Test 3.5 min FIFO 55 6 hours 2ND ASSY 3 Battery contacts and Ant PCBA 2ND ASSY 2 Rotary switch. Reed switch w/RTV and Epoxy Ant pin & Reed switch Install GPS bd Test Reed Switch shield cover On/Off with Ohmeter 0.17 min 0.5 min COMBO TEST (FCT 3 AND FCT4 ON RF BD) Combo test and shield covers Epoxy Ant pin & reed switch 1.67 min Install Radome 1.0 Solder Reed Switch & Install GPS bd 4.0 min Plug in J5 and J4 0.33 min SN ASSOCIATION GPS bd & Radome install Plug in Ant Matching O-ring for batt cover RTV Ultracap Flex Cable-RF Bd & install screws to Top Cover 0.17 min 2.0 min 1.75 min FCT 2 Blade Ant, VSWR and Batt cover FIFO 19 INTERIM INSP 1 Remote int. adaptor Test Reed switch Solder 5 wires for sticking 6.0 min 0.42 min Rotary switch Install RF Bd, solder 2 test FCT1 batt wires & plug in J4 1.17 min 4.5 min INTERIM INSP 2 Rotary switch/GPS Wiring FCT 1 Rotary switch Test & RF bd Install Top Cover w/4 screws, Torque Batt. O-ring, EMI shielding cover 3.0 min 0.3 min Leak test 1.17 min INTERIM INSP 3 & FCT 3 Top cover, Leak test & Final assy Remove battery cover 0.33 min Full Func Test 2.5 min Install Remote Adaptor Assy 2.5 min Install Seal Screw 0.33 min 500 units/wk 100 units per day 50 units per shift Transport 1 day Install batt cover, Final Insp, shipping box & Docs 1.0 min Shipping Staging FCT 4 & FINAL INSPECTION Final Test and pack out Ultracap sub-assy 6.0min NO SCANPOINT Ultra Cap sub assy Updated: 6-15-09 18 Confidential ing hipp To S FCT4 & FINAL INSP Final Test and pack out COMBO TEST Combo test & shield covers SN ASSOCIATION GPS Bd & Radome install INTERIM INSP 2 Rotary switch/GPS Wiring 2ND ASSY 3 Batt contacts & Ant PCBA 2ND ASSY 2 Rot sw, Reed sw w/RTV & Epoxy Ant pin & Reed sw S 4 S INTERIM INSP 1 Ant matching/ Remote adp assy M 3 Hepco S 2 S M S FCT1 Rotary sw test & RF bd install 2ND ASSY 1 RTV RF Cables & Slide switch 1 FCT2 Blade Ant, VSWR and battery cover CH AS SI S S IN MA INTERIM INSP 3 & FCT3 Top cover, Leak test and Final assy 7 9 11 Ultra Cap sub assy ER OV 6 YC ER TT BA 5 1101 01 01 13 12 8 12 10 R VE CO SOLDERING STATION MANTIS Updated: 6-15-09 19 Confidential Scaling Volume by Reallocating Operators: # of People 15 # of Portions 1 each # Per Shift 50 5 3 each 16 3 5 each 10 Balancing to 12 instead of 15: # of People 12 # of Portions 1 each # Per Shift 67 6 2 each 33 4 3 each 22 20 3 4 each 16 2 6 each 11 1 12 each 6 Confidential 21 Confidential RAW LONG-LEAD ALUMINUM ITEMS SUPPLIER ADC CCSD SEI PRODUCTION CONTROL PRODUCTION CONTROL SALES ORDER BANK CUSTOMER LOCATIONS USAF SHIPPED AS SHIPPED AS WEEKLY AS NEEDED SHIPPED AS SHIPPED AS 1x DAY 1x DAY CUSTOMER LOCATIONS ADC CCSD LOCATIONS CUSTOMER CUSTOMER LOCATIONS 100 Day 100 Day 100 Day SEI 22 FINISHED GOODS Confidential Concept Initiation / Approval Program Approval Prototype Pilot Launch ACT PLAN Planning ACT PLAN CHECK DO Planning CHECK DO Product Design & Dev. ACT PLAN Process Design & Development CHECK DO Product & Process Validation Production Feedback Assessment & Corrective Action Plan & Define Program Product Design & Development Verification Process Design & Development Verification 23 Product & Process Validation Feedback Assessment & Corrective Action Confidential 24 Confidential Contact: Kenny Heifner kheifner@smstech.com (858) 587-6960 25 Confidential