Bryan W. Shaw, Ph.D., Chairman
Carlos Rubinstein, Commissioner
Toby Baker, Commissioner
Zak Covar, Executive Director
TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
Protecting Texas by Reducing and Preventing Pollution
December 14, 2012
MR WAYNE ADAMS
SR VP
CENTURY EXPLORATION HOUSTON LLC
10210 GROGANS MILL RD
THE WOODLANDS TX 77380-1143
Permit by Rule Registration Number:
Location/City/County:
Project Description/Unit:
Regulated Entity Number:
Customer Reference Number:
New or Existing Site:
Renewal Date (if applicable):
106441
Fr Vidor Go N On Fm 105 For 4.1 Mi To Fm 1131 And
Continue W 1.7 Mi Turn R Onto Revere Ln And Go N
1.2 Mi Veer L Onto Rifle Range Rd And Continue 0.5
Mi Turn R And Continue N 2.0 Mi Go L And Travel S
0.3 Mi Turn L And Continue S 0.4 Mi To Facility,
Vidor, Orange County
Keith Davis Production Facility
RN106529621
CN603138280
New
None
Century Exploration Houston, LLC has certified the site wide emissions associated with the
Keith Davis Production Facility under Title 30 Texas Administrative Code §§ 106.352 (l)
(effective 2/27/11), 106.492, 106.512. For rule information see:
www.tceq.texas.gov/permitting/air/nav/numerical_index.html
Planned MSS emissions for blowdowns, blowcase vessels, and sampling have been reviewed.
These authorized MSS emissions are included on the emissions table. No other planned MSS
emissions have been represented or reviewed. The company is also reminded that these facilities
may be subject to and must comply with other state and federal air quality requirements. In
addition, under the General Requirements for all Permit by Rules, § 106.2 states that particular
requirements only apply “where construction is commenced on or after the effective date of the
relevant permit by rule.” This certification is taken under the authority delegated by the
Executive Director of the TCEQ. If you have questions, please contact Mr. Robert Chavez at
(512) 239-0442.
Sincerely,
Anne M. Inman, P.E., Manager
Rule Registrations Section
Air Permits Division
cc:
Air Section Manager, Region 10 - Beaumont
Project Number: 184046
P.O. Box 13087 • Austin, Texas 78711-3087 • 512-239-1000 • tceq.texas.gov
How is our customer service?
tceq.texas.gov/customersurvey
printed on recycled paper
Emission Sources - Certified Emission Rates
Registration Number 106441
This table lists the certified emission rates and all sources of air contaminants on the applicant’s property covered by this registration. The emission
rates shown are those derived from information submitted as part of the registration for PBR.
ESTIMATED EMISSIONS
EPN / Emission Source
Specific VOC or Other
Pollutants
VOC
NOx
CO
PM10
PM 2.5
SO2
HAPs
lbs/hr
tpy
lbs/hr
tpy
lbs/hr
tpy
lbs/hr
tpy
lbs/hr
tpy
lbs/hr
tpy
lbs/hr
tpy
0.01
0.02
0.09
0.39
0.07
0.31
0.01
0.04
0.01
0.04
<0.01
<0.01
<0.01
0.01
HT1 0.5MMBtu/hr/Heater
Treater
<0.01
<0.01
0.04
0.18
0.04
0.18
<0.01
0.01
<0.01
0.01
<0.01
<0.01
<0.01
<0.01
REB1-0.25 MMBtu/hr
Reboiler
<0.01
<0.01
0.02
0.09
0.02
0.09
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
COMP1/625 hp Caterpillar
398TA
0.16
0.68
0.69
3.02
0.69
3.02
0.1
0.44
0.1
0.44
<0.01
<0.01
0.17
0.74
COMP2/203 hp Caterpillar
3306TA
0.03
0.13
0.9
3.94
1.79
7.84
0.03
0.13
0.03
0.13
<0.01
<0.01
0.05
0.22
COMP3/830 hp Caterpillar
399 TA
0.73
3.2
3.66
16.03
7.32
32.06
0.13
0.57
0.13
0.57
<0.01
0.02
0.22
1.96
COMP4/1067 hp Waukesha
7042 GU
0.14
0.61
4.7
20.59
9.41
41.22
0.15
0.66
0.15
0.66
<0.01
0.02
0.25
1.09
MSS-COMP1/Compressor
Blowdown
MSS-COMP2/Compressor
Blowdown
MSS-COMP3/Compressor
Blowdown
MSS-COMP4/Compressor
Blowdown
TL1/Truck loading
23.21
0.14
0.77
<0.01
11.6
0.07
0.39
<0.01
38.68
0.93
1.28
0.03
38.68
0.93
1.28
0.03
0.63
LN1 -1.0MMBtu/hr/Line
Heater
0.39
0.16
1.49
TL2/Truck loading
0.55
0.19
0.03
0.01
FUG1/Fugitives
1.46
6.39
0.07
0.32
FUG2/Fugitives
0.09
0.39
<0.01
0.02
LOTANK/Lube Oil Tank
<0.01
<0.01
<0.01
<0.01
GLYTANK/Glycol Tank
<0.01
<0.01
<0.01
<0.01
BLCS1/Blowcase VesselCondensed Liquids
0.04
<0.01
<0.01
<0.01
BLCS2/Blowcase VesselCompressor Skid Fluids
0.42
0.16
0.01
<0.01
PC-Pneumatic Controllers
0.31
1.37
0.01
0.05
MSS-SAMPLE/Sampling
emissions
2.71
0.02
0.09
<0.01
FL1/Facility Flare
6.28
TOTAL EMISSIONS (TPY):
MAXIMUM OPERATING SCHEDULE:
8.72
24.13
Hours/Day
0.15
46.82
89.87
Days/Week
1.86
1.86
Weeks/Year
0.06
Hours/Year
0.23
4.36
8760