Doni Afrizal, ST
Specialties: Skid Package, Structural/Piping/PV Inspector, QA/QC Engineer
Phone: +6285264119767 or +6586708547
:
1.
Welding Inspector:
CSWIP 3.1 ( Cert No. 66993 Valid till 16 July 2017 ), TWI
Indonesian Welding Inspector (Cert No. 696/WI-XXV/X/2011), IKBAL M YOS
2.
NDT Inspector:
ASNT RI Level II (Cert No. RU/RI/09), ASNT NDT Level III Adi Padmo
ASNT MT Level II (Cert No. 1552/MT-II/RA/2011), ASNT NDT Level III Ronny Andalas
ASNT PT Level II (Cert No. 1553/PT-II/RA/2011), ASNT NDT Level III Ronny Andalas
ASNT UT Level II - training completed by ASNT NDT Level III Ronny Andalas
Globaltech System Engineering Pte Ltd, Singapore - Jan 2013 – Present
[An EPC company for major Oil and Gas company such as Chevron, Total, Connoco Phillips, Shell, etc. Also see http://www.gsepl.com/ ]
Projects:
1.
Chemical Injection Package for Brunei Shell Petroleum, Bumi Armada, ONGC, Total
2.
Injection Rate Control Device (IRCD Package) for Brunei Shell Petroleum
3.
Air Compressor and Dryer Package for ExxonMobile and Petronas
4.
Nitrogen Generator Package for Carigali-Hess and Bumi Armada
5.
Sulfinol Filtration Package for Malaysian LNG
6.
Allocation Gas Metering Package for Premier Oil
7.
Fuel Gas Conditiong Package for FPSO Blok 15/06 ENI Angola
8.
Fuel Gas Conditiong Package for Badamyar - Total Myanmar
9.
Nitrogen Generator for FPSO Blok 15/06 ENI Angola
10.
Nitrogen Generator for FPSO Jangkrik Complex Project, Indonesia
11.
Nitrogen Generator for Bergading - Carigali HESS, Malaysia
12.
Produced Water Treatment Package for FPSO Jangkrik Complex Project, Indonesia
13.
13 skids of Rota3 Process skid for Rota3, Petrobras - Brazil
Page 1 of 16
Doni Afrizal, ST
Specialties: Skid Package, Structural/Piping/PV Inspector, QA/QC Engineer
Phone: +6285264119767 or +6586708547
Assigned as:
Lead QA/QC for Rota3 Process Skid Project, 13 structural skids of process skid to supply for Rota3
Project. Contractor is Consortium QGIT, End user is Petrobras. The package will be mainly consisted of filter vessels, PSVs, Pumps, and Separator Vessel along with piping, electrical and instrument.
QA/QC Engineer, for all project with end user such as Brunei Shell Petroleum, Total, MLNG,
Premier Oil, ENI, Petrobras
Scope of work: Create Project Quality Plan, create ITP, create WPS, running PQR/WQT until
RT/DT, create hydrostatic/pneumatic test procedure, create surface preparation and painting procedure, create FAT procedure, organize pre-inspection meeting, organize subcontractor QA/QC inspector/engineer, create ASME QC Manual and implementation, supervise ASME U stamp fabrication.
Structural Inspector for skid fabrication for TOTAL Rubi Tie-in Chemical Injection & Air compressor/dryer Package, MLNG Sulfinol flush water filtration system package, ONGC CIP, BSP
CIP and IRCD, ENI, Petrobras, TOTAL Myanmar.CS, SS Proj.
Scope of work: reviewed procedure determined acceptance criteria based on client’s requirement, code/standard or approved spec (AWS D1.1, API RP), Weld Map and AFC
Drawing. Identified and transferred heat/cast number on material will be joined on module/skid based structural drawing. Checked dimension and Level surface of skid structure prior to piping/vessel/other mechanical items fit/assembly on skid structure. Monitoring welding activities to ensure welding carried out as per approved WPS/WPQ and procedure.
Request NDT as per extent required after completed welding. Followed-up repair activities.
Conducted punch list and followed up during final inspection. Maintained all records in within
Manufacture Data reports book.
Piping Inspector for piping fabrication for TOTAL Rubi Tie-in Chemical Injection & Air compressor/dryer Package, MLNG Sulfinol flush water filtration system package, ONGC CIP, BSP
CIP & IRCD, ENI, Petrobras, TOTAL Myanmar. CS, SS Project.
Scope of work: reviewed Project Spec/Procedure/Code Requirement, reviewed approved WPS and witnessing WQT and approved WQR, carried out inspection for incoming of pipes, fittings, prefabrication and joining by welding, adhesive bonding (especially for GRE Pipe, CPVC), requesting and selecting of NDT for completed joint as per extent requirement, PWHT if any, test packages generated for completed spools on shop and field joining, line-check and categories for punch list work (ensure all NDT, all reports and major item to be installed on pipe wall completed/clear), Ensure equipment’s parts which not include for testing has been removed (such as all instruments control piping/tubing, all system within accommodation, tiepoint and components like control valves, relief valves, on-line instruments), initial flushing to
Page 2 of 16
Doni Afrizal, ST
Specialties: Skid Package, Structural/Piping/PV Inspector, QA/QC Engineer
Phone: +6285264119767 or +6586708547 ensure internal pipe clean and free from debris or foreign material, reviewed and ensure all
PG and PR have valid calibration certificate, water quality review certificate, witnessing hydrostatic/pneumatic testing, post flushing and drying for completed pipe system test,
Internal and external cleaning (chemical cleaning such as acid pickling and passivation for stainless steel and duplex, released for final painting if painting not done yet), dismantling for ship loose pipe spools, re-instatement piping to its systems, bolt tensioning check / torque values and labeling it, closing punch list to completed ITRs
Pressure Vessel Inspector, for MLNG Sulfinol filtration system package, Gardner Separator tank,
ENI, Petrobras, TOTAL Myanmar. CS,SS Proj.
Scope of work: Prepared documentation and inspection method, reviewed approved WPS and ITP, acceptance criteria and tolerances base on client’s requirement, spec., code or standard
(ASME sect. VIII), reviewed weld map and AFC Drawing, reviewed validation test’s equipment calibration to be used. Witnessed welder qualification test with Client Reps. and recorded.
Inspection rolled shell plate with it curvature, Transferred heat/plate number (full traceability method) on material to be used on vessel fabrication. Inspected welding preparation (Type of joint, misalignment) on pressure shell, any vessel attachments (internal or external), determined and monitor welding sequences to minimizes any distortion/buckling/wrapping.
Checked of ovality or roundness of pressure shell and head before and after welding/assy.
Checked and determined quarter line and datum line of vessel; orientation, projection
(outward and inward), elevation/dimension from datum line of nozzles, manhole before and after welding, recorded. Checked and monitoring welding parameter of qualified welder against WPS. Checked and inspected weldment, size of weld. Prepared NDT method after completed weld. Conducted thickness test on pressure shell and leak test on repad. Prepared test packages for hydrotest. Maintained all records in approved forms and prepared for
Manufacture Data Report (MDR) book.
Tankage Inspector, for tank fabrication for Brunei Shell Petroleum CIP, TOTAL Rubi Tie-in Chemical
Injection, ONGC Chemical Injection Package, Pearl Oil (OMATA) Thailand etc. CS, SS, FRP Project.
Scope of work: Prepared Weld map, Review WPS, ITP, acceptance criteria and tolerances based on client’s requirement, spec., code or standard (API 650 for Atmospheric Storage Tank, or API
620 for low pressure Storage Tank) and AFC drawing. Witnessed welder qualification test and recorded, reviewed any validation test equipment to be used. Identified and Transferred
Heat/Plate/Cast number on plate (for shell, bottom, and roof) base on their courses or segments. Measured and recorded dimension of plate before and after cut. Inspected plate rolled (curvature) with radius required. Inspected welding preparation on shell plate, bottom, roof joined, determined and monitoring welding sequence to minimize at least distortion or buckling, qualified welder and welding process to be used. Inspected and recorded Banding, peaking, roundness, plumbness to meet tolerances and requirements. Inspected and reported orientation and dimension of nozzles, manhole or other appurtenances. Inspected weldment and size of weld to meet acceptance criteria. Prepared NDT method after completed welding.
Prepared test packages for Vacuum test, leak test and witnessed the test. Water leak test,
Page 3 of 16
Doni Afrizal, ST
Specialties: Skid Package, Structural/Piping/PV Inspector, QA/QC Engineer
Phone: +6285264119767 or +6586708547
Checked final plumbness and roundness. Maintained all records in approved report forms and prepared MDR.
PT. ONE CONNECT INDONESIA, Jakarta - Oct 2012 – Dec 2012
[A package vendor for metering gas for Oil and Gas project]
As Client Representative (QA/QC Engineer):
Project: ALLOCATION GAS METERING PACKAGE for Naga and Pelikan Project for Premier Oil
Natuna Sea BV.
Contractor: SMOE Indonesia, and Fabricator: Transalindo Eka Persada, PT (Batam)
Scope of work: Perform monitoring and expediting vendor’s fabrication progress and schedule,
Review Material Take Off (MTO), GA Drawing, weld map, Cut length/Lay out drawing for
Fabrication, Perform Inspection for incoming material, Fit-Up, welding, fabrication, Blasting and
Painting in accordance with project specification and scope of work as noted within the I.T.P.,
Witness testing for pressure test (Leak test, Hydro test, etc) and Co-ordinate interface with
Operations, Certifying Authority, Client, Job, Sharing Personnel and subcontractor assuring conformity to project specification., Review Supporting documents, Data Sheets, Mechanical
Completion and Final Dossier (MDR), Exercise proactive approach in prevention of a problem by interaction with Production, Engineers, and Management personnel.
PT. TOYO KANETSU INDONESIA, Batam - March 2012 – Oct 2012
[A public listing company for Construction Storage Tank for LPG and LNG including any structural and Piping Fabrication, also see this link ]
Projects:
1.
API 620 Storage Tank for QCLNG Project
2.
API 620 Storage Tank for GLNG Project
3.
API 620/API 650 Storage Tank for Donggi Senoro LNG Project
4.
Inpex LPG Storage Tank Project
As QC Coordinator assigned as:
Structural Inspector for project QCLNG-Donggi Senoro-Inpex LPG: pump platform structure, steel crate, roof stairway, roof structure, external staircase, emergency ladder, etc.
Scope of work: reviewed procedure determined acceptance criteria based on client’s requirement, code/standard or approved spec (AWS D1.1, API RP), Weld Map and AFC
Drawing. Identified and transferred heat/cast number on material will be joined on structural drawing. Checked dimension and Level surface of structure prior to piping/tankage/other mechanical items fit/assembly on structure. Monitoring welding activities to ensure welding carried out as per approved WPS/WPQ and procedure. Request NDT as per extent required
Page 4 of 16
Doni Afrizal, ST
Specialties: Skid Package, Structural/Piping/PV Inspector, QA/QC Engineer
Phone: +6285264119767 or +6586708547 after completed welding. Follow up repair activities. Conducted punch list and followed up during final inspection. Maintain all records in within Manufacture Data reports book.
Piping Inspector for project 12.000 dia-inch QCLNG Pipe-Carbon Steel and Stainless Steel
Scope of work: reviewed Project Spec/Procedure/Code Requirement, reviewed approved WPS and witnessing WQT and approved WQR, carried out inspection for incoming of pipes, fittings, prefabrication and joining by welding, requesting and selecting of NDT for completed joint as per extent requirement, PWHT if any, test packages generated for completed spools on shop and field joining, line-check and categories for punch list work (ensure all NDT, all reports and major item to be installed on pipe wall completed/clear), Ensure equipments parts which not include for testing has been removed (such as all instruments control piping/tubing, all system within accommodation, tie-point and components like control valves, relief valves, on-line instruments), initial flushing to ensure internal pipe clean and free from debris or foreign material, reviewed and ensure all PG and PR have valid calibration certificate, water quality review certificate, witnessing hydrostatic/pneumatic testing, post flushing and drying for completed pipe system test, Internal and external cleaning (chemical cleaning such as acid pickling and passivation for stainless steel and duplex, released for final painting if painting not done yet), dismantling for ship loose pipe spools, re-instatement piping to its systems, bolt tensioning check / torque values and labeling it, closing punch list to completed ITRs
Tankage Inspector, for Project QCLNG-Donggi Senoro-GLNG: 3 units of double shell LNG Tank,
Donggi senoro: 4 unit’s atmospheric tank. Inpex : 1 unit LPG tank, GLNG : 2 units of double shell
LNG tank. CS, SS, Inconel, Hastelloy, Aluminum, Ni 7%, and Ni 9%.
Scope of work: Prepared Weld map, Review WPS, ITP, acceptance criteria and tolerances based on client’s requirement, spec., code or standard (API 650 for Atmospheric Storage Tank, or API
620 for low pressure Storage Tank) and AFC drawing. Witnessed welder qualification test and recorded, reviewed any validation test equipment to be used. Identified and Transferred
Heat/Plate/Cast number on plate (for shell, bottom, and roof) base on their courses or segments. Measured and recorded dimension of plate before and after cut. Inspected plate rolled (curvature) with radius required. Inspected welding preparation on shell plate, bottom, roof joined, determined and monitoring welding sequence to minimize at least distortion or buckling, qualified welder and welding process to be used. Inspected and recorded Banding, peaking, roundness, plumbness to meet tolerances and requirements. Inspected and reported orientation and dimension of nozzles, manhole or other appurtenances. Inspected weldment and size of weld to meet acceptance criteria. Prepared NDT method after completed welding.
Prepared test packages for Vacuum test, leak test and witnessed the test. Water leak test,
Checked final plumbness and roundness. Maintained all records in approved report forms and prepared MDR.
Page 5 of 16
Doni Afrizal, ST
Specialties: Skid Package, Structural/Piping/PV Inspector, QA/QC Engineer
Phone: +6285264119767 or +6586708547
Radiographic Interpreter, for Project QCLNG-Donggi Senoro-GLNG-INPEX LPG-CHUBU: various materials such as CS, SS, Inconel, Hastelloy, Nickel, and Aluminum. And various welding process
SMAW, FCAW, GTAW, SAW, and GMAW.
Scope of work: Prepared NDE map, Review extent of NDE in ITP, acceptance criteria and tolerances based on client’s requirement, spec., code or standard (ASME VIII for tankage,
ASME B31.3 for process piping, AWS D1.1 for structure) and AFC drawing. Review RT film for welder qualification test and recorded. Verify joint no, welder no, welding process, and other identification mention in RT film. Review RT film for final acceptance. Issue welding repair if found any defect. Monitor repair action by fabrication, then request for RT once again.
PT. RADIANT UTAMA INTERINSCO, TBK – Batam Branch - June 2010 – March 2012
[ A public listing company servicing for Inspection, Certification, and Offshore services for major Oil and Gas company at Indonesia such as Chevron, Total, Pertamina, etc. Also see link ]
Projects:
1.
API 620/API 650 Storage Tank for Donggi Senoro LNG
2.
Plem Structure South Belut Connoco Philips Project
3.
Gajah Baru CPP Production cooler structure Project for Premier Oil
Assigned as Third Party Inspector cum MR for ISO:
TPI for Structural for project GAJAH BARU: CPP PRODUCTION COOLER structure (HP and LP compressor).
Scope of work: reviewed procedure determined acceptance criteria based on client’s requirement, code/standard or approved spec (AWS D1.1, API RP), Weld Map and AFC Drawing.
Identified and transferred heat/cast number on material will be joined on structural drawing.
Checked dimension and Level surface of structure prior pressure vessel to fit/assembly on structure. Monitoring welding activities to ensure welding carried out as per approved WPS/WPQ and procedure. Request NDT as per extent required after completed welding. Follow up repair activities. Conducted punch list and followed up during final inspection. Maintain all records in within Manufacture Data reports book.
Third Party Inspector for project Donggi Senoro LNG, Connoco Phillips : WPS, PQR, and Welder
Test as per ASME IX, AWS D1.1, API 1104
Scope of work: reviewed Project Spec/Procedure/Code Requirement, reviewed pWPS and suggest for change if any, review material and consumable certificate, review welder list, review procedure for making WPS and WQT, check for joint preparation, monitor-control-record welding parameter, and witness welder for welder test, control pre-heat and inter-pass temperature, visual welding after finished, request for RT and review the film, send and witness test plate/pipe for Destructive Testing (tensile test, bend test, impact test, CTOD test,
Page 6 of 16
Doni Afrizal, ST
Specialties: Skid Package, Structural/Piping/PV Inspector, QA/QC Engineer
Phone: +6285264119767 or +6586708547 and/or fracture test), compile all record, create/review PQR and/or WQR, send to MIGAS for approval, send back to CLIENT on time.
TPI for Tankage, for Project Donggi Senoro LNG: 1 unit of double shell LNG Tank, 3 unit’s atmospheric tank.
Scope of work: Review Weld map, Review WPS, ITP, acceptance criteria and tolerances based on client’s requirement, spec., code or standard (API 650 for Atmospheric Storage Tank, or API
620 for low pressure Storage Tank) and AFC drawing. Witnessed welder qualification test and witnessed procedure qualification test. Witnessed transferred Heat/Plate/Cast number on plate (for shell, bottom, and roof) base on their courses or segments. Witness measured and recorded dimension of plate before and after cut. Witness plate rolled (curvature) with radius required. Witnessed welding preparation on shell plate, bottom, roof joined, determined and monitoring welding sequence to minimize at least distortion or buckling, qualified welder and welding process to be used. Witnessed inspection and recording Banding, peaking, roundness, and plumbness to meet tolerances and requirements. Inspect orientation and dimension of nozzles, manhole or other appurtenances. Review RT film for acceptance. Witnessed test packages for Vacuum test, leak test and witnessed the test.
Management Representative: for ISO 9001, OHSAS 18001, ISO 14001, and SNI ISO 17020.
Scope of work: preparation documentation, implementation and assessment audit for Company
ISO9001:2008, OHSAS 18001:2007, ISO 14001:2004, SNI ISO 17020:1999. Issued NCR if any
QSHE problem and response for customer complaint. Organize internal audit and become internal auditor.
Wasco Energy Group ( Megaron Semesta, PT ) - Jan 2008 – May 2010
[An EPC company for major Oil and Gas company such as Chevron, Total, Connoco Phillips, Shell, etc. Also see http://www.wascoenergy.com/ ]
Projects:
1.
Module M30/M63 FPSO Cidade de Sao Mateus Petrobras Project
2.
Production Hydrocyclone package for SBM Offshore
3.
Gas Compressor Conversion package for Murphy Bintulu Project
4.
Pluto LNG skid packages
5.
E-house structure for several customer project
As QC Inspector Assigned as:
Structural Inspector for project Siemens Pte. LTd OYO: E-House structure, JUBILEE: E-House
(Siemens/Modec), USAN DEEPWATER Dev. (VWS-HHI-TOTAL)-Sea Water Fine and Coarse Filter
Packages (skid).
Scope of work: reviewed procedure determined acceptance criteria based on client’s requirement, code/standard or approved spec (AWS D1.1, API RP), Weld Map and AFC Drawing.
Page 7 of 16
Doni Afrizal, ST
Specialties: Skid Package, Structural/Piping/PV Inspector, QA/QC Engineer
Phone: +6285264119767 or +6586708547
Identified and transferred heat/cast number on material will be joined on module/skid based structural drawing. Checked dimension and Level surface of skid structure prior to piping/vessel/other mechanical items fit/assembly on skid structure. Monitoring welding activities to ensure welding carried out as per approved WPS/WPQ and procedure. Request NDT as per extent required after completed welding. Followed-up repair activities. Conducted punch list and followed up during final inspection. Maintained all records in within Manufacture Data reports book.
Piping Inspector for project Petrobras FSPO CIDADE de SAO MATEUS (Prosafe-VME)-GRE Pipe-CS
Pipe-Duplex-Stainless Steel Pipe for M30/M63 and M50 skid, PRODUCTION HYDROCYCLONE
PACKAGE (Veolia Water Solutions-SBM) for Duplex Piping and skid, MURPHY-BINTULU Project-
Compressor Conversion (GSI)-CS Pipe and PV, PLUTO LNG Packages Skid (VWS O&G/FWW)-CS
Pipe-CPVC-SS Pipe and skid
Scope of work: reviewed Project Spec/Procedure/Code Requirement, reviewed approved WPS and witnessing WQT and approved WQR, carried out inspection for incoming of pipes, fittings, prefabrication and joining by welding, adhesive bonding (especially for GRE Pipe, CPVC), requesting and selecting of NDT for completed joint as per extent requirement, PWHT if any, test packages generated for completed spools on shop and field joining, line-check and categories for punch list work (ensure all NDT, all reports and major item to be installed on pipe wall completed/clear), Ensure equipments parts which not include for testing has been removed (such as all instruments control piping/tubing, all system within accommodation, tiepoint and components like control valves, relief valves, on-line instruments), initial flushing to ensure internal pipe clean and free from debris or foreign material, reviewed and ensure all
PG and PR have valid calibration certificate, water quality review certificate, witnessing hydrostatic/pneumatic testing, post flushing and drying for completed pipe system test,
Internal and external cleaning (chemical cleaning such as acid pickling and passivation for stainless steel and duplex, released for final painting if painting not done yet), dismantling for ship loose pipe spools, re-instatement piping to its systems, bolt tensioning check / torque values and labeling it, closing punch list to completed ITRs
Pressure Vessel Inspector, for Project Petrobras FSPO CIDADE de SAO MATEUS (1 unit pressure vessel), Bintulu compressor system (12 units scrubber pressure vessel, 2 units coalesce pressure vessel, and 5 units repair pressure vessel), Petronas Carigali Waste Water Treatment Plant (12 units pressure vessel).
Scope of work: Prepared documentation and inspection method, reviewed approved WPS and ITP, acceptance criteria and tolerances base on client’s requirement, spec., code or standard
(ASME sect. VIII), reviewed weld map and AFC Drawing, reviewed validation test’s equipment calibration to be used. Witnessed welder qualification test with Client Reps. and recorded.
Inspection rolled shell plate with it curvature, Transferred heat/plate number (full traceability method) on material to be used on vessel fabrication. Inspected welding preparation (Type of joint, misalignment) on pressure shell, any vessel attachments (internal or external), determined and monitor welding sequences to minimizes any distortion/buckling/wrapping.
Page 8 of 16
Doni Afrizal, ST
Specialties: Skid Package, Structural/Piping/PV Inspector, QA/QC Engineer
Phone: +6285264119767 or +6586708547
Checked of ovality or roundness of pressure shell and head before and after welding/assy.
Checked and determined quarter line and datum line of vessel; orientation, projection
(outward and inward), elevation/dimension from datum line of nozzles, manhole before and after welding, recorded. Checked and monitoring welding parameter of qualified welder against WPS. Checked and inspected weldment, size of weld. Prepared NDT method after completed weld. Conducted thickness test on pressure shell and leak test on repad. Prepared test packages for hydrotest. Maintained all records in approved forms and prepared for
Manufacture Data Report (MDR) book.
PT. GUNUNG PERAK, Batam - Jan 2007 – Nov 2007
[Oil and gas sub-contractor for structure and piping for offshore platform]
As QC Inspector Assigned as:
Piping Inspector for project piping, pipe-Carbon Steel and Stainless Steel
Scope of work: reviewed Project Spec/Procedure/Code Requirement, reviewed approved WPS and witnessing WQT and approved WQR, carried out inspection for incoming of pipes, fittings, prefabrication and joining by welding, requesting and selecting of NDT for completed joint as per extent requirement, PWHT if any, Internal and external cleaning (chemical cleaning such as acid pickling and passivation for stainless steel and duplex, released for final painting if painting not done yet), release for shipment.
PT. RADIANT UTAMA INTERINSCO, TBK – Batam Branch - Feb 2005 – Dec 2006
[ A public listing company servicing for Inspection, Certification, and Offshore services for major Oil and Gas company at Indonesia such as Chevron, Total, Pertamina, etc. Also see link ]
As NDT Assistant assigned as:
NDT Assistant Inspector MT/PT: for project piping, structure, pressure vessel.
Scope of work: Managed as NDT Assistant Inspector to conduct NDT MT/PT Inspection. Deliver for consumable (SKC-S, WCP, 7HF, SKL-SP1, SKS-D, 20B), MT/PT equipment (AC Yoke, Coil, CDS
Unit, Power Pack, UV light meter, visible light meter), procedures (for material and weldment), records, helping to apply magnetic field and apply magnetic field, report to NDT
Inspector if found any indication for judgment, record the indication then generate NDT report for signing by NDT Inspector.
NDT Assistant Inspector RT: for project piping, structure, pressure vessel.
Scope of work: Managed as NDT Assistant Inspector to conduct NDT RT Inspection. Deliver for consumable (Agfa D4 & D7 film, developer and fixer chemical, cassette and lead screen), RT equipment (Camera Gamma, X-Ray machine, survey meter), procedures (for material and weldment), records, helping on bombing the part, bring the film to dark room for processing, pass to RT level 2 for reviewing, record the indication then generate NDT report for signing by
NDT Inspector.
Page 9 of 16
Doni Afrizal, ST
Specialties: Skid Package, Structural/Piping/PV Inspector, QA/QC Engineer
Phone: +6285264119767 or +6586708547
Electrical Engineering ( Cert No. 48008/0122/F31/S1/2004 ), Andalas University Padang
: English & Indonesian
Nationality: Indonesian
Location: Batam, Indonesia, and Singapore
Page 10 of 16
Doni Afrizal, ST
Specialties: Skid Package, Structural/Piping/PV Inspector, QA/QC Engineer
Phone: +6285264119767 or +6586708547
Certification Scheme for Welding & Inspection Personnel (CSWIP 3.1)
Page 11 of 16
Doni Afrizal, ST
Specialties: Skid Package, Structural/Piping/PV Inspector, QA/QC Engineer
Phone: +6285264119767 or +6586708547
Certificate of Welding Inspector
Page 12 of 16
Doni Afrizal, ST
Specialties: Skid Package, Structural/Piping/PV Inspector, QA/QC Engineer
Phone: +6285264119767 or +6586708547
Certificate of NDT Inspector
-ASNT RI Level II
Page 13 of 16
-ASNT MT Level II
-ASNT PT Level II
Doni Afrizal, ST
Specialties: Skid Package, Structural/Piping/PV Inspector, QA/QC Engineer
Phone: +6285264119767 or +6586708547
Page 14 of 16
Doni Afrizal, ST
Specialties: Skid Package, Structural/Piping/PV Inspector, QA/QC Engineer
Phone: +6285264119767 or +6586708547
Certificate of Internal Auditor (ISO 9001, ISO 14001, OHSAS 18001 – IMS)
Page 15 of 16
Doni Afrizal, ST
Specialties: Skid Package, Structural/Piping/PV Inspector, QA/QC Engineer
Phone: +6285264119767 or +6586708547
Engineering Degree Certificate
Page 16 of 16