MS Project

advertisement
Microsoft Project
Minder Chen, Ph.D.
CSU Channel Islands
Minder.chen@csuci.edu
Project Management Tool
• Track all of the information you gather about
the work (tasks), task duration, and resource
requirements for your project.
• Visualize your project plan in standard, welldefined formats.
• Schedule tasks and resources consistently and
effectively.
• Exchange project information with stakeholders
over networks and the Internet using standard
file formats.
• Communicate with resources and other
stakeholders while leaving ultimate control in
the hands of the project manager.
© Minder Chen, 2012
MS Project - 2
Gantt with Timeline View
• This is the default view.
• http://examples.oreilly.com/9780735626959-files/ Practice File
© Minder Chen, 2012
MS Project - 3
Timeline View
• Seeing the Big Picture of the project plan.
• Zoom: Zoom in or out / Changing the Timescale
© Minder Chen, 2012
MS Project - 4
Resource Sheet
© Minder Chen, 2012
MS Project - 5
Resource Usage
© Minder Chen, 2012
MS Project - 6
Task View and Task Details
© Minder Chen, 2012
MS Project - 7
Key Questions Regarding A Project
• With a good project management system in
place, you should be able to answer such
questions as:
– What tasks must be performed, and in what order,
to produce the deliverable of the project?
– When should each task be performed, and what is
the final deadline?
– Who will complete these tasks?
– How much will it cost?
– What if some tasks are not completed as
scheduled?
– What’s the best way to communicate project details
to those who have an interest in the project?
© Minder Chen, 2012
MS Project - 8
Project Basics
• A project is a temporary endeavor
undertaken to create a unique product,
service, or result. (PMBOK)
– Temporary endeavor  Every project has an end date
– A project is an endeavor. Resources, such as people
and equipment, need to do work. The endeavor is
undertaken by a team or an organization, and therefore
projects have a sense of being intentional, planned
events.  Tasks & Resources
– Every project creates a unique product or service. This
is the deliverable for the project and the reason that the
project was undertaken.
• When the Great Pyramids at Giza in Egypt were built,
somebody somewhere was tracking resources,
schedules, and specifications in some fashion.
© Minder Chen, 2012
MS Project - 9
Time, Cost, and Scope: Managing Project Constraints
• Project management gets most interesting when you must
balance the Project Triangle: time, cost, and scope
constraints of your projects.
• The project triangle illustrates the process of balancing
constraints because the three sides of the triangle are
connected, and changing one side of a triangle affects at
least one other side.
© Minder Chen, 2012
MS Project - 10
Trade-off: Impacts of Shorten Schedule
© Minder Chen, 2012
MS Project - 11
Impacts of Cost Cutting
• As a project manager, you must consider (or, more
likely, communicate to the decision makers) the
benefits versus the risks of reducing costs.
© Minder Chen, 2012
MS Project - 12
Impacts of Increased Scope
© Minder Chen, 2012
MS Project - 13
Project Management Skills
• Many projects, even with rigorous project
management oversight, are delivered late, over
budget, and with far less than expected scope.
• Success in project management requires a rare
mix of skills and knowledge in project
management practices and tools, as well as in
the domain or industry in which a project is
executed.
© Minder Chen, 2012
MS Project - 14
Gantt Chart
• The Gantt with Timeline view is the default; the
Gantt Chart is probably the best-known view in
Project, and the Gantt chart is the best-known
concept in project management as a whole.
© Minder Chen, 2012
MS Project - 15
© Minder Chen, 2012
MS Project - 16
Task Ribbon
• The Task tab provides buttons for adding, formatting, and
working with tasks. From the Schedule group, you can mark the
percentage complete, link tasks to one another, and inactivate a
task. You can also convert manually scheduled tasks
into automatically scheduled tasks from the Tasks group.
© Minder Chen, 2012
MS Project - 17
• Use the Project tab to handle advanced project functions involving
properties, scheduling, and reporting. For example, you can add custom
fields, define WBS codes, insert subprojects, and generate visual reports
from the Project tab.
© Minder Chen, 2012
MS Project - 18
View Tab
• The View tab is a one-stop shop for selecting the various views
available in Project 2010 and for customizing your current view.
It is also where you can add a timeline to your view.
© Minder Chen, 2012
MS Project - 19
Format Tab
• The Format tab buttons help you customize the text, columns, colors, and
other elements of each type of view. The groups and buttons in
the Format tab are completely different for each type of view. They change
automatically when you change the view.
© Minder Chen, 2012
MS Project - 20
Task Tab
© Minder Chen, 2012
MS Project - 21
Resource tab
• The buttons on the Resource tab help you with the often-complex
business of managing the resources who do the work on your project.
From this tab, you can add resources, assign them to tasks, and level
resources that are overallocated. You can also launch the powerful
team planner from this tab.
© Minder Chen, 2012
MS Project - 22
© Minder Chen, 2012
MS Project - 23
© Minder Chen, 2012
MS Project - 24
© Minder Chen, 2012
MS Project - 25
Meta Model for Projects
Has task relationship (FS, FF, SS, SF)
Task
Name
Work
Duration
Assignment Units
Start
Finish
Schedule mode
Predecessor tasks (Lag time)
Resources
Milestone (Y/N)
Summary task[Phase](Y/N)
Calendar
© Minder Chen, 2012
Assigned to
Resource
Name
Type
Costs
Working Time
MS Project - 26
Task Information
© Minder Chen, 2012
MS Project - 27
Project Management Tools
• Track all the information you gather about the
work, duration, and resource requirements for
your project.
• Visualize your project plan in standard, welldefined formats.
• Schedule tasks and resources consistently and
effectively.
• Exchange project information with stakeholders
in a variety of ways.
• Communicate with resources and other
stakeholders while leaving ultimate control in
the hands of the project manager.
© Minder Chen, 2012
MS Project - 28
Creating a Task List
• Create a new task and enter task names.
• Estimate and record how long each task should
last.
• Create a milestone to track an important event.
• Organize tasks into phases (Summary Tasks).
• Create task relationships by linking tasks.
• Switch task scheduling from manual to
automatic.
• Set nonworking days for the project plan.
• Check the project plan’s overall duration.
• Record task details in notes and insert a
hyperlink to content on the Web.
© Minder Chen, 2012
MS Project - 29
New Project Information
© Minder Chen, 2012
MS Project - 30
Defining the Right Tasks for the Deliverable
• Every project has an ultimate goal project
deliverable.
• Defining the right tasks to create the
deliverable is an essential skill for a project
manager.
• Product scope vs. project scope.
• Product scope describes the quality,
features, and functions of the deliverable of
the project.
• Project scope describes the work required
to deliver such a product or service.
© Minder Chen, 2012
MS Project - 31
Duration’s Unit of Measure
© Minder Chen, 2012
MS Project - 32
Task Duration Estimates
• Two general rules when estimating task durations:
– Overall project duration often correlates to task
duration; long projects tend to have tasks with longer
durations than do tasks in short projects.
– You should measure task durations at the lowest level
of detail or control that is important to you, but no
lower.
• Good sources of task duration estimates include:
– Historical information from previous, similar projects
– Estimates from the people who will complete the tasks
– The expert judgment of people who have managed
similar projects
– The standards of professional or industrial
organizations that carry out projects similar to yours
© Minder Chen, 2012
MS Project - 33
Task Duration
• Because inaccurate task duration
estimates are a major source of risk in
any project, making good estimates is
well worth the effort expended.
• 8/80 rule: This rule suggests that task
durations between 8 hours (or one day)
and 80 hours (10 working days, or two
weeks) are generally sized about right.
– Tasks shorter than one day might be too
granular, and tasks longer than two weeks
might be too long to manage properly.
© Minder Chen, 2012
MS Project - 34
Milestone
© Minder Chen, 2012
MS Project - 35
Phases
• In MS Project, phases are represented by summary tasks, and
the tasks indented below the summary task are called subtasks.
Summary task bar in the Gantt chart
© Minder Chen, 2012
MS Project - 36
Developing Tasks and Phases
• Top-down planning identifies major phases or
components of the project before filling in the
tasks required to complete those phases.
Complex projects can have several layers of
phases. This approach works from general to
specific.
• Bottom-up planning identifies as many of the
bottom-level detailed tasks as possible before
organizing them into logical groups called
phases or summary tasks. This approach works
from specific to general.
© Minder Chen, 2012
MS Project - 37
Task Relationship  Linking Tasks
© Minder Chen, 2012
MS Project - 38
Link Tasks
• Highlight the tasks to be linked and than click
the Link icon in the Schedule group under the
Task tab.
© Minder Chen, 2012
MS Project - 39
Linking Tasks with Mouse
• Point the mouse pointer at the Gantt bar for task x,
and then click and drag to the Gantt bar for task y,
to link the two tasks.
• Double click the link to define the task dependency
© Minder Chen, 2012
MS Project - 40
• MS Project requires a numeric time value for
every automatically scheduled task’s duration
value. BY default “1 day?” (estimated) will be
assigned.
© Minder Chen, 2012
MS Project - 41
Project Calendar
• The project calendar defines the general
working and nonworking time for tasks. Project
includes multiple calendars, called base
calendars, any one of which serves as the
project calendar for a project plan.
© Minder Chen, 2012
MS Project - 42
Elapsed Duration
• If needed, you can schedule tasks to occur
during working and nonworking time. To do
this, assign an elapsed duration to a task.
• You enter elapsed duration by preceding the
duration abbreviation with an e.
– For example, type 3ed to indicate three elapsed
days.
• You might use an elapsed duration for a task
that goes on around the clock rather than just
during normal working hours.
© Minder Chen, 2012
MS Project - 43
Timeline View
• Project Duration
© Minder Chen, 2012
MS Project - 44
Project Statistics
• Project  Project Information  Statistics
© Minder Chen, 2012
MS Project - 45
Task Notes
© Minder Chen, 2012
MS Project - 46
Key Points about Tasks
• Essential aspects of tasks in a project plan include their duration
and order of occurrence.
• Task links, or relationships, cause the start or end of one task to
affect the start or end of another task. A common task
relationship is a finish-to-start relationship, in which the
completion of one task controls the start of another task.
• In Project, phases of a schedule are represented as summary
tasks.
• Tasks can be manually or automatically scheduled. For manually
scheduled tasks, you can record whatever information you may
have about a task’s duration, start, and finish values.
• You use calendars in Project to control when work can be
scheduled to occur.
• You can document additional details using task notes and create
hyperlinks to the Web.
© Minder Chen, 2012
MS Project - 47
Resources
• Set up basic resource information for the
people who work on projects.
• Adjust the maximum capacity of a resource to
do work.
• Set up cost information for work resources.
• Change a resource’s availability for work.
• Enter cost resource information for financial
tracking.
• Record additional information about a resource
in a note.
© Minder Chen, 2012
MS Project - 48
Types of Resources
• Work resources include the people and
equipment needed to complete the tasks in a
project.
• Cost resources represent a financial cost
associated with a task that you need to account
for. Examples include categories of expenses
like travel, entertainment, and so on.
• Material resources are consumables that you
use up as the project proceeds. For example, a
construction project might need to track steel
or concrete as it is used throughout the project.
© Minder Chen, 2012
MS Project - 49
Work Resource Examples
• Work resources are the people and equipment that do the
work of the project.
• Project focuses on two aspects of work resources: their
availability and their costs.
• Availability determines when specific resources can work
on tasks and how much work they can perform, and costs
refer to how much money will be required to pay for those
resources.
© Minder Chen, 2012
MS Project - 50
Work Resources (Chapter 3)
• Most people resources have a working day of typically 8
and usually no more than 12 hours, but equipment
resources might have much more varied capacities for
work, ranging from short durations (followed by
maintenance) to around the clock without interruption.
• You do not need to track every piece of equipment that will
be used in your project, but you might want to set up
equipment resources when
– Multiple teams or people might need a piece of
equipment to accomplish different tasks
simultaneously, and the equipment might be
overbooked.
– You want to plan and track costs associated with the
equipment.
© Minder Chen, 2012
MS Project - 51
© Minder Chen, 2012
MS Project - 52
Resource Sheet
• Specifying that a resource has 100% maximum
units means that 100 percent of that resource’s
working time is available to work on assigned
tasks in the project plan.
• Project will alert you if you assign the resource
to more tasks than they can accomplish at
100% maximum units (in other words, if the
resource becomes overallocated ). 100% is the
default Max. Units value for new resources.
© Minder Chen, 2012
MS Project - 53
• Cost rates
• cost per use: A resource can include a set fee
that Project accrues to each task to which the
resource is assigned. It does not vary with the
task’s duration or amount of work the resource
performs on the task.
• Use the Cost/Use field in the Resource Sheet
view.
© Minder Chen, 2012
MS Project - 54
Default Standard Rate and Overtime Rate
• File  Project Options  Advanced
© Minder Chen, 2012
MS Project - 55
Adjusting Working Time for Individual Resources
• If all the working times of your resources match
the working time of the project calendar, you do
not need to edit any resource calendars.
• Exceptions:
– A flex-time work schedule
– Vacation time
– Other times when a resource is not available to
work on the project, such as time spent training or
attending a conference
© Minder Chen, 2012
MS Project - 56
Changing Working Time
© Minder Chen, 2012
MS Project - 57
Changing Working Time
• Exception and Work Weeks
© Minder Chen, 2012
MS Project - 58
Resource Information
© Minder Chen, 2012
MS Project - 59
Resource Form
• Resources  Properties  Details
Resource Form
© Minder Chen, 2012
MS Project - 60
Key Points on Project Resources
• Recording resource information in your project
plans helps you better control who does what
work when and at what costs.
• Work resources (people and equipment)
perform the work in a project.
• Cost resources account for the types of
expenses that you may wish to track across a
project.
© Minder Chen, 2012
MS Project - 61
Resource Form Tools
© Minder Chen, 2012
MS Project - 62
Assigning Resources to Tasks
• Assign work resources to tasks.
• Control how Project schedules additional
resource assignments.
• Assign cost resources to tasks.
© Minder Chen, 2012
MS Project - 63
Reasons to Assign Resources to Tasks
• Who should be working on what tasks and
when?
• Do you have the correct number of resources to
accomplish the scope of work that your project
requires?
• Are you expecting a resource to work on a task
at a time when that resource will not be
available to work (for example, when someone
will be on vacation)?
• Have you assigned a resource to so many tasks
that you have exceeded the capacity of the
resource to work—in other words, have you
over-allocated the resource?
© Minder Chen, 2012
MS Project - 64
Assign Resources
• Under Gantt Chart view
• Resources tab  Assign Resources
© Minder Chen, 2012
MS Project - 65
Resources Assigned Displayed
© Minder Chen, 2012
MS Project - 66
Task Detail Form: Work
© Minder Chen, 2012
MS Project - 67
Assign Multiple Resources
© Minder Chen, 2012
MS Project - 68
More Than One Resource Assigned
© Minder Chen, 2012
MS Project - 69
Assign Resources
© Minder Chen, 2012
MS Project - 70
Assign Resources
© Minder Chen, 2012
MS Project - 71
Assigned Resources
• Assigned resources using
– Assign Resources dialog box
– Assign resources in the Task Form (Task
Details)
– The Resource Names column in the Gantt
Chart view.
– On the Resources tab of the Task
Information dialog box
© Minder Chen, 2012
MS Project - 72
The Scheduling Formula: Duration, Units, and Work
• After you create a task, but before you assign a
resource to it, the task has duration but no work
associated with it.
• Work represents the amount of effort a resource or
resources will spend to complete a task.
– For example, if you have one person working full time,
the amount of time measured as work is the same as
the amount of time measured as duration.
– In general, the amount of work will match the duration
unless you assign more than one resource to a task or
the one resource you assign is not working full time.
• Project calculates work using the scheduling formula:
– Duration × Units = Work
© Minder Chen, 2012
MS Project - 73
© Minder Chen, 2012
MS Project - 74
Effort-Driven Scheduling
• Project gives you an option to control how it should
calculate work on a task when you assign additional
resources to the task or unassign (remove) resources from
automatically scheduled tasks. This option is called effortdriven scheduling.
• Actions list to control how Project schedules the work on a
task when adding or removing resources. Note the small
triangle in the upper-left corner of the name of a task.
© Minder Chen, 2012
MS Project - 75
Set Effort Driven
© Minder Chen, 2012
MS Project - 76
Effort-Driven Scheduling
• By default, effort-driven scheduling is disabled for
all tasks that you create in Project.
• File tab  Options  Schedule tab  “the New
tasks are effort-driven” check box.
• To control effort-driven scheduling for a specific
task or tasks, first select the task or tasks. Then,
on the Task tab, in the Properties group, click
Information, and on the Advanced tab of the Task
Information dialog box, select or clear the “Effort
driven” check box.
• You should analyze the nature of the work required
for each task in your project and decide when you
should apply effort-driven scheduling.
• Mythical Man-Month
© Minder Chen, 2012
MS Project - 77
Costs
• Work resource costs, such as a person’s
standard pay rate times the amount of work
they perform on the task.
• Cost resource costs, which are a fixed dollar
amount that you enter when assigning the cost
resource to a task.
– The amount is not affected by changes in duration
or any other schedule changes to the task, although
you can edit the amount at any time.
– You can also see cumulative costs resulting from
assigning the same cost resource to multiple tasks.
© Minder Chen, 2012
MS Project - 78
Cost Resource Assignment
© Minder Chen, 2012
MS Project - 79
Project Statistics
© Minder Chen, 2012
MS Project - 80
Key Points on Resource Assignment
• In Project, a task normally has work associated with it after a work
resource (which can be people or equipment) has been assigned to
the task.
• You must assign resources to tasks before you can track
resources’ progress or cost.
• Project follows the scheduling formula Duration × Units = Work.
• Effort-driven scheduling determines whether work remains
constant when you assign additional resources to tasks. Effortdriven scheduling is turned off by default.
• The easiest way to understand effort-driven scheduling is to ask
yourself this question: If one person can do this task in 10 days,
could two people do it in 5 days? If so, then effort-driven
scheduling should apply to the task.
• Actions lists appear after you perform certain actions in Project.
They allow you to quickly change the effect of your action to
something other than the default effect.
• Assigning cost resources allows you to associate financial costs
with a task other than those derived from work or material
resources.
© Minder Chen, 2012
MS Project - 81
© Minder Chen, 2012
MS Project - 82
Resource Pool Across Multiple Projects
© Minder Chen, 2012
MS Project - 83
GOAL
Set up a project
DESCRIPTION
Add tasks
Most projects begin with a list of the tasks that need to
be completed. Once you create or import your task list,
you can then define the relationships between them.
View your project
Project managers, stakeholders, and team members
need different types of project information. Project 2010
provides many customizable ways to view the critical
elements of your project.
Manage resources
Manage risks
© Minder Chen, 2012
Once you've finished your initial planning, use Project
2010 to create and set up your project plan.
Resources are typically people assigned to tasks in your
project plan. They can also include anything that is used
to complete a project, such as equipment and materials.
The best way to prevent risks to future projects is to
learn from the risks that came up in past projects.
MS Project - 84
GOAL
DESCRIPTION
Track progress
Though Project makes tracking easy, there are several steps
to take before you can begin tracking your progress.
Manage project
costs
Going over budget often causes projects to fail. Project 2010
can help you add and manage resources to make certain your
project ends on time and in good shape.
Work with multiple
projects
Use Project 2010 collaboration features to communicate
across and manage multiple projects.
Communicate
project information
Project 2010 can sync a task list to a list on a SharePoint site.
Or you can import a SharePoint list into Project. This helps
communication and collaboration in organizations that do not
use.
Create and print
reports
Project allows you to create visual and textual reports in Excel
or Visio to help you analyze and present project information to
stakeholders.
© Minder Chen, 2012
MS Project - 85