Concept / Development / Status LHC Collimator Survey Train Remote Controlled Measurements in the LHC Patrick Bestmann CERN BE/ABP/SU IWAA2010 14/09/2010 Overview 1 • Motivation • Task Definition 2 • The Train • The Concept 3 • Sensor Systems • Calculations 4 • Operation • Status Motivation Remanent dose rate map between D4 and Q5 after 180 days of continious operation with one month of cooling time Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status Motivation Significant activation of material by the beam cleaning process in Point 3 and 7 High Dose rates for peronnel in Place (4mSv/h) 500m of Beamline concerned at Point 7 26 Quadrupoles and 37 Collimators Conventional measurements ~90h Control of the Collimator Alignment using a remote controlled system Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status Task definition Control of the collimator alignment in vertical and horizontal direction Relative to the neigbouring quadrupoles Requested precision 0.2 mm Respecting the ALARA principle (As Low As Reasonably Achievable) Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status „TIM“ Train Inspection Monorail How to bring the equipment in place? Train based on the modular TIM concept Train for visual inspections Traction Module Battery Module Sensor Module Control Module The train is controlled either by the user Interface or the measurement program Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status „TIM“ Train Inspection Monorail Traction unit Sensor unit Control unit Battery unit Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status Concept Digital close range photogrammetry Fast and non contact measurement of the activated collimators Wire offset measurements to detect train position and link the different aquisition volumes. Reliable straight reference over long distances Precise model for the wire sag is needed Collimators Quad Motivation Task Definition Quad The Train The Concept Sensor Systems Calculations Operation Status Concept Collimator Quad Quad Targets Wire Sensor Cameras Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status Concept Targets External lights Wire Reference Pin Inclination sensor Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status Sensors AEROEL XLS35-XY laser micrometer as wire measurement system Open sensor configuration Large field of view 35mm Commercial on the market AICON MoveInspect HR Photogrammetric system WYLER Zerotronic Inclination Sensors Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status XLS-35 Micrometer Optical Laser Micrometer Measurement of dark/light transistions Relative position of 2 wires to the reference pin 200Hz aquisition frequency Linearity of ±2.5µm Repeatability of ±2µm Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status Photogrammetric System Commercial Photogrammetric system AICON MoveInspect HR 4 AVT Marlin F-201B Cameras in industrial housing Syncbox Calibration Panel MoveInspect HR software Custom modifications Motivation Task Definition The Train The Concept Sensor Systems Calculations MoveInspect HR Operation Status Photogrammetric System Single shot synchronised aquisition Automatic image measurement and calculations We obtain a set of 3D coordinates with identified point groups for collimator and wire sensor systems No simultaneous calibration; adjusted intersections Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status Targets Retro targets are sensitive to radiation Use of non retro targets Production of special aluminium targets whole body made of black matt aluminium with light grey aluminium insert Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status Calculations 3 different coordiante systems Left arm with measured wire Right arm with measured wire Photogrammetric system with arms and collimator 7P transformations of the arm systems into the photo system Axis alignment to the wire using 3 translations and 2 rotations Rotation of the y axis (wire axis) using the measured inclination of the two arms Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status Systems Arm System Camera System Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status Results are 3D coodinates for each collimator and quadrupole in following coordinate system: Aligned with the inclined wire Z axis in a vertical plane Generating LGC++ file using the x coordinates as horizontal offsets using the z coordinates as vertical distances (reduced by the slope and the wire sag) Online LGC++ calculation and comparison with theoretical values Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status Operation Autonomous system after the startup procedure Startup; Calibration; Sequence definition Controlled by the LabView Software Sequencer running on the train Remote Panel informing the operator Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status Status Sensorsystems are running All Subroutines are running Tunnelinstallation completed Finalising Software Finalising Hardware configuration Tests..... Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status