PREPAREDNESS IN PAKISTAN POST 2005 EARTHQUAKE LT GEN (R) FAROOQ AHMAD KHAN, CHAIRMAN, NDMA NDMA, PM Sectt, Islamabad 11 NDMA, PM Sectt, Islamabad 22 PAKISTAN’S HAZARDS VULNERABILITIES NDMA, PM Sectt, Islamabad 3 DROUGHT FLOODS NDMA, PM Sectt, Islamabad OIL SPILLS FOREST FIRES 44 TSUNAMIS CHEMICAL ACCIDENTS NDMA, PM Sectt, Islamabad TRANSPORTATION ACCIDENTS INDUSTRIAL ACCIDENTS 55 LAND SLIDES NDMA, PM Sectt, Islamabad 66 EARTHQUAKE NDMA, PM Sectt, Islamabad 77 1935 1905 1803 1833 1934 1897 1945 1819 2001 1950 1737 1881 1941 EARTHQUAKES OF GREATER THAN M=7.5 OCCURRED IN THE REGION NDMA, PM Sectt, Islamabad 88 EARTHQUAKE IN PAKISTAN – 1892 6.8 MAGNITUDE Chaman: Balochistan NDMA, PM Sectt, Islamabad 99 EARTHQUAKE KANGRA 1905 7.8 MAGNITUDE Himachal Pradesh 19,727 Town Hall Lahore Before NDMA, PM Sectt, Islamabad After 10 10 EARTHQUAKE IN QUETTA – 1935 7.7 MAGNITUDE Railway Station 35,000 deaths Lytton Road 35,000 deaths NDMA, PM Sectt, Islamabad 11 11 NDMA, PM Sectt, Islamabad 12 12 SEISMIC ZONES OF PAKISTAN EARTHQUAKE/ SEISMIC NDMA, PM Sectt, Islamabad 13 13 TSUNAMIS NDMA, PM Sectt, Islamabad 14 14 TSUNAMI - 1945 (MAKRAN COAST) PASNI 21 Nov 21: 56 UTC Pasni Karachi 8.3 Wave Height 40 ft Casualties 4000 NDMA, PM Sectt, Islamabad 15 15 EARTHQUAKE 2005 NDMA, PM Sectt, Islamabad 16 16 TOTAL POPULATION : 3.5 M 7.6 Kalam FAULT LINE 100 KM LONG Gilgit Pattan Mingora •HUMAN LOSS Kaghan Batgram - 73,338 Balakot GHB Mardan •INJURED Peshawar Mansehra Abbotabad Mzd - 1,28,309 Bagh Arja •FAMILIES AFFECTEDIsd 500,000 Rwkt Rwp AREA AFFECTED-30,000 SQ KM NDMA, PM Sectt, Islamabad 17 17 DAMAGES DUE TO EARTHQUAKE CATEGORY DESTROYED/ DAMAGED TOTAL HOUSES 6,00,152 7,669 7,87,583 1,1456 EDUCATIONAL INSTITUTES HEALTH INSTITUTES ROADS 18,095 STUDENTS DEAD 574 782 4,429 KMs 1,1963 KMs (37.02 %) MOST OF THE UTILITIES LIKE TELECOM, WATER SUPPLY & ELECTRICITY WERE OUT OF ORDER 200 MILLION TONS DEBRIS TO BE MANAGED NDMA, PM Sectt, Islamabad 18 18 PRE - EARTHQUAKE - 05 INSTITUTIONAL ARRANGEMENTS THE RELIEF COMMISSIONERATE SYSTEM IN TERMS OF THE CALAMITY ACT OF 1958 MEANT FOR PROVIDING RELIEF ASSISTANCE UNDER THE OLD ARRANGEMENT UNDER THE 1973 RULES OF BUSINESS, THE SUBJECT OF DISASTER RELIEF WAS ASSIGNED TO THE ERC OF THE CABINET DIVISION CRISIS MANAGEMENT CELL OF THE MINISTRY OF INTERIOR WAS CHARGED WITH THE RESPONSIBILITY OF COORDINATION OF EMERGENCIES THE CIVIL DEFENCE ORGANISATION WAS RESPONSIBLE FOR MAINTAINING NORMAL LIFE ACTIVITIES/ ITS RESTORATION WITHOUT DELAY, IF DISTURBED DUE TO ENEMY ACTION OR NATURAL CALAMITIES The focus of the above institutional arrangements remained primarily on post disaster response NDMA, PM Sectt, Islamabad 19 19 EARTHQUAKE – 2005 AND FORMATION OF FEDERAL RELIEF COMMISSION (FRC) MANDATE. “THE “FEDERAL RELIEF COMMISSION” SHALL CO-ORDINATE AND MONITOR THE RELIEF EFFORTS. HE SHALL REPORT DIRECTLY TO THE PRIME MINISTER. ALL AGENCIES CONCERNED WITH THE RELIEF AND REHABILITATION EFFORTS, INCLUDING CABINET, HEALTH, INTERIOR, FOREIGN AFFAIRS, COMMUNICATION AND INFORMATION DIVISIONS SHALL FUNCTION THROUGH HIM AND FORM A PART OF THE TEAM. ARMED FORCES SHALL ALSO BE A PART OF THE TEAM” NDMA, PM Sectt, Islamabad 20 20 DISASTER MANAGEMENT SPECTRUM • PSYCHO, PHYSICAL TRAUMA • SOCIO- ECONOMIC FALL OUTS • DISPLACED PEOPLE • MULTI-LATERAL RECONST • IMPLICATIONS OF DIMENSIONS • ALL SPHERE OF LIFE • INSTITUTIONS DEVASTATION AND • INFRASTRUCTURE DESTRUCTION • SOCIETY, FACILITIES • EVACUATIONS • DAMAGE CONTROL • HEALTH, FOOD, SHELTER CONSEQUENCE MGMT, RESCUE & REL RESPONSE MECHANISM REC & REHAB •RELIEF LOGISTICS •RESTORATIONS •SOCIAL/CIVIC ORDER •REVIVAL OF SYSTEMS •BUILDING CAPACITIES PREP & MITIGATION • INSTITUTION AND LEGAL ARRANGEMENTS • HAZARD AND VULNERABILITY ASSESSMENT • TRAINING, EDUCATION AND AWARENESS • MULTIHAZARD EARLY WARNING SYSTEM • EMERGENCY RESPONSE SYSTEM NDMA, PM Sectt, Islamabad • CAPACTIY DEVELOPMENT 21 21 COORDINATION MECHANISM FEDERAL RELIEF COMMISSIONER MILITARY COMPONENT ARMY FMNS LOG AVN PAF MED ISPR ENGRS PUBLIC/VOLUNTEERS EXPATRIATES STRATEGIC LEADERS GROUP CIVILIAN COMPONENT UN/US/NATO MINISTRIES INTL ORGs/NGOs GOVT DEPTS WB/ IDB/ ADB /IMF PROVINCES FOREIGN SP PIA, RAILWAYS, NLC, WAPDA, UTILITY STORES, PTCL, SCO, ERC, NCMC PHILANTHROPIST NDMA, PM Sectt, Islamabad 22 22 FOREIGN COUNTRIES DOMESTIC SOURCES IOs/NGOs BY AIR/RD/TRAIN Base Base National Response Concept Base FWD BASES BY AIR/HEL/ROAD DISTRIBUTION POINTS NODES NODES NODES NODES NODES NODES NODES •FORWARD TO REAR ------ HIGHER TO LOWER •HUTMENTS, HAMLETS, HOUSES LEVEL OP NDMA, PM Sectt, Islamabad HELs, ANIMAL TRANSPORT MAN PACK , LIGHT VEHICLES 23 23 RESCUE, RELIEF & RECOVERY CLUSTER APPROACH HEALTH -- WHO HEALTH SHELTER -- IOM FOOD LOGISTICS -- WFP EARLY RECOVERY -- UNDP LOGISTICS CAMP MANAGEMENT - UNHCR WATER, SANITATION- UNICEF SAFETY, SECURITY -UNDSS EDUCATION PROTECTION FOOD/NUTRITION WFP, UNICEF PROTECTION, EDUCATION SHELTERS CAMP MANAGEMENT UNICEF INFO, TELECOMM INFRASTRUCTURE WFP, UNICEF NDMA, PM Sectt, Islamabad 24 LESSONS LEARNT FROM EQ 2005 NDMA, PM Sectt, Islamabad 25 LESSONS LEARNT FROM EQ 2005 MOVE BEYOND ORGANIZATIONAL BEHAVIORS AND EGOS CREATE INTER AGENCIES & MULTI-ORGANIZATIONAL LIAISON MECHANISM DE-CONFLICTING CONSTITUTIONAL AND INSTITUTIONAL DOMAINS AND SPHERES HARMONIZE POLICIES AND RULES OF OFFICIAL BUSINESS ONE ROOF/ONE WINDOW OPERATION AT STRAT / OPERATIONAL LEVELS NDMA, PM Sectt, Islamabad 26 LESSONS LEARNT FROM EQ 2005 NEED FOR A PERMANENT LEAN STRUCTURE FLEXIBLE NDMA, PM Sectt, Islamabad FOCUSED APPROACH CAPACITIES 27 LESSONS LEARNT FROM EQ 2005 DISSEMINATION OF INFORMATION CREATE STRONG LINK BETWEEN MEDIA, AFFECTEES AND THE WORLD COMMUNITY THEIR JOB BE FACILITATED BY SHARING DATA AND INGRAINING THEM INTO THE RELIEF ORGANIZATION NDMA, PM Sectt, Islamabad 28 LESSONS LEARNT FROM EQ 2005 QUICK & SMOOTH RESPONSE HAVE SOPs ESTABLISH COORDINATION CENTERS SHARE INFORMATION USE COMMON DATABASE TRAIN SEARCH AND RESCUE TEAMS (REDUCING TIME OF EXECUTION CAN REDUCE THE COST OF MANAGING A CATASTROPHE) NDMA, PM Sectt, Islamabad 29 LESSONS LEARNT FROM EQ 2005 CAPACITY BUILDING IN S&R. CAPACITY BUILDING THROUGH EXPERTISE, EQUIPMENT & TRAINING FOR SEARCH, RESCUE AND DEBRIS REMOVAL TASKS PROMPT SMOOTH DECISION FIELD CONTINUOUS MAKING. OPERATIONS ANALYSIS NEED OF IMPEDIMENTS AND PROMPT DECISION MAKING TO ADJUST MICRO STRATEGIES NDMA, PM Sectt, Islamabad 30 LESSONS LEARNT FROM EQ 2005 DEPENDENCY SYNDROME UPLIFT COMMUNITIES FROM CYCLE OF DEPENDENCY INTO SELF-RELIANCE REGENERATION OF SOCIAL AND CULTURAL COHESION NDMA, PM Sectt, Islamabad 31 LESSONS LEARNT FROM EQ 2005 WIDE RANGING DISASTER MANAGEMENT STRATEGY LIKELY SCENARIOS DELINEATION OF RESPONSIBILITIES CAPACITY BUILDING GUIDELINES COMMUNITY INVOLVEMENT. TO MAKE RELIEF PROCESS SELF-SUSTAINING LOCAL COMMUNITIES, NOTABLES, POLITICAL LEADERS AND LOCAL GOVT REPRESENTATIVES BE DOVETAILED NDMA, PM Sectt, Islamabad 32 POST EQ 2005 LEGAL AND INSTITUTIONAL ARRANGEMENTS NDMA, PM Sectt, Islamabad 33 POST EQ 2005 LEGAL AND INSTITUTIONAL ARRANGEMENTS NATIONAL DISASTER MANAGEMENT ORDINANCE 2006/7 PROMULGATED IN DEC 2006 CALLS FOR ESTABLISHMENT OF DM ENTITIES AT FEDERAL, PROVINCIAL AND DISTRICT LEVELS NDMC HEADED BY THE PM (POLICY MAKING BODY) AND NDMA AS EXECUTIVE ARM NDMA RESPONSIBLE TO MANAGE COMPLETE SPECTRUM OF DM AT NATIONAL LEVEL FOR DM, ALL AGENCIES - FOREIGN OR DOMESTIC - SHALL WORK THROUGH NDMA NDMA, PM Sectt, Islamabad 34 POST EQ 2005 LEGAL AND INSTITUTIONAL ARRANGEMENTS DIFFERENT TIERS OF THE SYSTEM National Disaster Management Commission (NDMC) National Disaster Management Authority (NDMA) Federal Ministries, Departments, Technical Agencies Provincial/ Regional Disaster Management Commission (PDMCs) Provincial/ Regional Disaster Management Authorities (PDMAs) Media, Banks, Insurance & Private sector District/ Municipal Disaster Management Authorities (DDMAs) Donors, UN, NGOs, Media Tehsil Structures NDMA, PM Sectt, Islamabad 35 35 POST EQ 2005 LEGAL AND INSTITUTIONAL ARRANGEMENTS NDMC MEMBERS: PRIME MINISTER, OPPOSITION LEADER, PROVINCIAL CHIEF MINISTERS AND CIVIL SOCIETY REPRESENTATIVES FUNCTIONS LAYS DOWN POLICIES AT NATIONAL LEVEL APPROVES ENSURE NATIONAL DM FRAMEWORK AND PLAN INTEGRATED NATIONAL RESPONSE NDMA (EXECUTIVE ARM OF NDMC) SECRETARIAT MANAGES MAP COMPLETE SPECTRUM OF DRM AT NATIONAL LEVEL ALL HAZARDS IN THE COUNTRY ORGANIZE ACT TO NDMC TRAINING AND AWARENESS RAISING ACTIVITIES AS GOP’s FOCAL POINT FOR DEALING WITH NATIONAL AND INTERNATIONAL COMMUNITY NDMA, PM Sectt, Islamabad 36 36 POST EQ 2005 LEGAL AND INSTITUTIONAL ARRANGEMENTS NDMA ORGANOGRAM Chairman SO Dir Ops/ Coord Prep Aviation Wing Dir HR & Procurement Dir Finance & Accounts Military Wing SUMMARY •Officers •Supporting Staff Total - 26 - 85 - 111 NDMA, PM Sectt, Islamabad Ops Wing Avn Med Log Co-opted Members Recovery & Rehabilitation/ Re-const Wing Ops Centre Engrs Ops 37 37 POST EQ 2005 LEGAL AND INSTITUTIONAL ARRANGEMENTS PDMC MEMBERS. CHIEF MINISTER, LEADER OF OPPOSITION & A NOMINEE OF THE LEADER OF OPPOSITION FUNCTIONS. SAME FUNCTIONS AT PROVINCIAL LEVEL AS OF NDMC AT NATIONAL LEVEL PDMA SECRETARIAT OF PDMC DEALS WITH WHOLE SPECTRUM OF DRM AT PROVINCIAL LEVEL PERFORMS SAME FUNCTIONS AT PROVINCIAL LEVEL AS OF NDMA AT NATIONAL LEVEL NDMA, PM Sectt, Islamabad 38 POST EQ 2005 LEGAL AND INSTITUTIONAL ARRANGEMENTS DDMA ACTS AS FIRST RESPONDER DEALS WITH WHOLE SPECTRUM OF DRM AT DISTRICT LEVEL IMPLEMENT NATIONAL / PROVINCIAL POLICIES AND STRATEGIES AT DISTRICT LEVEL MOBILIZES RESOURCES AT DISTRICT LEVEL GIVE DIRECTIONS/GUIDELINES TO DISTRICT DEPARTMENTS / ORGANIZATIONS FOR PREVENTION AND MITIGATION OF DISASTERS NDMA, PM Sectt, Islamabad 39 POST EQ 2005 LEGAL AND INSTITUTIONAL ARRANGEMENTS NATIONAL DISASTER FRAMEWORK RISK MANAGEMENT NINE PRIORITY AREAS IDENTIFIED ESTABLISH AND CAPACITIES) STRENGTHEN (INSTITUTIONS AND NATIONAL RISK ASSESSMENT TRAINING AWARENESS MULTI HAZARD EWS MAINSTREAMING DRR INTO DEVELOPMENT COMMUNITY BASED DRR INITIATIVES EMERGENCY RESPONSE SYSTEMS CAPACITY RECOVERY NDMA, PM Sectt, Islamabad DEVELOPMENT FOR POST DISASTER 40 POST EQ 2005 LEGAL AND INSTITUTIONAL ARRANGEMENTS NDMF TO BE UTILIZED TO DEAL WITH WHOLE SPECTRUM OF DISASTER MANAGEMENT ACTIVITIES PROVINCIAL GOVERNMENTS ARE ALSO REQUIRED TO ESTABLISH SIMILAR FUNDS UNDER THE RESPECTIVE PDMAS NIDM CENTRE OF EXCELLENCE FOR DISASTER MANAGEMENT WILL CATER FOR DOMESTIC / REGIONAL TRAINING AND RESEARCH NEEDS DRM COURSES STARTED UNDER THE NIDM WHILE INFRASTRUCTURAL DEVELOPMENT OF THE INSTITUTE WILL BE INITIATED SHORTLY NDMA, PM Sectt, Islamabad 41 KEY DRM INITIATIVES NATIONAL CAPACITY BUILDING FOR DRM PROJECT HRD FOR DISASTER RISK MANAGEMENT DRM PLANNING DRR MAINSTREAMING COMMUNITY BASED DISASTER RISK MANAGEMENT ACTIVITIES RESPONSE PROJECT – PEER & USAR NDMA, PM Sectt, Islamabad 42 KEY DRM INITIATIVES NATIONAL ACTION PLAN FOR 2009-10 FULL OPERATIONALIZATION OF PDMAS AND DDMAS IN 50 HIGH RISK DISTRICTS COMPLETION EXERCISE OF RISK SENSITIVE PLANNING NATIONAL RISK DEVELOPMENT ASSESSMENT POLICY AND COMMUNITY BASED MITIGATION PROGRAMMES IN 50 DISTRICTS HUMAN RESOURCE DEVELOPMENT IN DRM RAISING PUBLIC AWARENESS EMERGENCY RESPONSE CAPACITY DEVELOPMENT NDMA, PM Sectt, Islamabad 43 KEY DRM INITIATIVES Contingency Plans Winter Contingency Plan Cyclone Contingency Plan (for Karachi City) Monsoon Contingency Plan 2007-2008 Marine Oil/Chemical Spill Contingency Plan Industrial & Chemical Accidents Contingency Plan (advanced stage of finalization) Technical Contingency Plan NDMA, PM Sectt, Islamabad 44 KEY DRM INITIATIVES COMPOSITE RISK ASSESSMENT PROJECT MAPPING OF HAZARD RISKS IN PAKISTAN DEVELOP GUIDELINES & STANDARDS FOR RESPONSE EQUIP NATIONAL AND PROVINCIAL EMERGENCY OPERATION CENTRES WITH ESSENTIAL IT EQUIPMENT PREPARE DEVELOP NATIONAL DISASTER DEPARTMENTAL SOPS RESPONSE FOR PLAN, DISASTER RESPONSE DEVELOP AN INFORMATION MANAGEMENT SYSTEM FOR DISASTER RESPONSE NDMA, PM Sectt, Islamabad 45 CHALLENGES POLITICAL ATTENTION RESOURCE CONSTRAINTS AND COMPETING DEMANDS LACK OF AWARENESS AND PROFESSIONAL EXPERTISE IN THE FIELD OF DRM WAVERING COMMITMENTS FROM THE DONOR AGENCIES NDMA, PM Sectt, Islamabad 46 THANK YOU NDMA, PM Sectt, Islamabad 47