Bill No 1. BILL OF QUANTITY FOR GENERAL ITEMS Sr.No. Description Unit Quantity Rate In Figure 1.01 1.02 1.03 1.04 1.05 1.06 Establish, operate and maintain field laboratory as per MORT&H Specification 120 including 1 number of Nuclear Moisture Density Equipment (MORT&H Specification Lab. Month 44 111.7), owned by the contractor. Provide 4x4 WD minimum 120 PS engine power two nos of vehicles with A/C for use by the site engineer from PIU Engineer including driver, fuel etc. as per Technical Specification clause 123 Month s 84 Provide Digital Photographs with GPS coordinates, date and time as per special provisions -100 photographs/set as per Technical Specification clause 124 Supply of set of edited master video cassette of important site activities with 4 copies thereof, complete as per MORT&H Specification 121 No. of sets No. of sets 250 Clearing road side vegetation, brush wood mooli bamboos, overgrown grass, removal of land slides/debarriesof about 10 cum at a place ,Restoration of Rain Cuts,Filling Pot- holes with approved hard material and Patch Repairs with open graded Premix surfacing, 20mm. and temporary restoration work with form of a palasiding with empty bags filled with approved quality earth/sand/moorum/gravel etc as per Technical Specification clause 125. Roadside Amenities kmmonth 672 ,Centering and shuttering including strutting,propping and removal of form, PUBLIC fifting ofTOILET watersupply ,door ,window& electrical fitting complete as per Drawing & CPWD Specification PUBLIC URINAL No. 2 No. 5 BUS SHED No. 5 BAZAR SHED Office building No. Sqm 5 150 20 Construction roadside Amenities including excavtion of foundation, laying of M15 PCC ,brick masonry (1:3) ,plastering of wall 12mm thk (1:3) ,stone Masonry (1:4) 1.07 Construction office building complete as per Drawing , CPWD Specification & Technical Specification clause No 122. Total Amount Bill No.1 carried to Summary In Word Amount Bill No 2. BILL OF QUANTITY FOR FORMATION CUTTING Sr.No. Description Unit Quantity Rate In Figure 2.01 Clearing and grubbing of road land including uprooting wild vegetation, grass, brushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per MORT&H Specification 201. (ii) By Mechanical Means A In area of light jungle Ha 21.00 B In area of thorny jungle Ha 28.00 (i) Girth above 300mm to 600mm. Nos 407.00 (ii) Girth above 600mm to 900mm. Nos 178.00 (iii) Girth above 900mm to 1800mm. Nos 78.00 (iv) Girth above 1800mm. Nos 30.00 2.02 Cutting of trees including cutting of trunks,branches and removal of stumps and root, refilling, compaction of backfilling and stacking of serviceable materials by manual means with all lifts as per MORT&H Specification 201 (A) Lead upto 1000m. In Word Amount 2.03 Excavation in Hilly Area in all types of excavation (Excavation in hilly areas in all types and means of excavation such as all types of soil ,soft rocks and ordinay not requiring blasting ,hard rock requireing blasting ,etc including trimming of slopes and disposal of cut material ) as per MORT&H Specification 300. (i) Disposal of cut material with all lifts and lead upto 1000 metres. 100% of total Quantity (ii) Additional haul of surplus earth disposal beyond 1km and upto 3 km (15%) (Maximum 2Km additional haul) 2123056.00 Cum Cum 308738.00 Cum 205825.00 Cum 1314603.00 Cum 293232.00 Cum 62813.00 (iii) Additional haul of surplus earth disposal beyond 3km and upto 6 km (10%) (Maximum 5Km additional haul) 2.04 2.05 2.06 2.07 Spreading & Compaction of Roadway cutting and excavation from drain and foundation of other structures surplus material at selected displosal location by Dozer at least four passes in layerwise not more than 300 mm thick. Construction of Embankment with approved material deposite at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per as per MORT&H Specification 300. Construction of sub-grade with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded , spreading, grading to required slope and compacted to meet requirement of table No. 300-2 as per MORT&H Specification 300. Compacting original ground supporting subgrade (Loosening of the ground upto a level of 500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.) as per MORT&H Cum Specification 300. 91761.00 2.08 2.09 2.10 2.11 Providing and laying of geotextile for drainage & separation with physical requirement as per MORT&H-702.2.2.3.2 .TABLE 700-4 after preparation of subgrade as per the specification along the road alignment,geotextile shall be rolled as indicated in the drawing .The entire rolled shall be placed on the subgrade and unrolled as smoothly as possible .Wrinkles and folds in the fabric shall be removed by stretching , as per MORT&H Specification 700. Sqm 91170.00 Rm 1231.00 Rm 2000.00 Construction of 300 mm wide transverse trench drain within the subgrade filled up with drainage material @ 50m interval on straight portion road & curve having center at valley side as per the specification along the road alignmen & gradient The bottom of the trench shall be slope to valley, including providing and laying of drainage material ,excavation of trench as per drawing or Specification (MORT&H 309.3.7 ,TABLE-300-4,GR.- CLASS-A) Sub Surface Drains with Perforated Pipe (Construction of subsurface drain with perforated pipe of 100 mm internal diameter of PVC, closely jointed, perforations ranging from 3 mm to 6 mm depending upon size of material surrounding the pipe, with 150 mm bedding below the pipe and 300 mm cushion above the pipe, cross section of excavation 450 x 550 mm. Excavated material to be utilised in roadway at site ) complete as per drawing or MORT&H Specification section 309 Rain cut drain:Construction of rain cut 1 m wide & 0.15 m deep flat V shape at an interval of 50m to 150 m as per site condition ,drain beyond the shoulder edge at Rm valley with coating of bitumen @ 1.0 Kg per sqm over the compacted surface 810.00 2.12 Construction of M20 grade lined surface drains parallel to centre line of the alignment, grades, levels and dimensions as per drawing and MORT&H Specification section 309 and 1700 Rm Assistant Engineer,(PIU) Aizawl, Mizoram. Executive Engineer, Total Amount Bill No.2 carried to (PIU) Summary Procurement Aizawl, Mizoram. 33524.00 Bill No 3. BILL OF QUANTITY FOR PAVEMENT WORKS Sr.No. Description Unit Quantity Rate In Figure 3.01 Cement Treated Soil Sub Base (i) Providing, laying and spreading soil on a prepared sub grade, pulverising, adding 3% quantity of cement to the spread soil, mixing in place with rotavator, grading with the motor grader and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base, complete as per MORT&H Specification 403 and Table 400-4 (ii) Extra for cement quantity beyond 3% for every additional of 0.10% cement content 3.02 Granular Sub-Base with well graded material (Table 400.1) Cum Mt 65631.00 2417.00 Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, addition of water ,mixing and compacting with vibratory roller to achieve the desired density, complete as per MORT&H Specification 401 (ii) For Grading I Material.(Table 400-1) 3.03 1920.00 Cum 19570.00 Excavated rock for shoulder portion Construction of granular sub-base for shoulder with approved specifed graded material from quarry or surplus roadway cutting , spreading in uniform layers with motor grader on prepared surface, addition of water ,mixing and compacting with vibratory roller to achieve the desired density, complete as per MORT&H Specification 401 3.04 Cum Water Bound Macadam Providing, laying, spreading and compacting graded stone aggregates to Water Bound Macadam specification including spreading in uniform thickness hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding materials to fill up the interstices of coarse aggregates, watering and compacting to the required density as per MoRTH In Word Amount Specification 404 3.05 B, By Mechanical Means: (i) Grading I (b) Using screening crushable type Cum 20246.00 B, By Mechanical Means: (ii) GradingII (b) Using screening crushable type Cum 24867.00 Sqm 318500.00 (i) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.250 kg per sqm on the prepared Normal Bituminous Surface with primer and cleaned with Hydraulic broom as per MORT&H Specification Clause 503. Sqm 214600.00 (iii) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.250 kg per sqm on the prepared granular surface treated with primer and cleaned with Hydraulic broom as per Technical Specification Clause 503. Sqm 202600.00 Cum 10130.00 Prime Coat Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.0 kg/sqm using mechanical means as per MORT&H Specification Clause 502. ((i) Low porosity) 3.06 3.07 Tack Coat 50 mm thick Dense Graded Bituminous Macadam Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5% by weight of total mix, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.) (i) Case - II for Grading II ( 26.5 mm nominal aggregate size ) Table 500.10 (ii) Extra for Bitumen quantity variation of bitumen content of 0.10 % by weight of mix (to be adjusted for plus or minus) 3.08 30 mm thick Bituminous Concrete Mt 48 Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 % by weigh of total mix, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) (i) Using polymer Modified Bitumen (i)for Grading-II ( 13.2 mm nominal aggregate size ) Cum (ii) Extra for Bitumen quantity variation of bitumen content of 0.10 % by weight of mix (to be adjusted for plus or minus) Mt 3.09 Surface Dressing 6078.00 14,270.00 134,384,871.0 28.00 Providing and laying surface dressing as wearing course in double coat using crushed stone aggregates of specified size including layers of bituminous binder laid on prime coated surface and rolling with 8-10 tonne smooth wheeled steel roller as per MORT&H Specification 509 3.10 First layer : 13 mm nominal size chipping and binder as per MORT&H Specification 509 Sqm 103899.00 96.00 11,345,731.2 Second layer : 10 mm nominal size chipping and binder as per MORT&H Specification 509 Sqm 294525.00 69.00 28,213,251.3 Close Graded Premix Surfacing/Mixed Seal Surfacing (Mechanical means using HMP of appropriate capacity not less than 75 tonnes/hour. Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-a) or 13.2 mm to 0.09 mm (Type-b) aggregates using penetration grade bitumen to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to required level and grade) Sqm 12000.00 276.00 4,916,250.0 B. Using modified bitumen Total Amount Bill No.3 carried to Summary 1,50,578,104.32 Bill No 4 BILL OF QUANTITY FOR SLOPE PROTECTION WORKS Sl. No Quantity Description of item Rate Amoun Unit In Figure In Word 4.01 Excavation for Structures Earth work in excavation of foundation of structures as per drawing and MORT&H specification 304 , including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Cum 20,990.00 310.00 6,681,399 4.02 Plain/Reinforced cement concrete in open foundation complete as per drawing and MORT&H specification 1000,1200,1500& 1700 , placed in foundation and compacted by vibration including curing for 14 days.. I. PCC grade M15 Nominal mix 1 : 2 : 4 (hand mixing) Cum 1,185.00 7,724.00 8,016,430 4.03 Stone masonry work in cement mortar 1:4 in foundation complete as drawing and MORT&H specification 1000 & 1400 d) Random Rubble Masonry Main Wall Cum 16,429.00 5,170.00 81,649,499 4.04 Back filling behind abutment, wing wall and return wall complete as per drawing and MORT&H specification 2200 & 710.1.4 of IRC :78 (a) Granular material Cum 1,913.00 1,894.00 3,816,580 4.05 Stone masonry work in cement mortar 1:4 for substructure complete as per drawing & technical specification MORT&H specification 1000 & 1400 Random rubble masonry , Parapet Cum 206.00 5,170.00 1,636,718 4.06 Plastering with cement mortar (1:3) on Brick/Stone works as per drawing and MORT&H specification 1000 & 1300 Sqm 1,506.00 4.07 Cement mortar 1:3 (1cement :3 sand) for 25 mm thick coping as per drawing and MORT&H specification 1000 & 1300 Between parapet walls Cum 4.08 Gabian Structure for Retaining Earth (Providing and construction of a gabain structure for retaining earth with segments of wire crates of size 7 m x 3 m x 0.6 m each divided into 1.5 m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be tied with 4 mm galvanised steel wire as per drawing and MORT&H specification 2503.3 Cum Total Amount Bill No.4 carried to Summary 175.90 406,592.8 24.00 5,801.00 126,519.8 12,210.00 3,033.00 41,582,430 73,238,858 Bill No 5. BILL OF QUANTITY FOR CROSS DRAINAGE WORKS Sr No 5.01 Quantity Description Unit Rate In Figure Amount In Word Clearing and grubbing of road land including uprooting wild vegetation, grass, brushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per MORT&H Specification 201. By Manual Means:- A .In area of light jungle Ha 1.00 58774. 0 35264.40 Ordinary Soil A.Manual means (i) upto 3m depth Cum 28025 310 12306380.00 Ordinary rock (not requiring blasting) A.Manual means (i) upto 3m depth Cum 3157 387 1172997.00 5.03 Provide M15 plain cement concrete levelling course below culverts, pipe bedding ,pipe credle ,pipe encasing ,wingwalls, catch pits, parapet wall ,cross drains chute etc. complete as per Drawings and MORT&H Specification 1500,1700 & 2100. Cum 2227 7724 27443372.00 5.04 Provide M20 plain cement concrete levelling course in catch pit complete as per Drawings and MORT&H Specification 1500,1700 & 2100. Cum 35 8626 388170.00 5.05 Provide coursed rubble masonry in cement mortar 1:4 in wing wall ,head wall of pipe culvert, catch pits , churt & appron complete as per Drawings and MORT&H Specification 1400 and 2500. Cum 9669 5404 78828148.00 5.06 Plain/Reinforced cement concrete M25 in sub-structure complete as per drawing and MORT&H Specification cum 1541 9449 12992375.00 5.02 Excavation for Structures Earth work in excavation of foundation of structures as per drawing and MORT&H specification 304 , including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. 5.07 Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing andMORT&H Specification 1600 MT 154 84851 11709438.00 5.08 Filling over pipe, backfilling behind abutments, wing walls etc. with selected earthen material complete as per MORT&H Specification 305 and 2907. Cum 8122 677 7222236.00 5.09 Providing ,Laying and jointing NP4 Reinforced Cement Concrete Pipe NP4 1000 mm diametre for culvert on concrete craddle bedding of in single row including flush joint with cement mortar 1:2 complete as per MORT&H Specification 2905 and 2906. RM 1650 12285 36216180.00 5.10 Provide 12mm thick cement mortar 1:3 plastering in catch pits complete as per Drawings and Technical Specification Clause 1312. Sqm 3117 176 939488.00 5.11 Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. ofMORT&H Specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing Cum 1161 1850 2096050.00 5.12 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and MORT&H Specification 2504 cum 80 1898 447928.00 5.13 Providing and laying Filter material underneath pitching in slopes complete as per drawing and MORT&H Specification 2504 cum 40 2052 242136.00 Total Amount Bill No.5 carried to Summary 235,092,334.32 Bill No 6. BILL OF QUANTITY FOR KM STONE & ROAD SIGN Sr.No. Description Unit Quantity Rate In Figure 6.01 Amoun In Word Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing (i) 90 cm equilateral triangle each 16 9537.00 114,444 (ii) 60 cm equilateral triangle each 27 5873.00 205,555 (iii) 60 cm circular each 36 8271.00 537,615 (iv) 80 mm x 60 mm rectangular each 26 11992.00 599,600 (v) 60 cm x 45 cm rectangular each 31 8026.00 361,170 (vi) 60 cm x 60 cm square each 21 9726.00 291,780 6.02 Direction and Place Identification signs upto 0.9 sqm size board. (Providing and erecting direction and place identification retro-reflectorised sign asper IRC:67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing) Sqm 10 22127.00 265,524 6.03 Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.) Sqm 6,860 1155.00 11,991,498 6.04 Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) (i) 5th kilometre stone (precast) each 4 5047.00 40,376 (ii) Ordinary Kilometer stone (Precast) each 22 3057.00 100,881 (iii) Hectometer stone (Precast) each 110 830.00 137,780 6.05 Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25-1967, fixed in position including finishing and lettering but excluding painting) each 512 769.00 461,400 Total Amount Bill No.6 carried to Summary 15,107,623 Bill No 7. BILL OF QUANTITY FOR ROAD SAFETY MEASURES Sr.No. Description Unit Quantity Rate Amount In Figure 7.01 Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per MORT&H Specification 811 Rm 1000 In Word 5,397.00 7,016,100.00 Total Amount Bill No.7 carried to Summary 7,016,100.00 Bill No 8. BILL OF QUANTITY FOR ENVIRONMENTAL MANAGEMENT Description Sr. No. 8.01 8.02 8.03 a Unit Quantity Rate In Figure Vegetated bamboo crib wall: Construction of Vegetated bamboo crib wall width 1.2m & height 1.5 m including providing & supplying bamboo, binding wire, and cutting, plantation of vegetation / grass, making benching & backfilling. Turfing with Sods Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the engineer including preparation of ground, fetching of rods and watering complete as per MORT&H Specification 307 (A) MITIGATION / ENHANCEMENT COMPONENT STAGE ITEM AIR Construction Sprinkling of water in the settlement and working area as per instruction of SC Rm 5500 Sqm 5500.00 20000 Rm Sqm Month 20000.00 42 Amount In Word b c WATER Pre- construction FLORA Construction Hand pump Compensatory afforestation, in accordance with Forest Conservation Act (1980) as per guideline provided in EMP Additional tree plantation along valley slopes as per guideline provided in EMP Maintenance Grant to local NGOs for ensuring survival as per guideline provided in EMP. d CONSERVATION OF Construction BIODIVERSITY No. 3 No 1000 No 15000 No 15000 Provision of bamboo tree guards for the trees500m on either side of villages as per guideline provided in EMP. m 3000 Provision of barbed wire fencing along realignment guideline provided in EMP. m 2000 m 250 Mitigation designs for endangered plant species as per guideline provided in EMP. 250 e f 8.04 STABILITY OF SLOPES ENVIRONMENTAL ENHANCEMENTS Bioengineering measures for protection of slopesAs per guideline provided in EMP. Construction sq. m. 40000 Enhancement of water harvesting points No. 4 Monitoring near all hot mix plant locations approved by the Engineer as per NAAQS ,2009 CPCB No. of Samples 1 2 Monitoring at construction sites in tandem with construction Engineer as per NAAQS ,2009 CPCB No. of Samples 1 2 At locations specified in the monitoring plan as per IS 10,500 & IS 2296 No. of Samples Operation At four locations specified in the Monitoring Plan as per IS 10,500 & IS 2296 No. of Samples Construction At equipment yards as directed by the Engineer as per CPCB guideline 1989 No. of Samples Operation At locations of compensatory plantation, All along the corridor as per CPCB guideline 1989 Construction Monitoring survival (B) MITIGATION / ENHANCEMENT COSTS Monitoring a b c d e 8.05 a AIR WATER QUALITY NOISE Bio Engineering Measures Bio Diversity study Construction Construction Operation Monitoring effectiveness Construction & operation Monitoring of impact on biodiversity Operation 1 0 4 0 No. of Years No. of Visits of Monitoring team 3 3 No. of Visits of Monitoring team 3 Half yearly 3 (C) TRAINING & MOBILISATION Advocacy and policy making 1 0 Erection of hoardings indicating the biological diversity, and scenic views along the project route No. 2 0 Holding meetings for policy planning and subsequent review meetings with the Revenue Department, local representatives, townplanning authorities, NGOs, etc. regarding development controls especially w.r.t biodiversity preservation and land use development studies b Administrative charges including Logistics c Miscellaneous items Construction Year 2 Month 42 No 1 No 2 Data processing, administrative support, stationery etc. Digital Camera for the Environmental Cell Portable sound level meter Total Amount Bill No.8 carried to Summary Bill No 9. BILL OF QUANTITY FOR SPECIAL PROVISION Sr. No. Description Unit Quantity Rate In Figure Land Slide clearing MORTH 301.3.9 9.01 9.02 Disposal of land slide material with all lifts and lead up to 1000 meters. Disposal of landslide material for additional haul involving beyond 1km and upto 6km Cum Cum 100,800 50,400 9.03 Cement Treated Crushed Rock or combination as per clause 403.2 and table 400.4in Sub base/ Base (Providing, laying and spreading Material on a prepared sub grade, adding the designed quantity of cement to the spread Material, mixing in place with rotavator, grading with the motor grader and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base., complete as per MORT&H Specification 403. (For week base course material to be decided by the Engineer on the basis of labrotory test specified MORT&H specification 403.2. Cum 2000 Total Amount Bill No.9 carried to Summary In Word Amount Bill No 10. DAY WORKS 10.01 Dayworks Use of contractor's equipment inclusive of all costs for run time only Cranes 3 tonnes Hours 100 Dozer D - 50 - A 15 Hours 100 Hydraulic Excavator of 1 cum bucket Hours 300 Tipper - 5 cum Hours 1,000 Motor Grader 3.35 m blade Hours 100 Generator 33 KVA Hours 500 Concrete Mixer 1 cum Hours 500 Needle Vibrator Hours 500 Plate Compactor Hours 500 Water Tank Hours 500 Tractor Hours 500 Mason/Mistri Mandays 300 Other skill labor/Electrician/Mechanics/carpenter etc Mandays 100 Unskilled Labor Mandays 1,000 10.02 Supply of Labor including tools and plants Total Amount Bill No.10 carried to Summary