MM VITAOILS SDN BHD: SHARING EXPERIENCE ON CLEANER PRODUCTION PROJECT IMPLEMENTATION DEPARTMENT OF ENVIRONMENT – UNIVERSITY OF MALAYA – MM VITAOILS MM VITAOILS SDN BHD. LOT 3, PERSIARAN PERUSAHAAN, SECTION 23, 40300 SHAH ALAM, SELANGOR CP COLLABORATION CEREMONY – DEMONSTRATION PROJECT MM VITAOILS SDN BHD IS BEING SELECTED AS A CLEANER PRODUCTION IMPLEMENTATION DEMONSTRATION PREMISE FEB 22ND 2010 CP INTRODUCTION AND AWARENESS PROGRAMS MARCH 2010 CLEANER PRODUCTION INTRODUCTION AND AWARENESS PROGRAMME WERE CONDUCTED AT MM VITAOILS PREMISE TO ALL STAFF CP IMPLEMENTATION - ACTIVITIES APRIL 2010 • AUDIT ACTIVITIES BY THE CONSULTANT • BRAINSTORMING SESSION FOR CP PROJECT OPTION CP AUDIT / PROJECT FINDINGS MAY 2010 TYPE OPTION IMPLEMENTATION TTL % 1 ALREADY IMPLEMENTED BY MM VITAOILS 78 30.7 2 TO BE IMPLEMENTED BY MM VITAOILS IN < 3 MONTHS 23 9.1 3 TO BE IMPLEMENTED BY MMVITAOILS WITHIN 1 YEAR 7 2.8 4 TO BE IMPLEMENTED BY MMVITAOILS WITHIN 1 TO 3 YEARS 7 2.8 5 TO BE IMPLEMENTED BY MMVITOAILS IF FINANCE AVAILABLE 27 10.5 6 TO BE IMPLEMENTED BY/ WITH ASSISTANCE OF THE CONSULTANT 65 25.6 7 TO BE CONSIDERED BY THE COMPANY 47 18.5 TOTAL OPTION NOTE : CATEGORY OF THE AUDIT WILL BE BASE BY 7 TYPES 254 100 CP AUDIT IMPLEMENTATION JUNE 2010 USING SUFFICIENT LIGHTING DURING DAY TIME TRANSPARENT ROOFING IS USED AT THE PRODUCTION AREA TANKS IS USED TO COLLECT RAIN WATER FOR THE FACTORY FLOOR CLEANING CP PROJECT IMPLEMENTED CP IMPROVEMENT # 1 TO INSTALL BYPASS PIPING AT THE CHILLING PROCESS BEFORE NEED TO SWITCH ON FOR THE CHILLING PROCESS DURING PRODUCTION AFTER THE NEW PIPING IS BY PASS THE CHILLING PROCESS AND DID NOT NEED TO SWITCH ON CHILLING PROCESS CP PROJECT IMPLEMENTED CP IMPROVEMENT NO # 2 TO CHANGE MANUAL TO AUTO PROCESS BY INSTALLATION OF PNUEMATIC CONTROL VALVE EQUIPMENT BEFORE: TIME SPENT FOR WALKING IS 5 MINUTES TO THE WORK PLACE AFTER ELIMINATE TIME SPENT TO WALK FROM THE OPERATION ROOM TO THE WORK PLACE CP PROJECT IMPLEMENTED CP PROJECT 3 IMPROVE HOMOGENOUS CYCLE BY INCREASE PIPING DIAMETER FROM 1.5 INCH TO 2.0 INCH PER CYLE IS 20 MT BEFORE : 1 HR PER CYCLE FOR 20 MT AFTER : 45 MINUTES PER CYCLE CP PROJECT IMPLEMENTED CP PROJECT NO # 4 TO IMPROVE PROCESS CYCLE FROM MANUAL HANDLING TO SEMI AUTOMATIC HANDLING BEFORE PROCESS CYCLE IS TO SEAL CARTON BOX IS 30 SECONDS AFTER PROCESS CYCLE IS TO SEAL CARTON IS 15 SECONDS CP PROJECT IMPLEMENTED CP PROJECT : PROJECT NO # 5 TO IMPROVE MOTOR AND PUMPS EFFICIENCY BEFORE USING THE PUMPS AND MOTOR WITH 80% EFFICIENCY AFTER USING THE PUMPS AND MOTOR WITH 90 % EFFICIENCY CP INITIAL NOISE MONITORING INTIAL NOISE MONITORING PROGRESS WHICH IT IS TO FULLFILL DEPARTMENT OF SAFETY AND HEALTH (DOSH) REQUIREMENT UNDER FACTORY AND MACHINERY ACT ( NOISE EXPOSE) REGULATION AT SEPT 2010 CP AUDIT RESULT BEFORE TYPE OPTION IMPLEMENTATION TTL % AFTER TTL % 1 ALREADY IMPLEMENTED BY MMVITAOILS 78 30.7 95 37.4 2 TO BE IMPLEMENTED BY MMVITAOILS IN < 3 MONTHS 23 9.1 10 3.9 3 TO BE IMPLEMENTED BY MMVITAOILSWITHIN 1 YEAR 7 2.8 4 1.6 4 TO BE IMPLEMENTED BY MMVITAOILS WITHIN 1 – 3 YEARS 7 2.8 6 2.5 5 TO BE IMPLEMENTED BY MMVITAOILS IF FINANCE AVAILABLE 27 10.5 27 10.5 6 TO BE IMPLEMENTED BY ASISSTANT BY / WITH CONSULTANT 65 25.6 65 25.6 7 TO BE CONSIDERED BY THE COMPANY 47 18.5 47 18.5 TOTAL OPTION Note: List of option based on 7 types 254 100 254 100 CP PROMOTION AT MM VITAOILS CP TRAINING DEPARTMENT OF ENVIRONMENT CP TEAM OCT 2010 CP CONCLUSION T H E I M P L E M E N TAT I O N O F T H E C P I S A " M I L E S T O N E " I N M A K I N G M M V I TA O I L S P L A N T I S M O R E E N V I R O N M E N TA L LY F R I E N D LY A N D A S A C O R P O R AT E S O C I A L R E S P O N S I B I L I T Y. W E A R E S AT I S F I E D W I T H T H E C O M M I T M E N T A N D C O O P E R AT I O N SHOWN BY THE D E PA R M E N T OF ENVIRONMENT AND UPUM IN THIS PROGRAM. MM V I TA O I L S I S C O N V I N C E D T H AT T H E C O N C E P T O F C P I S I D E A L F O R M M V I TA O I L S A N D F O R T H E I N D U S T R A I L ACTIVITIES. CP PRESENTATION TERIMA KASIH Q&A