Dynamic Traffic Assignment: Integrating Dynameq into Long Range Planning Studies Model City 2011 – Portland, Oregon Richard Walker - Portland Metro Scott Higgins, Peter Bosa – Portland Metro Introduction Current DTA Applications • Immediate project impacts (e.g., lane closures, ramp openings, construction impacts, etc.) • Short term horizon DTA as a planning tool • Alternative analysis (multiple scenarios, comparative evaluation metrics) • Long term horizon Overview 1. 2. 3. 4. 5. Motivation for change Assignment metrics Challenges Status Future plans and applications Motivation for Change • Congestion is a given. Assignment tools need to operate within that environment. • Decision metrics are changing • Queuing and path choice effects • Duration of congestion • Temporal characteristics matter Assignment Metrics -Static • Static assignment – Served us well, but – Shortcomings are becoming problematic Metrics - Static V/C ratios – PM 2 hr. Can exceed 1.0. Represent average conditions Metrics - Static Average speeds – PM 2 hr Metrics - Static PM 2-hr volume flows based upon average speeds for time period Assignment Metrics - DTA • Dynameq (DTA) – Addresses many of the shortcomings Metrics - DTA Incremental volumes: 6:30 – 6:35 p.m. Metrics - DTA Incremental volumes: 6:35 to 6:40 p.m. Metrics - DTA Incremental volumes: 6:40 to 6:45 p.m. Metrics – DTA Vehicles per lane per hour Temporal characteristics Detector DTA Static 13 Metrics – DTA Temporal characteristics 14 Metrics - DTA Queuing effects – 6:35 to 6:40 pm Metrics – DTA Time –space diagram 16 Metrics - DTA Travel time trajectories 17 Metrics - DTA • Potential for more “realistic” turns at intersections • Signal plans • Accounts for conflicting moves • Visualization/animation • Pricing strategies • Reliability Challenges • Building staff expertise • Adding network attributes •Validation more work • Base vs. future year temporal profile • Scenario preparation time • Computer run time Status Staff development Read (DTA Primer) Observe other studies Develop expertise with other DTA software. (Note: We have recently added Dynameq capability). Dynameq – tutorial and formal training Network development Geometries Attributes (signal locations, lanes/turn bays, etc.) Status Regional application - DynusT Freeway focus, major highways Consistent with cutline counts o Temporal profile checks Portal data - PSU INRIX o 2035 application Status Corridor application – Dynameq Recent purchase – very early stages Subarea has been created with INRO’s assistance Knowledge building o Add signal plans in the heart of the corridor study area. Simpler intersection treatment outside the focal point. o 2035 application o Alternative analysis Near Term Applications East Metro Connection Plan – Dynameq corridor study – “test” application SW Corridor Study – Transit study – Lane removals Future Plans • Elevate DTA to “everyday tool” status • Use DTA to provide better input to microsimulation • Link to MOVES • Investigate transit treatment in DTA • Link to tour based model – “DASH” model very temporally based Thank you Questions?