Present MWG Work Plan
Tom Miller
Hurdles
Tom Miller
Prospects for Clearing Hurdles Stan Holland
Potential Work Plan Adjustments Tom Miller
S
T
E
R
N
E
L
E
C
T
R
I
C
I
T
Y
C
O
O
R
D
I
N
A
T
I
N
G
C
O
U
N
C
I
L
3
1- MWG Work Plan
• Implement ABB Gridview Modeling
Enhancements
–
–
–
–
•
•
•
•
W
E
Multi-day look-ahead dispatch logic
FERC 789 Operating Reserve
Demand Response Programs
Hydro Modeling
Other High Priority Modeling
“Deeper Dive” Validation
Process improvement: tracking modeling
Standard Sensitivities and Scenario
S
T
E
R
N
E
L
E
C
T
R
I
C
I
T
Y
C
O
O
R
D
I
N
A
T
I
N
G
C
O
U
N
C
I
L
4
2015 Modeling Enhancements
W
No. Modeling
Enhancement
1
Reserves
FERC 789 Requirements & Flexibility Reserve Calculation
2
System
Constraints
Develop hierarchy for all system constraints (hard/soft)
Including back-down protocol and emergency power
3
DRP
Develop Gridview DRP Modeling Options to replace LBNL method
4
Look Ahead
Develop look-ahead logics for all dis-patchable resources
5
Hydro
PLF (Load Net Wind/Solar) and HTC-LMP Reference
Hydro Contribution to reserves (frequency response issue)
6
Resource
Modeling
Solar-Thermal, Storage Technologies, Geothermal, Advanced
Technologies, Existing Co-Generation
7
Intertie
Multi-hour Ramping limits
8
Electric
Topology
BA Level /Reserve Pools Enhancements, Hurdle Rates across
Major Inter-faces
9
CA GHG
Linear Programming of import penalty for CA Global Initiative
10
CCGT
Modeling of GT-Steam Generator Components
E
S
T
E
R
N
E
L
E
C
T
R
I
C
I
T
Y
C
O
O
R
D
I
N
A
T
I
N
G
C
O
U
N
C
I
L
5
2- Hurdles
•
•
•
•
•
Lost Time: Lag from 2015 as Transition Year
Going Forward: Time availability of WECC Staff
WECC Re-Staffing
Budget for ABB Support
Uncertainty: Evolving TEPPC Protocol, IRAM
and TEPPC Role (FERC Order 1000)
• Need to develop 2016 Goals for Revised Study
Plan
W
E
S
T
E
R
N
E
L
E
C
T
R
I
C
I
T
Y
C
O
O
R
D
I
N
A
T
I
N
G
C
O
U
N
C
I
L
6
3- Prospects for Clearing Hurdles
• Stan Holland Discussion
W
E
S
T
E
R
N
E
L
E
C
T
R
I
C
I
T
Y
C
O
O
R
D
I
N
A
T
I
N
G
C
O
U
N
C
I
L
7
4- Potential Work Plan Adjustments
Go Forward with Reduced/Deferred MWG Work Plan
• Size MWG Work Plan commensurate with WECC Staff availability
• Leverage MWG Gridview User’s/WECC-staff knowledge for
implementation of enhancements w/o ABB support
Position for Future Study Plan and 2026 Common Case
• Validation and Calibration 2024 CC for use in new 2026 Common Case
• Study Results (MWG Perspective): Deeper Dive to identify key metrics
• Analytic Platform: (1) Investigate practical translations between PCM and
PF; (2) support developemnt of zonal model
• Support Long-term Planning Tool: Validation/Calibration
• Support Development of New Resource Adequacy Tool (Gap Analysis)
• Out-reach to engage WECC Groups PCC & RCSG regarding modeling needs
• Host Vendors to share models and modeling techniques
W
E
S
T
E
R
N
E
L
E
C
T
R
I
C
I
T
Y
C
O
O
R
D
I
N
A
T
I
N
G
C
O
U
N
C
I
L
8
Questions or Comments
W
E
S
T
E
R
N
E
L
E
C
T
R
I
C
I
T
Y
C
O
O
R
D
I
N
A
T
I
N
G
C
O
U
N
C
I
L
Download