implementation of rlink-pppi at a pulp mill Klabin Group Klabin group is the largest paper manufacturer and the second largest pulp manufacturer in Brazil, as well as leading 10 out of the 11 markets for packaging and tissue paper items in which it is active. © Cybertécnica 2002 / Flávio Maeda 2 location of klabin’s sites © Cybertécnica 2002 / Flávio Maeda 3 klabin bacell Klabin Bacell, located in Camaçari, State of Bahia, produces dissolving pulp used primarily in the textile filaments, acetate grade and food industry. © Cybertécnica 2002 / Flávio Maeda 4 the plant the plant is one of the world's most modern bleach dissolving pulp plants which works with modern technology alternatives and high automation degree in its process control, managed by an ISO 9002 certified Quality System. It is the first industrial unit in its category to produce prehydrolysis Kraft Dissolving Pulp through TCF system (Total Chlorine Free), which is by itself one of the most significant evidences of its environmental performance. © Cybertécnica 2002 / Flávio Maeda 5 SAP/R3 at Klabin context Almost all sites of Klabin in Brazil run SAP/R3; © Cybertécnica 2002 / Flávio Maeda 6 The RLINK project at Klabin Bacell Bacell was the first Klabin mill where PI System was installed ( PI 2 System in 1995); The implementation of SAP/R3 4.6c at Bacell started in March, 2001 and the go-live happened on December 1st; RLINK PPPI implementation at Bacell started three months later ( June ); Project Team: • Maria Helena Del Grande (Project manager - Klabin Bacell) • Adroaldo Munhoz (Team Leader - Cybertecnica) • Flavio Maeda (Analyst - Cybertecnica) © Cybertécnica 2002 / Flávio Maeda 7 RLINK Cybertecnica’s expertise Both Adroaldo and Flavio attended the RLINK class at OSI office in Germany; The whole implementation of RLINK at Klabin Bacell; Complementation of the RLINK solution at CSN with standard PI monitoring tools (PIPB and VBA). © Cybertécnica 2002 / Flávio Maeda 8 project overview RLINK PPPI project was divided in two major parts: • migration from PI 2 system to PI 3.3 system running in a W2K machine; • implementation of RLINK PPPI (WNT machine). © Cybertécnica 2002 / Flávio Maeda 9 original pi system configuration PI-HOME V2.2 OVMS 7.1 SICP PI RDB Ethernet TCP/IP Dec-Alpha-OVMS P IPI-API-OVMS - API - OVMS V2.2 NT 4.0 PI PI- APIOVMS - NTI V 1.3 PI-IN-FI-CHIP-AXP PI-IN-YO-CPLUS : Client applications •PI-ProcessBook •PI-DataLink PI-IN-OS-RELDB-NT PI-IN-FI-CHIP-AXP CENTAP YOKOGAWA (DCS) SCALES SCALES © Cybertécnica 2002 / Flávio Maeda 10 actual pi configuration PI-HOME V3.3 Windows 2000 RLINK - PPPI PI MSQL Ethernet TCP/IP Dec-Alpha-OVMS PI-API-OVMS V2.3 : Client applications •PI-ProcessBook •PI-DataLink •PI ManualLogger PI-IN-FI-CHIP-AXP PI-IN-YO-CPLUS CENTAP YOKOGAWA (DCS) © Cybertécnica 2002 / Flávio Maeda 11 project environment SAP R/3 Production environment PRD DEV DB DB Test environment TCP / IP RLINK 1.4 PI Server 3.3 RLINK 1.4 PI API PI e RLINK • Win-NT 4 sp6 • SQL Server v7 • SAP GUI RLINK • Win-NT 4 sp6 • SQL Server 7.0 • SAP GUI YOKOGAWA (DCS) © Cybertécnica 2002 / Flávio Maeda 12 Registry configuration Registry Key PI_INFO Parameter PI_INIFILEWITHPATH PI_PASSWORD PI_USERNAME PLANT_SUITE_INFO DBNAME PASSWORD SERVERNAME USERNAME SAP_INFO CLIENT DESTINATION LANGUAGE PASSWORD SERVER_DEST TCRDPATH TCRPPATH USERNAME SAP Service SAP Host PROGRAM ID © Cybertécnica 2002 / Flávio Maeda Value C:\PIPC\DAT\PILOGIN.INI piadmin plant_suite KBSRV05 rlink 900 OSISOFT PT OSI_2 C:\RLINK\PPPI\CLIENT\FE C:\RLINK\PPPI\CLIENT\FE KBRLINK sapgw00 10.0.0.174 KBSRV05.tcrd.exe 13 integration: plant floor - erp ERP - SAP R/3 PP-PI PM Client applications MM QM Plant Suite -Server R/3 Link PROCESSO DCS PI System Manual Entry Packaging area discrete process MS-SQL Scales Pulp production area - continuous process © Cybertécnica 2002 / Flávio Maeda 14 data flow diagram ERP - SAP R/3 PP-PI Instructions Messages •Process order status •Process order info. Plant Suite -Server RLink •Process Order Info. (manual entry) Campaign Manager •Qty of wood consumed in a process order SRM Wood receiving and preparation •Manual production reporting •activity info •production •consumptions •activities •status •status •production reporting •activities •batch characteristics MS-SQL PI System •Process info. •process information DCS Pulp production plant © Cybertécnica 2002 / Flávio Maeda •Dry rate •consumptions •activities •discrete production information Scales Packaging line - bales - reels 15 pulp production stages Continuous process Discrete process PMADE wood raw materials Wood Preparation liquid effluents Bits of wood PMARR raw materials water unbleached pulp water raw materials SBOBI Reels PBRAN Delignification / bleaching Black liquor raw materials steam cooking Bleached pulp RECUP Drying SFARD Bales Recuperation White liquor © Cybertécnica 2002 / Flávio Maeda 16 Resource networks Continuous process • • • • PMADE PMARR PBRAN RECUP - wood preparation - unbleached pulp production - bleached pulp production - recuperation phase Discrete process • SFARD • SBOB - packaging of the final product into bales - packaging of the final product into reels However all sub-plants are of type BPI (PI-Batch Plant) © Cybertécnica 2002 / Flávio Maeda 17 Activities and materials - PMADE ELAPSED TIME 0,856 ORG_COZ INO_COZ RESOURCE RESOURCE ID MATERIAL WOOD MATERIAL1 MATERIAL2 MATERIAL3 MATERIAL4 ENERGY INDUSTRIAL WATER © Cybertécnica 2002 / Flávio Maeda EFLORG EFLINO ACTIVITY1 ACTIVITY2 ACTIVITY3 ACTIVITY4 ACTIVITY5 ACTIVITY6 0,5 0,1 0,2 0,15 0,23 0,31 0,07 0,23 0,8 0,019 0,477 0,252 0,252 14,133 0,505 MIN M3 M3 MIN MIN MIN MIN MIN MIN TAS XY XX ZZ XY KWH M3 18 production reporting -data flow SAP/R3 PI_PROD ; PI_CONS ; PI_PHACT ; PI_PHST ; PI_CRST RLINK PI System Quantity of energy and water consumed in the PO PINet Node ... Campaign Manager DCS quantity of each type of wood consumed in the P.O. PI-ProcessBook ODBC SRM © Cybertécnica 2002 / Flávio Maeda 19 material tag and common name tables - PMADE material_id INDUSTRIAL WATER CAV_RECEITA_1 CAV_RECEITA_2 CAV_RECEITA_3 CAV_RECEITA_4 CAV_RECEITA_5 ENERGY WOOD MATERIAL1 MATERIAL2 MATERIAL3 MATERIAL4 MATERIAL5 MATERIAL6 resource_id PICADOR PICADOR PICADOR PICADOR PICADOR PICADOR PICADOR PICADOR PICADOR PICADOR PICADOR PICADOR PICADOR PICADOR resource_id Common_name INO_CAV ORG_CAV PICADOR PICADOR PICADOR PICADOR PICADOR PICADOR SAP_EI SAP_EO SAP_02 SAP_03 SAP_61 SAP_62 SAP_64 SAP_DP quantity_tag_id 100AGUACONS.CALC 102CAVACO.MI 102CAVACO.MI 102CAVACO.MI 102CAVACO.MI 102CAVACO.MI 100ENERCAV.CALC 101WOOD_TAG.MI 101MATERIAL_TAG1.MI 101MATERIAL_TAG2.MI 101MATERIAL_TAG3.MI 101MATERIAL_TAG4.MI 101MATERIAL_TAG5.MI 101MATERIAL_TAG6.MI batch_tag_id C P P P P P C C C C C C C C misc_tag1 102STORAGE_LOCATION.MI 102STORAGE_LOCATION.MI 102STORAGE_LOCATION.MI 102STORAGE_LOCATION.MI 102STORAGE_LOCATION.MI 101BATCHID_TAG.MI 101BATCHID_TAG1.MI 101BATCHID_TAG2.MI 101BATCHID_TAG3.MI 101BATCHID_TAG4.MI 101BATCHID_TAG5.MI 101BATCHID_TAG6.MI tag_id 100EFLINORG.CALC 100EFLORG.CALC 100MAQHCAV.TOT 100HHCAV.TOT 100DIFCAV.TOT 100OUTVARCAV.TOT 100MAPCAV.TOT 100DEPRECAV.TOT © Cybertécnica 2002 / Flávio Maeda 21 activities for wood preparation Organic liquid effluent Inorganic liquid effluent Machine working hours - direct costing Machine working hours - indirect costing Man working hours - direct costing Depreciation © Cybertécnica 2002 / Flávio Maeda 22 campaign manager © Cybertécnica 2002 / Flávio Maeda 23 campaign manager is used... to view general information of all recipes available in rlink for the specific resource network: • • • • • process order id; control recipe id; control recipe status in rlink; material produced / planned quantity; total produced and remaining quantity; © Cybertécnica 2002 / Flávio Maeda 24 campaign manager is used... to view further information about the bill of material of each Control Recipe: • material id; • description; • quantity programmed to be consumed / produced; • total quantity already reported to SAP; • last quantity reported of each material (PI_CONS and PI_PROD); • timestamp of the last production report (partial finish); © Cybertécnica 2002 / Flávio Maeda 25 campaign manager is used... to change the control recipe status: To finish the process order To partially finish the process order reporting production to SAP To interrupt the process order in progress To start the control recipe when there is no other process order in progress © Cybertécnica 2002 / Flávio Maeda 26 manual input screen the manual input box is automatically opened only when there are materials that need manual reports of production (all information associated with .MI tags in material_tag and common_name tables) All the values are validated using the zero and span of each .MI tag before sending to PI SEND TO PI Current Time Timestamo of either the last production report or the start time of the control recipe Bacth id sent to SAP with the PI_CONS Wood consumption in this process order for this period of time Produced material Storage location © Cybertécnica 2002 / Flávio Maeda 27 control recipe status changings process order current status first production reported to SAP (partial finish) timestamp when the process order was started in RLINK © Cybertécnica 2002 / Flávio Maeda 28 discrete process - packaging area after the production of the Bleached Pulp this material (HALB) is available for the next phase of the process: the drying phase; after the bleached pulp has been dried it needs to be prepared to be shipped to the customer. The final product (FERT) can be shipped into reels or bales. Each unit shipped to the customer is called Bacell lot; © Cybertécnica 2002 / Flávio Maeda 29 the interaction between RLINK and the packaging line The process control is performed by a software that controls the packaging line. It communicates with equipments situated in the plant floor such as the scale and the printer; This application sends and receives data from RLINK and PI; The process information is continuously sent to RLINK in background. © Cybertécnica 2002 / Flávio Maeda 30 the process flow PI_PROD ; PI_CONS ; PI_PHACT ; PI_BT_CR ; PI_BT_CL PMU SAP/R3 RLINK Plant_Suite Database Download of process orders information SRP Upload of production information of each SAP Lot produced for the P.O by the end of the bacell lot. Each SAP Lot generate: - 01 PI_PROD (corresponding to the lot’s dry 1. The process control software (SRP) start the production of a Lot. weight); 2. Each SAP Lot produced is weighted by the scale; - n PI_CONS (for each material - obtained from PI 3. When a Lot is closed, the PCS sends the information of each SAP Lot tags); directly to RLINK (using customized stored procedures) - n PI_PHACT (for each activity - obtained from PI tags); - n PI_BT_CL (for each batch characteristic). scale This information is sent together to RLINK From the available process orders the operator chooses just one to start PI © Cybertécnica 2002 / Flávio Maeda 31 questions ?? © Cybertécnica 2002 / Flávio Maeda 32