Welcome to the International Right of Way Association’s Course 900 Principles of Real Estate Engineering 1 900-PT – Revision 2 –02.25.07.CA Introductions Who we are… What we do… Where we do it… How long we’ve been doing it… Our goals for the course... 2 Objectives (1) At the conclusion of the course, you will be able to… • Describe the basic principles of engineering drawings • Understand and interpret information on plans • Use an engineer’s scale and a metric (rational) scale to determine distances 3 Objectives (2) At the conclusion of the course, you will be able to… • Identify types of highway curves • Discuss the engineering effects of a project on a property • Understand the background of property descriptions 4 Objectives (3) At the conclusion of the course, you will be able to… • Describe the basic features of property descriptions • Identify the most common systems and methods of property descriptions • Write and plot property descriptions using various methods 5 Housekeeping 6 Schedule (1) 7 8:00 - 8:30 Introductions, Etc. 8:30 - 12:00 Use of Engineering Drawings and Plan Development 1:00 - 1:30 Utility Alignment Plans 1:30 - 2:30 Highway Construction Plans 2:45 - 3:45 Right of Way Plans 3:45 - 4:15 Interpreting Engineering Plans 4:15 - 4:45 Bearings 4:45 - 5:00 Recap Day One Schedule (2) 8 8:00 - 8:15 Recap Day One/Introduce Day Two 8:15 - 2:00 Property Descriptions 2:15 - 2:45 Summary of Property Descriptions 2:45 - 3:00 Summary and Review 3:00 - 5:00 Exam Plans Used By... Engineers Appraisers Negotiators Lawyers Others 9 Three-View Concept (Three perpendicular views) Plan View: Top view (length and width) Profile View: Side view (length and height) Cross-section view: End view (width and height) 10 Plan View (Top view) Horizontal alignment Topography North arrow Symbols 11 Scales (1) Metric 12 Scales (2) Imperial Architect 13 Exercise No. 1 14 Stations Stations: 100m or 1,000m intervals on centreline. Intermediate points are indicated as a “plus”. Station equation: Stations not continuous. A point has two station numbers, one ahead and one back. 15 20 m 20 m 20 m 20 m Sta 1+40 Sta 1+20 Sta 1+00 Sta 0+80 Sta 0+60 100 m Sta. 328.08’ 20 m 16 Sta 0+40 Sta 0+20 Sta 0+00 100 Metre Station 20 m 20 m Scale 1:1000 Exercise No. 2 17 Offsets Perpendicular distances Left or right of the centreline Locate a point by station and offset 18 Exercise No. 3 19 Curves (1) Simple curve Reverse curve 20 Curves (2) Compound curve Spiral curve 21 Contours Lines of equal elevation Shape and slope of land Close lines = steep slope Point up stream Annotation faces uphill (convention) 22 Pipeline 23 Overhead 24 Highway 25 Profile View (Side view) Centreline elevations Existing and proposed Exaggerated vertical scale 26 Datum/Benchmark Datum Basis for elevation reference Example: Mean sea level Benchmark Known elevation point 27 Used as reference Profile Grade Line Proposed centreline elevations Percent grade Rate of elevation change (%) Rise (+) or Fall (-) 28 Highway Curves Parabolic (sag or crest) P.V.C. P.V.I. P.T. L 29 Pipeline 30 Overhead 31 Highway 32 Cross-section View (End Shows effect on property Cut or fill Construction limits 33 Ditches view) Superelevation Slope pavement surface To counter centrifugal force 34 Exercise No. 6 35 Pipeline/Powerline Height and width Wire spacing Brace detail Clearance Foundation Trench depth Trench width Pipe diameter Backfill details 36 Bedding details Highway 37 Overhead Transmission Line 38 Pipeline 39 Area Map Utilities List Title Sheet Agency Name Project Name Project No. Layout Map 40 Sheet Index Schematic Plan/Typical Sections Schematic Plan: Overall scope of project. Typical Sections: Finished shape and dimensions. Pavement type and thickness. Superelevation details. 41 General Notes/General Summary General Notes: Clarify construction. Additional information. General Summary: Total quantities. Cost estimate. Bid preparation. 42 Plan-Profile Sheets Plan View: North arrow. Centreline and station. Detailed information. Profile View: Centreline elevations. Exaggerated vertical scale. 43 Cross-sections (1) Existing and proposed elevations 100m intervals Looking ahead, up sheet 44 Cross-sections (2) 45 Area Map Right of Way Plan Utilities List Agency Name Project Name Project No. Layout Map 46 Sheet Index Centreline Plan Major geographic features 47 Filed for record Property Maps Parcel acquisition details Major land details 48 Summary Sheet Tabulation of all parcels Ownership index Areas acquired 49 Detail Sheet Individual property plan Property rights acquired 50 Bearings 51 Exercise No. 10 (1) N 36o 30’ E S 36o 30’W S 43o 30’ W N 43o 30’E S 71o 00’ E N 71o 00’ W 52 N 57o 00’ W S 57o 00’E Exercise No.10 (2) N 68o 00’ E S 48o 45’ W N 28o 00’ W S 25o 00’ E 53 Recap Day One 54 Day Two 55 Property Descriptions (1) Dominion Lands Survey System Plane coordinate system Metes and bounds Point Centreline Lot and block Subdivision 56 Property Descriptions (2) Caption/Preamble Body Reservations/Exceptions 57 Dominion Lands Survey System 58 Exercise No. 11 59 Sections 36 section in a township Numbered 1 through 36 Beginning in SE corner Approximatel y 1 mile square 60 640 acres Section Parts (1) 61 Section Parts (2) 62 Exercise No. 12 (1) 63 Exercise No. 12 (2) 64 Plane Coordinate System* Well monumented Points located by coordinates “X” Easting “Y” Northing High degree of accuracy * Not currently permitted in any province or territory. However, experiments underway. 65 Plane Coordinate System (2) 66 Plane Coordinate System (3) 67 Plane Coordinate System (4) 68 Metes and Bounds Metes: Measurements of boundary. Bounds: Adjoining property owner. Monuments: Natural and artificial. 69 Angles 70 Property Descriptions Begins at a known point Enables future location Point of commencement (P.O.C.) Point of beginning (P.O.B.) Description (call for each line [clockwise], bearing and length, must close) 71 Magnetic North Pole 72 Exercise No. 13 73 Exercise No. 14 Commencing at the intersection of Provincial Highways 5 and 19; Thence, N 44o 51’ E - 127.92’ to the true Point of Beginning, which point is a 2” diameter brass cap mounted on a 3/4” iron pipe; Thence from the POB, N 49o 07’ W - 273.64’ to corner # 2, which corner is marked by a 1/2” iron rod. Said line crosses Red Creek at a distance of 12.5’ from corner #2; Thence N 61o 05’ E - 195.83’ to corner #3, which corner is a 10” white oak tree; Thence, S 26o 01’ E - 140.27’ to corner # 4, marked by a 4” x 4” wooden post. Said line crosses Red Creek at 18.5’ from corner #3. Thence, S 10o 00’ W - 150.00’ to the Point of Beginning. Containing 0.72 74 acres, more or less. Point Description Highway right of way Centreline - recorded Stations are basis Each point described by station and offset 75 Station and Offset 76 Exercise No. 15 Beginning at a point 25 feet left of highway station 210+98, which point is in the northern right of way line of Provincial Highway 47, as recorded in _________: 77 Thence, leaving said right of way line, and going to a point 54 feet left of station 211 +05; Thence, to a point 65 feet left of station 211 +50; Thence, to a point 57 feet left of station 212+07; Thence, to a point in the aforesaid right of way line, 25 feet left of 212+13; Thence, along said right of way back to the Point of Beginning. Centreline Description Used by utilities Acquisition of right of way strips Reference is stations Referenced, recorded Width of right of way specified 78 Exercise No. 16 (1) An easement for the construction, maintenance, use and operation of utility services, said easement situate, lying and being in Block 4 of Rolling Trails Addition, as shown on a plan thereof, recorded in __________, and being more particularly described as follows: 79 Exercise No. 16(2) Commencing at the intersection of the easterly right of way line of First Street and the northerly right of way line of Able Drive: Thence, in a northwest direction, along the easterly right of way line of First Street, a distance of 100’ to the true Point of Beginning for the centreline of the easement: Thence, N 59°58' E, 193.82’ to a point; Thence, N 84°05' E, 301.47’ to a point in the westerly right of way line of Second Street. Said point is 215’ in a northerly direction from the intersection of said right of way line with the northerly right of way line of Able Drive. 80 Said easement having a 20’ uniform width, 10’ being on each side of the above described centreline. Containing 9,906 sq. ft. Subdivision Plan Land subdivided into lots Named, plotted and recorded Description (lot number, subdivision name, location or record plan) 81 Lot and Block Urban areas Block plotted and recorded Description (lot number and block name, name of the political subdivision, location or registered plan) 82 Exercise No. 17 83 Metes and Bounds - Lot and Block Caption: A portion of Lot 7, Block 4, as shown on the map entitled “Tract 426” filed in the office of __________, on May 5, 1997, in Map Book 9, Page 78, described as follows. Body: Beginning at the northwesterly corner of Lot 7; thence along the northerly line of said lot S 88o, 50.00’; thence E, 50.00’ to the easterly line of said tract; thence along last said line S 1o 10’ W, 21.50’; thence S 72o 30’ W, 55.00’ to the westerly line of said lot; thence along last said line N 1o 10’ E, 39.12’ to the POB. Area: Containing 1,516 square feet, more or less. 84 Metes and Bounds - Dominion Lands Survey System Caption: A portion of the SW 1/4 of Section 3, T3N, R2W, MDB&M, described as follows. Body: Beginning at the southeasterly corner of the SW 1/4 of Section 3; thence along the southerly line of said Section 3, S 89o W, 1,200’; thence N 36o E, 2,000’ to the easterly line of the SW 1/4 of said section; thence along the last said line S 1o E, 1,600’ to the POB. Area: Containing 22 acres. 85 Metes and Bounds Metes and Bounds Caption: A portion of the parcel of land described in the deed to E. C. Jones, recorded February 1, 1960 in Volume 1620, Page 12, described as follows. Body: Beginning at a point on the southerly line of said parcel, distance thereon N 88o E, 100.00’ from the southwest corner of said parcel; thence N 2o W, 60.00’; thence N 88o E, 60.00’; thence S 2o E, 60.00’ to said southerly line; thence along said line, S 88o W, 60.00’ to the POB. Area: Containing 360 square feet, more or less. 86 Summary Property descriptions Essential elements of a right of way Proper wording critical 87 Methods Dominion Lands Survey System Plane coordinate system Metes and bounds Point Centreline Lot and block Subdivision 88 Objectives (1) Now, you are able to… • Describe the basic principles of engineering drawings • Understand and interpret information on plans • Use an engineer’s scale and a metric (rational) scale to determine distances 89 Objectives (2) Now, you are able to… • Identify types of highway curves • Discuss the engineering effects of a project on a property • Understand the background of property descriptions 90 Objectives (3) Now, you are able to… • Describe the basic features of property descriptions • Identify the most common systems and methods of property descriptions • Write and plot property descriptions using various methods 91 Thank you! 92 900-PT – Revision 2 –02.25.07.CA