MoA and M&O-B Pigi Paolucci Introduction • The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long experience regarding M&O-B. • In the 2009 we asked all the institution to contribute with at least 5 KCHF • All gave 5 KCHF • Ghent and Brussels 7.5 KCHF. • I.N.F.N. 163 KCHF 16/3/10 Pigi Paolucci - INFN Napoli 2 M&O-B 2009 2009 contributions Institution INFN (old account) INFN (new account) INFN Napoli INFN PS spare INFN GGM spare Korea Inre Univ Sofia Univ Ghent Univ China India Pakistan Brussel Univ Total Input 16/3/10 CHF 63.147 60.308 4.000 29.974 6.042 5.000 5.000 5.000 7.500 5.000 5.000 0 7.712 198.683 Pigi Paolucci - INFN Napoli 3 M&O-B 2009 balance Manpower description Manpower Hardware maintencance Cost description Hardware maintencance Gas comp. Description PINTO from 07.06.2009 to 20.06.2009 2.000,00 2009 contract for CAEN site up SHAHZAD from 10.07.2009 to 09.08.2009 VIVIANI from 03.08.2009 to 02.09.2009 4.128,00 Repair of CAEN crates 4.128,00 Upgrade Endcap Mainframes SHAHZAD from 10.08.2009 to 09.09.2009 POLESE from 01.09.2009 to 30.09.2009 MUHAMMAD from 01.09.2009 to 30.09.2009 LOMIDZE from 10.09.2009 to 09.10.2009 MUHAMMAD from 01.10.2009 to 31.10.2009 POLESE from 01.10.2009 to 31.10.2009 MUHAMMAD from 01.11.2009 to 30.11.2009 POLESE from 01.11.2009 to 30.11.2009 MUHAMMAD from 01.12.2009 to 31.12.2009 POLESE from 01.12.2009 to 31.12.2009 POLESE Conference 4.128,00 Accessoires Magasins (new account) 4.128,00 interface board for RH sensors 9.952,00 interface board for RH sensors Accessoires Magasins 2.570,00 (gas/power/cooling) 7.125,00 Temperature probes racks Analysis for the CMS Muon RPC 2.700,00 Detector 1.050,00 4.128,00 EASY crate Power Calbe 4.000,00 CAEN Reparation 208,00 2.060,00 4.128,00 Rental Pool (2009) 4.128,00 GSM operation phone 5.675,00 4.983,00 4.128,00 Hum. Plug sensors 4.128,00 4.128,00 4.128,00 720,00 PS CAEN board spare GGM CAEN board spare manpower 52.128 16/3/10 1.100,00 494,00 3.138,00 4.758,00 995,00 29.974,00 6.042,00 40.000,00 OLD ACCOUNT 2008/2009 balance TOTAL Gas comp. hardware gas comp. 113.334 Pigi Paolucci - INFN Napoli 9.490 Total Output 174.952 4 Questions addressed I • How is the M&O-B budget constructed (what are the items taken into account, are there cost items outside M&O-B budget): 2010 Budget is based on what we needed in the 2009 and taking into account the small number of spares we need and the short time for hardware reparation and maintenance (2 months). For the first time we are asking the institutions to contribute proportionally to the FTE (2010). Until now only Belgium and Italy gave a positive feedback. No answer from the other institutions. 16/3/10 Pigi Paolucci - INFN Napoli 5 Questions addressed II • What is the manpower component of the budget and what are the plans for moving towards the MoA system In the 2009 the manpower component was about 50 KCHF (1/4 of the total) and for the 2010 we are planning to have 180 KCHF (need to pay few experts in DCS, DQM, Electr. and DPG) Part of the services could be covered by MoA but mostly for short period and not for high-level expert. RPC project still need some high-level experts (DQM, DCS, Database, Power…) that are not easily replaceable by the institution. This number of experts must be reduced in the next years using the MoA 16/3/10 Pigi Paolucci - INFN Napoli 6 Questions addressed III • What is the long-term budgetary plan (e.g. is the Sub- system self-sufficient in a 10-15 year perspective) 2010 will be our first real test about the MOFB and only after that we could answer to this. In any case I don’t think we will be self-sufficient unless new institutions will not joint our project. • Are Upscope/Upgrade costs built into the M&O-B budget No it is not in the budget, but it will be in the 2011. 16/3/10 Pigi Paolucci - INFN Napoli 7 2010 material details MATERIALS Keuro KCHF 5,3 8,0 spares (10HV+6LV) 102,7 154,0 CAEN maintenance 21,3 32,0 cable, connect. distrib 5,3 8,0 infrastr. 5,3 8,0 gas & infrastr. 10,7 16,0 detector test (SJ) 5,3 8,0 materials 5,3 8,0 spares 11,0 16,5 11,0 16,5 10,7 16,0 12,7 2,0 19,0 3 ? (50.0) 208,7 313,0 Server (5 DCS + 3 DQM + RC) HV-LV HV-LV-ADC HV-LV-ADC P5 Lab ISR GIF Gas Monitoring Gas Monitoring CERN store Sensors upgrade endcap Electronic Pool CERN upgrade (every 2 years) Communication LB upgrade and spare contribution telephone for shifters and experts sensor on fiber TOTAL (maintenance and reparation) Shall we contribute to the LB upgrade/spare ? 16/3/10 Pigi Paolucci - INFN Napoli 8 2010 M&O-B manpower MANPOWER months FTE Keuro KCHF Detector reparation 6 tech 0,50 16,8 25,2 Electronic (TTU+FEB+CB) reparation 1 tech 0,08 2,8 4,2 HV-LV repar. And maint. 2 tech 0,17 5,6 8,4 HV-LV firmware upgrade 2 ing 0,17 5,6 8,4 DCS - DQM - DB software upgrade 6 ing 0,50 16,8 25,2 DCS - DQM machine maint. 2 ing 0,17 5,6 8,4 Sensors upgrade endcap upgrade endcap 2 ing 0,17 5,6 8,4 Gas gas test and reparation 4 tech 0,33 11,2 16,8 Gas Monitoring repair and maint. 2 tech 0,17 5,6 8,4 Cooling repar. and maint. 2 tech 0,17 5,6 8,4 2,42 81,2 121,8 TOTAL 16/3/10 29,0 Pigi Paolucci - INFN Napoli 9 MoA 2010 data tacking 10 shut-down 2 data tacking 10 shut-down 2 FTE FTE needed months needed months Detector Hardware chamber electronics services 2 0,5 1 3 2 2 20 5 10 6 4 4 49 Power system DCS-DSS TTU XDAQ 1 1 0 0,5 2 1 1 0,5 10 10 0 5 4 2 2 1 34 Raw Data/DQM Reconstructed Prompt Analysys-Run valid TTU 2 2 2 0,4 2 2 2 0,6 20 20 20 4 4 4 4 1,2 77,2 3 2 1 1 1 1 30 20 10 2 2 2 66 21 21 42 3 6 20 5 5 0,6 1,2 4 1 1 46,8 Electronic and DAQ Software and DQM Operation P5 shift CAF shift Shift leader Managment LV2 and LV3 Up Scope Simulation R&D Chamber production Front-end electronic Trigger electronic 0,3 0,6 2 0,5 0,5 47,3 TOTALE months 16/3/10 0,3 0,6 2 0,5 0,5 Pigi Paolucci - INFN Napoli 244 71 315 10 2010 M&O-B per institution M&O 2010 # M&O Amount due (KCHF) Peking univ SKK Univ (Korea) Korea Univ (Korea) Chonnam (Korea) Mumbai-Barc (India) Ghent (Belgium) Brussel Univ (Blgium) Uniandes Pakistan Bari LNF Napoli Pavia Sofia Univ Sofia INRE 3 6 11 0 2 9 1 2 3 10 4 6 3 6 6 17,9 35,7 65,5 0,0 11,9 53,6 6,0 11,9 17,9 59,6 29,8 35,7 17,9 35,7 35,7 INFN 23 RPC TOTAL 72 142,9 434,8 16/3/10 Pigi Paolucci - INFN Napoli 11 Proposal for 2010 M&OB budget sharing • At least 50% of the amount due in cash for subsistence, material and spares: 217 KCHF – M&OB material budget foreseen = 313 KCHF – Part of the cash can be used for materials/spare • 50% in manpower to cover the 2010 MoA – FTE/month = 4 KCHF – Total is 217/4 = 54 months – Needed MoA = 315 FTE (all covered by RPC institutions) • Example: Sofia INRE amount due 36 KCHF – 18 KCHF in cash (material/spare/subsistence) – 18 KCHF ==> 5 months of MoA 16/3/10 Pigi Paolucci - INFN Napoli 12 2010 M&O-B per institution M&O 2010 Cash/Materials (KCHF) Manpower (KCHF) 6,04 6,04 18,12 18,12 33,21 33,21 0,00 0,00 6,04 6,04 27,18 27,18 3,02 3,02 6,04 6,04 9,06 9,06 30,19 30,19 12,08 12,08 18,12 18,12 9,06 9,06 18,12 18,12 21,14 21,14 # M&O Amount due (KCHF) Peking univ SKK Univ (Korea) Korea Univ (Korea) Chonnam (Korea) Mumbai-Barc (India) Ghent (Belgium) Brussel Univ (Blgium) Uniandes Pakistan Bari LNF Napoli Pavia Sofia Univ Sofia INRE 2 6 11 0 2 9 1 2 3 10 4 6 3 6 7 12,1 36,2 66,4 0,0 12,1 54,4 6,0 12,1 18,1 60,4 24,2 36,2 18,1 36,2 42,3 INFN 23 138,9 69,45 69,45 RPC TOTAL 72 434,8 108,70 108,70 16/3/10 In red the already confirmed contributions Pigi Paolucci - INFN Napoli 13 Conclusions 15 institutions, 72 FTE M&OB = 435 KCHF MoA = 47 FTE = 315 months • We need to quantify our Cash/manpower contribution for 2010 M&O in March (50%) • CMS FB will approve it and then will prepare invoices for the institutions • CMS FB will follow the invoice payments as for the other subsystem. • We need make a proposal for the RPC MoA via email and approve the distribution • Then write pledge letters for the end April • 2011 budget and 2012-2013-2014 for RRB 16/3/10 Pigi Paolucci - INFN Napoli 14