1 UPDATE ON THE CMA REGIONAL STEERING COMMETTEE MEETINGS Presentation 28 November 2012 PROGRESS TO DATE ON THE ROLL OUT • The WMA gazette has closed on the 19 October 2012 (gazette No: 35517) • Two business cases are finalised ( InkomatiUsuthu and Breede-gouritz) • Business case for KZN and Limpopo are on advance stage • Draft viability study developed • Regional Steering Committe meetings are ongoing Dates for Regions and RSC WATER MANAGEMENT AREA REGIONAL CONSULTATION DATE STATUS CONSULTATION MEETING WITH STAKEHLDERS STATUS 1. LIMPOPO 18 July 2012 Done 4 & 5 September 2012 Done 7 November (Croc) 2. OLIFANTS/LETABA 28 August 2012 Done 19 November 2012 5 October 2012 3. INKOMATI-USUTHU 27 September 2012 22 August 2012 Done 21 September 2012 Done Done 16 November 2012 28 August , 20 Sept & 9-11 October 2012 Done 4. PONGOLAMZIMKHULU 3 August 2012 5. VAAL 15 August 2012 Done 9 November 2012 10 September 2012 6. ORANGE 15 August 2012 Done 10 September 2012 7. MZIMVUBUTSITSIKAMA 8. BREEDE-GOURITZ 30 August 2012 Done None 21 November 2012 Done None 9. BERGOLIFANTSDOORN 21 November 2012 Done None Postponed Done Done 4 Proposed dates for RSC further engagements WATER MANAGEMENT AREA REGIONAL STEERING COMMITTEE MEETINGS STATUS 1. LIMPOPO To be done 3. INKOMATI-USUTHU 15 November 2012 (Proposed but not confirmed) Postponed on the 5 Sept & not yet Identified 16 November 2012 4. PONGOLA- 8 November 2012 To be done 2. OLIFANTS MZIMKHULU 7. MZIMVUBU-TSITSIKAMA Postponed on the 19 Oct & not yet identified Postponed on the 19 Oct & not yet identified None 8. BREEDE-GOURITZ None 9. BERG-OLIFANTSDOORN None 5. VAAL 6. ORANGE To be done 5 CONCERNS AROUND HR ISSUES AND CHANGE MANAGEMENT • • • • • • • • • There should be shifting of functional responsibilities i.e who does what? There is a big concern around staff transfer Proto-CMA staff numbers are not accurate from all regions Not enough consultation have been done around CMA process and implications on transfer It is important to engage with unions upfront on the staff transfer It is noted that some regions do not have staff to be transferred Concerns around location of CMAs offices either head office or satellite offices There is need for awareness process around CMA establishment There is a need to fast track change management to expedite the process CONCERNS AROUND FINANCIAL ISSUES • Concerns of budget to fund the CMA in different regions • The projected establishment costs • Operational support costs for the new CMA • Under recovery support i.e efficiencies of collection and high cost on the tariffs • There is no budget for establishment of CMA from the regions (there is budget for stakeholder consultation around institutional establishment) CONCERNS AROUND FUNCTIONS • The challenge of Regulatory functions Vs Proto-CMA functions should be addressed. Alignment between the two directorate should be done • There is an urgent need on the standardisation of functions amongst the regions. • There is a concern that regions are filling their structure whereas they anticipate establishment of CMAs • There is a need to expedite finalisation of the pricing strategy to cater for nine WMAs tariff setting • There is need for an agreed roll out plan for delegating functions to Regions and CMAs CONCERNS AROUND PROCESS OF ESTABLISHING CMAs • Proposed times frames of 3-5 years seems to be unrealistic • The WMAs are vast and stakeholder participation needs to be structured to enable solid participation of stakeholders especially communities at grassroots level • Appointment of governing boards can be political driven due to proposed single Advisory Committee • There is a need for support from all regions involved in the CMA establishment • Stakeholders has to be involved in the development of business cases • There is a need to clarify roles between regions and national Office in establishment processes CONCERNS AROUND STAKEHOLDER PARTICIPATION • There is positive and negative influence from different sectors of stakeholders • Intensive stakeholder consultation is required around CMAs establishment • There is a need for stakeholder meetings to cover all WMAs DOCUMENTS DEVELOPED TODATE FOR THE ESTABLISHMENT OF CMAs • 5 Business Cases developed (Inkomati-Usuthu, Breede-Overberg, Limpopo-Croc, PongolaMzimkhulu & Letaba-olifants) • Document on the Executive Business case for CMAs • Document on the framework for establishing CMAs • Document on the viability of CMAs • Document on the governance framework of CMAs • Document on the standardisation Proto-CMAs functions [G1] Water Management Areas 1. Limpopo Proposed WMA CMAs Governing Board Appointed No of Proto CMA staff (includes vacant posts) No. of Vacant Proto-CMA Posts Estimated Full Staff Compliment for new CMA Limpopo 2013/14 62 15 100 91 53 43 07 65 36 2012/13 4 0 0 2014/15 3 (this will come from Mhlatuze) 20 2. Crocodile West Marico 3. Levhuvu-Letaba Letaba- Olifants 2015/16 4. Olifants 5. Inkomati CMA Inkomati -Usuthu 6. Usuthu 6. Mhlatuze 7. Thukela 11 . Mvoti to Umzimkulu Thukela, Mvoti to Umzimkulu 44 23 2 9 4 100 100 145 [G1] Water Management Areas 8. Upper Vaal 9. Middle Vaal 10. Lower Vaal 12. Mzimvubu to Keiskamma 15. Fish to Tsitsikamma 13. Upper Orange Proposed CMAs Governing Board Appointed Vaal 2014/15 Mzimvubu to Keiskamma & Fish to Tsitsikamma 2015/16 Orange 2015/16 Breede &Gouritz No. of Vacant Proto-CMA Posts (Region is not sure)16 23 (for both WMAs 12 and 15) 19 10 0 Estimated Full Staff Compliment for new CMA 145 100 23 (for both WMAs 12 and 15) 14. Lower Orange 16. Gouritz No of Proto CMA staff (includes vacant posts) 109 9 2012/13 18. Breede- 7 3 18 17 13 10 0 0 18 10 30 15 100 100 Overberg CMA 17. Olifants-Doorn 19. Berg Olifants/Doorn & Berg 2015/16 100 THANK YOU !!!!