Project: {Project Name} {Team No.} Spring 2013 CSE 5325/4322 Module: Project Scope & Feasibility Deliverable: Scope & Feasibility Document Version: [1.0] Date: [mm/dd/yyyy] Prepared by: Contributors list Revision History Version number 1.0 Date Originator Reason for change mm/dd/yyyy Name(s) Initial draft High level description of changes i TABLE OF CONTENTS 1. INTRODUCTION AND EXECUTIVE SUMMARY ............................................ 3 2. OBJECTIVES .................................................................................................. 4 2.1 BUSINESS Objectives ........................................................................................................... 4 2.2 SYSTEM Objectives ............................................................................................................... 4 3 PROJECT FEASIBILITY, RISKS AND METRICS ........................................ 5 3.1 Project Feasibility Concerns................................................................................................... 5 3.2 Project Risks .......................................................................................................................... 5 3.3 Project Metrics ....................................................................................................................... 5 4 PROJECT SCOPE AND PROCESS MODEL ............................................... 6 4.1 Project Process Model ........................................................................................................... 6 4.2 Project Context ....................................................................................................................... 7 5. ASSUMPTIONS AND CONSTRAINTS ........................................................... 8 5.1 ASSUMPTIONS ..................................................................................................................... 8 5.2 CONSTRAINTS ..................................................................................................................... 8 5.3 MILESTONES ........................................................................................................................ 8 6. PROJECT DELIVERY AND SCHEDULE ........................................................ 9 6.1 DELIVERABLES .................................................................................................................... 9 6.2 SCHEDULE ............................................................................................................................ 9 6.3 COST ..................................................................................................................................... 9 7. CONCLUSION AND RECOMMENDATIONS ................................................ 10 APPENDICES..................................................................................................... 11 ii 1. Introduction and Executive Summary {Describe high-level objectives and an executive summary..} 3 2. Objectives 2.1 BUSINESS OBJECTIVES The following is the list of business objectives: Objective 1: Login – project will be secure, users must register and login before use Objective 2: Cash management – System will accept Credit card is the primary method of payment Objective 3: . . . 2.2 SYSTEM OBJECTIVES The following is the list of system objectives: Objective 1: {Project will be web-based…} Objective 2: {Google Search will be integrated into the system for search requirements..} Objective 3: . . . 4 3 Project Feasibility, Risks and Metrics Project feasibility and metrics are summarized below: 3.1 PROJECT FEASIBILITY CONCERNS {Describe the project feasibility concerns that you envision early in the project. The feasibility concerns should cover: “Market readiness”, “Technical issues”, “Resources”, “cost”, “time to market”,…} 3.2 PROJECT RISKS {Includes all risks..} 3.3 PROJECT METRICS {What are the metrics of success for your project? (e.g. forecast of the number of users using the system, number of units sold,…)} 5 4 Project Scope and Process Model Project scope includes the following: 1. {List major functions that you are planning to include in your first release} 2. {Training customers} 3. . . . The following is a list of items out of scope: 1. {Post project maintenance} 2. 3. . . . 4.1 PROJECT PROCESS MODEL {Describe the project model (e.g. Waterfall, Incremental, Spiral, Agile…) that you will select to follow and why...} 6 4.2 PROJECT CONTEXT {Draw a high level diagram of the proposed approach/components (any format is acceptable)} 7 5. Assumptions and Constraints 5.1 ASSUMPTIONS The following is a list of assumptions: Assumption 1 Assumption 2 Assumption 3 5.2 CONSTRAINTS The following is a list of constraints: Constraint 1 Constraint 2 Constraint 3 5.3 MILESTONES The following is a list of major milestones for this project: Milestone 1 Milestone 2 Milestone 3 8 6. Project Delivery and Schedule {List a breakdown of all deliverables (i.e. tasks), tentative schedule and a high-level cost, mapping from start to finish. Remember this will be used to convince the senior management to authorize the project or not…} 6.1 DELIVERABLES The following is a list of project deliverables: Deliverable 1 Deliverable 2 Deliverable 3 …… 6.2 SCHEDULE {Tentative schedule} 6.3 COST {List the total cost of the project in as much details as possible yet stay high-level (keep in mind if the cost is too much, you might lose the project, if the cost is too little, you might not profit!)..} 9 7. Conclusion and Recommendations {A brief recap of the project highlighting risks, benefits and your recommendations…} 10 Appendices Additional documents or references, if any (Optional) 11