Commonwealth of Massachusetts Information Technology Division Commonwealth of Massachusetts – Information Technology Division Request for Quotation ITD RFQ 14-38 VMAX Storage Upgrade2 + SRM Upgrade Amended May 16, 2014 May 7, 2014 THIS RFQ AND ALL RESPONSES HERETO INCLUDING THE WINNING BID SHALL BECOME PUBLIC RECORD AS OF THE DATE THE CONTRACT REFERENCED HEREIN IS AWARDED, AND CAN BE OBTAINED FROM THE INFORMATION TECHNOLOGY DIVISION’S LEGAL UNIT BY SENDING AN EMAIL TO MICHELLE.BURWELL@STATE.MA.US. ANY PORTIONS OF A RESPONSE THAT ARE LABELED AS CONFIDENTIAL WILL STILL BE CONSIDERED PUBLIC RECORD. RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 1 1. General Procurement Information Purchasing Department: Information Technology Division Address: 200 Arlington St Chelsea, Massachusetts 02150 Procurement Contact: Rick Herbert Telephone: 617-660-4452 E-Mail Address: Rick.Herbert@state.ma.us RFQ File Number and Title: ITD RFQ 14-38 VMAX Storage Upgrade2 + SRM Upgrade This Request for Quotes (“RFQ”) does not commit the Commonwealth of Massachusetts (“Commonwealth”) or the Information Technology Division (“ITD”) to approve a Statement of Work, pay any costs incurred in the preparation of a Bidder’s response to this RFQ or to procure or contract for products or services. ITD reserves the right to accept or reject any and all proposals received as a result of this RFQ and to contract for some, all or none of the products and services as a result of this RFQ. ITD further reserves the right to negotiate with any or all qualified Bidders and to cancel in part or in its entirety this RFQ if it is in the best interest of ITD or the Commonwealth of Massachusetts to do so. ITD reserves the right to amend this RFQ at any time prior to the date the responses are due. Any such amendment will be posted to the Commonwealth’s interim procurement WIKI website, here and will be mailed to all vendors on the contracts specified below Bidders are advised to check this site regularly, as this will be the sole method used for notification of changes. This RFQ is restricted to vendors on the statewide hardware contract ITC47 who are authorized to sell storage. This RFQ refers to the following attachments: Exhibit A: Template Statement of Work 2. Agency ITD is responsible for the provision of infrastructure services, development of IT policy, and implementation and oversight of all information technology investments for the Commonwealth and its respective agencies. In addition, ITD provides the processing and application programming services for many state departments using some of the most advanced hardware and software available. 3. Overview ITD needs to expand block storage capacity for an existing EMC VMAX storage array at MITC and to upgrade of its existing EMC Control Center and Storage Scope implementation for data storage resource management and data storage chargeback information collection. RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 2 4. Requested Products & Services The winning Bidder shall be capable of providing the following goods and services as part of this engagement: Table 1 – Hardware & Software (Serial Numbers) Serial Number HK192605320: Line # QTY Product ID Description HW/SW SYSTEM UPGRADE SOLUTION Serial Number: HK192605320 VMAX 15SLT DR ENCL UFD HW VMAX 15SLT DR ENCL UPG HW 1 8 2 8 SBDE15DCHUFD SB-DE15-DIRU 3 2 SB-DB-SPS-U VMAX SB SPS UPG HW 4 1 SB-FE00040U VMAX 4Gb 4M FIC-UPG HW 5 1 SB-ADD64NDEU VMAX UPG ENGINE-64GB HW 6 1 SB-FE00400TU VMAX 10Gb 4M GIGE-UPG HW 7 60 NF4151461BU VMAX 4G 15K146GB DRV UPG HW 8 44 NF4154501BU VMAX 4G 15K450GB DRV UPG HW 9 4 SB-GE-SRDF VMAX GIGE SRDF PORTS HW 10 1 SB-PCBL3DHR 50A 3PH DELTA HBL-RSTOL HW 11 2 SB-ACON3P-50 ADPTR AC 3PH 50A W/3/4IN CONDUIT ADPTR HW 12 1 SB-DB-DIR-3DU VMAX SB DIR DELTA UPG HW 13 2 SB-DBDCSPS-UF VMAX SB DCH SPS UFD HW Unit Price Extended Price Hardware Sub-total 1 1 ESP-UPG ESP BASE UPGRADE SW 2 26 ESP-C06 ESP 1TB (101-150TB) SW 3 1 SYMVP-RN-OPN SYMM VIRTUAL PROV RUNTIME SW 4 1 SYMM-LS SYMM LICENSE SOLUTION SW 5 26 456-102-894 SW 6 1 457-100-530 RMT ASYNC-ADD-SRDFACMPEXT NOSATA101150T RMT ASYNC-ADD ON-SRDFA CMPEXT-UPG 7 26 456-104-054 ENGINUITY NON-SATA 101-150TB SW 8 1 457-100-969 ENGINUITY CAP UPG LICENSE SW SW Software Sub-total Serial Number HK192605721 Line # QTY Product ID Description HW/SW Unit Price MITC VMAX 600GB Drive Upgrade SN HK192605721 Serial Number: HK192605721 1 82 NS4106001BU VMAX 4G 10K 600GB SAS DRV UPG HW HW 2 2 SB-32-64UFD VMAX MEMCONV 2X16 to 2X32 GB HW Hardware Sub-total RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 3 Line # QTY Product ID Description 1 1 SYMM-LS SYMM LICENSE SOLUTION SW 2 48 456-104-055 ENGINUITY NON-SATA 151-250TB SW 3 1 457-100-969 ENGINUITY CAP UPG LICENSE SW 4 48 456-102-965 SW 5 1 457-100-544 LOCL REP-TFCLN CNFLASH NON-SATA 151-250T LOCL REP PROT-TFCLONE CNFLASHUPG Software Sub-total HW/SW Unit Price SW SRM Line # Qty Product ID Description 1 2 SYMM-LS SYMM LICENSE SOLUTION 2 2 457-101-178 SRSTP VMAX20K BASE =IC 3 2 457-002-043 SYMM MGMT SUITE VMAX 20K BASE LICENSE 4 200 456-006-235 SYMM MGMT SUITE VMAX 20K N-S 151-250TB 5 200 456-104-720 SRSTP VMAX20K (151-250TB) =CB 6 2 PSUPGD-VMAX ZERO DOLLAR VMAX UPGRADE 7 5 SRMST-SITE SRST SITE; SERVER BASE =IA 8 2 SRSTC-VMAX-B SRSTC VMAX BASE =IC 9 2 SRSTW-VMAX-B SRSTW VMAX BASE =IC 10 200 SRSTW-VMX7 SRSTW VMAX (151-250TB) NONSATA =CB 11 200 SRSTC-VMX7 SRSTC VMAX (151-250TB) NONSATA =CB 12 72 456-104-718 SRSTP VMAX20K (61-100TB) =CB 13 72 456-006-233 SYMM MGMT SUITE VMAX 20K N-S 61-100TB 14 72 SRSTC-VMX5 SRSTC VMAX (61-100TB) NONSATA =CB 15 72 SRSTW-VMX5 SRSTW VMAX (61-100TB) NONSATA =CB 16 2 SRSTC-VNX5 SRSTC VNX/CX/NS TIER 5 =IC 17 2 SRSTU-VNX5 SRSTU VNX/CX/NS TIER 5 =IC 18 1 SRSTU-VNX4 SRSTU VNX/CX/NS TIER 4 =IC 19 1 SRSTC-VNX4 SRSTC VNX/CX/NS TIER 4 =IC 20 Unit Extended Price Price SRM Software Sub-total For the installation and maintenance described below in Table 2, Bidder must agree to hold maintenance rates fixed (no price increases) for three years and agree that the rate of maintenance for each successive year beyond three (3) years will not increase more than 2% over the rate for the previous year. Table 2 - Maintenance Line QTY Item Description Unit Price Extended Price Storage Upgrade Maintenance RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 4 1 PREMIUM SOFTWARE SUPPORT - HK192605320 2 PREMIUM SOFTWARE SUPPORT - HK192605721 Maintenance Sub-total for HW SRM SW Maintenance Line QTY Item Description 3 5 M-PRESW-001 PREMIUM SOFTWARE SUPPORT 4 2 M-PRESW-011 5 2 M-PRESW-E12 PREMIUM SOFTWARE SUPPORT PLATFORM/ELM PREMIUM SOFTWARE SUPPORT 6 2 PS-CUS-EXPSMA BILLABLE EXPENSE SMARTS Unit Price Extended Price Maintenance Sub-total for 5. Additional Requirements ITD expects the services described in the Bidder’s response to be completed no later than June 27, 2014, regardless of the Effective Date of any Statement of Work entered under this RFQ (as such Effective Date is defined in such Statement of Work). Services required in this RFQ include installation, initial configuration and testing of the specified capacity onsite at ITD’s Data Centers at Chelsea. ITD shall have the option at its sole discretion to modify, increase, reduce or terminate any activity related to any Agreement entered into under this RFQ whenever, in the judgment of ITD, the goals of RFQ have been modified or altered in a way that necessitates such changes. Table 3 - Services Line QTY Item Description 1 Installation both serial numbers. 2 Installation SRM Unit Price Extended Price 6. Payment This is a fixed price engagement. 7. Order of Precedence The contract resulting from this RFQ shall consist of the following documents in the following order of precedence: (1) the Commonwealth’s Terms and Conditions; (2) the Commonwealth’s Standard Form Contract; (3) the Commonwealth’s RFR ITC47, whichever is relevant; (4) the Bidder’s response thereto; (5) this RFQ; (6) the Statement of Work and any other document negotiated between the parties and executed by both parties; and (7) the Bidder’s response to this RFQ. 8. Event Calendar All times in this RFQ are prevailing Eastern Time. RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 5 Event Calendar CALENDAR EVENT RFQ Posting and Release RFQ Responses Due DATE May 7, 2014 May 22, 2014 TIME 5:00 PM 5:00 PM Bids received after the stated closing date and time will not be considered. 9. Submission Requirements Interested Bidders must submit one (1) electronic copy of the response to the RFQ in Microsoft Word format via e-mail to Rick.Herbert@MassMail.State.MA.US with a copy to Annemarie.Kates@state.ma.us and should specify “RFQ 14-38 – MITC VMAX Capacity Upgrade2 and SRM – [VENDOR NAME] Response” in the subject line of the e-mail. Responses must be received no later than the response due date and time indicated in the Event Calendar above or they will not be evaluated. 10. Bidder Responses Bidders’ responses should include, at a minimum, the following: 1. A signed cover letter in which the Bidder affirmatively states that it agrees to the terms of this RFQ and affirms that the Bidder is approved under, is providing the bid under, and abides by the terms of ITC47. 2. The Bidder’s business response which: a. Details the Bidder’s affirmative agreement to provide the materials and deliverables as required under Section 4 of this RFQ, as well as any proposed additions to the tasks or deliverables based on the Bidder’s proposed approach. b. Includes a chart showing the names and roles of Bidder personnel who will perform the services described in Bidder’s response, as well as the anticipated hours per resource per task. c. 3. Includes an unlocked redline version of the Statement of Work (“SOW”), the template of which is attached hereto as Exhibit A, which fills in information required to be provided by the successful bidder. Most of the standard terms of the SOW are nonnegotiable but the parties will negotiate the specific approach for and timing of Tasks and Deliverables (as defined in the SOW) based on Bidder’s response. A cost response which: a. Provides an all-inclusive fixed price for the purchase, installation and configuration of the named products and services herein. The Commonwealth will not pay any costs and expenses not included in the cost response. b. Unless services are being provided at zero cost, provides hourly rates for the resources completing the tasks and deliverables set forth in Section 4 of this RFQ. All proposed rates must include all costs and expenses, including without limitation RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 6 delivery services, travel and all other costs and expenses. Rates must be good for the term of the SOW (as defined below). c. Is in a format that may be used to generate a purchase order, i.e., is on company letterhead and includes a quotation reference (quote number and/or date). d. Includes the chart requested in 2(b) above showing the names and roles of Bidder personnel, update to include the hourly rate of such personnel. All proposed rates must include all costs and expenses, including without limitation delivery services, travel and all other costs and expense. The Commonwealth will not pay any costs and expenses not included in the cost response. Rates must be good for the term of the SOW (as defined below). ITD reserves the right to negotiate the engagement of such personnel, on a time and materials basis at the hourly rates provided, and at no more than 40-hours per week for each person, for work closely related to the project described in this RFQ but not specifically described herein. 11. Miscellaneous By submitting a proposal in response to this RFQ, Bidders agree to the following terms: 1. 2. 3. All bids submitted in response to this RFQ must be valid for a minimum of ninety (90) calendar days. Extraneous marketing or promotional materials are discouraged and such information will not be factored into the evaluation of Bidders. ITD will not pay any charges not set forth in the Bidder’s response. 12. Evaluation Criteria The responses to this RFQ will be evaluated based on the criteria listed below. The criteria are listed in descending order of importance with the most important criteria listed first. The procurement management team reserves the right to remove from further consideration nonresponsive bids and those that include attempts by the Bidder to alter the Commonwealth’s standard legal terms. 1. Price 2. Proposed time to completion. 13. Miscellaneous A. Bid/Response Rejection ITD reserves the right to reject any or all bids (responses), in whole or in part and for any reason deemed non-compliant or non-response per this RFQ, its attachments or any subsequent changes. Bidders are advised to check prior to submitting a response to ensure that they have the most recent RFQ files and forum questions and answers. Bidders may not alter (manually or electronically) the RFQ language or any RFQ component files. Modifications to the body of the RFQ, forum questions and answers, specifications, terms and conditions, or which change the intent of this RFQ are prohibited and may disqualify a response. ITD reserves the right not to enter any agreement under this RFQ. B. Contract Amendments ITD reserves the right to amend this RFQ or any contract resulting from this RFQ. ITD may negotiate changes to the original performance measures, reporting requirements or payment methodologies tied to performance at any time during the contract duration if they are consistent with the specifications of this RFQ. ITD reserves the right to negotiate and execute contract amendments with the contractor(s) which ITD determines as necessary to result in the intent of this RFQ, to amend the RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 7 specifications for necessary requirements, or to result in a better valued contract. Negotiation would be with the successful contractor(s) of this RFQ. Amendments may include, but are not limited to, contract dollars, contract performance, increased or decreased obligations, scope of work, quantity, etc. C. Limitations. This RFQ does not commit the Commonwealth or ITD to approve a Statement of Work, pay any costs incurred in the preparation of a bidder’s response to this RFQ or to procure or contract for products or services. ITD reserves the right to accept or reject any and all proposals received as a result of this RFQ and to contract for some, all or none of the products and services as a result of this RFQ. ITD further reserves the right to negotiate with any or all qualified bidders and to cancel in part or in its entirety this RFQ if it is in the best interest of ITD or the Commonwealth of Massachusetts to do so. D. Review Rights Responses to this RFQ may be reviewed and evaluated by any person(s) at the discretion of ITD including non-allied and independent consultants retained by ITD now or in the future, for the sole purpose of obtaining an analysis of responses. Any and all respondents may be asked to further explain or clarify in writing areas of their response during the review process. ITD retains the right to request further information from respondents. E. Nonresponsive Bids ITD reserves the right to exclude from further consideration nonresponsive bids that fail to meet the submission requirements of this RFQ. RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 8 Attachment A HARDWARE INSTALLATION STATEMENT OF W ORK BY AND BETWEEN THE INFORMATION TECHNOLOGY DIVISION OF THE COMMONWEALTH OF MASSACHUSETTS AND [VENDOR NAME] FOR THE VMAX STORAGE UPGRADE PROJECT & EMC SRM SOLUTION 1. INTRODUCTION The following document will serve as a Hardware Installation Statement of Work (“SOW”) by and between the Information Technology Division (“ITD”) of the Commonwealth of Massachusetts and [Vendor Name], a [state of organization] [type of company] (“[Vendor Abbreviation]”) to apply to work on the VMAX storage upgrade (the “Project”)). The entire agreement between the parties (the “Agreement”) consists of the following documents in the following order of precedence: (1) the Commonwealth Standard Terms and Conditions; (2) the Commonwealth’s Standard Form Contract; (3) Request for Response ITC47 (“RFR”); (4) [Vendor Abbreviation]’s response thereto; (5) the Request for Quotes (“RFQ]; ITD RFQ 14-38 VMAX Storage Upgrade 2 and SRM(6) this SOW and any other documents negotiated between and signed by both parties; and (7) [Vendor Abbreviation]’s response to the RFQ. 2. DEFINITIONS The terms used in this SOW, unless defined in this SOW or in an amendment made hereto, shall have the meaning ascribed to them in the other documents that constitute the Agreement between the parties. “Business Day” is any day other than a Saturday, Sunday or any day on which offices of the Commonwealth (as set forth in the legal holiday calendar), banking institutions or savings and loan associations in the Commonwealth are authorized or required to close. As used in this definition, the term “legal holiday calendar” shall mean the Legal Holiday Calendar maintained and published by the Executive Office for Administration and Finance, available at http://www.mass.gov/anf/employment-equal-access-disability/oversight-agencies/hrd/legalholiday-calendar.html “Deliverable” means any work product that [Vendor Abbreviation] delivers for the purposes of fulfilling its obligations to ITD under the terms of the Agreement, including work product that [Vendor Abbreviation] must submit to ITD for ITD’s approval in accordance with the formal acceptance procedures set forth within the SOW or the Task Order(s) entered into hereunder. “Milestone Date” means a date or set of dates by which the Deliverable(s) and/or Task(s) are required to be completed in good faith and submitted for acceptance. “Milestone Payment Amount” means a defined payment amount associated with the completion of a particular Deliverable or Task or set of Deliverables or Tasks, following acceptance of such Deliverable(s) and/or Task(s) by ITD. RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 9 “Task” means a material activity engaged in by [Vendor Abbreviation] for the purpose of fulfilling its obligations to ITD under the terms of the Agreement, which may or may not result in the creation of a Deliverable. “Task Order” means an amendment to this SOW that specifies Tasks, Deliverables, or hourly rate services to be completed by [Vendor Abbreviation] under the terms of this Agreement. All references to time shall be deemed to be prevailing Eastern Time in Boston, Massachusetts 3. OVERVIEW, EFFECTIVE DATE AND TERM The purpose of this Project is to upgrade expand block storage capacity for an existing EMC VMAX 20K storage array at MITC and to install an upgrade to the ITD SRM (Storage Resource Management) too, which was competively quoted and procured.. [Vendor Abbreviation] will provide the professional services described in the RFQ. This Agreement’s term (the “Term”) begins on the date on that it is executed by both parties (the “Effective Date”) and shall terminate at 5:00 p.m. on [INSERT END DATE] (“Termination Date”). Notwithstanding the foregoing, Sections 5.1 and 5.2 of System Security, Section 10.1 Warranty and such other provisions of this SOW that by their express written terms survive termination, shall survive the termination of the remainder of this SOW. 4. POINTS OF CONTACT 4.1 Single Point of Contact [Vendor Abbreviation] and ITD will each assign a single point of contact with respect to this SOW. It is anticipated that the contact person will not change during the Term of this Agreement. In the event that a change is necessary, the party requesting the change will provide prompt written notice to the other. In the event a change occurs because of a non-emergency, two-week written notice is required. For a change resulting from an emergency, prompt notice is required. [Vendor Abbreviation]’s contact person is [Vendor Contact Name and Title], who can be reached at [Vendor Contact Address, phone number(s), email]. ITD’s contact is Rick Herbert, Director of Data Management, who can be reached at OTD, 200 Arlington St., Chelsea, MA 02150; 617-660-4452, rick.herbert@state.ma.us . 4.2. Affiliates and Subcontractors [Delete provision 4.2 the following provision if the Vendor is not using subcontractors and has no affiliates] [Vendor Abbreviation] shall take full responsibility for project management. [Vendor Abbreviation] shall submit all subcontracts related to work to be performed hereunder for approval by ITD within two weeks of the Execution Date of this SOW and within two weeks for any Task Order issued hereunder which entails work by [Vendor Abbreviation] subcontractors. [Vendor Abbreviation] shall ensure that its affiliate(s) and subcontractor(s) that perform work efforts under this SOW shall comply with all terms of the Agreement. [Vendor Abbreviation] will act as prime contractor for the [Vendor Abbreviations]’s affiliate(s) and subcontractor(s) and be responsible for the performance of affiliate(s) and subcontractor(s). [Vendor Abbreviation] must (i) submit the subcontractor for written RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 10 approval by ITD’s Project Manager prior to the affiliate or subcontractor providing services under the Agreement, (ii) be responsible for the affiliate’s or subcontractor’s performance under the Agreement and compliance with all relevant covenants, warranties and other terms and provisions of the Agreement, and (iii) require the affiliate or subcontractor to agree to all relevant covenants, warranties, and other terms and provisions of the Agreement, including without limitation Sections 5.1 and 5.2 of System Security. 5. SYSTEM SECURITY As part of its work efforts under this SOW, [Vendor Abbreviation] will be required to use Commonwealth data and IT resources. For purposes of this work effort, “Commonwealth Data” shall mean data provided by the ITD to [Vendor Abbreviation], which may physically reside at a Commonwealth or ITD or [Vendor Abbreviation] location. 5.1 Commonwealth Data In connection with Commonwealth Data, [Vendor Abbreviation] will implement commercially reasonable safeguards necessary to: 5.1.1 5.1.2 5.1.3 5.2 Prevent unauthorized access to Commonwealth Data from any public or private network; Prevent unauthorized physical access to any information technology resources involved in the development effort; and Prevent interception and manipulation of Commonwealth Data during transmission to and from any servers. Commonwealth Personal Data In addition to the above requirements for Commonwealth Data, [Vendor Abbreviation] may be required to use the following Commonwealth personal data under M.G.L. c. § 66A and/or personal information under M.G.L. c. 93H, or to work on or with information technology systems that contain such data as [here agency should list the categories of such data that the vendor will be required to use] in order to fulfill part of its specified tasks. For purposes of this work effort, electronic personal data and personal information includes data provided by the ITD to [Vendor Abbreviation] which may physically reside at a location owned and/or controlled by the Commonwealth or ITD or [Vendor Abbreviation]. In connection with electronic personal data and personal information, [Vendor Abbreviation] shall implement the maximum feasible safeguards reasonably needed to: 5.2.1 5.2.2 Ensure the security, confidentiality and integrity of electronic personal data and personal information; Prevent unauthorized access to electronic personal data or personal information or any other Commonwealth Data from any public or private network; RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 11 5.2.3 6. Notify ITD immediately if any breach of such system or of the security, confidentiality, or integrity of electronic personal data or personal information occurs. ACCEPTANCE OR REJECTION PROCESS [Vendor Abbreviation] will submit the required Tasks and/or Deliverables specified in this SOW, or any Task Order entered into hereunder, to ITD’s Project Manager for approval and acceptance. ITD will review work product for each of the Tasks and/or Deliverables and evaluate whether each Task or Deliverable has clearly met in all material respects the criteria established in this Agreement and the relevant Task Order specifications. Once reviewed and favorably evaluated, the Tasks and/or Deliverables will be deemed acceptable. Within approximately ten (10) Business Days after receipt of each Task or Deliverable, ITD’s Project Manager will notify [Vendor Abbreviation], in writing, of the acceptance or rejection of said Task or Deliverable using the acceptance criteria specified in this Section and associated with the Task or Deliverable specifications in this Agreement. A form signed by ITD shall indicate acceptance. [Vendor Abbreviation] shall acknowledge receipt of acceptance forms in writing. Any rejection will include a written description of the defects of the Task or Deliverable. If ITD does not respond to the submission of the Task or Deliverable, within five (5) Business Days of ITD’s receipt of each Task or Deliverable, [Vendor Abbreviation] shall provide a reminder notice to ITD’s Project Manager. If ITD fails to reject a Task or Deliverable within five (5) Business Days after ITD’s receipt of the reminder notice, the Task or Deliverable is deemed accepted. If ITD rejects a Task or Deliverable, [Vendor Abbreviation] will, upon receipt of such rejection, correct the specified defects and deliver an updated version of the Task or Deliverable to the Commonwealth within five (5) Business Days from receipt of the rejection notice (or such other time as agreed to by ITD’s Project Manager in writing). ITD will then have an additional five (5) Business Days from receipt of the updated Task or Deliverable to notify [Vendor Abbreviation], in writing, of the acceptance or rejection of the updated Task or Deliverable. Any such rejections will include a description of the way in which the updated Task or Deliverable fails to correct the previously reported deficiency. Following any acceptance of a Task or Deliverable which requires additional work to be entirely compliant with the pertinent specifications, and until the next delivery, [Vendor Abbreviation] will use reasonable efforts to provide a prompt correction or workaround. 7. PROJECT MANAGEMENT [Vendor Abbreviation] and ITD must notify the other party’s Project Managers of any change in the name, address, phone number, fax number, or email address of their respective Project Manager. 7.1 ITD’s Project Manager [INSERT NAME OF Agency Abbreviation Designed Project Manager, Agency Project Manager Title] (“ITD’s Project Manager”) shall perform project management on behalf of ITD for this engagement. ITD’s Project Manager will: 7.1.1 Work closely with [Vendor Abbreviation]’s Project Manager to ensure successful completion of the project. RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 12 7.1.2 Consult with [Vendor Abbreviation]’s Project Manager to develop the Project Management Plan. 7.1.3 Review weekly status reports and schedule weekly meetings with [Vendor Abbreviation], as necessary. 7.1.4 Acquire ITD project team members as needed. 7.1.5 Coordinate ITD’s review of the Deliverables and sign an acceptance form to signify acceptance for each accepted Deliverable. ITD’s Project Manager reports to [name and title], who reports to [name and title][repeat this phrase until last named individual is agency head]. [Name individual, with title] will sign this SOW and all amendments hereto on behalf of ITD. 7.2 Vendor Project Manager [The parties may insert additional language in this Section to incorporate the vendor’s additional project management practices for project planning, tracking, reporting and management, including the types, frequency and contents of reports that will be provided by the developer to the agency.] [INSERT NAME OF Vendor Abbreviation Designed Project Manager, Vendor Project Manager Title] (“[Vendor Abbreviation]’s Project Manager”, and together with ITD’s Project Manager, the “Project Managers” and each a “Project Manager”)) shall perform project management on behalf of [Vendor Abbreviation] for this engagement. [Vendor Abbreviation]’s Project Manager will: 7.2.1 Be responsible for administering this Agreement and the managing of the day-to-day operations under this Agreement. 7.2.2 Serve as an interface between ITD’s Project Manager and all [Vendor Abbreviation] personnel participating in this engagement. 7.2.3 Develop and maintain the Project Management Plan, in consultation with ITD’s Project Manager. 7.2.4 Facilitate regular communication with ITD’s Project Manager, including weekly status reports/updates, and review the project performance against the project plan. Facilitate weekly project status meetings for the duration of the engagement. 7.2.5 Update the project plan on a weekly basis and distribute at weekly meetings for the duration of the engagement. 7.2.6 Sign acceptance forms to acknowledge their receipt from ITD. 7.2.7 Be responsible for the management and deployment of [Vendor Abbreviation] personnel. [Vendor Abbreviation]’s Project Manager reports to _____, who reports to_____ [repeat until reaching engagement partner or equivalent]. [Name and title], being an authorized signatory named in [Vendor Abbreviation]’s response to the RFR, will sign this SOW and all amendments thereto on behalf of [Vendor Abbreviation]. RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 13 7.3 Issue Resolution The Project Managers from each organization bear the primary responsibility for ensuring issue resolution. If they mutually agree that they are unable to resolve an issue, they are responsible for escalating the issue to [insert name and title of respective persons at agency and vendor]. 8. Amendments to the Scope of Work This Agreement may be amended prior to the end of the Term. The Project Manager who would like to request a change in scope for this engagement or any other terms contained within the Agreement, will provide the suggested amendment in writing to the other party’s Project Manager. The Project Managers will jointly determine whether the change impacts any terms contained within the Agreement. The parties may mutually agree to the change through a written amendment to this SOW. For any amendment entered into under this Agreement where [Vendor Abbreviation] will be providing services on a Time and Materials basis, the parties shall apply the Time and Materials terms as described in Section 11 of this SOW to the relevant Task Order. 9. Personnel 9.1 Key Personnel [Vendor Abbreviation] agrees to provide the following personnel for the following amounts of time for the duration of this project: TABLE 1 KEY PERSONNEL Staff Members Role Time Commitment expressed as percentage of full time [Vendor Abbreviation] shall assign all of the foregoing personnel to this engagement on the time basis set forth in Table 1. In the event that a change is necessary, [Vendor Abbreviation]’s Project Manager will provide prompt written notice to ITD’s Project Manager of the proposed change. If the personnel change is a result of a nonemergency, [Vendor Abbreviation]’s Project Manager shall provide ITD’s Project RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 14 Manager two-week written notice. For personnel changes that result from an emergency, [Vendor Abbreviation]’s Project Manager shall provide prompt written notice to ITD’s Project Manager. ITD’s Project Manager has the right to accept or reject all personnel. [Vendor Abbreviation]’s personnel must comply with the Information Technology Division’s relevant Policies, Standards and Guidance and workplace policies, which may be located at www.mass.gov/itd. 9.2 Equipment, Work Space, Office Supplies ITD will provide [workspace, cubicles, standard office equipment, and standard network connectivity provided to state employees] for [Vendor Abbreviation] team members working on-site for activities defined by this SOW or in the relevant Task Order. [Vendor Abbreviation] will submit a list of employees who will need access to the building and to state systems before execution of this SOW. Any [Vendor Abbreviation] employees who have access to IT resources must comply with the “Acceptable Use Policy” (see www.mass.gov/itd) or any alternative Acceptable Use Policy adopted by the ITD. 9.3 Related Project Knowledge In addition to the “Statewide Contract IT Specifications”, all other terms of ITS47 and all other terms of ITS43, [Vendor Abbreviation] shall, prior to commencing any other work under this SOW, become familiar with the following documents: [here list any other material that the vendor must master in order to perform under the contract, such as prior studies, agreements, reports, etc.]. 10. ADDITIONAL TERMS 10.1 Warranty [Vendor Abbreviation] represents and warrants to ITD that: 10.1.1 [Vendor Abbreviation] and its subcontractors are sufficiently staffed and equipped to fulfill [Vendor Abbreviation]’s obligations under this Agreement; 10.1.2 [Vendor Abbreviation]’s services will be performed: 10.1.2.1 By appropriately qualified and trained personnel; 10.1.2.2. With due care and diligence and to a high standard of quality as is customary in the industry; 10.1.2.3 In compliance with the delivery dates set forth in Table 2 and the terms and conditions of this Agreement; and 10.1.2.4 In accordance with all applicable professional standards for the field of expertise; 10.1.3 Deliverables delivered under this Agreement will substantially conform with the Tasks and Deliverable descriptions set forth in this Agreement; RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 15 10.1.4 [Vendor Abbreviation] has obtained all rights, grants, assignments, conveyances, licenses, permissions and authorizations necessary or incidental to any materials owned by third parties supplied or specified by [Vendor Abbreviation] for incorporation in the Deliverables to be developed; 10.1.5 Documentation provided by [Vendor Abbreviation] under this Agreement shall be in sufficient detail so as to allow suitably skilled, trained, and educated ITD personnel to understand the operation of the Deliverables. [Vendor Abbreviation] shall promptly, at no additional cost to ITD make corrections to any documentation that does not conform to this warranty; and 10.1.6 Any systems installed, customized, created or otherwise modified by [Vendor Abbreviation] under this SOW shall operate in substantial conformance with the specifications for the installation, customization, system creation or other modifications for a minimum of three months (the “Warranty Period”) after ITD accepts such system or modifications pursuant to Section 6 of this SOW. During the Warranty Period, [Vendor Abbreviation] shall correct any Severity Level I, II or III defects. As used in this Section 10.1.6, Severity Level I, II and III are defined as follows: 11. Severity Level I: This is either a safety issue or an issue that affects a central requirement for which there is no workaround. It prevents either use or testing of the system. Severity Level II: This is an issue that affects a central requirement for which there is a workaround, where use or testing of the system can proceed in a degraded mode, or an issue that affects a non-central requirement for which there is no workaround, where the feature cannot be used. Severity Level III: This is an issue that affects a non-central requirement for which there is a workaround, or a cosmetic issue, i.e. information is correctly shown but the appearance is wrong, such as misspelled words, wrong font, wrong indentation, etc. [VENDOR ABBREVIATION] TASKS AND DELIVERABLES This Section describes the Deliverables that [Vendor Abbreviation] will provide to ITD and the Tasks that [Vendor Abbreviation] will complete by the end of the engagement described in this SOW. A Task or Deliverable will be considered “complete” when all the acceptance criteria set forth in this SOW have been met or the prescribed review period for each Deliverable or Task has expired without written response from ITD. The Task/Deliverable numbers are referred to in subsequent sections throughout this SOW. All written documents shall be delivered in machine-readable format, capable of being completely and accurately reproduced by computer software on a laser printer. All itemized and/or annotated lists shall be delivered in computer spreadsheets, capable of being imported to Microsoft Excel 2010 [or name alternative desktop software used by agency]. All meetings shall be held at MITC, 200 Arlington Street, Chelsea, MA unless agreed to otherwise by the Project Managers. Meetings must be scheduled at least three full Business Days in advance, RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 16 with reasonable accommodation of attendees’ schedules. All meeting results will be described in a follow-up report generated by [Vendor Abbreviation]’s Project Manager and approved by ITD’s Project Manager. 11.1 Fixed Price Tasks and Deliverables: [AGENCY AND VENDOR INSERT: Draft the specific description for each fixed price Task and/or Deliverable that is material for completion of services and deliverables for work efforts under the RFQ.] For the Fixed Price Tasks and Deliverables of this Agreement, [Vendor Abbreviation] shall perform Tasks or deliver Deliverables in conformance with the Description and Metrics of Acceptance on or before Milestone Dates set forth in Table 4. Deliverable/ Task Number TABLE 2 Deliverables and Tasks Deliverable or Task Name Description and Metrics of Acceptance 1.1 Inventory of components Storage 1.2 Installation 1.3 Inventory of SRM components 1.4 Installation, Configuration, Implementation, and Testing of SRM components – Watch4Net Install o Installation of core W4N software o Installation of client permanent license o Configuration of aggregates & retention o Configuration & validation of database o Installation of W4N Alerting module o Update W4N Build Guide o Take in Traps from ProSphere and SCA - Prosphere Install - SCA Install RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade upgrade Milestone Schedule Date) (Due ITD acceptance of inventory of all software components ITD acceptance of installation, configuration, implementation, and testing. ITD acceptance of inventory of all software components May 31, 2014. ITD acceptance of installation, configuration, implementation, and testing June 27, 2014 May 31, 2014 Page 17 1.5 Configure up to Five (5) report packs consisting of: o ReportPack for Oracle Database o ReportPack for VMAX o ReportPack for VNX Block o ReportPack for VNX File o ReportPack for VMWare 1.6 Chargeback Reporting – o Update data collectors to use CSV inputs for Rate Code and Account o Implement SAN and NAS chargeback report o Install and Review report 1.7 11.2 Documentation and Knowledge Transfer o Architectural Overview o Review of W4N data model o User interface (getting a report, searching data etc.) o Documentation location in user interface o Creating users o Roles and Rights o Alerting o Report Packs o Report Wizard o Creation of VPLEX / VNX Storage Pool Report o Adding a VPLEX / VNX o Database maintenance (cleanup) o Database restore from backup o Discovery ITD acceptance of installation, configuration, implementation, and testing June 27, 2014 ITD acceptance of installation, configuration, implementation, and testing June 27, 2014 ITD acceptance of documentation completion June 27, 2014 Time and Materials Personnel [Vendor Abbreviation] agrees to provide the following Named Resources on a Time and Materials basis and as described in any relevant Task Order entered into hereunder: RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 18 TABLE 3 Time and Materials Resources Named Resource 11.3 Title Hourly Rate Payment Terms All payments under this Agreement shall be made in accordance with the Commonwealth's bill paying policy. 11.4 Fixed Price Payments for Tasks and Deliverables A Deliverable or Task will be considered “completed” when ITD has determined that the acceptance criteria for that specific Deliverable or Task has been met as specified in Table 4 of this SOW or the relevant Task Order, and elsewhere in this Agreement. [Vendor Abbreviation] agrees to invoice the Commonwealth for the Deliverables or work completed per the requirements set forth in this SOW and the relevant Task Order and after the Deliverable or Task has been accepted by ITD pursuant to Section 6 of this SOW. ITD will make payments to [Vendor Abbreviation] only after receiving an accurate invoice for Tasks and Deliverables completed and accepted pursuant to Section 6 of this SOW. Payments for specific Tasks and Deliverables shall be made in accordance with Table 4 below. TABLE 4 Fixed Price Deliverables and Tasks 11.5 Deliverable or Task Number Deliverable or Task Name Milestone Date Milestone Payment Amount 1 Install and test all drives June 27, 2014 N/A 2 Install and test all SRM components as described abovel June 27, 2014 N/A Time and Materials Payments For the Time and Materials Services provided in any Task Order entered hereunder, [Vendor Abbreviation] shall complete the work described in the relevant Task Order and as scheduled through weekly planning meetings. [Vendor Abbreviation] will submit weekly reports to ITD’s Project Manager detailing the hours actually worked by the Named Resource performing Time and Materials work and described herein or in the relevant Task Order. The weekly reporting must show actual resource hours worked against assigned tasks. RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 19 [Vendor Abbreviation] will also report weekly to ITD’s Project Manager its expected work effort the forthcoming week, showing the Named Resource’s expected level of effort. The Named Resource will not be authorized for work without the prior review and authorization by ITD’s Project Manager. [Vendor Abbreviation] shall provide a bi-weekly invoice to ITD’s Project Manager for the actual hours worked per week of the Named Resource identified in Table 3. No invoice will exceed 40 hours per week per resource unless expressly approved in advance in writing by ITD’s Project Manager. The total payments under this SOW or the relevant Task Order will not exceed the authorized hours or the total authorized amount as identified in the relevant Task Order. ITD’s Project Manager will review and approve these invoices based on satisfactory work performance by the Named Resource. ITD’s Project Manager may terminate use of the Named Resource by providing ten (10) days written notice to [Vendor Abbreviation]’s Project Manager. If termination is “For Cause”, or for a violation of a term of this Agreement, ITD may terminate use of the Named Resource effective immediately by providing written notice to [Vendor Abbreviation]’s Project Manager. 12. TRANSFER OF ENGAGEMENT PRODUCTS AT CONTRACT TERMINATION 12.1 It is expressly understood by [Vendor Abbreviation] that ITD plans to support and maintain the [technology description] (the “Solution”) without [Vendor Abbreviation]’s assistance after termination of this Agreement, and therefore requires extensive knowledge concerning the installation, operation, and support and maintenance of the Solution from [Vendor Abbreviation] so that ITD is able to perform these activities without the assistance of [Vendor Abbreviation]. 13. MAINTENANCE [Agency and Vendor: Address maintenance to be provided by vendor, if any, and cost thereof] [remainder of page intentionally left blank] RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 20 The undersigned hereby represent that they are duly authorized to execute this SOW on behalf of their respective organizations. Information Technology Division [Vendor Name], a [state of organization] [type of company] By: ________________________ By: ________________________ [Vendor Signatory Name] [ITD Signatory Name] [Title] [Title] Date:______________________ Date:______________________ [Vendor Name], a [state of organization] [type of company] By: ________________________ [Vendor Signatory Name] [Title] Date:______________________ Signature page to SOW Version Control – Do Not Remove or Modify: Based on ITD Hardware RFQ Template SOW, Aug. 2012 RFQ – VMAX Capacity Upgrade 2 & SRM Upgrade Page 21