Ohio Hazmat & WMD Technician Module 1 Unit 7 Decontamination Procedures HazMat Technician Mod 1 Unit 7 Slide 1 Learning Objectives At the end of this training each student will demonstrate the set up of the warm zone and knowledge of proper decontamination techniques. HazMat Technician Mod 1 Unit 7 Slide 2 Student Performance Objectives • List the 5 separate types of decontamination • Perform emergency decontamination of a victim • Set up a mass decon corridor • Set up a technical decontamination area • Must be able to successfully competency evaluations 040, 041 and 042 HazMat Technician Mod 1 Unit 7 Slide 3 Decontamination Procedures • Emergency Decon Hydrant caps HazMat Technician Mod 1 Unit 7 Slide 4 Decontamination Procedures (cont.) • Mass Casualty Decon Hoseline Engine or Ladder corridors Tents and trailers HazMat Technician Mod 1 Unit 7 Slide 5 Decontamination Procedures (cont.) • Hospital Decon HazMat Technician Mod 1 Unit 7 Slide 6 Technical Decon • Purpose of decon • Contamination Prevention Minimize contact Remote procedures Protective covers Disposable clothing Limit contact Cover contaminants HazMat Technician Mod 1 Unit 7 Slide 7 Decontamination Planning • Types of contamination Surface Permeated • Factors affecting Contamination Contact time Concentration Temperature Physical state HazMat Technician Mod 1 Unit 7 Slide 8 Decontamination Planning (cont.) • Methods of Decontamination Type of contaminant Amount PPE Type of contamination Characteristics of the surface HazMat Technician Mod 1 Unit 7 Slide 9 Decontamination Planning (cont.) • Physical removal Techniques Brushing Scraping Vacuuming Washing and rinsing Heat or steam cleaning HazMat Technician Mod 1 Unit 7 Slide 10 Decontamination Planning (cont.) • Chemical removal techniques Dissolving Surfactants Neutralization Oxidation Solidification Disinfection/sterilization HazMat Technician Mod 1 Unit 7 Slide 11 Decontamination Planning (cont.) • • • • • • • Implementation Location PPE Procedures Equipment decon Decon solutions Processes Wet Dry HazMat Technician Mod 1 Unit 7 Slide 12 Decontamination Planning (cont.) • Decon effectiveness Visual Monitor devices Ultraviolet light Wipe sampling Chemical analysis HazMat Technician Mod 1 Unit 7 Slide 13 Equipment Decon HazMat Technician Mod 1 Unit 7 Slide 14 Exercise Time Allotted: 240 minutes Equipment needed: Various types of non-bulk containers 55 gallon drums Chlorine cylinder Various types of bulk containers 1 ton cylinder 307/407 312/412 Railcar* Overpack drums Chlorine kits A, B, and C Transfer pumps Plugging kit Supplies needed: Bonding and grounded equipment Patches and plugs Full Decon Set-up Decon checklist Level B Suit ensembles Level B dressout checklist Methodology: The instructor will give you the scenario and you will have to work through solutions based on the information that you have learned. HazMat Technician Mod 1 Unit 7 Slide 15 Unit 7 Quiz HazMat Technician Mod 1 Unit 7 Slide 16 Decon set-up procedures Decon Checklist Name of decon tech________________________________________ Names of personnel assigned for decon per the I.C. ______________________ ____________________ _____________________ ______________________ ____________________ _____________________ 1-5 gal bucket w/soap 3 trashcans w/liners rolled plastic 2 Decon Decks w/bladders (pools) 2 scrub brushes w/wands Manifold Lights(optional) Tarp (optional) (optional ___ Confirm type and extent of decon with Hazmat Branch Officer ___ Confirm Selected Decon area (upwind, uphill, flat surface) ___ Light area if at night ___ Place canvas tarps down if on rough ground (gravel) ___ Lay out plastic minimum size 20’ x 50’ ___ Roll up sides and tape (optional) ___ Lay 1 1/2 hose from an engine attach decon manifold and 2 garden hoses ___ Place zoning tape around perimeter and mark entrance and exit ___ Place Decon Decks in position and attach bladders ___ Place 5 gal bucket with soapy water and brushes for washing ___ Review Decon procedures with I.C. ___ Confirm dress out level for decon personnel ___ Assign tenders and dress decon personnel as per dress-out procedures 2 hoses duct tape HazMat Technician Mod 1 Unit 7 Slide 17 Standard Decon Diagram Entry HOT ZONE 5 gal bucket w/soap and water Lined trash can for tool drop Manifold Bladder Decon deck Lined trash can 1” garden hose w wand 1-½ from engine pylons Banner tape Exit HazMat Technician Mod 1 Unit 7 Slide 18 Questions? HazMat Technician Mod 1 Unit 7 Slide 19