Client Name Project Title Health and Safety File Date Document1 Issue No: Document Owner: Page 1 of 56 Date: xx/xx/xxxx Health and safety file – authorisation record sheet CDM Co-ordinator File prepared by Date [NAME] [NAME] [DATE] File reviewed by Signature [NAME] Date [DATE] Disclaimer This document and its contents have been prepared and are intended solely for the University of West England, (Clients Name)’s information and use in relation to the site for which this file has been prepared. University of West England (UWE) (CDM-C) assumes no responsibility to any other party in respect of or arising out of or in connection with this document and / or its contents. Copyright The copyright of this document is vested in University of West England (UWE). This document may not be reproduced in whole or in part without their express written permission. Health and safety file – amendment sheet No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Document1 Issue No: Amendment (detail) Amended by Document Owner: Date Page 2 of 56 Date: xx/xx/xxxx CONTENTS 1. INTRODUCTION ............................................................................................................................... 4 1.1 Purpose of the health and safety file .......................................................................................................... 4 1.2 Location of the file ...................................................................................................................................... 4 1.3 Site information .......................................................................................................................................... 4 2. 3. PROJECT DETAILS ............................................................................................................................ 5 EXISTING ENVIRONMENT ................................................................................................................ 7 3.1 Local environment ...................................................................................................................................... 7 3.2 Reports / investigations .............................................................................................................................. 8 4. SPECIFIC PROJECT PARTICULARS .................................................................................................... 11 4.1 Residual Hazards ....................................................................................................................................... 11 4.2 As built information .................................................................................................................................. 12 4.3 Drawings ................................................................................................................................................... 12 5. MECHANICAL INSTALLATIONS ....................................................................................................... 14 5.1 5.2 5.3 5.4 5.5 5.6 6. ELECTRICAL INSTALLATIONS .......................................................................................................... 21 6.1 6.2 6.3 6.4 6.5 6.6 7. Manufactures Literature ........................................................................................................................... 29 Testing and Commissioning ....................................................................................................................... 30 Operations ................................................................................................................................................ 31 Spares schedule ........................................................................................................................................ 32 Maintenance ............................................................................................................................................. 33 Warranty schedule .................................................................................................................................... 34 STRUCTURAL WORK ...................................................................................................................... 35 8.1 8.2 8.3 8.4 8.5 8.6 9. Manufactures Literature ........................................................................................................................... 22 Testing and Commissioning ....................................................................................................................... 23 Operations ................................................................................................................................................ 24 Spares schedule ........................................................................................................................................ 25 Maintenance ............................................................................................................................................. 26 Warranty schedule .................................................................................................................................... 27 ARCHITECTURAL / FABRIC WORK ................................................................................................... 28 7.1 7.2 7.3 7.4 7.5 7.6 8. Manufactures Literature ........................................................................................................................... 15 Testing and Commissioning ....................................................................................................................... 16 Operations ................................................................................................................................................ 17 Spares schedule ........................................................................................................................................ 18 Maintenance ............................................................................................................................................. 19 Warranty schedule .................................................................................................................................... 20 Manufactures Literature ........................................................................................................................... 36 Testing and Commissioning ....................................................................................................................... 37 Operations ................................................................................................................................................ 38 Spares schedule ........................................................................................................................................ 39 Maintenance ............................................................................................................................................. 40 Warranty schedule .................................................................................................................................... 41 CIVIL WORK .................................................................................................................................. 42 9.1 9.2 9.3 9.4 9.5 9.6 Manufactures Literature ........................................................................................................................... 43 Testing and Commissioning ....................................................................................................................... 44 Operations ................................................................................................................................................ 45 Spares schedule ........................................................................................................................................ 46 Maintenance ............................................................................................................................................. 47 Warranty schedule .................................................................................................................................... 48 10. SPECIALIST INSTALLATIONS ........................................................................................................... 49 10.1 10.2 10.3 10.4 10.5 10.6 Manufactures Literature ........................................................................................................................... 50 Testing and Commissioning ....................................................................................................................... 51 Operations ................................................................................................................................................ 52 Spares schedule ........................................................................................................................................ 53 Maintenance ............................................................................................................................................. 54 Warranty schedule .................................................................................................................................... 55 11. ASSET REGISTER ............................................................................................................................ 56 Document1 Issue No: Document Owner: Page 3 of 56 Date: xx/xx/xxxx 1. INTRODUCTION 1.1 Purpose of the health and safety file This health and safety file is produced in order to comply with regulations 10 (d), 17 (1-4) and 20 (e) to (f) of the Construction (Design and Management) Regulations 2007 (CDM2007) and includes information which seeks to assist persons carrying out construction work in the property at any time after completion of the current project. It is the collation of information provided by all parties including the client, designers and contractors. The health and safety file has been designed to alert those who will be responsible for the property after handover, to potential risks and hazards that must be managed when the structure and associated plant is maintained, cleaned, repaired, renovated or demolished. It is a record of information to influence future decisions on the management of health and safety in connection with persons at work in or on the property or of any person who may be affected by the work of such persons. The health and safety file must be kept available for the benefit of those involved in future construction projects and maintenance activities. It will form the major part of information to be made available by the client during the planning stages of future works and should also be made available to the CDM coordinator on any future major projects. The health and safety file has been created in relation to the construction work actually carried out in the current project and subject to CDM2007. However, as further work is carried out, the health and safety file will be added to and amended, allowing an increasingly detailed health and safety file to be developed. The client and / or his appointed CDM coordinator will be responsible for making the necessary additions and amendments. The format of the health and safety file has been designed with this in mind; the ‘amendment sheet’ having been provided to ensure recording of the development of the file concerned. 1.2 Location of the file The client is responsible for ensuring that the health and safety file is made available to those who may benefit from it, including maintenance contractors, CDM coordinators and contractors carrying out future work. The University of West England (or his CDM coordinator) shall ensure that the health and safety file remains complete and in a satisfactory condition. Any amendments or additions to the health and safety file must be made as soon as possible following any changes. Documents are stored electronically and hard copies are archived. Site information Site details The details of the site to which this file relates are as follows: [CLIENT NAME] [ADDRESS] Tel: Fax: Project location The site is located [DETAILS] A site location plan can be found in section ‘5.00 Site location plan’ of this file. General site notes [NOTES] Document1 Issue No: Document Owner: Page 4 of 56 Date: xx/xx/xxxx 2. PROJECT DETAILS Project directory – Key participants Company Name Address Phone Number Contact [Address Line 1] [Address Line 2] [Address Line 3] [Postcode] [Details] 0000 000 0000 0000 000 0000 Fax 0000 000 0000 Mob [Contact Name] [Address Line 1] [Address Line 2] [Address Line 3] [Postcode] [Details] 0000 000 0000 0000 000 0000 Fax 0000 000 0000 Mob [Contact Name] [Address Line 1] [Address Line 2] [Address Line 3] [Postcode] [Details] 0000 000 0000 0000 000 0000 Fax 0000 000 0000 Mob [Contact Name] [Address Line 1] [Address Line 2] [Address Line 3] [Postcode] [Details] 0000 000 0000 0000 000 0000 Fax 0000 000 0000 Mob [Contact Name] [Address Line 1] [Address Line 2] [Address Line 3] [Postcode] [Details] 0000 000 0000 0000 000 0000 Fax 0000 000 0000 Mob [Contact Name] Phone Number Contact Client [Company Name] E-mail address: Client Project Manager [Company Name] E-mail address: CDM Co-coordinator [Company Name] E-mail address: Designer [Company Name] E-mail address: Principal Contractor [Company Name] E-mail address: Project directory – Sub contractors / suppliers Company Name Address Sub-contractors [Company Name] E-mail address: Trade: [Address Line 1] [Address Line 2] [Address Line 3] [Postcode] [Details] Sub-contractors [Company Name] E-mail address: 0000 000 0000 0000 000 0000 Fax 0000 000 0000 Mob [Contact Name] Trade: [Address Line 1] [Address Line 2] [Address Line 3] [Postcode] [Details] 0000 000 0000 0000 000 0000 Fax 0000 000 0000 Mob [Contact Name] Continue on next page as required … Document1 Issue No: Document Owner: Page 5 of 56 Date: xx/xx/xxxx Project information Nature of Project (Describe) Start Date: xx/xx/xxxx Document1 Issue No: Completion Date: xx/xx/xxxx Document Owner: Page 6 of 56 Date: xx/xx/xxxx 3. EXISTING ENVIRONMENT 3.1 Local environment Previous use of the site The site was previously used [DESCRIBE] OR, Previous use of the site is not known but not considered significant to this scheme. Current use of the site The site, i.e. building, is [DESCRIBE] Existing structures and key structural principles The existing structure is estimated to have been constructed circa [YEAR OF CONSTRUCTION] and comprises [DESCRIBE] OR, The existing structure comprises [DESCRIBE] Previous use of adjacent sites Previous use of adjacent sites includes: [LIST] OR, Previous use of adjacent sites is not known but not considered significant to this scheme. Current or anticipated use of adjacent sites Adjacent sites comprise the following: North South East West - [DESCRIBE] [DESCRIBE] [DESCRIBE] [DESCRIBE] Contractors carrying out future maintenance, repair or other building works must indicate specific arrangements for maintaining services, safety and providing a safe entrance and exit route to all the aforementioned sites. OR, [DESCRIBE i.e.; from the PCI] Contractors carrying out future maintenance, repair or other building works must indicate specific arrangements for maintaining services, safety and providing a safe entrance and exit route to all the aforementioned sites. Road and traffic systems adjacent to the site Busy main road, town Centre location. No on street parking available. Restricted loading / unloading times. OR, Document1 Issue No: Document Owner: Page 7 of 56 Date: xx/xx/xxxx [DESCRIBE i.e.; from the PCI] 3.2 Reports / investigations Existing services (utilities) The property is served by gas, water, electricity, telecoms and drainage. Statutory utility service entry points are as follows: Gas - } Water - } Refer to any existing Operation and Maintenance (O&M) manuals held on site. Electricity - } Prior to the commencement of any future works, contractors should make themselves aware of the mains location and position of all isolation points, so that in the event of an emergency, power supplies etc. can be quickly isolated. OR, The property is served by gas, water, electricity, telecoms and drainage. Statutory utility service entry points are as follows: Gas - [LOCATION] Water - [LOCATION] Electricity - [LOCATION] Prior to the commencement of any future works, contractors should make themselves aware of the mains location and position of all isolation points, so that in the event of an emergency, power supplies etc. can be quickly isolated. OR, Information relating to existing services was not sought from the statutory undertakers, due to the nature of the works. Prior to the commencement of any future works, contractors should make themselves aware of the mains location and position of all isolation points, so that in the event of an emergency, power supplies etc. can be quickly isolated. Emergency and firefighting systems There was an existing fire alarm, smoke detection and firefighting system prior to these works. [DESCRIBE] OR, There was no existing fire alarm, smoke detection or firefighting system at this site. [However, a system has now been installed as part of this project. Refer to section ‘2.03 Nature of the project’. / Installation of a new system was not included within this project and, therefore, there remains to be no system in place.] As built drawings and O&M information The following existing as built drawings and O&M information have been provided in relation to the works: By: [COMPANY NAME] Document1 Issue No: Document Owner: Page 8 of 56 Date: xx/xx/xxxx [LIST] A copy of the above information can be found [DESCRIBE] OR, Refer to any existing O&M manuals and / or any existing health and safety file(s) held on site. Inspection and test certificates The following existing inspection and test certificates have been provided in relation to the works: By: [COMPANY NAME] [LIST] A copy of these certificates can be found [DESCRIBE] OR, Refer to any existing O&M manuals and / or any existing health and safety file(s) held on site. Asbestos Management and Refurbishment / demolition survey asbestos survey have been carried out on the existing premises. Asbestos and / or Asbestos Containing Materials (ACMs) [were / were not] detected. A comprehensive asbestos register is available [IF SO, DESCRIBE] Refer to the asbestos report issued by [COMPANY NAME], Ref. [REFERENCE NO.], which can be found [DESCRIBE] [IF APPLICABLE] The above noted ACMs [were / were not] removed prior to commencement of the works. Contractors should ask to view the current asbestos register prior to works commencing. All investigations will have been conducted in such a manner as to minimise any damage to the fabric and decoration of the premises. It is therefore possible that Asbestos Containing Materials (ACMs) not detected during this work, may still be present in concealed areas and voids. During future works to the property suspect material may therefore be uncovered. Should this occur then work should stop immediately in this area and advice sought from the client and / or his representative or CDM coordinator. All employers have a legal duty to prevent the exposure of their employees to asbestos, or if this is not possible to reduce it to the lowest possible level. The Control of Asbestos Regulations requires them to manage the risk from asbestos by: Document1 Issue No: finding out if there is asbestos in the premises, its amount and what condition it is in presuming materials contain asbestos, unless there is strong evidence that they do not making and keeping up to date a record of the location and condition of the ACMs or presumed ACMs in the premises assessing the risk from the material preparing a plan that sets out in detail how the risk from this material is to be managed taking steps needed to put the plan into action reviewing and monitoring the plan and the arrangements made to put it in place Document Owner: Page 9 of 56 Date: xx/xx/xxxx providing information on the location and condition of the material to anyone who is liable to work within close proximity to ACMs or disturb them Anyone with any interest in the property will have a duty to co-operate with employers to enable them to manage the risk. Ground conditions The following information has been provided in relation to the works: By: [COMPANY NAME] [LIST] A copy of the above information can be found [DESCRIBE] OR, Due to the internal nature of the works undertaken, this information was not required. Local authority restrictions Planning consent [was / was not] required for this project. Building regulations approval [was / was not] required for this project. [IF SO] The above document(s) is / are held by [PARTY HOLDING DOCUMENTS] Site restrictions [DESCRIBE] Concurrent construction activities by others Where two or more employers share a work place; contractors carrying out future maintenance, repair or other building works must indicate specific arrangements of how they propose to: Co-operate with the other employers concerned so far as is necessary to enable them to comply with the requirements and prohibitions imposed upon them by or under the relevant statutory provisions (Taking into account the nature of the activities) Take all reasonable steps to co-ordinate the measures taken to comply with the requirements and prohibitions imposed upon them by or under the relevant statutory provisions Take reasonable steps to inform the other employers concerned of the risks to their employees’ health and safety arising out of, or in connection with, his activities Existing drawings The following existing drawings have been provided in relation to the works: By: [COMPANY NAME] [LIST] A copy of these drawings can be found [DESCRIBE] OR, Refer to any existing O&M manuals and / or any existing health and safety file(s) held on site. Document1 Issue No: Document Owner: Page 10 of 56 Date: xx/xx/xxxx 4. SPECIFIC PROJECT PARTICULARS 4.1 Residual Hazards General Information relating to significant cleaning and maintenance hazards is detailed below. This covers: [LIST THE SITE SPECIFIC HAZARDS FOR WHICH INFORMATION HAS BEEN PROVIDED] Maintenance must be undertaken by competent and adequately resourced personnel. All work must be performed in compliance with relevant acts and regulations, client rules and procedures and where appropriate under the jurisdiction of an appropriate permit-to-work. The following points should be observed: Personnel should be inducted and familiar with site safety procedures Refer to asbestos register Assess work area for potential hazards prior to commencing work Refer to relevant O&M manuals Isolate and make safe as required Ensure all appropriate tools, plant; safety equipment including PPE is available Always replace guards removed for maintenance purposes Do not proceed if a hazard is perceived. Report the hazard immediately Any work which is to be undertaken and will involve the exposure of persons to hazardous substances should have a COSHH assessment carried out for that activity. This assessment as required under the Control of Substances Hazardous to Health Regulations (COSHH) must be undertaken by the employer and issued to those actually performing the work. Client rules and procedures The contractor should appoint a representative of his company to be responsible for ensuring that the principles within this file and the health and safety regulations are complied with. The contractor should employ proven methods and safe working practices when carrying out construction works. If during the course of the works unforeseen hazards are encountered, the following procedures shall apply: As soon as a hazard is encountered, the project manager and CDM coordinator (if one has been appointed) shall be notified The contractor shall prepare an appropriate method statement to address risks associated with the encountered hazard on the basis of risk assessments The contractor shall be required to update, amend and modify as necessary the construction phase plan to address any risks associated with the encountered hazard Other rules and procedures Contractors should consider the following site rules: Security Adequately safeguard the site, the works, products, materials and plant affected by the works from damage or theft. Noise Comply generally with BS 5228. Noise shall at all times be kept to a minimum and no noise shall be created at unsociable hours. Nuisance Take all necessary precautions to prevent nuisance from smoke, dust, rubbish and other causes. Document1 Issue No: Document Owner: Page 11 of 56 Date: xx/xx/xxxx Parking Contractors’ vehicles shall be restricted to the area of the site. Fire Burning on site of materials arising from the works will not be permitted. Pollution Take all necessary precautions to prevent pollution of the site, the works and the general environment including streams and waterways. If pollution occurs inform the appropriate authorities. Smoking [DELETE AS APPLICABLE] The Health Act 2006 (amended 1st July 2007) requires that all enclosed premises in England be smoke free. The principal contractor must ensure that all requirements of the aforementioned Act are adhered to at all times. OR, The Health Act 2006 (26th March 2006) requires that all enclosed premises in Scotland be smoke free. The principal contractor must ensure that all requirements of the aforementioned Act are adhered to at all times. Other Other contractors must provide for as appropriate and ensure that all visitors are wearing adequate and proper protective equipment before allowing their entry onto the site. Maintenance, alteration and demolition Work must only be undertaken having taken due regard to the contents of this file and in all cases with the knowledge and written agreement of the appropriate manager / supervisor / engineer. As appropriate, risk assessments as defined by The Management of Health and Safety at Work Regulations, or other associated health and safety regulations, may be required. Planned cleaning and maintenance The following information, which relates to equipment provided for cleaning and maintaining the structure, has been provided: [DESCRIBE] The above information can be found [DESCRIBE]. All operations must be performed as recommended in manufacturers’ literature. OR, No information has been provided for this section of the file. No specialist operations were carried out that required special cleaning or maintenance. All operations must be performed as recommended in manufacturers’ literature. 4.2 As built information Drawing number 4.3 Revision Title Drawings Insert behind here Document1 Issue No: Document Owner: Page 12 of 56 Date: xx/xx/xxxx Document1 Issue No: Document Owner: Page 13 of 56 Date: xx/xx/xxxx 5. MECHANICAL INSTALLATIONS Document1 Issue No: Document Owner: Page 14 of 56 Date: xx/xx/xxxx 5.1 Manufactures Literature (Insert Behind) Sec No. Manufacturer / Supplier Equipment Supplied Literature Provided Complete details here in alphabetical order Document1 Issue No: Document Owner: Page 15 of 56 Date: xx/xx/xxxx 5.2 Testing and Commissioning (Insert Behind) Document1 Issue No: Document Owner: Page 16 of 56 Date: xx/xx/xxxx 5.3 Operations TYPE OF SYSTEM Provide a brief summary of system / equipment type. e.g. centralized chilled water generation via air cooled chiller with pumped 2 pipe distribution. TYPE OF SYSTEM Item List the main plant and equipment in system and its location. This should include Manufacturer, Description, Assets Code of all Assets on the Asset Schedule for a particular system e.g. “Carrier” Air Cooled Chiller Insert rows as required Location Plant Roof Area SERVING Provide Description of the system or items DEPENDENT ON Show dependents of the system on other services e.g. Mains water to pressurisation unit ASSOCIATED DRAWINGS List all applicable drawings and titles NOTE DETAILS NO. 1. Normal Operations Provide details of Normal Operations of the equipment including switch selections etc. 2. Manual Operation Provide details of Normal Operations of the equipment including switch selections etc. 3. Fire and other interfaces Provide details of interfaces to other systems and equipment 4. Specific notes Use this for other notes, change the tittle and add additional numbered notes as required 5. 6. Document1 Issue No: Document Owner: Page 17 of 56 Date: xx/xx/xxxx 5.4 Spares schedule Equipment Document1 Issue No: Description Part reference Document Owner: Quantity Page 18 of 56 Date: xx/xx/xxxx 5.5 Maintenance Risk Assessment – Warning – Manufacturers Literature – Health, Safety and Environment – Daily, Weekly Tasks – Specialist Equipment – ITEM A risk assessment must be carried out, by the maintenance contractor, the form completed and signed prior to commencing work. Control measures must be taken if dictated by the risk assessment. Due regard must also be given to the Residual Hazards detailed in the appropriate section off the Health and Safety File. Before commencing maintenance work on any items of plant, ensure that the associated supplies have been isolated and locked off and that all control and ancillary circuits have been made dead. The general maintenance guidance notes are supplemented by particular manufacturers’ recommendations: - Refer to companion manufacturers’ literature documents. All work must be carried out in accordance with relevant Health, Safety and Environmental Legislation and associated Standards and Industry Guidance Routine Daily / Weekly inspections and tasks must form part of the maintenance routine and Actions arising must be dealt with It is recommended that a Maintenance Contract is placed for any specialist equipment FREQUENCY MAINTENANCE TASKS Provide Maintenance Instructions for all items within the system. Each task should have a reference to item and frequency and the task NOTE: Specific details of any residual hazards specialist tools or equipment should also be detailed here Document1 Issue No: Document Owner: Page 19 of 56 Date: xx/xx/xxxx 5.6 Warranty schedule (Insert Behind) list alphabetically Description Document1 Issue No: Issue Date Document Owner: Expiry Date Page 20 of 56 Date: xx/xx/xxxx 6. ELECTRICAL INSTALLATIONS Document1 Issue No: Document Owner: Page 21 of 56 Date: xx/xx/xxxx 6.1 Manufactures Literature (Insert Behind) Sec No. Manufacturer / Supplier Document1 Issue No: Equipment Supplied Document Owner: Literature Provided Page 22 of 56 Date: xx/xx/xxxx 6.2 Testing and Commissioning (Insert Behind) Document1 Issue No: Document Owner: Page 23 of 56 Date: xx/xx/xxxx 6.3 Operations TYPE OF SYSTEM Provide a brief summary of system / equipment type. e.g. centralized chilled water generation via air cooled chiller with pumped 2 pipe distribution. TYPE OF SYSTEM Item List the main plant and equipment in system and its location. This should include Manufacturer, Description, Assets Code of all Assets on the Asset Schedule for a particular system e.g. “Carrier” Air Cooled Chiller Insert rows as required Location Plant Roof Area SERVING Provide Description of the system or items DEPENDENT ON Show dependents of the system on other services e.g. Mains water to pressurisation unit ASSOCIATED DRAWINGS List all applicable drawings and titles NOTE DETAILS NO. 1. Normal Operations Provide details of Normal Operations of the equipment including switch selections etc. 2. Manual Operation Provide details of Normal Operations of the equipment including switch selections etc. 3. Fire and other interfaces Provide details of interfaces to other systems and equipment 4. Specific notes Use this for other notes, change the tittle and add additional numbered notes as required 5. 6. Document1 Issue No: Document Owner: Page 24 of 56 Date: xx/xx/xxxx 6.4 Spares schedule (Insert Behind) Equipment Document1 Issue No: Description Part reference Document Owner: Quantity Page 25 of 56 Date: xx/xx/xxxx 6.5 Maintenance Notes: Risk Assessment – Warning – Manufacturers Literature – Health, Safety and Environment – Daily, Weekly Tasks – Specialist Equipment – ITEM A risk assessment must be carried out, by the maintenance contractor, the form completed and signed prior to commencing work. Control measures must be taken if dictated by the risk assessment. Due regard must also be given to the Residual Hazards detailed in the appropriate section off the Health and Safety File. Before commencing maintenance work on any items of plant, ensure that the associated supplies have been isolated and locked off and that all control and ancillary circuits have been made dead. The general maintenance guidance notes are supplemented by particular manufacturers’ recommendations: - Refer to companion manufacturers’ literature documents. All work must be carried out in accordance with relevant Health, Safety and Environmental Legislation and associated Standards and Industry Guidance Routine Daily / Weekly inspections and tasks must form part of the maintenance routine and Actions arising must be dealt with It is recommended that a Maintenance Contract is placed for any specialist equipment FREQUENCY MAINTENANCE TASKS Provide Maintenance Instructions for all items within the system. Each task should have a reference to item and frequency and the task NOTE: Specific details of any residual hazards specialist tools or equipment should also be detailed here Document1 Issue No: Document Owner: Page 26 of 56 Date: xx/xx/xxxx 6.6 Warranty schedule (Insert Behind) Description Document1 Issue No: Issue Date Document Owner: Expiry Date Page 27 of 56 Date: xx/xx/xxxx 7. ARCHITECTURAL / FABRIC WORK Document1 Issue No: Document Owner: Page 28 of 56 Date: xx/xx/xxxx 7.1 Manufactures Literature (Insert Behind) Sec No. Manufacturer / Supplier Document1 Issue No: Equipment Supplied Document Owner: Literature Provided Page 29 of 56 Date: xx/xx/xxxx 7.2 Testing and Commissioning (Insert Behind) Document1 Issue No: Document Owner: Page 30 of 56 Date: xx/xx/xxxx 7.3 Operations TYPE OF SYSTEM Provide a brief summary of system / equipment type. e.g. centralized chilled water generation via air cooled chiller with pumped 2 pipe distribution. TYPE OF SYSTEM Item List the main plant and equipment in system and its location. This should include Manufacturer, Description, Assets Code of all Assets on the Asset Schedule for a particular system e.g. “Carrier” Air Cooled Chiller Insert rows as required Location Plant Roof Area SERVING Provide Description of the system or items DEPENDENT ON Show dependents of the system on other services e.g. Mains water to pressurisation unit ASSOCIATED DRAWINGS List all applicable drawings and titles NOTE DETAILS NO. 7. Normal Operations Provide details of Normal Operations of the equipment including switch selections etc. 8. Manual Operation Provide details of Normal Operations of the equipment including switch selections etc. 9. Fire and other interfaces Provide details of interfaces to other systems and equipment 10. Specific notes Use this for other notes, change the tittle and add additional numbered notes as required 11. 12. Document1 Issue No: Document Owner: Page 31 of 56 Date: xx/xx/xxxx 7.4 Spares schedule (Insert Behind) Equipment Document1 Issue No: Description Part reference Document Owner: Quantity Page 32 of 56 Date: xx/xx/xxxx 7.5 Maintenance Notes: Risk Assessment – Warning – Manufacturers Literature – Health, Safety and Environment – Daily, Weekly Tasks – Specialist Equipment – ITEM A risk assessment must be carried out, by the maintenance contractor, the form completed and signed prior to commencing work. Control measures must be taken if dictated by the risk assessment. Due regard must also be given to the Residual Hazards detailed in the appropriate section off the Health and Safety File. Before commencing maintenance work on any items of plant, ensure that the associated supplies have been isolated and locked off and that all control and ancillary circuits have been made dead. The general maintenance guidance notes are supplemented by particular manufacturers’ recommendations: - Refer to companion manufacturers’ literature documents. All work must be carried out in accordance with relevant Health, Safety and Environmental Legislation and associated Standards and Industry Guidance Routine Daily / Weekly inspections and tasks must form part of the maintenance routine and Actions arising must be dealt with It is recommended that a Maintenance Contract is placed for any specialist equipment FREQUENCY MAINTENANCE TASKS Provide Maintenance Instructions for all items within the system. Each task should have a reference to item and frequency and the task NOTE: Specific details of any residual hazards specialist tools or equipment should also be detailed here Document1 Issue No: Document Owner: Page 33 of 56 Date: xx/xx/xxxx 7.6 Warranty schedule (Insert Behind) Description Document1 Issue No: Issue Date Document Owner: Expiry Date Page 34 of 56 Date: xx/xx/xxxx 8. STRUCTURAL WORK Document1 Issue No: Document Owner: Page 35 of 56 Date: xx/xx/xxxx 8.1 Manufactures Literature (Insert Behind) Sec No. Manufacturer / Supplier Document1 Issue No: Equipment Supplied Document Owner: Literature Provided Page 36 of 56 Date: xx/xx/xxxx 8.2 Testing and Commissioning (Insert Behind) Document1 Issue No: Document Owner: Page 37 of 56 Date: xx/xx/xxxx 8.3 Operations TYPE OF SYSTEM Provide a brief summary of system / equipment type. e.g. centralized chilled water generation via air cooled chiller with pumped 2 pipe distribution. TYPE OF SYSTEM Item List the main plant and equipment in system and its location. This should include Manufacturer, Description, Assets Code of all Assets on the Asset Schedule for a particular system e.g. “Carrier” Air Cooled Chiller Insert rows as required Location Plant Roof Area SERVING Provide Description of the system or items DEPENDENT ON Show dependents of the system on other services e.g. Mains water to pressurisation unit ASSOCIATED DRAWINGS List all applicable drawings and titles NOTE DETAILS NO. 13. Normal Operations Provide details of Normal Operations of the equipment including switch selections etc. 14. Manual Operation Provide details of Normal Operations of the equipment including switch selections etc. 15. Fire and other interfaces Provide details of interfaces to other systems and equipment 16. Specific notes Use this for other notes, change the tittle and add additional numbered notes as required 17. 18. Document1 Issue No: Document Owner: Page 38 of 56 Date: xx/xx/xxxx 8.4 Spares schedule (Insert Behind) Equipment Document1 Issue No: Description Part reference Document Owner: Quantity Page 39 of 56 Date: xx/xx/xxxx 8.5 Maintenance Notes: Risk Assessment – Warning – Manufacturers Literature – Health, Safety and Environment – Daily, Weekly Tasks – Specialist Equipment – ITEM A risk assessment must be carried out, by the maintenance contractor, the form completed and signed prior to commencing work. Control measures must be taken if dictated by the risk assessment. Due regard must also be given to the Residual Hazards detailed in the appropriate section off the Health and Safety File. Before commencing maintenance work on any items of plant, ensure that the associated supplies have been isolated and locked off and that all control and ancillary circuits have been made dead. The general maintenance guidance notes are supplemented by particular manufacturers’ recommendations: - Refer to companion manufacturers’ literature documents. All work must be carried out in accordance with relevant Health, Safety and Environmental Legislation and associated Standards and Industry Guidance Routine Daily / Weekly inspections and tasks must form part of the maintenance routine and Actions arising must be dealt with It is recommended that a Maintenance Contract is placed for any specialist equipment FREQUENCY MAINTENANCE TASKS Provide Maintenance Instructions for all items within the system. Each task should have a reference to item and frequency and the task NOTE: Specific details of any residual hazards specialist tools or equipment should also be detailed here Document1 Issue No: Document Owner: Page 40 of 56 Date: xx/xx/xxxx 8.6 Warranty schedule (Insert Behind) Description Document1 Issue No: Issue Date Document Owner: Expiry Date Page 41 of 56 Date: xx/xx/xxxx 9. CIVIL WORK Document1 Issue No: Document Owner: Page 42 of 56 Date: xx/xx/xxxx 9.1 Manufactures Literature (Insert Behind) Sec No. Manufacturer / Supplier Document1 Issue No: Equipment Supplied Document Owner: Literature Provided Page 43 of 56 Date: xx/xx/xxxx 9.2 Testing and Commissioning (Insert Behind) Document1 Issue No: Document Owner: Page 44 of 56 Date: xx/xx/xxxx 9.3 Operations TYPE OF SYSTEM Provide a brief summary of system / equipment type. e.g. centralized chilled water generation via air cooled chiller with pumped 2 pipe distribution. TYPE OF SYSTEM Item List the main plant and equipment in system and its location. This should include Manufacturer, Description, Assets Code of all Assets on the Asset Schedule for a particular system e.g. “Carrier” Air Cooled Chiller Insert rows as required Location Plant Roof Area SERVING Provide Description of the system or items DEPENDENT ON Show dependents of the system on other services e.g. Mains water to pressurisation unit ASSOCIATED DRAWINGS List all applicable drawings and titles NOTE DETAILS NO. 19. Normal Operations Provide details of Normal Operations of the equipment including switch selections etc. 20. Manual Operation Provide details of Normal Operations of the equipment including switch selections etc. 21. Fire and other interfaces Provide details of interfaces to other systems and equipment 22. Specific notes Use this for other notes, change the tittle and add additional numbered notes as required 23. 24. Document1 Issue No: Document Owner: Page 45 of 56 Date: xx/xx/xxxx 9.4 Spares schedule (Insert Behind) Equipment Document1 Issue No: Description Part reference Document Owner: Quantity Page 46 of 56 Date: xx/xx/xxxx 9.5 Maintenance Notes: Risk Assessment – Warning – Manufacturers Literature – Health, Safety and Environment – Daily, Weekly Tasks – Specialist Equipment – ITEM A risk assessment must be carried out, by the maintenance contractor, the form completed and signed prior to commencing work. Control measures must be taken if dictated by the risk assessment. Due regard must also be given to the Residual Hazards detailed in the appropriate section off the Health and Safety File. Before commencing maintenance work on any items of plant, ensure that the associated supplies have been isolated and locked off and that all control and ancillary circuits have been made dead. The general maintenance guidance notes are supplemented by particular manufacturers’ recommendations: - Refer to companion manufacturers’ literature documents. All work must be carried out in accordance with relevant Health, Safety and Environmental Legislation and associated Standards and Industry Guidance Routine Daily / Weekly inspections and tasks must form part of the maintenance routine and Actions arising must be dealt with It is recommended that a Maintenance Contract is placed for any specialist equipment FREQUENCY MAINTENANCE TASKS Provide Maintenance Instructions for all items within the system. Each task should have a reference to item and frequency and the task NOTE: Specific details of any residual hazards specialist tools or equipment should also be detailed here Document1 Issue No: Document Owner: Page 47 of 56 Date: xx/xx/xxxx 9.6 Warranty schedule (Insert Behind) Description Document1 Issue No: Issue Date Document Owner: Expiry Date Page 48 of 56 Date: xx/xx/xxxx 10. SPECIALIST INSTALLATIONS Document1 Issue No: Document Owner: Page 49 of 56 Date: xx/xx/xxxx 10.1 Manufactures Literature (Insert Behind) Sec No. Manufacturer / Supplier Document1 Issue No: Equipment Supplied Document Owner: Literature Provided Page 50 of 56 Date: xx/xx/xxxx 10.2 Testing and Commissioning (Insert Behind) Document1 Issue No: Document Owner: Page 51 of 56 Date: xx/xx/xxxx 10.3 Operations TYPE OF SYSTEM Provide a brief summary of system / equipment type. e.g. centralized chilled water generation via air cooled chiller with pumped 2 pipe distribution. TYPE OF SYSTEM Item List the main plant and equipment in system and its location. This should include Manufacturer, Description, Assets Code of all Assets on the Asset Schedule for a particular system e.g. “Carrier” Air Cooled Chiller Insert rows as required Location Plant Roof Area SERVING Provide Description of the system or items DEPENDENT ON Show dependents of the system on other services e.g. Mains water to pressurisation unit ASSOCIATED DRAWINGS List all applicable drawings and titles NOTE DETAILS NO. 25. Normal Operations Provide details of Normal Operations of the equipment including switch selections etc. 26. Manual Operation Provide details of Normal Operations of the equipment including switch selections etc. 27. Fire and other interfaces Provide details of interfaces to other systems and equipment 28. Specific notes Use this for other notes, change the tittle and add additional numbered notes as required 29. 30. Document1 Issue No: Document Owner: Page 52 of 56 Date: xx/xx/xxxx 10.4 Spares schedule (Insert Behind) Equipment Document1 Issue No: Description Part reference Document Owner: Quantity Page 53 of 56 Date: xx/xx/xxxx 10.5 Maintenance Notes: Risk Assessment – Warning – Manufacturers Literature – Health, Safety and Environment – Daily, Weekly Tasks – Specialist Equipment – ITEM A risk assessment must be carried out, by the maintenance contractor, the form completed and signed prior to commencing work. Control measures must be taken if dictated by the risk assessment. Due regard must also be given to the Residual Hazards detailed in the appropriate section off the Health and Safety File. Before commencing maintenance work on any items of plant, ensure that the associated supplies have been isolated and locked off and that all control and ancillary circuits have been made dead. The general maintenance guidance notes are supplemented by particular manufacturers’ recommendations: - Refer to companion manufacturers’ literature documents. All work must be carried out in accordance with relevant Health, Safety and Environmental Legislation and associated Standards and Industry Guidance Routine Daily / Weekly inspections and tasks must form part of the maintenance routine and Actions arising must be dealt with It is recommended that a Maintenance Contract is placed for any specialist equipment FREQUENCY MAINTENANCE TASKS Provide Maintenance Instructions for all items within the system. Each task should have a reference to item and frequency and the task NOTE: Specific details of any residual hazards specialist tools or equipment should also be detailed here Document1 Issue No: Document Owner: Page 54 of 56 Date: xx/xx/xxxx 10.6 Warranty schedule (Insert Behind) Description Document1 Issue No: Issue Date Document Owner: Expiry Date Page 55 of 56 Date: xx/xx/xxxx 11. ASSET REGISTER Project Document1 Issue No: Package number Equip ID Description System ID Manufacturer Document Owner: Model No Serial No Life Safety Critical Business Critical Page 56 of 56 Date: xx/xx/xxxx Building Floor Room Location Handover Date Warranty Expiry Date Expect ed Life Span