Study on the Plan of the RBTC technology development unrelated to Speed and Operational Environment 2010-10-28 Study on the Plan of the RBTC technology development Train Control & Communication Research Contents 1 Introduction TCS(Train Control System) : Definition TCS : Composition TCS : Development History TCS : Developmental direction of future RBTC(Radio Based Train Control) : Definition RBTC : Development case study : ETCS, CTCS, CBTC RBTC : Development plan Conclusion Study on the Plan of the RBTC technology development Train Control & Communication Research Abbreviation 2 TCS : Train Control System RBTC : Radio Based Train Control TGV : Train a Grande Vitesse = French High Speed Train IT : Information Technology CTC : Centralized Traffic Control IXL : Interlocking ATC : Automatic Train Control ATP : Automatic Train Protection ATO : Automatic Train Operation ATS : Automatic Train Supervision ETCS : European Train Control System CBTC : Communication Based Train Control CTCS : Chinese Train Control System ISM : Industrial, Scientific and Medical radio band GSM : Global System for Mobile Study on the Plan of the RBTC technology development Train Control & Communication Research 1. Introduction 3 Many countries made more effort to develop the railway transportation under the slogan of Railway Renaissance. 574.8km/h : New record of Max. speed in TGV(Train a Grande Vitesse : French High Speed Train) on 10th June 2007 The study of safe TCS according to speed up was necessary And also, Application of IT(Information Technology) and Radio communication In this conference, I introduce the plan on RBTC technology development unrelated to speed and operational environment. Study on the Plan of the RBTC technology development Train Control & Communication Research 2. TCS : Definition 4 TCS definition : All command & Control related to the train operation and movement TCS Role : Analyze train movement direction, train speed, distance between trains, operational environment, and wayside safety, and Transfer movement authority in driver. TCS consists of CTC, IXL, Safety equipment and Train control CTC : Handling & Monitoring of train movement IXL : Decision of train route Safety Devices : Protection of Rolling Stock, Staff, materials Train Control : Command & Control of train speed - ATC, ATP, ATS, ATO. Study on the Plan of the RBTC technology development Train Control & Communication Research 3. TCS : Composition(1/2) TCS in Gyoungbu High Speed Line Consists of CTC, IXL, ATC and Safety devices Study on the Plan of the RBTC technology development Train Control & Communication Research 5 3. TCS : Composition(2/2) TCS in Honam Conventional Line Consists of CTC, IXL, ATP and Safety devices Study on the Plan of the RBTC technology development Train Control & Communication Research 6 4. TCS : Development History 7 Transition of TCS technology On board signal (CL) F : (ATP) : Ebicab, KVB, ZUB Wayside Signal K : 3,4,5 Aspects signal F : 3 Aspects signal Wayside Signal + Safety device K : ATS F : AWS, ASFA Signum, Indusi On board signal (HSL) F :(ATC) : TVM, LZB, ATCC On board signal (metro, LRT) F : (ATC/ATO) : SACEM, ATC/ATO 1st Generation 1930 Less then 150km/h 2nd Generation 1960 180km/h Study on the Plan of the RBTC technology development 3rd Generation 1980 270km/h On board signal (CL : Interoperability) K : ETCS Level 1 F : ETCS Level 1 On board signal (HSL : Interoperability) K : TVM430 F : TVM, LZB, ETCS Level 2 On board signal (Radio) K : RTCS F : ETCS Level 3 On board signal (Metro, LRT : Driverless)) K : MBS, CBTC F : MBS, CBTC 4th Generation(1) 2000 300km/h, Driverless 4th Generation(2) 2017 More then 350km/h Train Control & Communication Research 5. TCS : Development direction of future Application of IT and Radio : Train control -> Automation, Driverless : Real time Diagnostic and supervision Study on the Plan of the RBTC technology development Train Control & Communication Research 8 6. RBTC : Definition(1/2) 9 Application of Radio communication in TCS TCS are realized by changing from train control equipment such as Track Circuit, Balise or Loop installed in rail, to Radio communication antenna in wayside Train Control Information Radio Block Center(Signaling Room) Study on the Plan of the RBTC technology development Train Control & Communication Research 6. RBTC : Definition(2/2) 10 Comparison between ATC, ATP and RBTC methods Study on the Plan of the RBTC technology development Train Control & Communication Research 7. RBTC : Development case study RBTC Application example CBTC : Communication Based Train Control ETCS Level 2, Level 3 : European Train Control System CTCS Level 3 : Chinese Train Control System Study on the Plan of the RBTC technology development Train Control & Communication Research 11 8. RBTC : Development Plan 12 Development Goal : - Train operation safety - Speed up of operation train - Minimum Headway - Minimization and Simplification of Operation & Maintenance - Application of IT & Radio communication Study on the Plan of the RBTC technology development Train Control & Communication Research 8. RBTC : Development Plan Comparison of RBTC development process Study on the Plan of the RBTC technology development Train Control & Communication Research 13 8. RBTC : Development Plan Radio communication : method and frequency CBTC : use 2.4GHz ISM band -> security and output power will be limited -> change and modification of frequency ETCS : use 800~900MHz GSM -> problem of data quantity -> application of 4th Generation Study on the Plan of the RBTC technology development Train Control & Communication Research 14 8. RBTC : Development Plan in Korea 15 Not consider interoperability between countries like ETCS Not necessary the development stage of ETCS L1, L2, L3 Apply the well-developed radio system in Korea Set up the speed used in current railway as a stage specific goal -> 150km/h, 230km/h, and 400km/h Accomplish Speed improvement from R&D Realize in the way to complement the lack of technology required in each CBTC and ETCS Study on the Plan of the RBTC technology development Train Control & Communication Research 9. Conclusion 16 For the technology development of RBTC for HSL in Korea, as shown in the previous page, we select the core technology required to establish the systems as a priority and then we set up the speed suitable for each operation environment(150km/h, 230km/h, 400km/h) In this way, it is expected that it will be desirable to push forward step-by-step speed improvement and the commercialization in parallel. In terms of not only radio utilization in TCS but also the compatibility with all the fields of railways and operation environment, it is expected that the application of radio communication shall ensure the availability of railway transportation with more easiness. Study on the Plan of the RBTC technology development Train Control & Communication Research Study on the Plan of the RBTC technology development Train Control & Communication Research