UCAR Subcontract No. S15-19374 (v1) SCHEDULE E DELIVERABLE REQUIREMENTS In addition to the deliverable and reporting requirements identified below, the Subcontractor shall comply with any additional deliverable and reporting requirements identified in Schedules B, D, E, F, G and H. The Subcontractor shall provide the following deliverable(s) to UCAR: DELIVERABLE CLASSIFICATION DUE DATE METHOD OF DELIVERY RECIPIENT Representations and Certifications For Information Electronic UCAR Contract Representative Risk Management Plan, Risk Register and Risk Assessment Report For Approval Electronic UCAR Contract & Technical Representatives Project Planning Workshop For Information Face to face UCAR Technical Representative Subcontractor’s Project Plan For Approval Electronic UCAR Contract & Technical Representatives Subcontract’s Problem Severity Classification and Response Document For Approval Electronic UCAR Project Manager Pre-Delivery Test For Inspection Annually, every twelve (12) months after the Subcontract’s Effective Date Initial: 30 days after Effective Date Update: as in Schedule G Initial: 45 days after Effective Date Update: as in Schedule G Initial: 60 days after Effective Date Update: as in Schedule G Initial: 90 days after Effective Date Update: as in Schedule G TBD Subcontracto r Facility TBD NWSC-2 Factory Trial For Inspection TBD Subcontracto r Facility TBD UCAR Project Manager, Technical Representative, and other UCAR staff UCAR Project Manager, Technical Representative, and other UCAR staff Page E-1 UCAR Subcontract No. S15-19374 (v1) NWSC-2 Test System For Acceptance FOB NWSC For Inspection At least 60 days before initial production equipment delivery At least 30 days before initial production equipment delivery TBD AMPS System For Acceptance Post-Delivery Test of Production HPC and PFS systems NWSC-2 Production HPC System For Acceptance TBD FOB NWSC NWSC-2 Production PFS System For Acceptance TBD FOB NWSC FOB NWSC NWSC UCAR Project Manager and Contract & Technical Representatives UCAR Project Manager and Contract & Technical Representatives UCAR Project Manager, Technical Representative, and other UCAR staff UCAR Project Manager and Contract & Technical Representatives UCAR Project Manager and Contract & Technical Representatives TBD TBD A “Certificate of Completion” shall be signed and submitted by the Subcontractor with the deliverables and will be countersigned by UCAR’s Contract Representative upon final acceptance. The F.O.B. point for all deliverables requiring physical delivery is destination. UCAR shall evaluate the deliverables to ensure that the Subcontractor has interpreted the requirements correctly. The deliverables shall be classified in one of the following categories: 1. For Approval – This category includes documents that require formal approval in writing from UCAR before acceptance or intended use. A signature block for UCAR approval shall be included on the document. The use by Subcontractor of a document in the “For Approval” category before UCAR’s written approval is at Subcontractor’s risk. UCAR shall approve the document or ask for resubmission within thirty (30) calendar Days of its receipt. If not approved, UCAR shall notify the Subcontractor of those parts of the document, which cannot be approved, together with the reasons and instructions concerning re-submission of the document. If none of the above responses are received within the thirty (30), the document is approved. Any material changes to an approved document are subject to this same approval procedure for the changes. Page E-2 UCAR Subcontract No. S15-19374 (v1) 2. For Information – This category includes routine documentation to be evaluated by UCAR to determine current program status, progress, and future planning. “For Information” documents should be sent to UCAR as soon as they are available. A formal response by UCAR is not required, but UCAR may make comments. 3. For Acceptance – This category includes all items subject to acceptance testing as identified in the above table. Acceptance testing procedures and criteria are defined in Schedules F and H. Items in this category require formal acceptance in writing from UCAR as described in Schedule F. 4. For Inspection – This category includes all other tangible items identified for delivery in Schedules B, D, E, F, G and H of this Subcontract. Page E-3