ARCHITECTURAL PLAN REVIEW SUBMITTAL FORM OFFICIAL USE ONLY DEC 2012 IOWA STATE FIRE MARSHAL OFFICE STATE BUILDING CODE BUREAU 215 EAST 7TH STREET DES MOINES, IA 50319 Business Hours: 8am - 4:30pm M-F Phone: 515-725-6145 Building Code Bureau: www.iowabuildingcode.org Fax: 515-725-6172 Email: bcinfo@dps.state.ia.us State Fire Marshal: www.dps.state.ia.us/fm/index.shtml Please send this completed form with plans and fees to the SFM’s address listed above. PROVIDE ALL INFORMATION REQUESTED OR MARK AS NOT APPLICABLE. Part 1- GENERAL INFORMATION Project Name: Brief description of work: Project Street Address: City: Owner: Owner Email: Iowa, Zip: County Name: Contact: Phone: Architect/Engineer Firm Name: Phone: A/E Responsible Designer’s Name: A/E Firm’s Street Address: City: IA License #: State: Zip: A/E Contact Email: Firm Submitting plans: (If not the designer) Firm Contact: Person’s Name: Phone: Email Address: A prelim review is required prior to bid letting for building projects that are required to comply with the State Building Code per 661-300.4 (1). Has a prelim been performed?: Yes No N/A Prelim was performed by- State Official’s name: Date performed: Is this project owned by the State of Iowa? Yes No Is this project built with any funds appropriated by the State of Iowa? If YES, describe type of state funds used: Yes No Is this project located in a jurisdiction that has adopted and enforces building codes through plans review and inspections? Yes No If yes, Building Department or Official’s name: Phone: 1/4 Part 2 - BUILDING INFORMATION BUILDING USE: (State all uses in mixed use buildings) NUMBER OF FLOORS: (Split levels, full stories or basements) MEZZANINE(s) Shown on plans? Yes If yes, describe use of mezzanine(s): OCCUPANCY GROUP: (Per IBC Chapter 3) HEIGHT OF BUILDING (FT): N/A Total Area: FIRE ALARM, SPRINKLER AND SUPPRESSION SUBMITTALS Fire Protection plans & fees shall be submitted separately by the responsible contractor, using the Fire Alarm; Sprinkler; or Suppression submittal forms available on our website: BCB FORMS Part 3 – PLAN REVIEW CODE INFORMATION Please indicate below type of construction used as defined by the International Building Code NEW: I-A I-B II-A II-B III-A III-B IV V-A V-B EXISTING: I-A I-B II-A II-B III-A III-B IV V-A V-B Will the new building or addition have a fire sprinkler? Yes No Does the existing building have a fire sprinkler? Yes No What type of NFPA fire sprinkler does the building have? 13 13R 13D Will the new building be provided with a complete NFPA 72 fire alarm system? Yes No Does the existing building have a NFPA 72 fire alarm? Yes No SIZE OF AREAS (SF) AND OCCUPANT LOADS FOR APPLICABLE WORK Please indicate scope of work, area and calculated occupant loads below. New Building (New stand alone structure) Square Feet: Occupant Load: Remodeled Space (Renovated area that was previously occupied) Square Feet: Occupant Load: New Addition to Building (New structure attached to existing building) Square Feet: Occupant Load: Finish Existing Shell Space (Existing space not previously finished or occupied) Square Feet: Occupant Load: Part 4 – PLAN REVIEW FEES BUILDING VALUATION: Total building construction valuation includes materials & labor for all trades used (except fire protection) supervision, project management, profit and overhead. (Does not include value of land civil & site improvements). Valuation for Fire Alarm/Sprinkler-Suppression systems shall be considered separately for purposes of establishing plan review fees on a separate submittal form. TOTAL PROJECT VALUATION Value: $ In accordance with Administrative Rule 661-300.4(2), I hereby certify that to the best of my knowledge that the total estimated cost for this project is: BUILDING VALUATION Up to and Including: $344,836 Greater than $344,836 up to $1,000,000 FEE CALCULATION REVIEW FEE $200 minimum fee $ $ 0.58 per thousand or fraction thereof $ $ 580 for first million, plus $0.32 for each additional $ thousand or fraction thereof An additional $25 fee is charged for Energy code review for new buildings or additions to buildings that have 100,000 cubic feet or more of conditioned space. Greater than: $1,000,000 2/4 $ 25.00 N/A Part 5 - ASSISTED LIVING AND ADULT DAY SERVICES REVIEW FEES Plan Review Fee required for Assisted Living and Adult Day Care projects: Make checks payable to: INSPECTIONS AND APPEALS $ 900.00 N/A Part 6 – BUILDING INSPECTIONS AND FEES Building projects subject to compliance with the State Building Code are required to have building inspections performed for new buildings and additions, except for projects that will be reviewed & inspected by local jurisdictions that have adopted a building code and have building code enforcement. State owned projects for new construction require state inspections. Inspections fees are not required for projects that only involve renovations/remodeling. You may check our approved list of jurisdictions with building code enforcement, please note that this list may change without notice. Please call our office if you have questions regarding whether inspections fees are applicable to your project. Inspection fees are assessed based on project valuation below. REQUIRED INSPECTION FEE CONSTRUCTION VALUATION Up to $100,000 $100,001 to $1,000.000 $1,000,001 to $10,000,000 $10,000,001 and above $ 598.00 $ 645.00 $ 722.00 $ 783.00 Inspection Fees for state owned (IOWA BOARD OF REGENTS) projects. All required fees for Assisted Living and Adult Day Services are shown in $ 900.00 Part 5 Part 7 – SUSTAINABLE DESIGN REVIEW FEES This part only applies if plans are submitted for Sustainable Design Review Plan review fees for sustainable design projects subject to State Building Code per administrative rule 661- 310.6(1) Plan review fees for sustainable design projects subject to Local Building Code review per administrative rule 661- 310.6(2) Provide evidence of review in Part 8 Plan review fees for sustainable design projects not subject to Local or State Building Code review per administrative rule 661- 310.6(3) N/A $ 100.00 $ 250.00 $ 100.00 Part 8 - TOTAL FEES SUBMITTED Total Fees submitted for Plan Review and Applicable Inspection Fees. Parts 4, 6, & 7 Make checks payable to: STATE OF IOWA TREASURER $ Part 5, Make checks payable to: INSPECTIONS AND APPEALS $ Part 9 - REQUIRED DOCUMENT SUBMITTALS Indicate below which submittals are applicable for this submittal. SUSTAINABLE DESIGN The following are applicable if construction documents are being submitted for Sustainable Design review. Evidence that the building code review has been approved for construction is required per 661-310.3 (4) Attached is documentation from the local building department: Yes No N/A Building Plans are submitted for concurrent review for building code and sustainability: Yes No N/A Indicate below the standard used for sustainable design as per Green Building Rating System v3 or Higher or other recognized standard for sustainable design per . 661-310.5 (103A) 3/4 RESIDENTIAL PROJECTS sustainable design criteria as per 661—310.4(103A) Iowa Green Streets LEED ICC 700 Other Standard: N/A COMMERICAL PROJECTS sustainable design criteria as per 661—310.5(103A) N/A LEED Gold LEED Silver Iowa Green Streets (Small Projects only) Other: ENERGY CODE COMPLIANCE Do the construction documents (including all trades) comply with the requirements of the State Energy Code ? Yes No N/A If yes, Indicate below the compliance method used to determine that this project complies with the energy code, and provide documentation to show this project is compliant. COMcheck ASHRAE/IESNA Std. 90.1 IECC PRESCRIPTIVE & MANDATORY PROVISIONS Other: In addition to the documentation requested above, a completed energy review form signed by responsible architect or engineer is required for buildings that have 100,000 Cubic Feet or more of conditioned space. Is the Energy Code Review Form attached?: Yes No N/A LIFE CYCLE COST ANALYSIS A Life Cycle Cost Analysis is required per 661-303.4(470) and LCCA GUIDELINES. Is a Life Cycle Cost Analysis required for this project? Yes No N/A If yes, have you received final approval for Life Cycle Cost Analysis by the Building Commissioner pursuant to Iowa Code Section 470.1? Yes No ELECTRONIC PLAN SUBMITTAL All construction Documents shall be submitted in electronic format on a disc with paper submittal form. Digital drawings are required in DWF format with addendum, specifications, etc. in PDF format. One set of paper drawings shall also be submitted along with the electronic documents. All drawings designed by an Architect/Engineer shall bear the seal and signature along with a certification indicating which drawings the designer is responsible for. PART 10 - REQUIRED SIGNATURE A signature is required by Architect/Engineer responsible for this plan design submittal or an authorized representative knowledgeable of the construction documents who can answer building code questions. I hereby certify to the best of my knowledge that all information submitted on this submittal form is accurate and true and, I acknowledge that missing or incomplete information on construction documents or required fees, may delay the plan review process until such time all information or fees are received. Name(print): Signature: Date: 4/4