Process Improvement that won’t crunch your budget Expert Insight from Griffin’s Foods Ltd & Kepner-Tregoe Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 1 Presentation Outline • Business introduction • Business Case • Project Objectives • KT’s Step Change Model • Griffin’s Foods Step Change Journey – Diagnose – Implement – Sustain • Results Achieved • Critical Success Factors Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 2 Business Introduction: Kepner Tregoe • Dedicated to the belief that “effective action follows clear thinking” • Configure our proprietary processes into application models which deliver real and tangible results to our clients • Transfer our methodologies to clients working as part of their team • Operational Excellence practice includes: • KT Step Change • KT CAPA (Compliance) • KT Shutdown & Turnaround (STO) • KT WorkSafe Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 3 Business Introduction: Griffin’s Foods Ltd • John Griffin and his family started Griffin’s in Nelson back in 1864 • Biscuit factory is located in Papakura, south of Auckland. • Chips, Snacks & Bar factory is located in Wiri, South Auckland • Annual turnover of more than NZ$300 million, making us one of New Zealand’s largest branded food companies. • Operations employees across both sites totaling 460 • 6 Manufacturing Lines in Biscuits, 3 in Bars, 3 Snacks & 2 in Chips • Pacific Equity Partners (PEP) purchased Griffin's Foods Limited from Danone in 2006 Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 4 Business Case • Site was not achieving expected overall performance after facility upgrade. • Struggling to meet market demand. • Incurring large negative variances to the standard. • Previous success with KT Step Change improvement projects. Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 5 Project Objectives • Increase Operational Efficiency from X to Y, through increased cycle time, reduced waste and increased plant uptime. • Analyze and modify operating systems to better facilitate use of the KT Tools and manufacturing excellence principles. • Develop, Report and Visualize Key Performance Indicators (KPI’s). • Create a visible project reporting and tracking model. • Provide an opportunity for Griffin’s personnel to lead a Step Change project with KT providing ongoing support. Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 6 KT’s Step Change Model DIAGNOSE Complete Detailed Analysis • Management expectations established • Business Process Flow analysis completed • Operational Data analysis completed • Human Performance analysis completed • Asset Performance analysis completed • Draft project list developed DIAGNOSE Quantify & Prioritize Projects • Quantify the financial benefit of each project • Ensure project link to the company strategy • Prioritize projects based on criteria developed by mgt • Select projects the project portfolio • Determine ROI and obtain mgt sign-off IMPLEMENT Train People in Relevant Tools & Techniques Determine the most appropriate tools required for Project Implementation and transfer capability: • Lean Manufacturing • Six Sigma • Root Cause Analysis • Decision Making • Risk Assessment • Project Management IMPLEMENT Establishing Project Plans & Monitoring • Project objectives finalized • Project planning completed • Resource requirements established • Risk assessments completed • Reporting and monitoring system established Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. SUSTAIN Achieve & Sustain the Right Results • Coach in the use of new tools • Monitor project performance • Implement effective control plans • Review the system effectiveness quarterly • Continually identify and launch new projects 7 KT’s Step Change Model Diagnosis Phase New View / Continuous Improvement Zone Paradigm Shift Resource Constrained Payback level $ Management Input Level Step Change Zone Suggestion Box Efforts – Diagnostics – Systems - Resources Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 8 KT’s Step Change Model Diagnosis Phase Use Decision Analysis to select the “Critical Few” improvement projects Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 9 KT’s Step Change Model Implement Phase QUICK CHANGEOVER VISUAL FACTORY 7 WASTES 5S Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 10 KT’s Step Change Model Implement Phase Potential Problem Analysis (PPA) A simple but powerful tool Potential Problem Preventative Actions (to stop/reduce cause) Likely Causes Contingent Actions (to limit impact) Likely Effects Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 11 KT’s Step Change Model Implement Phase PLAN MONITOR Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 12 KT’s Step Change Model Sustain Phase Capability Transfer To transfer capability in the appropriate skill set to a critical mass of employees to drive the business transformation. Performance System Integration Capability Transfer To ensure that the work environment (expectations, measure, tool/resources, consequences & feedback) is conducive to manufacturing excellence behaviors and using the new skills. Sustainable Process Integration Business Transformation Process Integration To ensure that there are clear links between business processes, improvement objectives and expectations. Performance System Integration Coaching On-the-Job Coaching On-the-Job To ensure that time guidance is available through content and process experts: results measured and appropriate behavior is reinforced. Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 13 Step Change Journey Diagnose Phase • • • • • Extensive Analysis completed over a 4 week period. Eight potential improvement projects identified and presented to executive team. Four projects recommended based on ability to provide a step change in Operational Efficiency (OE). Project portfolio targeted a return on investment of 5:1. Five project managers selected and removed from their normal duties: – Shift Manager – Engineer (2) – Operator – CI Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 14 Step Change Journey Diagnose Phase (cont.) Improvement Projects Selected Included: 1. 2. 3. 4. Identify and Implement "ONE BEST WAY MANUFACTURING” to achieve consistent high volume outputs of potato chips and standardise operations across all shifts by July 2012. Identify and Implement “ONE BEST WAY PACKING” to achieve consistent high volume outputs of saleable product and standardise operations across all shifts by July 2012. Embed sustainable, self driven “MANUFACTURING EXCELLENCE” disciplines on Chip line by July 2012. Identify key reasons for and “REDUCE MECHANICAL DOWNTIME” on key pieces of equipment by July 2012. Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 15 Step Change Journey Implementation Phase • Capability development for all Project Managers and key Chip Line stakeholders: PSDM, Project Management, Lean Manufacturing concepts. • Robust project plans developed using a “Learn & Do” approach. Griffin's Chip Line Step Change Improvement Projects As of 23/07/2012 Week 29 data: OE% Run Rate B&R 72% 1112 2.8% Projects Target date Forecast date Overview: 2/07/2010 8/10/2010 31% Project 1: Embed sustainable, self driven manufacturing disciplines on Lines 1 &4 by 10th October 2010 8/10/2010 8/10/2010 39% Project 2: Implement a consistent approach on start-ups and changeovers on Toffee Pops Family, Squiggle Hokey Pokey Family, Shrewsbury & ChitChat on Line 4 by Oct 8, 2010 8/10/2010 8/10/2010 22% Current critical tasks Date Milestones % complete Due date Operator shift handover meeting established 4/07/2010 KPI Boards established for all Lines 22/07/2010 Observe changeovers and collect data 9/08/2010 5S Disciplines on Line 4 established 26/07/2010 Initiate quick changeover project for chit chat 6/08/2010 Implementation of matrix at individual workstations for changeovers Define roles and responsibilities for changeovers Results to date: Date Issues to be resolved: 6/08/2010 27/08/2010 Date raised PPA training started for other functional areas 2/08/2010 B&R Data project to be aligned 9/07/2010 5S champions trained and intro. to Lean Manufacturing completed 2/08/2010 Implementation of Quality visual standards Changeover Matrix established for each work station 6/08/2010 Handover Start-Up and Changeover PPA responsibilities to production 6/08/2010 Awaiting Whiteboards for Lines 2 & 3 6/08/2010 16/07/2010 • Reporting system established including, newsletters, monthly crew briefs and weekly reviews with site management. • Weekly review meeting with Executive team established. • All Chip Line Crew members introduced to Potential Problem Analysis (PPA) and Problem Analysis (PA) tools Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 16 Step Change Journey Implementation Phase (cont.) Implementation • Discipline for completing PPA’s on all weekly start-ups and key product changeovers. • Changeover Matrix established to set targets for all changeovers. • Team leaders and team members trained in how they and their teams can impact OE. • KPI board created. • Daily team briefs reviewing performance using KPI board. Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 17 Step Change Journey Implementation Phase (cont.) (cont.) • Established optimal set points for each of the critical machine variables within the process. • Established disciplined team leader shift handover. • Identified and removed time in motion waste, through removing daily non-value add operator tasks • Celebration of wins in the form of crew BBQ’s for breaking production records. Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 18 Step Change Journey Sustain Phase Journey • Updating of whiteboards transitioned from Project Resources to crews. • All Team Leaders and Senior Operators trained in calculation of KPI’s. • Facilitation of weekly start-up and changeover PPAs transferred from Project Resources to the line leadership. • Development of internal KT Program Leaders to provide ongoing training and monitoring in the use of the KT tools. • Development of Continuous Improvement Technicians to internal KT Facilitators. Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 19 Results Achieved KGs/HR WEEKLY THROUGHPUT Throughput Baseline Target 6wk mov avg 1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17 18 19 20 21 22 23 24 25 27 28 29 30 WEEKS Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 20 Results Summary • 38% Improvement in Production Rate (kg/hr ) • 37% Improvement in Operational Performance (OE) Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. Copyright © 2010 Griffin’s Foods Ltd. All Rights Reserved 21 Intangible Results Achieved • Active crew participation in PPA’s for all start-ups and changeovers. • An increase in OE awareness by teams. A desire to beat the minimum OE targets and disappointment if OE targets are not met. • The ease at which the teams now handle and respond to change. • A questioning environment where the staff wants more engagement and input to see the department succeed. • Team members have better understanding on the impact of changeovers on OE. • Operators are more proactive and communicate better during Changeovers. Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 22 Critical Success Factors • • • • • • • • Determine the optimal project mix using best in class diagnostics. Ensure improvement initiatives are aligned to strategic objectives. Focus on the critical few projects to provide a step change in performance Full-time commitment of internal Project Managers based on skill set required for project implementation. Provide a common set of tools for issue resolution and project implementation. Establish an effective system for measuring, monitoring and managing progress toward target objectives. Engineer the performance system to promote sustainable behaviour. Involvement of key stakeholders to assist with “road block” removal. Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 23 What Questions Do You Have? Thank You Copyright © 2012 Kepner-Tregoe, Inc. All Rights Reserved. 24