EHT INTERNATIONAL ICOD Deployment Financial Benefits EHT INTERNATIONAL Financial Analysis Hypothetical Utility Savings – Operational data such as failure rates may vary from one utility to another. This analysis uses data published by industry organizations such as CIGRE and obtained from discussions with utilities and experienced consultants. It aims to demonstrate the benefits of using ICOD in a realistic way. – Disconnect switches are strategic to an electric grid due to their direct influence on grid reliability. For our business case, assume that the utility has 32,000 disconnects installed and are distributed as follows: Voltages Distribution (%) Quantities 735 kV 5% 1600 230-315 kV 10% 3200 120-161 kV 20% 6400 49-69 kV 5% 1600 34 kV and less 60% 19200 EHT INTERNATIONAL Financial Analysis Hypothetical Utility Savings Assumptions (%) Assumptions (Qty) 31.25% 10 000 Amount of critical disconnectors 10% 3200 Amount of critical disconnectors 735kV 3ph 50% 800 Amount of critical disconnectors 315kV and below 1ph 7.5% 2400 Amount of critical controls for disconnectors 735kV 3ph 50% 2400 Amount of critical controls for disconnectors 315kV and below 1ph 7.5% 2400 Total amount of critical controls 15% 4800 16.25% 5200 Descriptions Total amount of motorised mechanism Total amount of other important controls Out of the 32 000 disconnects, assume 31.25% are motorized EHT INTERNATIONAL Evaluation Table: Losses due to Failures Disconnect failure (location) 735kV -Line departure -Transformers -Bus bars -Breakers Energy losses or outage MVA Duration Min./Max. Hours Losses $ 1000/2000 5/24 300k$ / 3M$ 150/300 150 5/48 5/48 50k$ / 1M$ 50k$ / ,5M$ -Synchronise Compensation 600 5/48 200k$ / 2M$ -Static Compensation 300 5/48 100k$ / 1M$ 300/1000 5/48 100k$ / 3M$ -Inductance 735kV -Inductance 315kV 315kV -Line departure -Transformers -Bus bars -Breakers EHT INTERNATIONAL Evaluation Table: Losses due to Failures (continued) Disconnector failure (location) 230-120kV -Line departure -Transformers -Bus bars -Breakers Energy losses or outage MVA Duration Min./Max. Hours Losses $ 150/500 5/48 50k$ / 1,7M$ 500/1000 100/250 50/100 225/100 50/100 5/24 5/24 5/24 5/24 5/24 200k$ / 1,7M$ 30k$ / ,4M$ 20K$ / 200K$ 10k$ / 165K$ 20k$ / 165k$ -Capacitor bank 315kV -Capacitor bank 230kV -Capacitor bank 120kV -Capacitor bank 25kV 300 100 50/100 5/10 5/48 5/48 5/48 5/48 100K$ / 1M$ 35k$ / 300k$ 20k$ / 300k$ 20k$ / 30k$ -Alternator 25/300 5/48 10k$ / 1M$ -Backup 315kV -Backup 230kV -Backup 120kV -Backup 69kV -Backup 25kV EHT INTERNATIONAL Financial Justifications – Failure and Energy Loss Reduction Descriptions Critical disconnectors susceptible of failing every year Minor/Major mean costs per failure Amounts 1% 32 disconnectors Minor 100k$/yr Major 1M$/yr Major failure/total failure 50% Total minor failures costs 3,2M$/yr Total major failures costs 16M$/yr % of reduction thanks to ICOD Total gain per year 50% 9.6M$/yr The ICOD’s predictive and real time monitoring will reduce failure rates by identifying incipient faults N.B. The disconnect failure rate may vary between utilities. EHT INTERNATIONAL Financial Justification Reduced Maintenance – 20% of the annual substation maintenance costs is allocated to disconnects. – Using ICODs, the motorised disconnect maintenance becomes as follows: • • • 123- ICOD supervision of operation, predictive and real time monitoring (70%) Thermography (20%) Visual inspection (10%) Descriptions Amounts Annual workload dedicated to disconnectors 20 000 hrs/yr % allocated to motorised disconnectors (versus non motorised) 40% Annual workload for motorised disconnectors 8000 hrs/yr % of reduction thanks to ICOD 70% Total time reduction 5600 hrs/yr Total reduction in $ (at 100$/hr) 560 000$/yr EHT INTERNATIONAL Financial Justifications Reduction of the motorised DS mechanical failure rate Descriptions Amounts Failure rate without ICOD 1% Disconnectors failure rate reduction 50% Failure rate with ICOD 0.5% Replacement cost of parts 50k$ Advantage due to mechanical failure reduction Assuming 32 DS failures per year 800k$ EHT INTERNATIONAL Financial Justifications Advantageous Replacement Costs – In addition to the substantial benefits of predictive and real time monitoring, the cost of an ICOD control is less than or comparable to the refurbishing of a conventional control. – Refurbishing versus ICOD purchase comparison Description Conventional control mechanism costs DSC control mechanism DSV control mechanism Stocking and material handling of refurbished units (reception, expedition, etc.) 1000$ (1d x 1 person) 0$ 0$ Disassembly (in the shop), recuperation, cleaning, tools 2000$ (2d x 1 person) 1000$ 1000$ Refurbishing 3000$ (Material) 3000$ (3d x 1 person) 9000$ 4000 $ (cabinet) 11500$ 4000 $(cabinet) Project administration – management, building, vehicle, etc 2700$ (30% x 9000$) 0$ 0$ Total ≈ 12 000$ ≈ 14 000$ ≈ 15 500$ EHT INTERNATIONAL Financial Justifications Reduction of detection and intervention time – ICOD System: • Allows early detection of the developing failures and reduces repairs • Allows better scheduling and minimizes outages and transmission losses – Gains estimated due to a better scheduling: Greater than 100 000$/ yr – Gains estimated due to early detection: Greater than 60 000$ / yr EHT INTERNATIONAL Financial Justifications Advantages due to reduction of harmonics by 50% For a 735kV grid (rates from CIGRE) Failure rate of power transformers : Without ICOD = 0.003 / yr With ICOD = 0.0027 / yr Failure rate of current transformers : Without ICOD = 0.005 / yr With ICOD = 0.00425 / yr Economies for the utilities for a 30 years period (for 800 disconnectors) : Power transformers : $27M Current transformers : $13M Net gain : ~ 1.3M$/year EHT INTERNATIONAL Financial Justification Minimum Annual Gain with a Conservative 1% Failure Rate Descriptions Preventive maintenance time reduction DSC DSV $560 000,00 $560 000,00 $9 600 000,00 $9 600 000,00 Mechanical failure rate reduction $800 000,00 $800 000,00 Just in time maintenance $100 000,00 $100 000,00 $60 000,00 $60 000,00 $0,00 $1 300 000,00 Energy losses reduction Reduction by 20% of detection and intervention time Reduced equipment and grid degradation by decreasing harmonics EHT INTERNATIONAL Financial Justification Assumption of ICOD deployment Description DSL DSC DSV 735kV Critical 0 unit 0 unit 2400 units 735kV Important 0 unit 2400 units 0 unit 315kV (or less) Critical 0 unit 2400 units 0 unit 315kV (or less ) Important 2800 units 0 unit 0 unit Total 2800 units 4800 units 2400 units EHT INTERNATIONAL Financial Justifications ICOD System Investment • Conservative failure rate of 1% • Investment: – 2800 DSL units for 8 100 $ – 4800 DSC units for 14 000 $ – 2400 DSV units for 15 500 $ Total Investment Total Annual Gain Payback : 5.6 years 127 080 000$ 22 820 000$ EHT INTERNATIONAL Thank You Energy HT International Inc. Quebec Canada www.energieht.com