RFP from UIA: EMBRAER E190 BASE-1C CHEK
Private Stock Company
Ukraine International Airlines
TENDER DOCUMENTATION
(in form of REQUEST FOR PROPOSAL)
EMBRAER E190
BASE-1C CHEK
Ukraine, Kyiv
May 2015
03 APR 2015
Page 1 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
Table of Contents:
1.
2.
3.
4.
5.
6.
7.
Tender Announcement
Important Tender Documentation Requirements
Tender Procedure Instructions
Annex 1
Annex 2
Annex 3
Annex 4
03 APR 2015
Page 2 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
TENDER ANOUNCEMENT
1. Customer:
1.1. Private Stock Company Ukraine International Airlines.
1.2. Legal address. 4, Lysenka street, Kyiv, 01030, Ukraine
1.3. Person responsible for Tender.
Procedure issues –
Stakhurska Maryna, Tender Committee Secretary,
Tel.:+380 44 581 5656 (9533); Stahurskaya.maryna@flyuia.com;
Technical issues –
Vasilenko Sergey, Continuing Airworthiness Manager
vasilenko.sergey@flyuia.com
2. Information about subject of Tender:
2.1. Embraer E190 (UR-EMA & UR-EMB) BASE-1C CHEK
2.2. Place and term of services. Europe, One-time service
3. Receipt of Tender documentation. Via E-mail.
4. Conditions of tender proposal submission:
4.1. Place. Ukraine International Airlines, 201-203, Kharkivske Road, Kyiv, 02121, Ukraine
Attention: Stakhurska Maryna, Tender Committee Secretary
4.2. Means of receipt. Via Courier
4.3. Deadline. 28 May 2015, 13-00 (Kyiv time)
5. Opening of tender proposals:
5.1. Place. 201-203, Kharkivske Road, room 717, Kyiv, 02121, Ukraine
5.2. Date. 28 May 2015, 15-30 (Kyiv time)
Tender proposal
03 APR 2015
Page 3 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
Important Tender Documentation Requirements
1. Ukraine International Airlines
Ukraine International Airlines (UIA) is Ukrainian leading airline established in 1992. Today, UIA
is a 100% privately-owned company. UIA’s primary business is to provide safe and reliable passenger
and cargo transportation. The UIA’s fleet currently comprises 35 modern aircraft: medium-haul Boeing
737 (including one freighter 737-300SF), medium-haul Еmbraer-190 and long-haul Boeing 767. The main
base airport for UIA is Kiev Boryspil International Airport (KBP).
2. Request for Base-1C Check proposal
This Tender documentation includes maintenance of aircraft described in Annex 1 hereto.
Tender proposal validity time shall be not less than 60 days from the date of opening of Tender
proposal.
Currency of this Tender documentation is US Dollars or Euro. Payments for services shall be made in US
Dollars or Euro.
UIA is seeking qualified maintenance provider (Participant) for aircraft base maintenance for UIA’s
Embraer fleet requirements, with following qualifying criteria:
- At least 2 years of Embraer 190 maintenance experience with appropriate capability level;
- Availability of essential facilities and equipment shall correspond to aircraft type and level of
required maintenance;
- Part 145 approval issued by State Aviation Authority of Ukraine (holding of EASA Part 145 approval
considered as advantage)
(i)
Workscope
Workscope specified in Annex 2 and Annex 3 hereto.
(ii)
Payment terms
Payment will be arranged per each Aircraft as follows:
-
(iii)
At each Aircraft Delivery: an amount equal to fifty percent (50%) of the Fixed Price for such
Aircraft;
Upon each Aircraft Redelivery: interim invoice an amount equal fifty percent (50%) of the Fixed
Price for such Aircraft;
Following Aircraft Redelivery a final invoice will be issued to UIA and paid within thirty (30)
calendar days thereafter.
Certification
Participant must have all the necessary certificates needed for maintenance.
3. Selection process
The successful candidate will be selected deriving from the following process:
3.1. All documents provided by Participant meet requirements of tender documentation:
03 APR 2015
Page 4 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
 the completeness of proposal
 meeting of requested payment terms
 meeting of requested service level and others
3.2. Criteria:
The lowest offered price shall detail Participant’s charges, turnaround times for each aircraft HMV and
the various surcharges on the services.
Participant shall present HMV package pricing detailed to the level that gives the opportunity to
demonstrate its competitive advantages.
The Fixed Prices should include following costs/works:
 Aircraft Work Package: preparation works, access open/close up, routine inspection, tests,
replacements, servicing, components servicing;
 Defect Rectification raised from routine inspection up to 10 MH per Task Card;
 Routine, Raw and Repair materials, related to the above tasks, with the agreed limit of the
purchasing price up to 250 USD per item, Miscellaneous Small Parts (such as, but not limited to nuts,
bolts, rivets, washers, etc., having the unit value up to 2USD), Consumables, Disposables;
 Daily and Pre-flight check;
 Aircraft Exterior Washing, Interior and Technical cleaning;
 Ground handling fees;
 Hangar space during the agreed slot;
 General tools and equipment required for requested work package;
 Office for UIA’s technical representatives (include E-Net access);
Addition quote is required to be presented/defined as follows:
 Man-hour rates:
- Mechanics/electricians: _____ $;
- Mechanics in overtime: _____ $;
- NDT: _____ $;
- Engineering: _____ $;
- Shop repairs: _____ $;
- Interior (cabin Unskilled): _____ $.
 Material charges:
- Handling charges for parts and materials (new and used) with your proposed caps;
- Handling charges for UIA supplied material, if any;
- Exchange fees and the proposed caps;
- Sub-contractor services and the proposed caps;
- any other charges can be exercised.
 Warranty Condition:
- The warranty period should be 3000FH/2000FC/12 Months WOF.
 Insurance:
- details regard insurance terms and condition under maintenance period.
3.3. UIA leaves the right:



to Extend timing of selection process
to Stop the selection process anytime
not to select a successful candidate.
03 APR 2015
Page 5 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
All Participants will be informed about results in accordance to UIA’s internal tender procedures as
further described herein. UIA does not bear any responsibility or obligations associated with costs or
missed opportunities of any candidate somehow linked or seemed to be linked to his/her response to
this request for proposal and his/her possible expectations from the selection process and/or results of
projects.
4. Confidentiality
UIA does not accept and does not allow forwarding this request for proposal to any other party without
prior written consent from UIA official contacts listed herein.
03 APR 2015
Page 6 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
TENDER PROCEDURE INSTRUCTIONS
1. General
1.1. Private Stock Company Ukraine International Airlines (hereinafter – UIA) announces tender
(hereinafter – the Tender) for the purchase of services in accordance with the procedures and
conditions specified in the Tender documentation (hereinafter - the Tender documentation) and
internal UIA tender procedure orders.
1.2 Participants are individuals (residents or nonresidents), which confirmed their intention to
participate in the procurement procedure and filed a Tender proposal.
1.3. In accordance with the requirements of the Tender documentation Participants must meet the
qualification requirements.
1.4. Each Participant shall submit its proposal in the form properly executed in accordance with the
requirements hereof.
1.5. Participant shall be responsible for all costs associated with preparation and submission of its
Tender proposal and such costs will not be reimbursed to the Participant(s).
2. Clarification of the Tender documentation
2.1. Participant has the right not later than seven calendar days before the deadline for submission of
Tender proposal to contact UIA for the clarification of the Tender documentation. UIA within three
business days (in Kiev, Ukraine) should answer to such the request of the Participant.
3. Amendments to Tender documentation
3.1. Not later than five working days before the deadline for submission of a Tender proposal UIA has
right on its own initiative or on the results of searches of Participants who received Tender
documentation to amend the Tender documentation and to notify about such changes in writing all
persons who filed UIA with a Tender proposal.
3.2. Before the expiration of the deadline for submission of Tender documentation UIA is entitled to
decide on its continuation in the event that one or more Participants who have received the Tender
documentation may not submit a Tender proposal for the specified period in accordance to any
objective reasons. Notice of extension of time, change of place and procedures for opening of tender
offers (proposals) shall be immediately sent to each person who was submitted with a Tender
documentation.
03 APR 2015
Page 7 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
4. Tender proposal language
4.1. All documents relating to the Tender proposal shall be made in English or Ukrainian.
5. Contents of Tender proposal
5.1. Proposal submitted by the Participant shall include complete information about products or services
and price information made pursuant to the requirements of the Tender documentation, the list of
documents required to verify compliance of Participant’s qualifications (including but not limited to the
information set forth in Annex 4 hereto) and other requirements of the Tender documentation,
documents certifying the credentials of the person signing the Tender proposal, as well as other
documents that must be executed and submitted by the Participants in accordance with this Tender
documentation.
6. Prices of Proposals
6.1. Participant shall determine the price of goods or services which it offers to put under the
Agreement, indicating the taxes and fees paid or to be paid and all related expenses.
6.2. Price mentioned in Tender proposal shall be specified in accordance with the requirements of
Tender documentation.
6.3. Prices must be clearly defined.
7. Documents proving compliance of Participant with the qualification requirements
7.1. Participant is responsible for obtaining any and all necessary permits, licenses, certificates, required
for sale of goods or services, and other documents related to the Tender and shall be responsible for all
costs of their receipt.
7.2. According to this Tender Participant shall submit such documentation as part of its Tender proposal
proving compliance of Participant with qualification requirements.
7.3. UIA has the right to request from any Participant to repeat confirmation with the qualification
requirements set forth in this Tender documentation.
7.4. In the event of (i) Participant's refusal to provide such confirmation or (ii) receipt of reliable
information about his non-compliance with the qualification requirements set forth in the Tender
documentation or (iii) it is discovered that Participant has made any false statement or material
misrepresentation in any provision of the Tender proposal, UIA has right to reject Tender proposal of
such Participant and determine the winner of Tender proposal among those Participants who remained.
8. Documents proving compliance of the goods or services
8.1. Proposal submitted by the Participant, shall include the technical, quality and other characteristics
of the subject of Tender and certificates.
03 APR 2015
Page 8 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
9. Tender proposal duration
9.1. Tender proposal remains valid after the submission deadline for the period specified in the Tender
documentation. Tender proposal valid for a shorter period shall be rejected by UIA, as such, that does
not meet the Tender documentation requirements.
9.2. Before the expiration of the Tender proposal UIA may require the Participant to continue the
validity of the proposal for an additional period of time. Request to and response from the Participant
shall be submitted by means of communication, followed by written confirmation.
10. Execution and signing
10.1. Tender proposal shall be submitted in writing in a sealed envelope to ensure confidentiality of the
Participant prior to its official opening.
Tender proposal shall be submitted via courier.
10.2. Tender proposal shall be signed by the Participant or person (s) duly authorized to sign on behalf
of the Participant. Such powers shall be specified in writing instruction that is part of the Tender
proposal. All pages of Tender proposal must contain the signature of the authorized person(s). All pages
of the Tender proposal where were made any specific records or edits should be indicated by the initials
of the person or persons signing such proposal. Responsibility for the errors printed in the documents
and submitted to the Tender Committee and signed accordingly is on the Participant.
10.3. Tender proposal must (i) be broshured, (ii) have pagination and (iii) register of the documents.
11. Sealing and marking of proposals
11.1. Tender proposal shall be submitted in one copy in the appropriately marked envelope and must
indicate the name and address of UIA, the subject of Tender according to the announcement of the
Tender
and
the
Participant's
name,
address,
contact
telephone
numbers.
11.2. If the envelope is not marked in accordance with the above requirements, UIA is not responsible
for the premature opening of such Tender proposal.
12. Deadline for submission of Tender proposal
12.1. Proposals must be submitted via courier and not later than the time and date specified in the
Tender documentation.
13. Proposals which were delayed
03 APR 2015
Page 9 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
13.1. All proposals submitted to UIA after the deadline of the submission shall not be considered by UIA
and will be returned to the Participant.
14. Change and cancellation of Tender proposal
14.1. Participants may change or cancel their proposal by notification to UIA in writing before the
deadline for submission of Tender proposal.
15. Alternative Tender proposal
15.1. Submission of alternative Tender proposal is not allowed.
16. Disclosure of Tender proposal by UIA
16.1. UIA opens Tender proposal in a time and place specified in this Tender documentation.
Participants are allowed their representatives to be present during procedure of opening of Tender
proposals. Such representatives shall have official document from Participant (power of attorney etc)
confirming its authority.
17. Tender proposal explanation
17.1. UIA may request the Participant to explain or comment on its Tender proposal in order to facilitate
its review, evaluation and comparison with other offers.
It is not accepted, not discussed and not allowed to make any changes to the Tender proposal on merits,
including changes to prices, delivered during the opening of Tender proposal and the changes are aimed
at adjusting the Tender proposal, which does not meet the requirements of the Tender documentation,
in order to bring it in compliance with such requirements.
18. Tender proposal consideration
18.1. UIA will consider the Tender proposal to determine that the Participant meets the qualification
requirements, and that each Tender proposal meets the conditions of Tender documentation.
18.2. If the proposal does not meet any condition of Tender documentation, it shall be rejected by UIA
and can not be brought into conformity by adjusting or changing or canceling inappropriate deviations
or reservations.
18.3. Tender proposal defined as those that meet the conditions of Tender documentation will be
reviewed by UIA in terms of arithmetic errors. Errors will be corrected by UIA as follows:
03 APR 2015
Page 10 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
a) When the difference between the amounts indicated in letters and figures, the amount of letters is
crucial;
b) When the difference between unit price and total price of services obtained by multiplying the price
per unit of quantity, the unit price is decisive and final price is being corrected. If, in the opinion of UIA,
in the unit price is a clear shift decimal distributor, in this case meant the final price is crucial, and the
unit price corrected.
18.4. UIA has the right to correct arithmetic errors when receiving the written consent of the Participant
to such correction.
18.5. If a Participant does not agree with the correction of errors, his Tender proposal shall be rejected.
19. Evaluation and comparison of Tender documentation
19.1. After the opening of Tender proposal, checking them for the accuracy of and compliance with the
qualification requirements and conditions of Tender documentation, than evaluation begins and UIA
determine the winner. UIA evaluates and compares those proposals which were not rejected.
19.2. For proposals evaluation UIA will be using the criteria specified in the Tender documentation.
20. Privacy
20.1. To ensure confidentiality of information regarding the consideration and/or evaluation of Tender
documentation, such information will not be distributed to and between the Participants.
21. The right of UIA to reject all proposals
21.1. UIA reserves the right to reject all Tender offers (proposal) at any time prior to acceptance of the
Tender proposal.
21.2. UIA shall have no liability to the Participant in the case of Clause 22.1.
21.3. In case of rejection of all Tender offers (proposals) UIA cancels Tender and will send respective
notice to the Participants.
22. Acceptance of a Tender proposal
22.1. UIA accepts the Tender proposal of the Participant who meets qualification requirements specified
in the Tender documentation and whose proposal is the best from the evaluated Tender offers
(proposal) and meets the requirements of the Tender documentation.
03 APR 2015
Page 11 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
22.2. If the Participant, whose Tender proposal accepted, refuses to sign the Agreement, UIA shall select
the best Tender proposal among those whose validity has not expired and are sufficient to determine
the winner.
22.3. Final acceptance of Tender offer shall be made by UIA Supervisory Board.
23. Execution of Contract
23.1. The contract will be signed with the Participant, whose Tender proposal was accepted.
24. Audit
24.1. If necessary, UIA may audit the Participants on the stage of evaluation for compliance with the
requirements of Tender documentation (including quality and safety audit).
24.2. Ukrainian CAA may audit Participants according to Ukrainian legislation.
03 APR 2015
Page 12 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
Annex 1
Manufactured:
A/C Reg.:
Line №:
A/C Effective:
Engine Type:
Eng.№1 S/N:
EMBRAER
Model:
UR-EMA
S/N:
--Manufact. Date:
AV 001
IPC №:
UIA Embraer MP Iss 2, Rev 01 25.08.2014
CF34-10E6G07
424261
Eng.№2 S/N:
The planned START date of
maintenance:
Manufactured:
A/C Reg.:
Line №:
A/C Effective:
Engine Type:
Eng.№1 S/N:
424263
01.08.2015
EMBRAER
Model:
UR-EMB
S/N:
--Manufact. Date:
AV 002
IPC №:
UIA Embraer MP Iss 2, Rev 01 25.08.2014
CF34-10E6G07
424282
Eng.№2 S/N:
The planned START date of
maintenance:
E190
19000494
07.12.2011
494
E190
19000501
04.01.2012
501
424283
16.08.2015
03 APR 2015
Page 13 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
Annex 2
UR-EMA
MSN 19000494
BASE-1C CHECK
WORKSCOPE
(Rev. 1 – Fabruary, 2015)
Checks Task Cards
№
TC number
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
21-32-04-001-U
21-51-01-001-LH
21-51-01-001-RH
21-51-04-001-LH
21-51-04-001-RH
21-62-05-001-LH
21-62-05-001-RH
23-51-01-001-LH
23-51-01-001-RH
23-51-01-002-LH
23-51-01-002-RH
23-61-00-001-LH
23-61-00-001-RH
23-61-00-001-T
25-11-01-001-U
25-11-01-003-U
25-11-02-001-U
25-11-02-002-U
25-21-20-002-U
26-11-01-001-LH
26-11-01-001-RH
26-12-01-001-U
26-14-01-001-AFT
26-14-01-001-FWD
26-21-00-001-U
26-22-07-001-U
26-23-09-001-U
26-23-13-001-U
27-03-00-001-U
27-03-01-001-U
27-03-04-001-U
27-11-00-005-U
27-11-03-004-U
27-11-03-006-U
27-12-01-006-LH
27-12-01-006-RH
27-14-01-001-U
27-21-00-001-U
27-21-03-001-U
NEGATIVE-PRESSURE RELIEF - OPERATIONAL TEST
PACK FLOW-CONTROL-VALVES FILTER - CLEANING (ULTRASONIC METHOD) (CR)
PACK FLOW-CONTROL-VALVES FILTER - CLEANING (ULTRASONIC METHOD) (CR)
DUAL HEAT EXCHANGERS - SHOP CLEANING
DUAL HEAT EXCHANGERS - SHOP CLEANING
TRIM-AIR MODULATING-VALVES FILTER - CLEANING (ULTRASONIC METHOD) (CR)
TRIM-AIR MODULATING-VALVES FILTER - CLEANING (ULTRASONIC METHOD) (CR)
AIRBORNE AUDIO SYSTEM BACKUP MODE - OPERATIONAL TEST
AIRBORNE AUDIO SYSTEM BACKUP MODE - OPERATIONAL TEST
PASSENGER ADDRESS AND CABIN-INTERPHONE-SYSTEM EMERGENCY MODE - OPERATI
PASSENGER ADDRESS AND CABIN-INTERPHONE-SYSTEM EMERGENCY MODE - OPERATI
STATIC DISCHARGERS - FUNCTIONAL TEST
STATIC DISCHARGERS - FUNCTIONAL TEST
STATIC DISCHARGERS - FUNCTIONAL TEST
PILOT SEATS ATTACHMENT - DETAILED INSPECTION
PILOT-SEAT INERTIAL REELS - OPERATIONAL TEST
OBSERVER SEAT - EXTERNAL DETAILED INSPECTION
OBSERVER-SEAT INERTIAL REEL - OPERATIONAL TEST
FLIGHT-ATTENDANT-SEAT INERTIAL REELS - OPERATIONAL TEST
ENGINE FIRE DETECTION LOOP - OPERATIONAL CHECK
ENGINE FIRE DETECTION LOOP - OPERATIONAL CHECK
APU FIRE DETECTION LOOP - OPERATIONAL CHECK
LAVATORY SMOKE DETECTOR - OPERATIONAL TEST
LAVATORY SMOKE DETECTOR - OPERATIONAL TEST
ENGINE FIRE EXTINGUISHING SYSTEM - FUNCTIONAL TEST
APU FIRE EXTINGUISHING SYSTEM DISCHARGE PIPING - INSPECTION/CHECK
CARGO-COMPARTMENT DISCHARGE TUBING / NOZZLE - FUNCTIONAL TEST
CARGO-COMPARTMENT FIRE-EXTINGUISHING SYSTEM - OPERATIONAL CHECK
FLY-BY-WIRE BACKUP BATTERY - OPERATIONAL TEST
FLIGHT CONTROLS PANEL (DIRECT MODE SWITCH) - OPERATIONAL TEST
TRIM CONTROL PANEL (CUTOUT SWITCHES) - OPERATIONAL TEST
AILERON CONTROL CABLES - OPERATIONAL TEST
AILERON CONTROL CABLES, PULLEYS ANDQUADRANT - FUSELAGE AREA
FNC - AILERON CONTROL CABLES - FUSELAGE AREA
AILERON CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST
AILERON CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST
AILERON TRIM ACTUATOR - FUNCTIONAL TEST
RUDDER MECHANICAL COMPONENTS - GENERAL VISUAL INSPECTION
RUDDER-PEDAL DAMPER FLUID-LEVEL - GENERAL VISUAL INSPECTION
03 APR 2015
Page 14 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
27-22-01-002-U
27-22-01-006-U
27-24-01-001-U
27-31-00-001-U
27-32-01-002-LH
27-32-01-002-RH
27-32-01-006-LH
27-32-01-006-RH
27-40-00-001-U
27-51-01-003-LH
27-51-01-003-RH
27-51-03-001-LH
27-51-03-001-RH
27-51-03-002-LH
27-51-03-002-RH
27-51-11-001-LH
27-51-11-001-RH
27-81-03-001-LH
27-81-03-001-RH
27-81-03-002-LH
27-81-03-002-RH
28-12-11-001-LH
28-12-11-001-RH
28-12-11-002-LH
28-12-11-002-RH
28-21-00-001-U
29-10-00-001-U
29-11-03-001-U
29-11-20-001-U
29-12-00-005-U
29-33-02-001-U
29-33-02-003-U
30-11-00-001-LH
30-11-00-001-RH
30-11-06-001-LH
30-11-06-001-RH
30-32-00-001-U
32-11-11-001-LH
32-11-11-001-RH
32-21-09-001-U
32-33-01-001-U
32-34-00-001-U
32-34-00-002-U
32-34-00-003-U
32-35-00-001-U
32-40-00-001-AFTLH
32-40-00-001-AFTRH
32-40-00-001-
RUDDER POWER CONTROL UNIT - DETAILED VISUAL INSPECTION
RUDDER CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST
RUDDER TRIM ACTUATOR - FUNCTIONAL TEST
ELEVATOR MECHANICAL COMPONENTS - GENERAL VISUAL INSPECTION
ELEVATOR POWER CONTROL UNIT - DETAILED VISUAL INSPECTION
ELEVATOR POWER CONTROL UNIT - DETAILED VISUAL INSPECTION
ELEVATOR CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST
ELEVATOR CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST
HORIZONTAL-STABILIZER SYSTEM BACKLASH - FUNCTIONAL TEST
INBOARD FLAP ACTUATOR - FUNCTIONAL TEST
INBOARD FLAP ACTUATOR - FUNCTIONAL TEST
FLAP TORQUE TUBES - LUBRICATING
FLAP TORQUE TUBES - LUBRICATING
FLAP MECHANICAL DRIVE LINE - DETAILED VISUAL INSPECTION
FLAP MECHANICAL DRIVE LINE - DETAILED VISUAL INSPECTION
FLAP-TRACK-MECHANISM NEEDLE ROLLERS - DETAILED VISUAL INSPECTION
FLAP-TRACK-MECHANISM NEEDLE ROLLERS - DETAILED VISUAL INSPECTION
SLAT TORQUE TUBES - LUBRICATING
SLAT TORQUE TUBES - LUBRICATING
SLAT MECHANICAL DRIVE LINE - DETAILED VISUAL INSPECTION
SLAT MECHANICAL DRIVE LINE - DETAILED VISUAL INSPECTION
FLAME ARRESTOR/SURGE RELIEF VALVE - INSPECTION (CR)
FLAME ARRESTOR/SURGE RELIEF VALVE - INSPECTION (CR)
FLAME ARRESTOR/SURGE RELIEF VALVE - OPERATIONAL TEST (CR)
FLAME ARRESTOR/SURGE RELIEF VALVE - OPERATIONAL TEST (CR)
CROSS-FEED SYSTEM - OPERATIONAL TEST
HYDRAULIC FLUID - HYDRAULIC FLUID SAMPLING ANALYSIS
MAIN COMPONENTS OF POWER TRANSFER UNIT (PTU) - FUNCTIONAL TEST
LG AND NWS PRIORITY VALVE OF NO. 2 HYDRAULIC SYSTEM - FUNCTIONAL TEST
INTERNAL LEAKAGE OF THE NO. 3 HYDRAULIC SYSTEM - FUNCTIONAL TEST
AUTOMATIC SHUTDOWN OF ALTERNATING-CURRENT MOTOR-DRIVEN PUMP (ACMP) OF
HYDRAULIC TEMPERATURE SWITCH OF NO. 3 HYDRAULIC SYSTEM - FUNCTIONAL TE
WING THERMAL ANTI-ICING SYSTEM - GENERAL VISUAL INSPECTION
WING THERMAL ANTI-ICING SYSTEM - GENERAL VISUAL INSPECTION
WING ANTI-ICE SLAT-HOSE - DETAILED VISUAL INSPECTION
WING ANTI-ICE SLAT-HOSE - DETAILED VISUAL INSPECTION
STATIC PORT HEATING - OPERATIONAL TEST
MLG TORQUE LINK CLEARANCE AND SHIMMY DAMPER TORQUE - FUNCTIONAL TEST
MLG TORQUE LINK CLEARANCE AND SHIMMY DAMPER TORQUE - FUNCTIONAL TEST
NOSE-LANDING-GEAR TORQUE LINK - INSPECTION
CONTROL-LEVER RELEASE SWITCH - OPERATIONAL TEST
EMERGENCY-EXTENSION SYSTEM (ON JACKS) - FUNCTIONAL TEST
EMERGENCY-EXTENSION SYSTEM - INSPECTION
EMERGENCY-EXTENSION SYSTEM - ADJUSTMENT
EMERGENCY-EXTENSION ELECTRICAL-RELEASE SYSTEM - OPERATIONAL TEST
MAIN BRAKE HYDRAULIC-FUSE AND EMERGENCY/PARKING BRAKE HYDRAULIC-FUSE MAIN BRAKE HYDRAULIC-FUSE AND EMERGENCY/PARKING BRAKE HYDRAULIC-FUSE MAIN BRAKE HYDRAULIC-FUSE AND EMERGENCY/PARKING BRAKE HYDRAULIC-FUSE 03 APR 2015
Page 15 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
FWDRH
32-44-00-001-U
32-49-03-001-U
32-49-03-002-U
32-49-07-001-LH
32-49-07-001-RH
32-49-07-002-LH
32-49-07-002-RH
32-49-11-001-LH
32-49-11-001-RH
35-11-00-001-U
35-20-04-001-U
35-21-00-001-U
35-21-00-002-U
36-10-01-001-U
36-11-01-001-LH
36-11-01-001-RH
36-11-03-001-LH
36-11-03-001-RH
36-11-09-001-LH
36-11-09-001-RH
38-32-06-001-U
44-10-00-001-U
49-62-01-001-U
49-80-01-001-U
52-11-20-003FWDLH
52-11-22-001FWDLH
52-11-23-001FWDLH
52-11-25-001FWDLH
52-11-30-003FWDLH
52-11-40-001FWDLH
52-11-40-003FWDLH
52-11-40-004-U
52-11-51-001FWDLH
52-11-52-001FWDLH
52-12-20-003-AFTLH
52-12-22-001-AFTLH
52-12-23-001-AFTLH
52-12-25-001-AFTLH
52-12-27-001-AFTLH
52-12-30-003-AFTLH
EMERGENCY/PARKING BRAKE SYSTEM - FUNCTIONAL TEST
NOSE-LANDING-GEAR TIRE PRESSURE - CHECK
NOSE WHEEL TIRE - INSPECTION
MAIN-LANDING-GEAR TIRE PRESSURE - CHECK
MAIN-LANDING-GEAR TIRE PRESSURE - CHECK
MAIN WHEEL TIRE - INSPECTION
MAIN WHEEL TIRE - INSPECTION
BRAKE ASSEMBLY WEAR-PIN (FAST CHECK - WHEEL INSTALLED ON AIRCRAFT) - G
BRAKE ASSEMBLY WEAR-PIN (FAST CHECK - WHEEL INSTALLED ON AIRCRAFT) - G
PRESSURE TRANSDUCER INDICATION - GENERAL VISUAL INSPECTION
PASSENGER-CABIN OXYGEN MASKS - DETAILED VISUAL INSPECTION
PASSENGER OXYGEN SYSTEM - FUNCTIONAL CHECK
PASSENGER OXYGEN SYSTEM - OPERATIONAL CHECK
CROSS-BLEED VALVE FILTER - CLEANING (ULTRASONIC METHOD)
HIGH-STAGE BLEED-VALVE FILTER - CLEANING (ULTRASONIC METHOD) (CR)
HIGH-STAGE BLEED-VALVE FILTER - CLEANING (ULTRASONIC METHOD) (CR)
NACELLE PRSOV FILTER - CLEANING (ULTRASONIC METHOD) (CR)
NACELLE PRSOV FILTER - CLEANING (ULTRASONIC METHOD) (CR)
FAN-AIR VALVE FILTER - CLEANING (ULTRASONIC METHOD) (CR)
FAN-AIR VALVE FILTER - CLEANING (ULTRASONIC METHOD) (CR)
WATER SEPARATOR - INSPECTION
CABIN LOUDSPEAKERS - OPERATIONAL TEST
AUXILIARY POWER UNIT (APU) EMERGENCY SHUTDOWN - OPERATIONAL TEST
EXHAUST SILENCER LINER - INSPECTION
FORWARD PASSENGER-DOOR MAIN-SHAFTS - INSPECTION
FORWARD PASSENGER-DOOR BOX-MECHANISM - INSPECTION
FORWARD PASSENGER-DOOR STOPS - FUNCTIONAL CHECK
FORWARD PASSENGER-DOOR VENT-FLAP - INSPECTION
FORWARD PASSENGER DOOR ACTUATOR ASSEMBLY - INSPECTION
FORWARD-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM - INSPECTI
FORWARD-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN
EMERGEN
FORWARD-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN
NORMAL
FORWARD PASSENGER DOOR PNEUMATIC ASSEMBLY - INSPECTION
FORWARD-PASSENGER-DOOR CONTROL MECHANISM - INSPECTION
AFT PASSENGER-DOOR MAIN-SHAFTS - INSPECTION
AFT PASSENGER-DOOR BOX-MECHANISM - INSPECTION
AFT PASSENGER-DOOR STOPS - FUNCTIONAL TEST
AFT PASSENGER-DOOR VENT-FLAP - INSPECTION
AFT PASSENGER DOOR DAMPER - OPERATIONAL TEST
AFT PASSENGER DOOR ACTUATOR ASSEMBLY - INSPECTION
03 APR 2015
Page 16 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
52-12-40-001-AFTLH
52-12-40-003-AFTLH
52-12-40-004-AFTLH
52-12-51-001-AFTLH
52-12-52-001-AFTLH
52-21-02-001-LH
52-21-02-001-RH
52-21-02-002-LH
52-21-02-002-RH
52-21-20-001-LH
52-21-20-001-RH
52-21-20-002-LH
52-21-20-002-RH
52-21-23-001-LH
52-21-23-001-RH
52-31-02-001FWDRH
52-31-20-002FWDRH
52-31-23-001FWDRH
52-31-24-001FWDRH
52-31-25-001FWDRH
52-31-27-001FWDRH
52-31-27-002-U
52-31-28-001FWDRH
52-32-02-001-AFTRH
52-32-02-002-AFTRH
52-32-20-002-AFTRH
52-32-23-001-AFTRH
52-32-24-001-AFTRH
52-32-25-001-AFTRH
52-32-27-001-AFTRH
52-32-27-002-AFTRH
52-32-28-001-AFTRH
52-41-20-003FWDRH
52-41-22-001FWDRH
52-41-25-001FWDRH
52-41-27-001FWDRH
52-41-30-003FWDRH
52-41-40-001FWDRH
52-41-40-003-
AFT PASSENGER DOOR SLIDE BELLCRANK, GIRT BAR AND SLIDE MECHANISM
AFT-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN EMERGENCY C
AFT-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN NORMAL CONF
AFT PASSENGER DOOR PNEUMATIC ASSEMBLY - INSPECTION
AFT-PASSENGER-DOOR CONTROL MECHANISM - INSPECTION
OVERWING-ESCAPE-HATCH STRUCTURES (HANDLE AND LATCH-DRIVING FITTING-KIT
OVERWING-ESCAPE-HATCH STRUCTURES (HANDLE AND LATCH-DRIVING FITTING-KIT
OVERWING-ESCAPE-HATCH STRUCTURES (DRAIN HOLES) - INSPECTION
OVERWING-ESCAPE-HATCH STRUCTURES (DRAIN HOLES) - INSPECTION
OVERWING ESCAPE HATCH ACTUATING AND LOCKING MECHANISM COMPONENTS - INS
OVERWING ESCAPE HATCH ACTUATING AND LOCKING MECHANISM COMPONENTS - INS
OVERWING ESCAPE HATCH ACTUATING AND LOCKING MECHANISM - OPERATIONAL TE
OVERWING ESCAPE HATCH ACTUATING AND LOCKING MECHANISM - OPERATIONAL TE
OVERWING-ESCAPE-HATCH STOPS AND FITTINGS COMPONENTS - INSPECTION
OVERWING-ESCAPE-HATCH STOPS AND FITTINGS COMPONENTS - INSPECTION
FORWARD CARGO-DOOR VENT-FLAP-BEARINGS - INSPECTION
FORWARD CARGO-DOOR TERMINAL-SHAFTS - INSPECTION
FORWARD CARGO DOOR FITTINGS - INSPECTION
FORWARD CARGO-DOOR HOOK - INSPECTION
FORWARD CARGO-DOOR VENT-FLAP - INSPECTION
FORWARD CARGO-DOOR ACTUATOR - INSPECTION
FORWARD-CARGO-DOOR ACTUATORS - FUNCTIONAL TEST
FORWARD CARGO-DOOR DRIVE-ROD - INSPECTION
AFT CARGO-DOOR VENT-FLAP-BEARINGS - INSPECTION
AFT CARGO-DOOR DRAIN HOLES - INSPECTION
AFT CARGO-DOOR TERMINAL-SHAFTS - INSPECTION
AFT CARGO DOOR FITTINGS - INSPECTION
AFT CARGO-DOOR HOOK - INSPECTION
AFT CARGO-DOOR VENT-FLAP - INSPECTION
AFT CARGO-DOOR ACTUATOR - INSPECTION
AFT-CARGO-DOOR ACTUATORS - FUNCTIONAL TEST
AFT CARGO-DOOR DRIVE-ROD - INSPECTION
FORWARD SERVICE-DOOR MAIN-SHAFTS - INSPECTION
FORWARD SERVICE-DOOR BOX-MECHANISM - INSPECTION
FORWARD SERVICE-DOOR VENT-FLAP - INSPECTION
FORWARD SERVICE DOOR DAMPER - OPERATIONAL TEST
FORWARD SERVICE DOOR ACTUATOR ASSEMBLY - INSPECTION
FORWARD-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM - INSPECTION
FORWARD-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN
03 APR 2015
Page 17 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
170
171
172
173
174
175
176
177
178
179
180
FWDRH
52-41-40-004FWDRH
52-41-51-001FWDRH
52-41-52-001FWDRH
52-42-20-003-AFTRH
52-42-22-001-AFTRH
52-42-25-001-AFTRH
52-42-27-001-AFTRH
52-42-30-003-AFTRH
52-42-40-001-AFTRH
52-42-40-003-AFTRH
52-42-40-004-AFTRH
52-42-51-001-AFTRH
52-42-52-001-AFTRH
52-43-20-001-FWD
181
52-43-20-002-FWD
182
183
184
185
186
52-46-20-001-M
52-46-20-002-M
52-73-00-001-U
53-05-00-001-U
53-10-21-001FWDLH
53-10-21-002FWDLH
53-10-21-003FWDLH
53-10-25-001FWDRH
53-10-25-002FWDRH
53-10-25-003FWDRH
53-21-29-001FWDRH
53-21-29-002FWDRH
53-21-29-003FWDRH
53-21-29-004FWDRH
53-22-11-001-LH
53-22-11-001-RH
53-23-21-001-AFTLH
53-23-21-002-AFTLH
53-23-21-003-AFTLH
53-23-25-001-AFTRH
53-23-25-002-AFTRH
167
168
169
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
EMERGENCY
FORWARD-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN NORMAL
CO
FORWARD SERVICE DOOR PNEUMATIC ASSEMBLY - INSPECTION
FORWARD-SERVICE-DOOR CONTROL MECHANISM - INSPECTION
AFT SERVICE-DOOR MAIN-SHAFTS - INSPECTION
AFT SERVICE-DOOR BOX-MECHANISM - INSPECTION
AFT SERVICE-DOOR VENT-FLAP - INSPECTION
AFT SERVICE DOOR DAMPER - OPERATIONAL TEST
AFT SERVICE DOOR ACTUATOR ASSEMBLY - INSPECTION
AFT-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM - INSPECTION
AFT-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN EMERGENCY CON
AFT-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN NORMAL CONFIG
AFT SERVICE DOOR PNEUMATIC ASSEMBLY - INSPECTION
AFT-SERVICE-DOOR CONTROL MECHANISM - INSPECTION
FORWARD-AVIONICS-COMPARTMENT ACCESS-HATCH ACTUATING AND LOCKING
MECHAN
FORWARD AVIONICS COMPARTMENT ACCESS HATCH ACTUATING AND LOCKING
MECHAN
MIDDLE-AVIONICS-COMPARTMENT ACCESS-DOOR ACTUATING AND LOCKING MECHANIS
MIDDLE AVIONICS COMPARTMENT ACCESS DOOR ACTUATING AND LOCKING MECHANIS
OPERATIONAL CHECK OF FORWARD/AFT CARGO DOOR WARNING SENSOR (LOCKED).
FUSELAGE DRAINS - DETAILED INSPECTION
FORWARD-PASSENGER-DOOR KEEPER KIT - INSPECTION
FORWARD-PASSENGER-DOOR COMMAND RAMP - INSPECTION
FORWARD-PASSENGER-DOOR EVACUATION SLIDE-FITTING - INSPECTION
FORWARD-SERVICE-DOOR KEEPER KIT - INSPECTION
FORWARD-SERVICE-DOOR COMMAND RAMP - INSPECTION
FORWARD-SERVICE-DOOR EVACUATION SLIDE-FITTING - INSPECTION
FORWARD CARGO-DOOR UPLOCK ON THE FUSELAGE - INSPECTION
FORWARD CARGO-DOOR LATCH-FITTINGS ON THE FUSELAGE - INSPECTION
FORWARD CARGO-DOOR LATCH-FITTINGS - FUNCTIONAL CHECK
FORWARD CARGO-DOOR LATCH FITTINGS - LUBRICATION
OVERWING SCAPE HATCH SURROUNDING STRUCTURE COMPONENTS - GENERAL VISUAL
OVERWING SCAPE HATCH SURROUNDING STRUCTURE COMPONENTS - GENERAL VISUAL
AFT PASSENGER-DOOR KEEPER-KIT ON THE FUSELAGE - INSPECTION
AFT PASSENGER-DOOR COMMAND-RAMP ON THE FUSELAGE - INSPECTION
AFT PASSENGER-DOOR EVACUATION-SLIDE-FITTING - INSPECTION
AFT SERVICE-DOOR KEEPER-KIT ON THE FUSELAGE - INSPECTION
AFT SERVICE-DOOR COMMAND-RAMP ON THE FUSELAGE - INSPECTION
03 APR 2015
Page 18 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
53-23-25-003-AFTRH
53-23-29-001-AFTRH
53-23-29-002-AFTRH
53-23-29-003-AFTRH
53-23-29-004-AFTRH
56-30-00-001FWDLH
56-30-00-002-AFTLH
56-30-00-003FWDRH
56-30-00-004-AFTRH
71-00-00-002-U
71-31-00-001-LH
71-31-00-001-RH
72-00-00-003-U
72-23-00-001-LH
72-23-00-001-RH
72-23-00-003-LH
72-23-00-003-RH
72-30-00-001-LH
72-30-00-001-RH
72-32-00-002-LH
72-32-00-002-RH
73-11-00-001-LH
73-11-00-001-RH
73-11-04-001-LH
73-11-04-001-RH
73-31-01-001-LH
73-31-01-001-RH
74-11-02-001-LH
74-11-02-001-RH
75-31-00-001-LH
75-31-00-001-RH
75-31-00-002-LH
75-31-00-002-RH
78-31-00-002-LH
78-31-00-002-RH
78-32-00-001-LH
78-32-00-001-RH
78-32-00-002-LH
78-32-00-002-RH
79-34-01-001-LH
79-34-01-001-RH
79-35-01-001-LH
79-35-01-001-RH
Z198-001-U
Z200-001-U
Z310-001-U
AFT SERVICE-DOOR EVACUATION-SLIDE-FITTING - INSPECTION
AFT CARGO-DOOR UPLOCK ON THE FUSELAGE - INSPECTION
AFT CARGO-DOOR LATCH-FITTINGS ON THE FUSELAGE - INSPECTION
AFT CARGO-DOOR LATCH-FITTINGS - FUNCTIONAL CHECK
AFT CARGO-DOOR LATCH FITTINGS - LUBRICATION
DOORS WINDOW - INSPECTION/CHECK
DOORS WINDOW - INSPECTION/CHECK
DOORS WINDOW - INSPECTION/CHECK
DOORS WINDOW - INSPECTION/CHECK
POWERPLANT SYSTEM - FAULT MESSAGES CHECK
ENGINE FIREZONE - INSPECTION/CHECK (CR)
ENGINE FIREZONE - INSPECTION/CHECK (CR)
ENGINE TREND-MONITORING HISTORY - DATA RECORDING
ENGINE AFT FAN CASE MOUNT CLEVIS - DETAILED INSPECTION (CR)
ENGINE AFT FAN CASE MOUNT CLEVIS - DETAILED INSPECTION (CR)
ENGINE FORWARD FAN CASE - EXTERNAL GENERAL VISUAL INSPECTION
ENGINE FORWARD FAN CASE - EXTERNAL GENERAL VISUAL INSPECTION
ENGINE COMPRESSOR ROTOR BLADES AND STATOR VANES - BORESCOPE INSP (CR)
ENGINE COMPRESSOR ROTOR BLADES AND STATOR VANES - BORESCOPE INSP (CR)
ENGINE COMPRESSOR CASE - EXTERNAL GENERAL VISUAL INSPECTION (CR)
ENGINE COMPRESSOR CASE - EXTERNAL GENERAL VISUAL INSPECTION (CR)
ENGINE FUEL DISTRIBUTION SYSTEM - INSPECTION
ENGINE FUEL DISTRIBUTION SYSTEM - INSPECTION
ENGINE FUEL FILTER ELEMENT - DISCARD (CR)
ENGINE FUEL FILTER ELEMENT - DISCARD (CR)
FUEL-FILTER IMPENDING-BYPASS SWITCH - REMOVAL FOR RESTORATION (CR)
FUEL-FILTER IMPENDING-BYPASS SWITCH - REMOVAL FOR RESTORATION (CR)
IGNITION - STATIC CHECK
IGNITION - STATIC CHECK
COMPRESSOR CONTROL ACTUATION - DETAILED INSPECTION
COMPRESSOR CONTROL ACTUATION - DETAILED INSPECTION
COMPRESSOR BLEED-CONTROL-SYSTEM - DETAILED INSPECTION
COMPRESSOR BLEED-CONTROL-SYSTEM - DETAILED INSPECTION
THRUST-REVERSER FIRE ZONE - GENERAL VISUAL INSPECTION
THRUST-REVERSER FIRE ZONE - GENERAL VISUAL INSPECTION
THRUST-REVERSER LOCKING SYSTEM - OPERATIONAL TEST
THRUST-REVERSER LOCKING SYSTEM - OPERATIONAL TEST
THRUST-REVERSER ACTUATION SYSTEM - DETAILED INSPECTION
THRUST-REVERSER ACTUATION SYSTEM - DETAILED INSPECTION
OIL FILTER BYPASS SENSOR - FUNCTIONAL TEST
OIL FILTER BYPASS SENSOR - FUNCTIONAL TEST
CHIP DETECTOR - FUNCTIONAL CHECK
CHIP DETECTOR - FUNCTIONAL CHECK
CENTER FUSELAGE II AND III LOWER PORTION AND KEEL BEAM AT AREAS COVERE
FORWARD AND CENTER FUSELAGE I, II AND III TOP AND SIDE AREAS - EXTERNA
REAR FUSELAGE, REAR PRESSURE BULKHEAD, HORIZONTAL STABILIZER ROOT AREA
03 APR 2015
Page 19 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
Z350-001-U
Z400-001-U
Z400-002-U
Z500-002-U
Z510-001-U
Z700-001-U
Z700-002-U
Z811-001-LH
Z811-002-LH
Z812-001-U
Z812-002-U
Z813-001-LH
Z821-001-U
Z821-002-RH
Z822-001-RH
Z822-002-RH
Z823-001-RH
Z823-002-U
Z824-001-U
Z824-002-RH
Z825-001-RH
TAIL CONE AND AUXILIARY POWER UNIT (APU) - INTERNAL GENERAL VISUAL INS
PYLON, INLET COWL, FAN COWL AND AFT CORE COWL, THRUST REVERSER AND ENG
FAN COWL, THRUST REVERSER, AFT CORE COWL AND ENGINE - INTERNAL
FLAP, AILERON, SPOILERS, WING TRAILING EDGE, FLAP TRACK FAIRINGS AND S
WING LEADING EDGE, WING SLATS, WING ROOT LANDING LIGHT FAIRING, WINGLE
NOSE LANDING GEAR, NOSE LANDING GEAR DOORS AND NOSE LANDING GEAR BAY MAIN LANDING GEAR, MAIN LANDING GEAR COMPARTMENT AND DOORS - EXTERNAL
FORWARD PASSENGER DOOR - EXTERNAL GENERAL VISUAL INSPECTION
FORWARD PASSENGER DOOR - INTERNAL GENERAL VISUAL INSPECTION
AFT PASSENGER DOOR - EXTERNAL GENERAL VISUAL INSPECTION
AFT PASSENGER DOOR - INTERNAL GENERAL VISUAL INSPECTION
LEFT OVERWING DOOR - EXTERNAL GENERAL VISUAL INSPECTION
FORWARD SERVICE DOOR - EXTERNAL GENERAL VISUAL INSPECTION
FORWARD SERVICE DOOR - INTERNAL GENERAL VISUAL INSPECTION
FORWARD CARGO DOOR - EXTERNAL GENERAL VISUAL INSPECTION
FORWARD CARGO DOOR - INTERNAL GENERAL VISUAL INSPECTION
AFT CARGO DOOR - EXTERNAL GENERAL VISUAL INSPECTION
AFT CARGO DOOR - INTERNAL GENERAL VISUAL INSPECTION
AFT SERVICE DOOR - EXTERNAL GENERAL VISUAL INSPECTION
AFT SERVICE DOOR - INTERNAL GENERAL VISUAL INSPECTION
RIGHT OVERWING DOOR - EXTERNAL GENERAL VISUAL INSPECTION
03 APR 2015
Page 20 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
Annex 3
UR-EMB
MSN 19000501
BASE-1C CHECK
WORKSCOPE
(Rev. 1 – Fabruary, 2015)
Checks Task Cards
№
TC number
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
21-32-04-001-U
21-51-01-001-LH
21-51-01-001-RH
21-51-04-001-LH
21-51-04-001-RH
21-62-05-001-LH
21-62-05-001-RH
23-51-01-001-LH
23-51-01-001-RH
23-51-01-002-LH
23-51-01-002-RH
23-61-00-001-LH
23-61-00-001-RH
23-61-00-001-T
25-11-01-001-U
25-11-01-003-U
25-11-02-001-U
25-11-02-002-U
25-21-20-002-U
26-11-01-001-LH
26-11-01-001-RH
26-12-01-001-U
26-14-01-001-AFT
26-14-01-001-FWD
26-21-00-001-U
26-22-07-001-U
26-23-09-001-U
26-23-13-001-U
27-03-00-001-U
27-03-01-001-U
27-03-04-001-U
27-11-00-005-U
27-11-03-004-U
27-11-03-006-U
27-12-01-006-LH
27-12-01-006-RH
27-14-01-001-U
27-21-00-001-U
27-21-03-001-U
NEGATIVE-PRESSURE RELIEF - OPERATIONAL TEST
PACK FLOW-CONTROL-VALVES FILTER - CLEANING (ULTRASONIC METHOD) (CR)
PACK FLOW-CONTROL-VALVES FILTER - CLEANING (ULTRASONIC METHOD) (CR)
DUAL HEAT EXCHANGERS - SHOP CLEANING
DUAL HEAT EXCHANGERS - SHOP CLEANING
TRIM-AIR MODULATING-VALVES FILTER - CLEANING (ULTRASONIC METHOD) (CR)
TRIM-AIR MODULATING-VALVES FILTER - CLEANING (ULTRASONIC METHOD) (CR)
AIRBORNE AUDIO SYSTEM BACKUP MODE - OPERATIONAL TEST
AIRBORNE AUDIO SYSTEM BACKUP MODE - OPERATIONAL TEST
PASSENGER ADDRESS AND CABIN-INTERPHONE-SYSTEM EMERGENCY MODE - OPERATI
PASSENGER ADDRESS AND CABIN-INTERPHONE-SYSTEM EMERGENCY MODE - OPERATI
STATIC DISCHARGERS - FUNCTIONAL TEST
STATIC DISCHARGERS - FUNCTIONAL TEST
STATIC DISCHARGERS - FUNCTIONAL TEST
PILOT SEATS ATTACHMENT - DETAILED INSPECTION
PILOT-SEAT INERTIAL REELS - OPERATIONAL TEST
OBSERVER SEAT - EXTERNAL DETAILED INSPECTION
OBSERVER-SEAT INERTIAL REEL - OPERATIONAL TEST
FLIGHT-ATTENDANT-SEAT INERTIAL REELS - OPERATIONAL TEST
ENGINE FIRE DETECTION LOOP - OPERATIONAL CHECK
ENGINE FIRE DETECTION LOOP - OPERATIONAL CHECK
APU FIRE DETECTION LOOP - OPERATIONAL CHECK
LAVATORY SMOKE DETECTOR - OPERATIONAL TEST
LAVATORY SMOKE DETECTOR - OPERATIONAL TEST
ENGINE FIRE EXTINGUISHING SYSTEM - FUNCTIONAL TEST
APU FIRE EXTINGUISHING SYSTEM DISCHARGE PIPING - INSPECTION/CHECK
CARGO-COMPARTMENT DISCHARGE TUBING / NOZZLE - FUNCTIONAL TEST
CARGO-COMPARTMENT FIRE-EXTINGUISHING SYSTEM - OPERATIONAL CHECK
FLY-BY-WIRE BACKUP BATTERY - OPERATIONAL TEST
FLIGHT CONTROLS PANEL (DIRECT MODE SWITCH) - OPERATIONAL TEST
TRIM CONTROL PANEL (CUTOUT SWITCHES) - OPERATIONAL TEST
AILERON CONTROL CABLES - OPERATIONAL TEST
AILERON CONTROL CABLES, PULLEYS ANDQUADRANT - FUSELAGE AREA
FNC - AILERON CONTROL CABLES - FUSELAGE AREA
AILERON CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST
AILERON CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST
AILERON TRIM ACTUATOR - FUNCTIONAL TEST
RUDDER MECHANICAL COMPONENTS - GENERAL VISUAL INSPECTION
RUDDER-PEDAL DAMPER FLUID-LEVEL - GENERAL VISUAL INSPECTION
03 APR 2015
Page 21 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
27-22-01-002-U
27-22-01-006-U
27-24-01-001-U
27-31-00-001-U
27-32-01-002-LH
27-32-01-002-RH
27-32-01-006-LH
27-32-01-006-RH
27-40-00-001-U
27-51-01-003-LH
27-51-01-003-RH
27-51-03-001-LH
27-51-03-001-RH
27-51-03-002-LH
27-51-03-002-RH
27-51-11-001-LH
27-51-11-001-RH
27-81-03-001-LH
27-81-03-001-RH
27-81-03-002-LH
27-81-03-002-RH
28-12-11-001-LH
28-12-11-001-RH
28-12-11-002-LH
28-12-11-002-RH
28-21-00-001-U
29-10-00-001-U
29-11-03-001-U
29-11-20-001-U
29-12-00-005-U
29-33-02-001-U
29-33-02-003-U
30-11-00-001-LH
30-11-00-001-RH
30-11-06-001-LH
30-11-06-001-RH
30-32-00-001-U
32-11-11-001-LH
32-11-11-001-RH
32-21-09-001-U
32-33-01-001-U
32-34-00-001-U
32-34-00-002-U
32-34-00-003-U
32-35-00-001-U
32-40-00-001-AFTLH
32-40-00-001-AFTRH
32-40-00-001-
RUDDER POWER CONTROL UNIT - DETAILED VISUAL INSPECTION
RUDDER CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST
RUDDER TRIM ACTUATOR - FUNCTIONAL TEST
ELEVATOR MECHANICAL COMPONENTS - GENERAL VISUAL INSPECTION
ELEVATOR POWER CONTROL UNIT - DETAILED VISUAL INSPECTION
ELEVATOR POWER CONTROL UNIT - DETAILED VISUAL INSPECTION
ELEVATOR CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST
ELEVATOR CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST
HORIZONTAL-STABILIZER SYSTEM BACKLASH - FUNCTIONAL TEST
INBOARD FLAP ACTUATOR - FUNCTIONAL TEST
INBOARD FLAP ACTUATOR - FUNCTIONAL TEST
FLAP TORQUE TUBES - LUBRICATING
FLAP TORQUE TUBES - LUBRICATING
FLAP MECHANICAL DRIVE LINE - DETAILED VISUAL INSPECTION
FLAP MECHANICAL DRIVE LINE - DETAILED VISUAL INSPECTION
FLAP-TRACK-MECHANISM NEEDLE ROLLERS - DETAILED VISUAL INSPECTION
FLAP-TRACK-MECHANISM NEEDLE ROLLERS - DETAILED VISUAL INSPECTION
SLAT TORQUE TUBES - LUBRICATING
SLAT TORQUE TUBES - LUBRICATING
SLAT MECHANICAL DRIVE LINE - DETAILED VISUAL INSPECTION
SLAT MECHANICAL DRIVE LINE - DETAILED VISUAL INSPECTION
FLAME ARRESTOR/SURGE RELIEF VALVE - INSPECTION (CR)
FLAME ARRESTOR/SURGE RELIEF VALVE - INSPECTION (CR)
FLAME ARRESTOR/SURGE RELIEF VALVE - OPERATIONAL TEST (CR)
FLAME ARRESTOR/SURGE RELIEF VALVE - OPERATIONAL TEST (CR)
CROSS-FEED SYSTEM - OPERATIONAL TEST
HYDRAULIC FLUID - HYDRAULIC FLUID SAMPLING ANALYSIS
MAIN COMPONENTS OF POWER TRANSFER UNIT (PTU) - FUNCTIONAL TEST
LG AND NWS PRIORITY VALVE OF NO. 2 HYDRAULIC SYSTEM - FUNCTIONAL TEST
INTERNAL LEAKAGE OF THE NO. 3 HYDRAULIC SYSTEM - FUNCTIONAL TEST
AUTOMATIC SHUTDOWN OF ALTERNATING-CURRENT MOTOR-DRIVEN PUMP (ACMP) OF
HYDRAULIC TEMPERATURE SWITCH OF NO. 3 HYDRAULIC SYSTEM - FUNCTIONAL TE
WING THERMAL ANTI-ICING SYSTEM - GENERAL VISUAL INSPECTION
WING THERMAL ANTI-ICING SYSTEM - GENERAL VISUAL INSPECTION
WING ANTI-ICE SLAT-HOSE - DETAILED VISUAL INSPECTION
WING ANTI-ICE SLAT-HOSE - DETAILED VISUAL INSPECTION
STATIC PORT HEATING - OPERATIONAL TEST
MLG TORQUE LINK CLEARANCE AND SHIMMY DAMPER TORQUE - FUNCTIONAL TEST
MLG TORQUE LINK CLEARANCE AND SHIMMY DAMPER TORQUE - FUNCTIONAL TEST
NOSE-LANDING-GEAR TORQUE LINK - INSPECTION
CONTROL-LEVER RELEASE SWITCH - OPERATIONAL TEST
EMERGENCY-EXTENSION SYSTEM (ON JACKS) - FUNCTIONAL TEST
EMERGENCY-EXTENSION SYSTEM - INSPECTION
EMERGENCY-EXTENSION SYSTEM - ADJUSTMENT
EMERGENCY-EXTENSION ELECTRICAL-RELEASE SYSTEM - OPERATIONAL TEST
MAIN BRAKE HYDRAULIC-FUSE AND EMERGENCY/PARKING BRAKE HYDRAULIC-FUSE MAIN BRAKE HYDRAULIC-FUSE AND EMERGENCY/PARKING BRAKE HYDRAULIC-FUSE MAIN BRAKE HYDRAULIC-FUSE AND EMERGENCY/PARKING BRAKE HYDRAULIC-FUSE 03 APR 2015
Page 22 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
FWDRH
32-44-00-001-U
32-49-03-001-U
32-49-03-002-U
32-49-07-001-LH
32-49-07-001-RH
32-49-07-002-LH
32-49-07-002-RH
32-49-11-001-LH
32-49-11-001-RH
35-11-00-001-U
35-20-04-001-U
35-21-00-001-U
35-21-00-002-U
36-10-01-001-U
36-11-01-001-LH
36-11-01-001-RH
36-11-03-001-LH
36-11-03-001-RH
36-11-09-001-LH
36-11-09-001-RH
38-32-06-001-U
44-10-00-001-U
49-62-01-001-U
49-80-01-001-U
52-11-20-003FWDLH
52-11-22-001FWDLH
52-11-23-001FWDLH
52-11-25-001FWDLH
52-11-30-003FWDLH
52-11-40-001FWDLH
52-11-40-003FWDLH
52-11-40-004-U
52-11-51-001FWDLH
52-11-52-001FWDLH
52-12-20-003-AFTLH
52-12-22-001-AFTLH
52-12-23-001-AFTLH
52-12-25-001-AFTLH
52-12-27-001-AFTLH
52-12-30-003-AFTLH
EMERGENCY/PARKING BRAKE SYSTEM - FUNCTIONAL TEST
NOSE-LANDING-GEAR TIRE PRESSURE - CHECK
NOSE WHEEL TIRE - INSPECTION
MAIN-LANDING-GEAR TIRE PRESSURE - CHECK
MAIN-LANDING-GEAR TIRE PRESSURE - CHECK
MAIN WHEEL TIRE - INSPECTION
MAIN WHEEL TIRE - INSPECTION
BRAKE ASSEMBLY WEAR-PIN (FAST CHECK - WHEEL INSTALLED ON AIRCRAFT) - G
BRAKE ASSEMBLY WEAR-PIN (FAST CHECK - WHEEL INSTALLED ON AIRCRAFT) - G
PRESSURE TRANSDUCER INDICATION - GENERAL VISUAL INSPECTION
PASSENGER-CABIN OXYGEN MASKS - DETAILED VISUAL INSPECTION
PASSENGER OXYGEN SYSTEM - FUNCTIONAL CHECK
PASSENGER OXYGEN SYSTEM - OPERATIONAL CHECK
CROSS-BLEED VALVE FILTER - CLEANING (ULTRASONIC METHOD)
HIGH-STAGE BLEED-VALVE FILTER - CLEANING (ULTRASONIC METHOD) (CR)
HIGH-STAGE BLEED-VALVE FILTER - CLEANING (ULTRASONIC METHOD) (CR)
NACELLE PRSOV FILTER - CLEANING (ULTRASONIC METHOD) (CR)
NACELLE PRSOV FILTER - CLEANING (ULTRASONIC METHOD) (CR)
FAN-AIR VALVE FILTER - CLEANING (ULTRASONIC METHOD) (CR)
FAN-AIR VALVE FILTER - CLEANING (ULTRASONIC METHOD) (CR)
WATER SEPARATOR - INSPECTION
CABIN LOUDSPEAKERS - OPERATIONAL TEST
AUXILIARY POWER UNIT (APU) EMERGENCY SHUTDOWN - OPERATIONAL TEST
EXHAUST SILENCER LINER - INSPECTION
FORWARD PASSENGER-DOOR MAIN-SHAFTS - INSPECTION
FORWARD PASSENGER-DOOR BOX-MECHANISM - INSPECTION
FORWARD PASSENGER-DOOR STOPS - FUNCTIONAL CHECK
FORWARD PASSENGER-DOOR VENT-FLAP - INSPECTION
FORWARD PASSENGER DOOR ACTUATOR ASSEMBLY - INSPECTION
FORWARD-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM - INSPECTI
FORWARD-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN
EMERGEN
FORWARD-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN
NORMAL
FORWARD PASSENGER DOOR PNEUMATIC ASSEMBLY - INSPECTION
FORWARD-PASSENGER-DOOR CONTROL MECHANISM - INSPECTION
AFT PASSENGER-DOOR MAIN-SHAFTS - INSPECTION
AFT PASSENGER-DOOR BOX-MECHANISM - INSPECTION
AFT PASSENGER-DOOR STOPS - FUNCTIONAL TEST
AFT PASSENGER-DOOR VENT-FLAP - INSPECTION
AFT PASSENGER DOOR DAMPER - OPERATIONAL TEST
AFT PASSENGER DOOR ACTUATOR ASSEMBLY - INSPECTION
03 APR 2015
Page 23 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
128
129
52-12-40-001-AFTLH
52-12-40-003-AFTLH
AFT PASSENGER DOOR SLIDE BELLCRANK, GIRT BAR AND SLIDE MECHANISM
AFT-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN EMERGENCY C
130
52-12-40-004-AFTLH
AFT-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN NORMAL CONF
131
132
133
52-12-51-001-AFTLH
52-12-52-001-AFTLH
52-21-02-001-LH
AFT PASSENGER DOOR PNEUMATIC ASSEMBLY - INSPECTION
AFT-PASSENGER-DOOR CONTROL MECHANISM - INSPECTION
OVERWING-ESCAPE-HATCH STRUCTURES (HANDLE AND LATCH-DRIVING FITTING-KIT
134
52-21-02-001-RH
OVERWING-ESCAPE-HATCH STRUCTURES (HANDLE AND LATCH-DRIVING FITTING-KIT
135
136
137
138
139
140
141
142
143
52-21-02-002-LH
52-21-02-002-RH
52-21-20-001-LH
52-21-20-001-RH
52-21-20-002-LH
52-21-20-002-RH
52-21-23-001-LH
52-21-23-001-RH
52-31-02-001FWDRH
52-31-20-002FWDRH
52-31-23-001FWDRH
52-31-24-001FWDRH
52-31-25-001FWDRH
52-31-27-001FWDRH
52-31-27-002-U
52-31-28-001FWDRH
52-32-02-001-AFTRH
52-32-02-002-AFTRH
52-32-20-002-AFTRH
52-32-23-001-AFTRH
52-32-24-001-AFTRH
52-32-25-001-AFTRH
52-32-27-001-AFTRH
52-32-27-002-AFTRH
52-32-28-001-AFTRH
52-41-20-003FWDRH
52-41-22-001FWDRH
52-41-25-001FWDRH
52-41-27-001FWDRH
OVERWING-ESCAPE-HATCH STRUCTURES (DRAIN HOLES) - INSPECTION
OVERWING-ESCAPE-HATCH STRUCTURES (DRAIN HOLES) - INSPECTION
OVERWING ESCAPE HATCH ACTUATING AND LOCKING MECHANISM COMPONENTS - INS
OVERWING ESCAPE HATCH ACTUATING AND LOCKING MECHANISM COMPONENTS - INS
OVERWING ESCAPE HATCH ACTUATING AND LOCKING MECHANISM - OPERATIONAL TE
OVERWING ESCAPE HATCH ACTUATING AND LOCKING MECHANISM - OPERATIONAL TE
OVERWING-ESCAPE-HATCH STOPS AND FITTINGS COMPONENTS - INSPECTION
OVERWING-ESCAPE-HATCH STOPS AND FITTINGS COMPONENTS - INSPECTION
FORWARD CARGO-DOOR VENT-FLAP-BEARINGS - INSPECTION
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
FORWARD CARGO-DOOR TERMINAL-SHAFTS - INSPECTION
FORWARD CARGO DOOR FITTINGS - INSPECTION
FORWARD CARGO-DOOR HOOK - INSPECTION
FORWARD CARGO-DOOR VENT-FLAP - INSPECTION
FORWARD CARGO-DOOR ACTUATOR - INSPECTION
FORWARD-CARGO-DOOR ACTUATORS - FUNCTIONAL TEST
FORWARD CARGO-DOOR DRIVE-ROD - INSPECTION
AFT CARGO-DOOR VENT-FLAP-BEARINGS - INSPECTION
AFT CARGO-DOOR DRAIN HOLES - INSPECTION
AFT CARGO-DOOR TERMINAL-SHAFTS - INSPECTION
AFT CARGO DOOR FITTINGS - INSPECTION
AFT CARGO-DOOR HOOK - INSPECTION
AFT CARGO-DOOR VENT-FLAP - INSPECTION
AFT CARGO-DOOR ACTUATOR - INSPECTION
AFT-CARGO-DOOR ACTUATORS - FUNCTIONAL TEST
AFT CARGO-DOOR DRIVE-ROD - INSPECTION
FORWARD SERVICE-DOOR MAIN-SHAFTS - INSPECTION
FORWARD SERVICE-DOOR BOX-MECHANISM - INSPECTION
FORWARD SERVICE-DOOR VENT-FLAP - INSPECTION
FORWARD SERVICE DOOR DAMPER - OPERATIONAL TEST
03 APR 2015
Page 24 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
164
170
171
172
173
174
175
176
177
178
179
180
52-41-30-003FWDRH
52-41-40-001FWDRH
52-41-40-003FWDRH
52-41-40-004FWDRH
52-41-51-001FWDRH
52-41-52-001FWDRH
52-42-20-003-AFTRH
52-42-22-001-AFTRH
52-42-25-001-AFTRH
52-42-27-001-AFTRH
52-42-30-003-AFTRH
52-42-40-001-AFTRH
52-42-40-003-AFTRH
52-42-40-004-AFTRH
52-42-51-001-AFTRH
52-42-52-001-AFTRH
52-43-20-001-FWD
181
52-43-20-002-FWD
182
183
184
185
186
52-46-20-001-M
52-46-20-002-M
52-73-00-001-U
53-05-00-001-U
53-10-21-001FWDLH
53-10-21-002FWDLH
53-10-21-003FWDLH
53-10-25-001FWDRH
53-10-25-002FWDRH
53-10-25-003FWDRH
53-21-29-001FWDRH
53-21-29-002FWDRH
53-21-29-003FWDRH
53-21-29-004FWDRH
53-22-11-001-LH
53-22-11-001-RH
53-23-21-001-AFTLH
165
166
167
168
169
187
188
189
190
191
192
193
194
195
196
197
198
FORWARD SERVICE DOOR ACTUATOR ASSEMBLY - INSPECTION
FORWARD-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM - INSPECTION
FORWARD-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN
EMERGENCY
FORWARD-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN NORMAL
CO
FORWARD SERVICE DOOR PNEUMATIC ASSEMBLY - INSPECTION
FORWARD-SERVICE-DOOR CONTROL MECHANISM - INSPECTION
AFT SERVICE-DOOR MAIN-SHAFTS - INSPECTION
AFT SERVICE-DOOR BOX-MECHANISM - INSPECTION
AFT SERVICE-DOOR VENT-FLAP - INSPECTION
AFT SERVICE DOOR DAMPER - OPERATIONAL TEST
AFT SERVICE DOOR ACTUATOR ASSEMBLY - INSPECTION
AFT-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM - INSPECTION
AFT-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN EMERGENCY CON
AFT-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN NORMAL CONFIG
AFT SERVICE DOOR PNEUMATIC ASSEMBLY - INSPECTION
AFT-SERVICE-DOOR CONTROL MECHANISM - INSPECTION
FORWARD-AVIONICS-COMPARTMENT ACCESS-HATCH ACTUATING AND LOCKING
MECHAN
FORWARD AVIONICS COMPARTMENT ACCESS HATCH ACTUATING AND LOCKING
MECHAN
MIDDLE-AVIONICS-COMPARTMENT ACCESS-DOOR ACTUATING AND LOCKING MECHANIS
MIDDLE AVIONICS COMPARTMENT ACCESS DOOR ACTUATING AND LOCKING MECHANIS
OPERATIONAL CHECK OF FORWARD/AFT CARGO DOOR WARNING SENSOR (LOCKED).
FUSELAGE DRAINS - DETAILED INSPECTION
FORWARD-PASSENGER-DOOR KEEPER KIT - INSPECTION
FORWARD-PASSENGER-DOOR COMMAND RAMP - INSPECTION
FORWARD-PASSENGER-DOOR EVACUATION SLIDE-FITTING - INSPECTION
FORWARD-SERVICE-DOOR KEEPER KIT - INSPECTION
FORWARD-SERVICE-DOOR COMMAND RAMP - INSPECTION
FORWARD-SERVICE-DOOR EVACUATION SLIDE-FITTING - INSPECTION
FORWARD CARGO-DOOR UPLOCK ON THE FUSELAGE - INSPECTION
FORWARD CARGO-DOOR LATCH-FITTINGS ON THE FUSELAGE - INSPECTION
FORWARD CARGO-DOOR LATCH-FITTINGS - FUNCTIONAL CHECK
FORWARD CARGO-DOOR LATCH FITTINGS - LUBRICATION
OVERWING SCAPE HATCH SURROUNDING STRUCTURE COMPONENTS - GENERAL VISUAL
OVERWING SCAPE HATCH SURROUNDING STRUCTURE COMPONENTS - GENERAL VISUAL
AFT PASSENGER-DOOR KEEPER-KIT ON THE FUSELAGE - INSPECTION
03 APR 2015
Page 25 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
53-23-21-002-AFTLH
53-23-21-003-AFTLH
53-23-25-001-AFTRH
53-23-25-002-AFTRH
53-23-25-003-AFTRH
53-23-29-001-AFTRH
53-23-29-002-AFTRH
53-23-29-003-AFTRH
53-23-29-004-AFTRH
56-30-00-001FWDLH
56-30-00-002-AFTLH
56-30-00-003FWDRH
56-30-00-004-AFTRH
71-00-00-002-U
71-31-00-001-LH
71-31-00-001-RH
72-00-00-003-U
72-23-00-001-LH
72-23-00-001-RH
72-23-00-003-LH
72-23-00-003-RH
72-30-00-001-LH
72-30-00-001-RH
72-32-00-002-LH
72-32-00-002-RH
73-11-00-001-LH
73-11-00-001-RH
73-11-04-001-LH
73-11-04-001-RH
73-31-01-001-LH
73-31-01-001-RH
74-11-02-001-LH
74-11-02-001-RH
75-31-00-001-LH
75-31-00-001-RH
75-31-00-002-LH
75-31-00-002-RH
78-31-00-002-LH
78-31-00-002-RH
78-32-00-001-LH
78-32-00-001-RH
78-32-00-002-LH
78-32-00-002-RH
79-34-01-001-LH
79-34-01-001-RH
79-35-01-001-LH
AFT PASSENGER-DOOR COMMAND-RAMP ON THE FUSELAGE - INSPECTION
AFT PASSENGER-DOOR EVACUATION-SLIDE-FITTING - INSPECTION
AFT SERVICE-DOOR KEEPER-KIT ON THE FUSELAGE - INSPECTION
AFT SERVICE-DOOR COMMAND-RAMP ON THE FUSELAGE - INSPECTION
AFT SERVICE-DOOR EVACUATION-SLIDE-FITTING - INSPECTION
AFT CARGO-DOOR UPLOCK ON THE FUSELAGE - INSPECTION
AFT CARGO-DOOR LATCH-FITTINGS ON THE FUSELAGE - INSPECTION
AFT CARGO-DOOR LATCH-FITTINGS - FUNCTIONAL CHECK
AFT CARGO-DOOR LATCH FITTINGS - LUBRICATION
DOORS WINDOW - INSPECTION/CHECK
DOORS WINDOW - INSPECTION/CHECK
DOORS WINDOW - INSPECTION/CHECK
DOORS WINDOW - INSPECTION/CHECK
POWERPLANT SYSTEM - FAULT MESSAGES CHECK
ENGINE FIREZONE - INSPECTION/CHECK (CR)
ENGINE FIREZONE - INSPECTION/CHECK (CR)
ENGINE TREND-MONITORING HISTORY - DATA RECORDING
ENGINE AFT FAN CASE MOUNT CLEVIS - DETAILED INSPECTION (CR)
ENGINE AFT FAN CASE MOUNT CLEVIS - DETAILED INSPECTION (CR)
ENGINE FORWARD FAN CASE - EXTERNAL GENERAL VISUAL INSPECTION
ENGINE FORWARD FAN CASE - EXTERNAL GENERAL VISUAL INSPECTION
ENGINE COMPRESSOR ROTOR BLADES AND STATOR VANES - BORESCOPE INSP (CR)
ENGINE COMPRESSOR ROTOR BLADES AND STATOR VANES - BORESCOPE INSP (CR)
ENGINE COMPRESSOR CASE - EXTERNAL GENERAL VISUAL INSPECTION (CR)
ENGINE COMPRESSOR CASE - EXTERNAL GENERAL VISUAL INSPECTION (CR)
ENGINE FUEL DISTRIBUTION SYSTEM - INSPECTION
ENGINE FUEL DISTRIBUTION SYSTEM - INSPECTION
ENGINE FUEL FILTER ELEMENT - DISCARD (CR)
ENGINE FUEL FILTER ELEMENT - DISCARD (CR)
FUEL-FILTER IMPENDING-BYPASS SWITCH - REMOVAL FOR RESTORATION (CR)
FUEL-FILTER IMPENDING-BYPASS SWITCH - REMOVAL FOR RESTORATION (CR)
IGNITION - STATIC CHECK
IGNITION - STATIC CHECK
COMPRESSOR CONTROL ACTUATION - DETAILED INSPECTION
COMPRESSOR CONTROL ACTUATION - DETAILED INSPECTION
COMPRESSOR BLEED-CONTROL-SYSTEM - DETAILED INSPECTION
COMPRESSOR BLEED-CONTROL-SYSTEM - DETAILED INSPECTION
THRUST-REVERSER FIRE ZONE - GENERAL VISUAL INSPECTION
THRUST-REVERSER FIRE ZONE - GENERAL VISUAL INSPECTION
THRUST-REVERSER LOCKING SYSTEM - OPERATIONAL TEST
THRUST-REVERSER LOCKING SYSTEM - OPERATIONAL TEST
THRUST-REVERSER ACTUATION SYSTEM - DETAILED INSPECTION
THRUST-REVERSER ACTUATION SYSTEM - DETAILED INSPECTION
OIL FILTER BYPASS SENSOR - FUNCTIONAL TEST
OIL FILTER BYPASS SENSOR - FUNCTIONAL TEST
CHIP DETECTOR - FUNCTIONAL CHECK
03 APR 2015
Page 26 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
79-35-01-001-RH
Z198-001-U
Z200-001-U
Z310-001-U
Z350-001-U
Z400-001-U
Z400-002-U
Z500-002-U
Z510-001-U
Z700-001-U
Z700-002-U
Z811-001-LH
Z811-002-LH
Z812-001-U
Z812-002-U
Z813-001-LH
Z821-001-U
Z821-002-RH
Z822-001-RH
Z822-002-RH
Z823-001-RH
Z823-002-U
Z824-001-U
Z824-002-RH
Z825-001-RH
CHIP DETECTOR - FUNCTIONAL CHECK
CENTER FUSELAGE II AND III LOWER PORTION AND KEEL BEAM AT AREAS COVERE
FORWARD AND CENTER FUSELAGE I, II AND III TOP AND SIDE AREAS - EXTERNA
REAR FUSELAGE, REAR PRESSURE BULKHEAD, HORIZONTAL STABILIZER ROOT AREA
TAIL CONE AND AUXILIARY POWER UNIT (APU) - INTERNAL GENERAL VISUAL INS
PYLON, INLET COWL, FAN COWL AND AFT CORE COWL, THRUST REVERSER AND ENG
FAN COWL, THRUST REVERSER, AFT CORE COWL AND ENGINE - INTERNAL
FLAP, AILERON, SPOILERS, WING TRAILING EDGE, FLAP TRACK FAIRINGS AND S
WING LEADING EDGE, WING SLATS, WING ROOT LANDING LIGHT FAIRING, WINGLE
NOSE LANDING GEAR, NOSE LANDING GEAR DOORS AND NOSE LANDING GEAR BAY MAIN LANDING GEAR, MAIN LANDING GEAR COMPARTMENT AND DOORS - EXTERNAL
FORWARD PASSENGER DOOR - EXTERNAL GENERAL VISUAL INSPECTION
FORWARD PASSENGER DOOR - INTERNAL GENERAL VISUAL INSPECTION
AFT PASSENGER DOOR - EXTERNAL GENERAL VISUAL INSPECTION
AFT PASSENGER DOOR - INTERNAL GENERAL VISUAL INSPECTION
LEFT OVERWING DOOR - EXTERNAL GENERAL VISUAL INSPECTION
FORWARD SERVICE DOOR - EXTERNAL GENERAL VISUAL INSPECTION
FORWARD SERVICE DOOR - INTERNAL GENERAL VISUAL INSPECTION
FORWARD CARGO DOOR - EXTERNAL GENERAL VISUAL INSPECTION
FORWARD CARGO DOOR - INTERNAL GENERAL VISUAL INSPECTION
AFT CARGO DOOR - EXTERNAL GENERAL VISUAL INSPECTION
AFT CARGO DOOR - INTERNAL GENERAL VISUAL INSPECTION
AFT SERVICE DOOR - EXTERNAL GENERAL VISUAL INSPECTION
AFT SERVICE DOOR - INTERNAL GENERAL VISUAL INSPECTION
RIGHT OVERWING DOOR - EXTERNAL GENERAL VISUAL INSPECTION
03 APR 2015
Page 27 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
Annex 4
Tender proposal should contain, but not limited to, the following information:
1
COMPANY INFORMATION
1.1
Company trading name:
1.2
Contact name:
1.3
Head office address:
1.4
Postcode:
1.5
Telephone number:
1.6
Fax number:
1.7
Email address:
1.8
How long has your company been established?
1.9
Registration number:
1.10
Date of registration:
1.11
Address of registered office (if different from above):
1.13
What is the ownership structure of the business?
Sole Trader
Public Ltd Company
Partnership
Public Sector
Limited Company
Subsidiary
If you are a Subsidiary, please provide:
1.14
Holding Company Name:
1.15
Names of other Divisions / Subsidiary companies within the same group:
2
CERTIFICATION AND QUALITY PROCESSES
03 APR 2015
Page 28 of 29
RFP from UIA: EMBRAER E190 BASE-1C CHEK
2.1
Please describe any relevant certifications and approvals held by your company.
2.2
Please describe your quality assurance systems in your company’s processes. Include in your
response details of any relevant quality programmes (e.g. ISO 9000, date achieved, etc.).
3.
EXPERIENCE
3.1
What experience does your organisation have in managing contracts such as this?
4
REFERENCES
Please provide at least two references and contact details (below) from organisations you have done
work of a similar scale for.
Referee Name:
Company Name:
Address:
Postcode:
Telephone:
Referee Name:
Company Name:
Address:
Postcode:
Telephone:
03 APR 2015
Page 29 of 29