RFP from UIA: EMBRAER E190 BASE-1C CHEK Private Stock Company Ukraine International Airlines TENDER DOCUMENTATION (in form of REQUEST FOR PROPOSAL) EMBRAER E190 BASE-1C CHEK Ukraine, Kyiv May 2015 03 APR 2015 Page 1 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK Table of Contents: 1. 2. 3. 4. 5. 6. 7. Tender Announcement Important Tender Documentation Requirements Tender Procedure Instructions Annex 1 Annex 2 Annex 3 Annex 4 03 APR 2015 Page 2 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK TENDER ANOUNCEMENT 1. Customer: 1.1. Private Stock Company Ukraine International Airlines. 1.2. Legal address. 4, Lysenka street, Kyiv, 01030, Ukraine 1.3. Person responsible for Tender. Procedure issues – Stakhurska Maryna, Tender Committee Secretary, Tel.:+380 44 581 5656 (9533); Stahurskaya.maryna@flyuia.com; Technical issues – Vasilenko Sergey, Continuing Airworthiness Manager vasilenko.sergey@flyuia.com 2. Information about subject of Tender: 2.1. Embraer E190 (UR-EMA & UR-EMB) BASE-1C CHEK 2.2. Place and term of services. Europe, One-time service 3. Receipt of Tender documentation. Via E-mail. 4. Conditions of tender proposal submission: 4.1. Place. Ukraine International Airlines, 201-203, Kharkivske Road, Kyiv, 02121, Ukraine Attention: Stakhurska Maryna, Tender Committee Secretary 4.2. Means of receipt. Via Courier 4.3. Deadline. 28 May 2015, 13-00 (Kyiv time) 5. Opening of tender proposals: 5.1. Place. 201-203, Kharkivske Road, room 717, Kyiv, 02121, Ukraine 5.2. Date. 28 May 2015, 15-30 (Kyiv time) Tender proposal 03 APR 2015 Page 3 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK Important Tender Documentation Requirements 1. Ukraine International Airlines Ukraine International Airlines (UIA) is Ukrainian leading airline established in 1992. Today, UIA is a 100% privately-owned company. UIA’s primary business is to provide safe and reliable passenger and cargo transportation. The UIA’s fleet currently comprises 35 modern aircraft: medium-haul Boeing 737 (including one freighter 737-300SF), medium-haul Еmbraer-190 and long-haul Boeing 767. The main base airport for UIA is Kiev Boryspil International Airport (KBP). 2. Request for Base-1C Check proposal This Tender documentation includes maintenance of aircraft described in Annex 1 hereto. Tender proposal validity time shall be not less than 60 days from the date of opening of Tender proposal. Currency of this Tender documentation is US Dollars or Euro. Payments for services shall be made in US Dollars or Euro. UIA is seeking qualified maintenance provider (Participant) for aircraft base maintenance for UIA’s Embraer fleet requirements, with following qualifying criteria: - At least 2 years of Embraer 190 maintenance experience with appropriate capability level; - Availability of essential facilities and equipment shall correspond to aircraft type and level of required maintenance; - Part 145 approval issued by State Aviation Authority of Ukraine (holding of EASA Part 145 approval considered as advantage) (i) Workscope Workscope specified in Annex 2 and Annex 3 hereto. (ii) Payment terms Payment will be arranged per each Aircraft as follows: - (iii) At each Aircraft Delivery: an amount equal to fifty percent (50%) of the Fixed Price for such Aircraft; Upon each Aircraft Redelivery: interim invoice an amount equal fifty percent (50%) of the Fixed Price for such Aircraft; Following Aircraft Redelivery a final invoice will be issued to UIA and paid within thirty (30) calendar days thereafter. Certification Participant must have all the necessary certificates needed for maintenance. 3. Selection process The successful candidate will be selected deriving from the following process: 3.1. All documents provided by Participant meet requirements of tender documentation: 03 APR 2015 Page 4 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK the completeness of proposal meeting of requested payment terms meeting of requested service level and others 3.2. Criteria: The lowest offered price shall detail Participant’s charges, turnaround times for each aircraft HMV and the various surcharges on the services. Participant shall present HMV package pricing detailed to the level that gives the opportunity to demonstrate its competitive advantages. The Fixed Prices should include following costs/works: Aircraft Work Package: preparation works, access open/close up, routine inspection, tests, replacements, servicing, components servicing; Defect Rectification raised from routine inspection up to 10 MH per Task Card; Routine, Raw and Repair materials, related to the above tasks, with the agreed limit of the purchasing price up to 250 USD per item, Miscellaneous Small Parts (such as, but not limited to nuts, bolts, rivets, washers, etc., having the unit value up to 2USD), Consumables, Disposables; Daily and Pre-flight check; Aircraft Exterior Washing, Interior and Technical cleaning; Ground handling fees; Hangar space during the agreed slot; General tools and equipment required for requested work package; Office for UIA’s technical representatives (include E-Net access); Addition quote is required to be presented/defined as follows: Man-hour rates: - Mechanics/electricians: _____ $; - Mechanics in overtime: _____ $; - NDT: _____ $; - Engineering: _____ $; - Shop repairs: _____ $; - Interior (cabin Unskilled): _____ $. Material charges: - Handling charges for parts and materials (new and used) with your proposed caps; - Handling charges for UIA supplied material, if any; - Exchange fees and the proposed caps; - Sub-contractor services and the proposed caps; - any other charges can be exercised. Warranty Condition: - The warranty period should be 3000FH/2000FC/12 Months WOF. Insurance: - details regard insurance terms and condition under maintenance period. 3.3. UIA leaves the right: to Extend timing of selection process to Stop the selection process anytime not to select a successful candidate. 03 APR 2015 Page 5 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK All Participants will be informed about results in accordance to UIA’s internal tender procedures as further described herein. UIA does not bear any responsibility or obligations associated with costs or missed opportunities of any candidate somehow linked or seemed to be linked to his/her response to this request for proposal and his/her possible expectations from the selection process and/or results of projects. 4. Confidentiality UIA does not accept and does not allow forwarding this request for proposal to any other party without prior written consent from UIA official contacts listed herein. 03 APR 2015 Page 6 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK TENDER PROCEDURE INSTRUCTIONS 1. General 1.1. Private Stock Company Ukraine International Airlines (hereinafter – UIA) announces tender (hereinafter – the Tender) for the purchase of services in accordance with the procedures and conditions specified in the Tender documentation (hereinafter - the Tender documentation) and internal UIA tender procedure orders. 1.2 Participants are individuals (residents or nonresidents), which confirmed their intention to participate in the procurement procedure and filed a Tender proposal. 1.3. In accordance with the requirements of the Tender documentation Participants must meet the qualification requirements. 1.4. Each Participant shall submit its proposal in the form properly executed in accordance with the requirements hereof. 1.5. Participant shall be responsible for all costs associated with preparation and submission of its Tender proposal and such costs will not be reimbursed to the Participant(s). 2. Clarification of the Tender documentation 2.1. Participant has the right not later than seven calendar days before the deadline for submission of Tender proposal to contact UIA for the clarification of the Tender documentation. UIA within three business days (in Kiev, Ukraine) should answer to such the request of the Participant. 3. Amendments to Tender documentation 3.1. Not later than five working days before the deadline for submission of a Tender proposal UIA has right on its own initiative or on the results of searches of Participants who received Tender documentation to amend the Tender documentation and to notify about such changes in writing all persons who filed UIA with a Tender proposal. 3.2. Before the expiration of the deadline for submission of Tender documentation UIA is entitled to decide on its continuation in the event that one or more Participants who have received the Tender documentation may not submit a Tender proposal for the specified period in accordance to any objective reasons. Notice of extension of time, change of place and procedures for opening of tender offers (proposals) shall be immediately sent to each person who was submitted with a Tender documentation. 03 APR 2015 Page 7 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK 4. Tender proposal language 4.1. All documents relating to the Tender proposal shall be made in English or Ukrainian. 5. Contents of Tender proposal 5.1. Proposal submitted by the Participant shall include complete information about products or services and price information made pursuant to the requirements of the Tender documentation, the list of documents required to verify compliance of Participant’s qualifications (including but not limited to the information set forth in Annex 4 hereto) and other requirements of the Tender documentation, documents certifying the credentials of the person signing the Tender proposal, as well as other documents that must be executed and submitted by the Participants in accordance with this Tender documentation. 6. Prices of Proposals 6.1. Participant shall determine the price of goods or services which it offers to put under the Agreement, indicating the taxes and fees paid or to be paid and all related expenses. 6.2. Price mentioned in Tender proposal shall be specified in accordance with the requirements of Tender documentation. 6.3. Prices must be clearly defined. 7. Documents proving compliance of Participant with the qualification requirements 7.1. Participant is responsible for obtaining any and all necessary permits, licenses, certificates, required for sale of goods or services, and other documents related to the Tender and shall be responsible for all costs of their receipt. 7.2. According to this Tender Participant shall submit such documentation as part of its Tender proposal proving compliance of Participant with qualification requirements. 7.3. UIA has the right to request from any Participant to repeat confirmation with the qualification requirements set forth in this Tender documentation. 7.4. In the event of (i) Participant's refusal to provide such confirmation or (ii) receipt of reliable information about his non-compliance with the qualification requirements set forth in the Tender documentation or (iii) it is discovered that Participant has made any false statement or material misrepresentation in any provision of the Tender proposal, UIA has right to reject Tender proposal of such Participant and determine the winner of Tender proposal among those Participants who remained. 8. Documents proving compliance of the goods or services 8.1. Proposal submitted by the Participant, shall include the technical, quality and other characteristics of the subject of Tender and certificates. 03 APR 2015 Page 8 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK 9. Tender proposal duration 9.1. Tender proposal remains valid after the submission deadline for the period specified in the Tender documentation. Tender proposal valid for a shorter period shall be rejected by UIA, as such, that does not meet the Tender documentation requirements. 9.2. Before the expiration of the Tender proposal UIA may require the Participant to continue the validity of the proposal for an additional period of time. Request to and response from the Participant shall be submitted by means of communication, followed by written confirmation. 10. Execution and signing 10.1. Tender proposal shall be submitted in writing in a sealed envelope to ensure confidentiality of the Participant prior to its official opening. Tender proposal shall be submitted via courier. 10.2. Tender proposal shall be signed by the Participant or person (s) duly authorized to sign on behalf of the Participant. Such powers shall be specified in writing instruction that is part of the Tender proposal. All pages of Tender proposal must contain the signature of the authorized person(s). All pages of the Tender proposal where were made any specific records or edits should be indicated by the initials of the person or persons signing such proposal. Responsibility for the errors printed in the documents and submitted to the Tender Committee and signed accordingly is on the Participant. 10.3. Tender proposal must (i) be broshured, (ii) have pagination and (iii) register of the documents. 11. Sealing and marking of proposals 11.1. Tender proposal shall be submitted in one copy in the appropriately marked envelope and must indicate the name and address of UIA, the subject of Tender according to the announcement of the Tender and the Participant's name, address, contact telephone numbers. 11.2. If the envelope is not marked in accordance with the above requirements, UIA is not responsible for the premature opening of such Tender proposal. 12. Deadline for submission of Tender proposal 12.1. Proposals must be submitted via courier and not later than the time and date specified in the Tender documentation. 13. Proposals which were delayed 03 APR 2015 Page 9 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK 13.1. All proposals submitted to UIA after the deadline of the submission shall not be considered by UIA and will be returned to the Participant. 14. Change and cancellation of Tender proposal 14.1. Participants may change or cancel their proposal by notification to UIA in writing before the deadline for submission of Tender proposal. 15. Alternative Tender proposal 15.1. Submission of alternative Tender proposal is not allowed. 16. Disclosure of Tender proposal by UIA 16.1. UIA opens Tender proposal in a time and place specified in this Tender documentation. Participants are allowed their representatives to be present during procedure of opening of Tender proposals. Such representatives shall have official document from Participant (power of attorney etc) confirming its authority. 17. Tender proposal explanation 17.1. UIA may request the Participant to explain or comment on its Tender proposal in order to facilitate its review, evaluation and comparison with other offers. It is not accepted, not discussed and not allowed to make any changes to the Tender proposal on merits, including changes to prices, delivered during the opening of Tender proposal and the changes are aimed at adjusting the Tender proposal, which does not meet the requirements of the Tender documentation, in order to bring it in compliance with such requirements. 18. Tender proposal consideration 18.1. UIA will consider the Tender proposal to determine that the Participant meets the qualification requirements, and that each Tender proposal meets the conditions of Tender documentation. 18.2. If the proposal does not meet any condition of Tender documentation, it shall be rejected by UIA and can not be brought into conformity by adjusting or changing or canceling inappropriate deviations or reservations. 18.3. Tender proposal defined as those that meet the conditions of Tender documentation will be reviewed by UIA in terms of arithmetic errors. Errors will be corrected by UIA as follows: 03 APR 2015 Page 10 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK a) When the difference between the amounts indicated in letters and figures, the amount of letters is crucial; b) When the difference between unit price and total price of services obtained by multiplying the price per unit of quantity, the unit price is decisive and final price is being corrected. If, in the opinion of UIA, in the unit price is a clear shift decimal distributor, in this case meant the final price is crucial, and the unit price corrected. 18.4. UIA has the right to correct arithmetic errors when receiving the written consent of the Participant to such correction. 18.5. If a Participant does not agree with the correction of errors, his Tender proposal shall be rejected. 19. Evaluation and comparison of Tender documentation 19.1. After the opening of Tender proposal, checking them for the accuracy of and compliance with the qualification requirements and conditions of Tender documentation, than evaluation begins and UIA determine the winner. UIA evaluates and compares those proposals which were not rejected. 19.2. For proposals evaluation UIA will be using the criteria specified in the Tender documentation. 20. Privacy 20.1. To ensure confidentiality of information regarding the consideration and/or evaluation of Tender documentation, such information will not be distributed to and between the Participants. 21. The right of UIA to reject all proposals 21.1. UIA reserves the right to reject all Tender offers (proposal) at any time prior to acceptance of the Tender proposal. 21.2. UIA shall have no liability to the Participant in the case of Clause 22.1. 21.3. In case of rejection of all Tender offers (proposals) UIA cancels Tender and will send respective notice to the Participants. 22. Acceptance of a Tender proposal 22.1. UIA accepts the Tender proposal of the Participant who meets qualification requirements specified in the Tender documentation and whose proposal is the best from the evaluated Tender offers (proposal) and meets the requirements of the Tender documentation. 03 APR 2015 Page 11 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK 22.2. If the Participant, whose Tender proposal accepted, refuses to sign the Agreement, UIA shall select the best Tender proposal among those whose validity has not expired and are sufficient to determine the winner. 22.3. Final acceptance of Tender offer shall be made by UIA Supervisory Board. 23. Execution of Contract 23.1. The contract will be signed with the Participant, whose Tender proposal was accepted. 24. Audit 24.1. If necessary, UIA may audit the Participants on the stage of evaluation for compliance with the requirements of Tender documentation (including quality and safety audit). 24.2. Ukrainian CAA may audit Participants according to Ukrainian legislation. 03 APR 2015 Page 12 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK Annex 1 Manufactured: A/C Reg.: Line №: A/C Effective: Engine Type: Eng.№1 S/N: EMBRAER Model: UR-EMA S/N: --Manufact. Date: AV 001 IPC №: UIA Embraer MP Iss 2, Rev 01 25.08.2014 CF34-10E6G07 424261 Eng.№2 S/N: The planned START date of maintenance: Manufactured: A/C Reg.: Line №: A/C Effective: Engine Type: Eng.№1 S/N: 424263 01.08.2015 EMBRAER Model: UR-EMB S/N: --Manufact. Date: AV 002 IPC №: UIA Embraer MP Iss 2, Rev 01 25.08.2014 CF34-10E6G07 424282 Eng.№2 S/N: The planned START date of maintenance: E190 19000494 07.12.2011 494 E190 19000501 04.01.2012 501 424283 16.08.2015 03 APR 2015 Page 13 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK Annex 2 UR-EMA MSN 19000494 BASE-1C CHECK WORKSCOPE (Rev. 1 – Fabruary, 2015) Checks Task Cards № TC number Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 21-32-04-001-U 21-51-01-001-LH 21-51-01-001-RH 21-51-04-001-LH 21-51-04-001-RH 21-62-05-001-LH 21-62-05-001-RH 23-51-01-001-LH 23-51-01-001-RH 23-51-01-002-LH 23-51-01-002-RH 23-61-00-001-LH 23-61-00-001-RH 23-61-00-001-T 25-11-01-001-U 25-11-01-003-U 25-11-02-001-U 25-11-02-002-U 25-21-20-002-U 26-11-01-001-LH 26-11-01-001-RH 26-12-01-001-U 26-14-01-001-AFT 26-14-01-001-FWD 26-21-00-001-U 26-22-07-001-U 26-23-09-001-U 26-23-13-001-U 27-03-00-001-U 27-03-01-001-U 27-03-04-001-U 27-11-00-005-U 27-11-03-004-U 27-11-03-006-U 27-12-01-006-LH 27-12-01-006-RH 27-14-01-001-U 27-21-00-001-U 27-21-03-001-U NEGATIVE-PRESSURE RELIEF - OPERATIONAL TEST PACK FLOW-CONTROL-VALVES FILTER - CLEANING (ULTRASONIC METHOD) (CR) PACK FLOW-CONTROL-VALVES FILTER - CLEANING (ULTRASONIC METHOD) (CR) DUAL HEAT EXCHANGERS - SHOP CLEANING DUAL HEAT EXCHANGERS - SHOP CLEANING TRIM-AIR MODULATING-VALVES FILTER - CLEANING (ULTRASONIC METHOD) (CR) TRIM-AIR MODULATING-VALVES FILTER - CLEANING (ULTRASONIC METHOD) (CR) AIRBORNE AUDIO SYSTEM BACKUP MODE - OPERATIONAL TEST AIRBORNE AUDIO SYSTEM BACKUP MODE - OPERATIONAL TEST PASSENGER ADDRESS AND CABIN-INTERPHONE-SYSTEM EMERGENCY MODE - OPERATI PASSENGER ADDRESS AND CABIN-INTERPHONE-SYSTEM EMERGENCY MODE - OPERATI STATIC DISCHARGERS - FUNCTIONAL TEST STATIC DISCHARGERS - FUNCTIONAL TEST STATIC DISCHARGERS - FUNCTIONAL TEST PILOT SEATS ATTACHMENT - DETAILED INSPECTION PILOT-SEAT INERTIAL REELS - OPERATIONAL TEST OBSERVER SEAT - EXTERNAL DETAILED INSPECTION OBSERVER-SEAT INERTIAL REEL - OPERATIONAL TEST FLIGHT-ATTENDANT-SEAT INERTIAL REELS - OPERATIONAL TEST ENGINE FIRE DETECTION LOOP - OPERATIONAL CHECK ENGINE FIRE DETECTION LOOP - OPERATIONAL CHECK APU FIRE DETECTION LOOP - OPERATIONAL CHECK LAVATORY SMOKE DETECTOR - OPERATIONAL TEST LAVATORY SMOKE DETECTOR - OPERATIONAL TEST ENGINE FIRE EXTINGUISHING SYSTEM - FUNCTIONAL TEST APU FIRE EXTINGUISHING SYSTEM DISCHARGE PIPING - INSPECTION/CHECK CARGO-COMPARTMENT DISCHARGE TUBING / NOZZLE - FUNCTIONAL TEST CARGO-COMPARTMENT FIRE-EXTINGUISHING SYSTEM - OPERATIONAL CHECK FLY-BY-WIRE BACKUP BATTERY - OPERATIONAL TEST FLIGHT CONTROLS PANEL (DIRECT MODE SWITCH) - OPERATIONAL TEST TRIM CONTROL PANEL (CUTOUT SWITCHES) - OPERATIONAL TEST AILERON CONTROL CABLES - OPERATIONAL TEST AILERON CONTROL CABLES, PULLEYS ANDQUADRANT - FUSELAGE AREA FNC - AILERON CONTROL CABLES - FUSELAGE AREA AILERON CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST AILERON CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST AILERON TRIM ACTUATOR - FUNCTIONAL TEST RUDDER MECHANICAL COMPONENTS - GENERAL VISUAL INSPECTION RUDDER-PEDAL DAMPER FLUID-LEVEL - GENERAL VISUAL INSPECTION 03 APR 2015 Page 14 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 27-22-01-002-U 27-22-01-006-U 27-24-01-001-U 27-31-00-001-U 27-32-01-002-LH 27-32-01-002-RH 27-32-01-006-LH 27-32-01-006-RH 27-40-00-001-U 27-51-01-003-LH 27-51-01-003-RH 27-51-03-001-LH 27-51-03-001-RH 27-51-03-002-LH 27-51-03-002-RH 27-51-11-001-LH 27-51-11-001-RH 27-81-03-001-LH 27-81-03-001-RH 27-81-03-002-LH 27-81-03-002-RH 28-12-11-001-LH 28-12-11-001-RH 28-12-11-002-LH 28-12-11-002-RH 28-21-00-001-U 29-10-00-001-U 29-11-03-001-U 29-11-20-001-U 29-12-00-005-U 29-33-02-001-U 29-33-02-003-U 30-11-00-001-LH 30-11-00-001-RH 30-11-06-001-LH 30-11-06-001-RH 30-32-00-001-U 32-11-11-001-LH 32-11-11-001-RH 32-21-09-001-U 32-33-01-001-U 32-34-00-001-U 32-34-00-002-U 32-34-00-003-U 32-35-00-001-U 32-40-00-001-AFTLH 32-40-00-001-AFTRH 32-40-00-001- RUDDER POWER CONTROL UNIT - DETAILED VISUAL INSPECTION RUDDER CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST RUDDER TRIM ACTUATOR - FUNCTIONAL TEST ELEVATOR MECHANICAL COMPONENTS - GENERAL VISUAL INSPECTION ELEVATOR POWER CONTROL UNIT - DETAILED VISUAL INSPECTION ELEVATOR POWER CONTROL UNIT - DETAILED VISUAL INSPECTION ELEVATOR CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST ELEVATOR CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST HORIZONTAL-STABILIZER SYSTEM BACKLASH - FUNCTIONAL TEST INBOARD FLAP ACTUATOR - FUNCTIONAL TEST INBOARD FLAP ACTUATOR - FUNCTIONAL TEST FLAP TORQUE TUBES - LUBRICATING FLAP TORQUE TUBES - LUBRICATING FLAP MECHANICAL DRIVE LINE - DETAILED VISUAL INSPECTION FLAP MECHANICAL DRIVE LINE - DETAILED VISUAL INSPECTION FLAP-TRACK-MECHANISM NEEDLE ROLLERS - DETAILED VISUAL INSPECTION FLAP-TRACK-MECHANISM NEEDLE ROLLERS - DETAILED VISUAL INSPECTION SLAT TORQUE TUBES - LUBRICATING SLAT TORQUE TUBES - LUBRICATING SLAT MECHANICAL DRIVE LINE - DETAILED VISUAL INSPECTION SLAT MECHANICAL DRIVE LINE - DETAILED VISUAL INSPECTION FLAME ARRESTOR/SURGE RELIEF VALVE - INSPECTION (CR) FLAME ARRESTOR/SURGE RELIEF VALVE - INSPECTION (CR) FLAME ARRESTOR/SURGE RELIEF VALVE - OPERATIONAL TEST (CR) FLAME ARRESTOR/SURGE RELIEF VALVE - OPERATIONAL TEST (CR) CROSS-FEED SYSTEM - OPERATIONAL TEST HYDRAULIC FLUID - HYDRAULIC FLUID SAMPLING ANALYSIS MAIN COMPONENTS OF POWER TRANSFER UNIT (PTU) - FUNCTIONAL TEST LG AND NWS PRIORITY VALVE OF NO. 2 HYDRAULIC SYSTEM - FUNCTIONAL TEST INTERNAL LEAKAGE OF THE NO. 3 HYDRAULIC SYSTEM - FUNCTIONAL TEST AUTOMATIC SHUTDOWN OF ALTERNATING-CURRENT MOTOR-DRIVEN PUMP (ACMP) OF HYDRAULIC TEMPERATURE SWITCH OF NO. 3 HYDRAULIC SYSTEM - FUNCTIONAL TE WING THERMAL ANTI-ICING SYSTEM - GENERAL VISUAL INSPECTION WING THERMAL ANTI-ICING SYSTEM - GENERAL VISUAL INSPECTION WING ANTI-ICE SLAT-HOSE - DETAILED VISUAL INSPECTION WING ANTI-ICE SLAT-HOSE - DETAILED VISUAL INSPECTION STATIC PORT HEATING - OPERATIONAL TEST MLG TORQUE LINK CLEARANCE AND SHIMMY DAMPER TORQUE - FUNCTIONAL TEST MLG TORQUE LINK CLEARANCE AND SHIMMY DAMPER TORQUE - FUNCTIONAL TEST NOSE-LANDING-GEAR TORQUE LINK - INSPECTION CONTROL-LEVER RELEASE SWITCH - OPERATIONAL TEST EMERGENCY-EXTENSION SYSTEM (ON JACKS) - FUNCTIONAL TEST EMERGENCY-EXTENSION SYSTEM - INSPECTION EMERGENCY-EXTENSION SYSTEM - ADJUSTMENT EMERGENCY-EXTENSION ELECTRICAL-RELEASE SYSTEM - OPERATIONAL TEST MAIN BRAKE HYDRAULIC-FUSE AND EMERGENCY/PARKING BRAKE HYDRAULIC-FUSE MAIN BRAKE HYDRAULIC-FUSE AND EMERGENCY/PARKING BRAKE HYDRAULIC-FUSE MAIN BRAKE HYDRAULIC-FUSE AND EMERGENCY/PARKING BRAKE HYDRAULIC-FUSE 03 APR 2015 Page 15 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 FWDRH 32-44-00-001-U 32-49-03-001-U 32-49-03-002-U 32-49-07-001-LH 32-49-07-001-RH 32-49-07-002-LH 32-49-07-002-RH 32-49-11-001-LH 32-49-11-001-RH 35-11-00-001-U 35-20-04-001-U 35-21-00-001-U 35-21-00-002-U 36-10-01-001-U 36-11-01-001-LH 36-11-01-001-RH 36-11-03-001-LH 36-11-03-001-RH 36-11-09-001-LH 36-11-09-001-RH 38-32-06-001-U 44-10-00-001-U 49-62-01-001-U 49-80-01-001-U 52-11-20-003FWDLH 52-11-22-001FWDLH 52-11-23-001FWDLH 52-11-25-001FWDLH 52-11-30-003FWDLH 52-11-40-001FWDLH 52-11-40-003FWDLH 52-11-40-004-U 52-11-51-001FWDLH 52-11-52-001FWDLH 52-12-20-003-AFTLH 52-12-22-001-AFTLH 52-12-23-001-AFTLH 52-12-25-001-AFTLH 52-12-27-001-AFTLH 52-12-30-003-AFTLH EMERGENCY/PARKING BRAKE SYSTEM - FUNCTIONAL TEST NOSE-LANDING-GEAR TIRE PRESSURE - CHECK NOSE WHEEL TIRE - INSPECTION MAIN-LANDING-GEAR TIRE PRESSURE - CHECK MAIN-LANDING-GEAR TIRE PRESSURE - CHECK MAIN WHEEL TIRE - INSPECTION MAIN WHEEL TIRE - INSPECTION BRAKE ASSEMBLY WEAR-PIN (FAST CHECK - WHEEL INSTALLED ON AIRCRAFT) - G BRAKE ASSEMBLY WEAR-PIN (FAST CHECK - WHEEL INSTALLED ON AIRCRAFT) - G PRESSURE TRANSDUCER INDICATION - GENERAL VISUAL INSPECTION PASSENGER-CABIN OXYGEN MASKS - DETAILED VISUAL INSPECTION PASSENGER OXYGEN SYSTEM - FUNCTIONAL CHECK PASSENGER OXYGEN SYSTEM - OPERATIONAL CHECK CROSS-BLEED VALVE FILTER - CLEANING (ULTRASONIC METHOD) HIGH-STAGE BLEED-VALVE FILTER - CLEANING (ULTRASONIC METHOD) (CR) HIGH-STAGE BLEED-VALVE FILTER - CLEANING (ULTRASONIC METHOD) (CR) NACELLE PRSOV FILTER - CLEANING (ULTRASONIC METHOD) (CR) NACELLE PRSOV FILTER - CLEANING (ULTRASONIC METHOD) (CR) FAN-AIR VALVE FILTER - CLEANING (ULTRASONIC METHOD) (CR) FAN-AIR VALVE FILTER - CLEANING (ULTRASONIC METHOD) (CR) WATER SEPARATOR - INSPECTION CABIN LOUDSPEAKERS - OPERATIONAL TEST AUXILIARY POWER UNIT (APU) EMERGENCY SHUTDOWN - OPERATIONAL TEST EXHAUST SILENCER LINER - INSPECTION FORWARD PASSENGER-DOOR MAIN-SHAFTS - INSPECTION FORWARD PASSENGER-DOOR BOX-MECHANISM - INSPECTION FORWARD PASSENGER-DOOR STOPS - FUNCTIONAL CHECK FORWARD PASSENGER-DOOR VENT-FLAP - INSPECTION FORWARD PASSENGER DOOR ACTUATOR ASSEMBLY - INSPECTION FORWARD-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM - INSPECTI FORWARD-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN EMERGEN FORWARD-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN NORMAL FORWARD PASSENGER DOOR PNEUMATIC ASSEMBLY - INSPECTION FORWARD-PASSENGER-DOOR CONTROL MECHANISM - INSPECTION AFT PASSENGER-DOOR MAIN-SHAFTS - INSPECTION AFT PASSENGER-DOOR BOX-MECHANISM - INSPECTION AFT PASSENGER-DOOR STOPS - FUNCTIONAL TEST AFT PASSENGER-DOOR VENT-FLAP - INSPECTION AFT PASSENGER DOOR DAMPER - OPERATIONAL TEST AFT PASSENGER DOOR ACTUATOR ASSEMBLY - INSPECTION 03 APR 2015 Page 16 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 52-12-40-001-AFTLH 52-12-40-003-AFTLH 52-12-40-004-AFTLH 52-12-51-001-AFTLH 52-12-52-001-AFTLH 52-21-02-001-LH 52-21-02-001-RH 52-21-02-002-LH 52-21-02-002-RH 52-21-20-001-LH 52-21-20-001-RH 52-21-20-002-LH 52-21-20-002-RH 52-21-23-001-LH 52-21-23-001-RH 52-31-02-001FWDRH 52-31-20-002FWDRH 52-31-23-001FWDRH 52-31-24-001FWDRH 52-31-25-001FWDRH 52-31-27-001FWDRH 52-31-27-002-U 52-31-28-001FWDRH 52-32-02-001-AFTRH 52-32-02-002-AFTRH 52-32-20-002-AFTRH 52-32-23-001-AFTRH 52-32-24-001-AFTRH 52-32-25-001-AFTRH 52-32-27-001-AFTRH 52-32-27-002-AFTRH 52-32-28-001-AFTRH 52-41-20-003FWDRH 52-41-22-001FWDRH 52-41-25-001FWDRH 52-41-27-001FWDRH 52-41-30-003FWDRH 52-41-40-001FWDRH 52-41-40-003- AFT PASSENGER DOOR SLIDE BELLCRANK, GIRT BAR AND SLIDE MECHANISM AFT-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN EMERGENCY C AFT-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN NORMAL CONF AFT PASSENGER DOOR PNEUMATIC ASSEMBLY - INSPECTION AFT-PASSENGER-DOOR CONTROL MECHANISM - INSPECTION OVERWING-ESCAPE-HATCH STRUCTURES (HANDLE AND LATCH-DRIVING FITTING-KIT OVERWING-ESCAPE-HATCH STRUCTURES (HANDLE AND LATCH-DRIVING FITTING-KIT OVERWING-ESCAPE-HATCH STRUCTURES (DRAIN HOLES) - INSPECTION OVERWING-ESCAPE-HATCH STRUCTURES (DRAIN HOLES) - INSPECTION OVERWING ESCAPE HATCH ACTUATING AND LOCKING MECHANISM COMPONENTS - INS OVERWING ESCAPE HATCH ACTUATING AND LOCKING MECHANISM COMPONENTS - INS OVERWING ESCAPE HATCH ACTUATING AND LOCKING MECHANISM - OPERATIONAL TE OVERWING ESCAPE HATCH ACTUATING AND LOCKING MECHANISM - OPERATIONAL TE OVERWING-ESCAPE-HATCH STOPS AND FITTINGS COMPONENTS - INSPECTION OVERWING-ESCAPE-HATCH STOPS AND FITTINGS COMPONENTS - INSPECTION FORWARD CARGO-DOOR VENT-FLAP-BEARINGS - INSPECTION FORWARD CARGO-DOOR TERMINAL-SHAFTS - INSPECTION FORWARD CARGO DOOR FITTINGS - INSPECTION FORWARD CARGO-DOOR HOOK - INSPECTION FORWARD CARGO-DOOR VENT-FLAP - INSPECTION FORWARD CARGO-DOOR ACTUATOR - INSPECTION FORWARD-CARGO-DOOR ACTUATORS - FUNCTIONAL TEST FORWARD CARGO-DOOR DRIVE-ROD - INSPECTION AFT CARGO-DOOR VENT-FLAP-BEARINGS - INSPECTION AFT CARGO-DOOR DRAIN HOLES - INSPECTION AFT CARGO-DOOR TERMINAL-SHAFTS - INSPECTION AFT CARGO DOOR FITTINGS - INSPECTION AFT CARGO-DOOR HOOK - INSPECTION AFT CARGO-DOOR VENT-FLAP - INSPECTION AFT CARGO-DOOR ACTUATOR - INSPECTION AFT-CARGO-DOOR ACTUATORS - FUNCTIONAL TEST AFT CARGO-DOOR DRIVE-ROD - INSPECTION FORWARD SERVICE-DOOR MAIN-SHAFTS - INSPECTION FORWARD SERVICE-DOOR BOX-MECHANISM - INSPECTION FORWARD SERVICE-DOOR VENT-FLAP - INSPECTION FORWARD SERVICE DOOR DAMPER - OPERATIONAL TEST FORWARD SERVICE DOOR ACTUATOR ASSEMBLY - INSPECTION FORWARD-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM - INSPECTION FORWARD-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN 03 APR 2015 Page 17 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK 170 171 172 173 174 175 176 177 178 179 180 FWDRH 52-41-40-004FWDRH 52-41-51-001FWDRH 52-41-52-001FWDRH 52-42-20-003-AFTRH 52-42-22-001-AFTRH 52-42-25-001-AFTRH 52-42-27-001-AFTRH 52-42-30-003-AFTRH 52-42-40-001-AFTRH 52-42-40-003-AFTRH 52-42-40-004-AFTRH 52-42-51-001-AFTRH 52-42-52-001-AFTRH 52-43-20-001-FWD 181 52-43-20-002-FWD 182 183 184 185 186 52-46-20-001-M 52-46-20-002-M 52-73-00-001-U 53-05-00-001-U 53-10-21-001FWDLH 53-10-21-002FWDLH 53-10-21-003FWDLH 53-10-25-001FWDRH 53-10-25-002FWDRH 53-10-25-003FWDRH 53-21-29-001FWDRH 53-21-29-002FWDRH 53-21-29-003FWDRH 53-21-29-004FWDRH 53-22-11-001-LH 53-22-11-001-RH 53-23-21-001-AFTLH 53-23-21-002-AFTLH 53-23-21-003-AFTLH 53-23-25-001-AFTRH 53-23-25-002-AFTRH 167 168 169 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 EMERGENCY FORWARD-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN NORMAL CO FORWARD SERVICE DOOR PNEUMATIC ASSEMBLY - INSPECTION FORWARD-SERVICE-DOOR CONTROL MECHANISM - INSPECTION AFT SERVICE-DOOR MAIN-SHAFTS - INSPECTION AFT SERVICE-DOOR BOX-MECHANISM - INSPECTION AFT SERVICE-DOOR VENT-FLAP - INSPECTION AFT SERVICE DOOR DAMPER - OPERATIONAL TEST AFT SERVICE DOOR ACTUATOR ASSEMBLY - INSPECTION AFT-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM - INSPECTION AFT-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN EMERGENCY CON AFT-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN NORMAL CONFIG AFT SERVICE DOOR PNEUMATIC ASSEMBLY - INSPECTION AFT-SERVICE-DOOR CONTROL MECHANISM - INSPECTION FORWARD-AVIONICS-COMPARTMENT ACCESS-HATCH ACTUATING AND LOCKING MECHAN FORWARD AVIONICS COMPARTMENT ACCESS HATCH ACTUATING AND LOCKING MECHAN MIDDLE-AVIONICS-COMPARTMENT ACCESS-DOOR ACTUATING AND LOCKING MECHANIS MIDDLE AVIONICS COMPARTMENT ACCESS DOOR ACTUATING AND LOCKING MECHANIS OPERATIONAL CHECK OF FORWARD/AFT CARGO DOOR WARNING SENSOR (LOCKED). FUSELAGE DRAINS - DETAILED INSPECTION FORWARD-PASSENGER-DOOR KEEPER KIT - INSPECTION FORWARD-PASSENGER-DOOR COMMAND RAMP - INSPECTION FORWARD-PASSENGER-DOOR EVACUATION SLIDE-FITTING - INSPECTION FORWARD-SERVICE-DOOR KEEPER KIT - INSPECTION FORWARD-SERVICE-DOOR COMMAND RAMP - INSPECTION FORWARD-SERVICE-DOOR EVACUATION SLIDE-FITTING - INSPECTION FORWARD CARGO-DOOR UPLOCK ON THE FUSELAGE - INSPECTION FORWARD CARGO-DOOR LATCH-FITTINGS ON THE FUSELAGE - INSPECTION FORWARD CARGO-DOOR LATCH-FITTINGS - FUNCTIONAL CHECK FORWARD CARGO-DOOR LATCH FITTINGS - LUBRICATION OVERWING SCAPE HATCH SURROUNDING STRUCTURE COMPONENTS - GENERAL VISUAL OVERWING SCAPE HATCH SURROUNDING STRUCTURE COMPONENTS - GENERAL VISUAL AFT PASSENGER-DOOR KEEPER-KIT ON THE FUSELAGE - INSPECTION AFT PASSENGER-DOOR COMMAND-RAMP ON THE FUSELAGE - INSPECTION AFT PASSENGER-DOOR EVACUATION-SLIDE-FITTING - INSPECTION AFT SERVICE-DOOR KEEPER-KIT ON THE FUSELAGE - INSPECTION AFT SERVICE-DOOR COMMAND-RAMP ON THE FUSELAGE - INSPECTION 03 APR 2015 Page 18 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 53-23-25-003-AFTRH 53-23-29-001-AFTRH 53-23-29-002-AFTRH 53-23-29-003-AFTRH 53-23-29-004-AFTRH 56-30-00-001FWDLH 56-30-00-002-AFTLH 56-30-00-003FWDRH 56-30-00-004-AFTRH 71-00-00-002-U 71-31-00-001-LH 71-31-00-001-RH 72-00-00-003-U 72-23-00-001-LH 72-23-00-001-RH 72-23-00-003-LH 72-23-00-003-RH 72-30-00-001-LH 72-30-00-001-RH 72-32-00-002-LH 72-32-00-002-RH 73-11-00-001-LH 73-11-00-001-RH 73-11-04-001-LH 73-11-04-001-RH 73-31-01-001-LH 73-31-01-001-RH 74-11-02-001-LH 74-11-02-001-RH 75-31-00-001-LH 75-31-00-001-RH 75-31-00-002-LH 75-31-00-002-RH 78-31-00-002-LH 78-31-00-002-RH 78-32-00-001-LH 78-32-00-001-RH 78-32-00-002-LH 78-32-00-002-RH 79-34-01-001-LH 79-34-01-001-RH 79-35-01-001-LH 79-35-01-001-RH Z198-001-U Z200-001-U Z310-001-U AFT SERVICE-DOOR EVACUATION-SLIDE-FITTING - INSPECTION AFT CARGO-DOOR UPLOCK ON THE FUSELAGE - INSPECTION AFT CARGO-DOOR LATCH-FITTINGS ON THE FUSELAGE - INSPECTION AFT CARGO-DOOR LATCH-FITTINGS - FUNCTIONAL CHECK AFT CARGO-DOOR LATCH FITTINGS - LUBRICATION DOORS WINDOW - INSPECTION/CHECK DOORS WINDOW - INSPECTION/CHECK DOORS WINDOW - INSPECTION/CHECK DOORS WINDOW - INSPECTION/CHECK POWERPLANT SYSTEM - FAULT MESSAGES CHECK ENGINE FIREZONE - INSPECTION/CHECK (CR) ENGINE FIREZONE - INSPECTION/CHECK (CR) ENGINE TREND-MONITORING HISTORY - DATA RECORDING ENGINE AFT FAN CASE MOUNT CLEVIS - DETAILED INSPECTION (CR) ENGINE AFT FAN CASE MOUNT CLEVIS - DETAILED INSPECTION (CR) ENGINE FORWARD FAN CASE - EXTERNAL GENERAL VISUAL INSPECTION ENGINE FORWARD FAN CASE - EXTERNAL GENERAL VISUAL INSPECTION ENGINE COMPRESSOR ROTOR BLADES AND STATOR VANES - BORESCOPE INSP (CR) ENGINE COMPRESSOR ROTOR BLADES AND STATOR VANES - BORESCOPE INSP (CR) ENGINE COMPRESSOR CASE - EXTERNAL GENERAL VISUAL INSPECTION (CR) ENGINE COMPRESSOR CASE - EXTERNAL GENERAL VISUAL INSPECTION (CR) ENGINE FUEL DISTRIBUTION SYSTEM - INSPECTION ENGINE FUEL DISTRIBUTION SYSTEM - INSPECTION ENGINE FUEL FILTER ELEMENT - DISCARD (CR) ENGINE FUEL FILTER ELEMENT - DISCARD (CR) FUEL-FILTER IMPENDING-BYPASS SWITCH - REMOVAL FOR RESTORATION (CR) FUEL-FILTER IMPENDING-BYPASS SWITCH - REMOVAL FOR RESTORATION (CR) IGNITION - STATIC CHECK IGNITION - STATIC CHECK COMPRESSOR CONTROL ACTUATION - DETAILED INSPECTION COMPRESSOR CONTROL ACTUATION - DETAILED INSPECTION COMPRESSOR BLEED-CONTROL-SYSTEM - DETAILED INSPECTION COMPRESSOR BLEED-CONTROL-SYSTEM - DETAILED INSPECTION THRUST-REVERSER FIRE ZONE - GENERAL VISUAL INSPECTION THRUST-REVERSER FIRE ZONE - GENERAL VISUAL INSPECTION THRUST-REVERSER LOCKING SYSTEM - OPERATIONAL TEST THRUST-REVERSER LOCKING SYSTEM - OPERATIONAL TEST THRUST-REVERSER ACTUATION SYSTEM - DETAILED INSPECTION THRUST-REVERSER ACTUATION SYSTEM - DETAILED INSPECTION OIL FILTER BYPASS SENSOR - FUNCTIONAL TEST OIL FILTER BYPASS SENSOR - FUNCTIONAL TEST CHIP DETECTOR - FUNCTIONAL CHECK CHIP DETECTOR - FUNCTIONAL CHECK CENTER FUSELAGE II AND III LOWER PORTION AND KEEL BEAM AT AREAS COVERE FORWARD AND CENTER FUSELAGE I, II AND III TOP AND SIDE AREAS - EXTERNA REAR FUSELAGE, REAR PRESSURE BULKHEAD, HORIZONTAL STABILIZER ROOT AREA 03 APR 2015 Page 19 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 Z350-001-U Z400-001-U Z400-002-U Z500-002-U Z510-001-U Z700-001-U Z700-002-U Z811-001-LH Z811-002-LH Z812-001-U Z812-002-U Z813-001-LH Z821-001-U Z821-002-RH Z822-001-RH Z822-002-RH Z823-001-RH Z823-002-U Z824-001-U Z824-002-RH Z825-001-RH TAIL CONE AND AUXILIARY POWER UNIT (APU) - INTERNAL GENERAL VISUAL INS PYLON, INLET COWL, FAN COWL AND AFT CORE COWL, THRUST REVERSER AND ENG FAN COWL, THRUST REVERSER, AFT CORE COWL AND ENGINE - INTERNAL FLAP, AILERON, SPOILERS, WING TRAILING EDGE, FLAP TRACK FAIRINGS AND S WING LEADING EDGE, WING SLATS, WING ROOT LANDING LIGHT FAIRING, WINGLE NOSE LANDING GEAR, NOSE LANDING GEAR DOORS AND NOSE LANDING GEAR BAY MAIN LANDING GEAR, MAIN LANDING GEAR COMPARTMENT AND DOORS - EXTERNAL FORWARD PASSENGER DOOR - EXTERNAL GENERAL VISUAL INSPECTION FORWARD PASSENGER DOOR - INTERNAL GENERAL VISUAL INSPECTION AFT PASSENGER DOOR - EXTERNAL GENERAL VISUAL INSPECTION AFT PASSENGER DOOR - INTERNAL GENERAL VISUAL INSPECTION LEFT OVERWING DOOR - EXTERNAL GENERAL VISUAL INSPECTION FORWARD SERVICE DOOR - EXTERNAL GENERAL VISUAL INSPECTION FORWARD SERVICE DOOR - INTERNAL GENERAL VISUAL INSPECTION FORWARD CARGO DOOR - EXTERNAL GENERAL VISUAL INSPECTION FORWARD CARGO DOOR - INTERNAL GENERAL VISUAL INSPECTION AFT CARGO DOOR - EXTERNAL GENERAL VISUAL INSPECTION AFT CARGO DOOR - INTERNAL GENERAL VISUAL INSPECTION AFT SERVICE DOOR - EXTERNAL GENERAL VISUAL INSPECTION AFT SERVICE DOOR - INTERNAL GENERAL VISUAL INSPECTION RIGHT OVERWING DOOR - EXTERNAL GENERAL VISUAL INSPECTION 03 APR 2015 Page 20 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK Annex 3 UR-EMB MSN 19000501 BASE-1C CHECK WORKSCOPE (Rev. 1 – Fabruary, 2015) Checks Task Cards № TC number Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 21-32-04-001-U 21-51-01-001-LH 21-51-01-001-RH 21-51-04-001-LH 21-51-04-001-RH 21-62-05-001-LH 21-62-05-001-RH 23-51-01-001-LH 23-51-01-001-RH 23-51-01-002-LH 23-51-01-002-RH 23-61-00-001-LH 23-61-00-001-RH 23-61-00-001-T 25-11-01-001-U 25-11-01-003-U 25-11-02-001-U 25-11-02-002-U 25-21-20-002-U 26-11-01-001-LH 26-11-01-001-RH 26-12-01-001-U 26-14-01-001-AFT 26-14-01-001-FWD 26-21-00-001-U 26-22-07-001-U 26-23-09-001-U 26-23-13-001-U 27-03-00-001-U 27-03-01-001-U 27-03-04-001-U 27-11-00-005-U 27-11-03-004-U 27-11-03-006-U 27-12-01-006-LH 27-12-01-006-RH 27-14-01-001-U 27-21-00-001-U 27-21-03-001-U NEGATIVE-PRESSURE RELIEF - OPERATIONAL TEST PACK FLOW-CONTROL-VALVES FILTER - CLEANING (ULTRASONIC METHOD) (CR) PACK FLOW-CONTROL-VALVES FILTER - CLEANING (ULTRASONIC METHOD) (CR) DUAL HEAT EXCHANGERS - SHOP CLEANING DUAL HEAT EXCHANGERS - SHOP CLEANING TRIM-AIR MODULATING-VALVES FILTER - CLEANING (ULTRASONIC METHOD) (CR) TRIM-AIR MODULATING-VALVES FILTER - CLEANING (ULTRASONIC METHOD) (CR) AIRBORNE AUDIO SYSTEM BACKUP MODE - OPERATIONAL TEST AIRBORNE AUDIO SYSTEM BACKUP MODE - OPERATIONAL TEST PASSENGER ADDRESS AND CABIN-INTERPHONE-SYSTEM EMERGENCY MODE - OPERATI PASSENGER ADDRESS AND CABIN-INTERPHONE-SYSTEM EMERGENCY MODE - OPERATI STATIC DISCHARGERS - FUNCTIONAL TEST STATIC DISCHARGERS - FUNCTIONAL TEST STATIC DISCHARGERS - FUNCTIONAL TEST PILOT SEATS ATTACHMENT - DETAILED INSPECTION PILOT-SEAT INERTIAL REELS - OPERATIONAL TEST OBSERVER SEAT - EXTERNAL DETAILED INSPECTION OBSERVER-SEAT INERTIAL REEL - OPERATIONAL TEST FLIGHT-ATTENDANT-SEAT INERTIAL REELS - OPERATIONAL TEST ENGINE FIRE DETECTION LOOP - OPERATIONAL CHECK ENGINE FIRE DETECTION LOOP - OPERATIONAL CHECK APU FIRE DETECTION LOOP - OPERATIONAL CHECK LAVATORY SMOKE DETECTOR - OPERATIONAL TEST LAVATORY SMOKE DETECTOR - OPERATIONAL TEST ENGINE FIRE EXTINGUISHING SYSTEM - FUNCTIONAL TEST APU FIRE EXTINGUISHING SYSTEM DISCHARGE PIPING - INSPECTION/CHECK CARGO-COMPARTMENT DISCHARGE TUBING / NOZZLE - FUNCTIONAL TEST CARGO-COMPARTMENT FIRE-EXTINGUISHING SYSTEM - OPERATIONAL CHECK FLY-BY-WIRE BACKUP BATTERY - OPERATIONAL TEST FLIGHT CONTROLS PANEL (DIRECT MODE SWITCH) - OPERATIONAL TEST TRIM CONTROL PANEL (CUTOUT SWITCHES) - OPERATIONAL TEST AILERON CONTROL CABLES - OPERATIONAL TEST AILERON CONTROL CABLES, PULLEYS ANDQUADRANT - FUSELAGE AREA FNC - AILERON CONTROL CABLES - FUSELAGE AREA AILERON CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST AILERON CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST AILERON TRIM ACTUATOR - FUNCTIONAL TEST RUDDER MECHANICAL COMPONENTS - GENERAL VISUAL INSPECTION RUDDER-PEDAL DAMPER FLUID-LEVEL - GENERAL VISUAL INSPECTION 03 APR 2015 Page 21 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 27-22-01-002-U 27-22-01-006-U 27-24-01-001-U 27-31-00-001-U 27-32-01-002-LH 27-32-01-002-RH 27-32-01-006-LH 27-32-01-006-RH 27-40-00-001-U 27-51-01-003-LH 27-51-01-003-RH 27-51-03-001-LH 27-51-03-001-RH 27-51-03-002-LH 27-51-03-002-RH 27-51-11-001-LH 27-51-11-001-RH 27-81-03-001-LH 27-81-03-001-RH 27-81-03-002-LH 27-81-03-002-RH 28-12-11-001-LH 28-12-11-001-RH 28-12-11-002-LH 28-12-11-002-RH 28-21-00-001-U 29-10-00-001-U 29-11-03-001-U 29-11-20-001-U 29-12-00-005-U 29-33-02-001-U 29-33-02-003-U 30-11-00-001-LH 30-11-00-001-RH 30-11-06-001-LH 30-11-06-001-RH 30-32-00-001-U 32-11-11-001-LH 32-11-11-001-RH 32-21-09-001-U 32-33-01-001-U 32-34-00-001-U 32-34-00-002-U 32-34-00-003-U 32-35-00-001-U 32-40-00-001-AFTLH 32-40-00-001-AFTRH 32-40-00-001- RUDDER POWER CONTROL UNIT - DETAILED VISUAL INSPECTION RUDDER CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST RUDDER TRIM ACTUATOR - FUNCTIONAL TEST ELEVATOR MECHANICAL COMPONENTS - GENERAL VISUAL INSPECTION ELEVATOR POWER CONTROL UNIT - DETAILED VISUAL INSPECTION ELEVATOR POWER CONTROL UNIT - DETAILED VISUAL INSPECTION ELEVATOR CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST ELEVATOR CONTROL SYSTEM BACKLASH - FUNCTIONAL TEST HORIZONTAL-STABILIZER SYSTEM BACKLASH - FUNCTIONAL TEST INBOARD FLAP ACTUATOR - FUNCTIONAL TEST INBOARD FLAP ACTUATOR - FUNCTIONAL TEST FLAP TORQUE TUBES - LUBRICATING FLAP TORQUE TUBES - LUBRICATING FLAP MECHANICAL DRIVE LINE - DETAILED VISUAL INSPECTION FLAP MECHANICAL DRIVE LINE - DETAILED VISUAL INSPECTION FLAP-TRACK-MECHANISM NEEDLE ROLLERS - DETAILED VISUAL INSPECTION FLAP-TRACK-MECHANISM NEEDLE ROLLERS - DETAILED VISUAL INSPECTION SLAT TORQUE TUBES - LUBRICATING SLAT TORQUE TUBES - LUBRICATING SLAT MECHANICAL DRIVE LINE - DETAILED VISUAL INSPECTION SLAT MECHANICAL DRIVE LINE - DETAILED VISUAL INSPECTION FLAME ARRESTOR/SURGE RELIEF VALVE - INSPECTION (CR) FLAME ARRESTOR/SURGE RELIEF VALVE - INSPECTION (CR) FLAME ARRESTOR/SURGE RELIEF VALVE - OPERATIONAL TEST (CR) FLAME ARRESTOR/SURGE RELIEF VALVE - OPERATIONAL TEST (CR) CROSS-FEED SYSTEM - OPERATIONAL TEST HYDRAULIC FLUID - HYDRAULIC FLUID SAMPLING ANALYSIS MAIN COMPONENTS OF POWER TRANSFER UNIT (PTU) - FUNCTIONAL TEST LG AND NWS PRIORITY VALVE OF NO. 2 HYDRAULIC SYSTEM - FUNCTIONAL TEST INTERNAL LEAKAGE OF THE NO. 3 HYDRAULIC SYSTEM - FUNCTIONAL TEST AUTOMATIC SHUTDOWN OF ALTERNATING-CURRENT MOTOR-DRIVEN PUMP (ACMP) OF HYDRAULIC TEMPERATURE SWITCH OF NO. 3 HYDRAULIC SYSTEM - FUNCTIONAL TE WING THERMAL ANTI-ICING SYSTEM - GENERAL VISUAL INSPECTION WING THERMAL ANTI-ICING SYSTEM - GENERAL VISUAL INSPECTION WING ANTI-ICE SLAT-HOSE - DETAILED VISUAL INSPECTION WING ANTI-ICE SLAT-HOSE - DETAILED VISUAL INSPECTION STATIC PORT HEATING - OPERATIONAL TEST MLG TORQUE LINK CLEARANCE AND SHIMMY DAMPER TORQUE - FUNCTIONAL TEST MLG TORQUE LINK CLEARANCE AND SHIMMY DAMPER TORQUE - FUNCTIONAL TEST NOSE-LANDING-GEAR TORQUE LINK - INSPECTION CONTROL-LEVER RELEASE SWITCH - OPERATIONAL TEST EMERGENCY-EXTENSION SYSTEM (ON JACKS) - FUNCTIONAL TEST EMERGENCY-EXTENSION SYSTEM - INSPECTION EMERGENCY-EXTENSION SYSTEM - ADJUSTMENT EMERGENCY-EXTENSION ELECTRICAL-RELEASE SYSTEM - OPERATIONAL TEST MAIN BRAKE HYDRAULIC-FUSE AND EMERGENCY/PARKING BRAKE HYDRAULIC-FUSE MAIN BRAKE HYDRAULIC-FUSE AND EMERGENCY/PARKING BRAKE HYDRAULIC-FUSE MAIN BRAKE HYDRAULIC-FUSE AND EMERGENCY/PARKING BRAKE HYDRAULIC-FUSE 03 APR 2015 Page 22 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 FWDRH 32-44-00-001-U 32-49-03-001-U 32-49-03-002-U 32-49-07-001-LH 32-49-07-001-RH 32-49-07-002-LH 32-49-07-002-RH 32-49-11-001-LH 32-49-11-001-RH 35-11-00-001-U 35-20-04-001-U 35-21-00-001-U 35-21-00-002-U 36-10-01-001-U 36-11-01-001-LH 36-11-01-001-RH 36-11-03-001-LH 36-11-03-001-RH 36-11-09-001-LH 36-11-09-001-RH 38-32-06-001-U 44-10-00-001-U 49-62-01-001-U 49-80-01-001-U 52-11-20-003FWDLH 52-11-22-001FWDLH 52-11-23-001FWDLH 52-11-25-001FWDLH 52-11-30-003FWDLH 52-11-40-001FWDLH 52-11-40-003FWDLH 52-11-40-004-U 52-11-51-001FWDLH 52-11-52-001FWDLH 52-12-20-003-AFTLH 52-12-22-001-AFTLH 52-12-23-001-AFTLH 52-12-25-001-AFTLH 52-12-27-001-AFTLH 52-12-30-003-AFTLH EMERGENCY/PARKING BRAKE SYSTEM - FUNCTIONAL TEST NOSE-LANDING-GEAR TIRE PRESSURE - CHECK NOSE WHEEL TIRE - INSPECTION MAIN-LANDING-GEAR TIRE PRESSURE - CHECK MAIN-LANDING-GEAR TIRE PRESSURE - CHECK MAIN WHEEL TIRE - INSPECTION MAIN WHEEL TIRE - INSPECTION BRAKE ASSEMBLY WEAR-PIN (FAST CHECK - WHEEL INSTALLED ON AIRCRAFT) - G BRAKE ASSEMBLY WEAR-PIN (FAST CHECK - WHEEL INSTALLED ON AIRCRAFT) - G PRESSURE TRANSDUCER INDICATION - GENERAL VISUAL INSPECTION PASSENGER-CABIN OXYGEN MASKS - DETAILED VISUAL INSPECTION PASSENGER OXYGEN SYSTEM - FUNCTIONAL CHECK PASSENGER OXYGEN SYSTEM - OPERATIONAL CHECK CROSS-BLEED VALVE FILTER - CLEANING (ULTRASONIC METHOD) HIGH-STAGE BLEED-VALVE FILTER - CLEANING (ULTRASONIC METHOD) (CR) HIGH-STAGE BLEED-VALVE FILTER - CLEANING (ULTRASONIC METHOD) (CR) NACELLE PRSOV FILTER - CLEANING (ULTRASONIC METHOD) (CR) NACELLE PRSOV FILTER - CLEANING (ULTRASONIC METHOD) (CR) FAN-AIR VALVE FILTER - CLEANING (ULTRASONIC METHOD) (CR) FAN-AIR VALVE FILTER - CLEANING (ULTRASONIC METHOD) (CR) WATER SEPARATOR - INSPECTION CABIN LOUDSPEAKERS - OPERATIONAL TEST AUXILIARY POWER UNIT (APU) EMERGENCY SHUTDOWN - OPERATIONAL TEST EXHAUST SILENCER LINER - INSPECTION FORWARD PASSENGER-DOOR MAIN-SHAFTS - INSPECTION FORWARD PASSENGER-DOOR BOX-MECHANISM - INSPECTION FORWARD PASSENGER-DOOR STOPS - FUNCTIONAL CHECK FORWARD PASSENGER-DOOR VENT-FLAP - INSPECTION FORWARD PASSENGER DOOR ACTUATOR ASSEMBLY - INSPECTION FORWARD-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM - INSPECTI FORWARD-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN EMERGEN FORWARD-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN NORMAL FORWARD PASSENGER DOOR PNEUMATIC ASSEMBLY - INSPECTION FORWARD-PASSENGER-DOOR CONTROL MECHANISM - INSPECTION AFT PASSENGER-DOOR MAIN-SHAFTS - INSPECTION AFT PASSENGER-DOOR BOX-MECHANISM - INSPECTION AFT PASSENGER-DOOR STOPS - FUNCTIONAL TEST AFT PASSENGER-DOOR VENT-FLAP - INSPECTION AFT PASSENGER DOOR DAMPER - OPERATIONAL TEST AFT PASSENGER DOOR ACTUATOR ASSEMBLY - INSPECTION 03 APR 2015 Page 23 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK 128 129 52-12-40-001-AFTLH 52-12-40-003-AFTLH AFT PASSENGER DOOR SLIDE BELLCRANK, GIRT BAR AND SLIDE MECHANISM AFT-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN EMERGENCY C 130 52-12-40-004-AFTLH AFT-PASSENGER-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN NORMAL CONF 131 132 133 52-12-51-001-AFTLH 52-12-52-001-AFTLH 52-21-02-001-LH AFT PASSENGER DOOR PNEUMATIC ASSEMBLY - INSPECTION AFT-PASSENGER-DOOR CONTROL MECHANISM - INSPECTION OVERWING-ESCAPE-HATCH STRUCTURES (HANDLE AND LATCH-DRIVING FITTING-KIT 134 52-21-02-001-RH OVERWING-ESCAPE-HATCH STRUCTURES (HANDLE AND LATCH-DRIVING FITTING-KIT 135 136 137 138 139 140 141 142 143 52-21-02-002-LH 52-21-02-002-RH 52-21-20-001-LH 52-21-20-001-RH 52-21-20-002-LH 52-21-20-002-RH 52-21-23-001-LH 52-21-23-001-RH 52-31-02-001FWDRH 52-31-20-002FWDRH 52-31-23-001FWDRH 52-31-24-001FWDRH 52-31-25-001FWDRH 52-31-27-001FWDRH 52-31-27-002-U 52-31-28-001FWDRH 52-32-02-001-AFTRH 52-32-02-002-AFTRH 52-32-20-002-AFTRH 52-32-23-001-AFTRH 52-32-24-001-AFTRH 52-32-25-001-AFTRH 52-32-27-001-AFTRH 52-32-27-002-AFTRH 52-32-28-001-AFTRH 52-41-20-003FWDRH 52-41-22-001FWDRH 52-41-25-001FWDRH 52-41-27-001FWDRH OVERWING-ESCAPE-HATCH STRUCTURES (DRAIN HOLES) - INSPECTION OVERWING-ESCAPE-HATCH STRUCTURES (DRAIN HOLES) - INSPECTION OVERWING ESCAPE HATCH ACTUATING AND LOCKING MECHANISM COMPONENTS - INS OVERWING ESCAPE HATCH ACTUATING AND LOCKING MECHANISM COMPONENTS - INS OVERWING ESCAPE HATCH ACTUATING AND LOCKING MECHANISM - OPERATIONAL TE OVERWING ESCAPE HATCH ACTUATING AND LOCKING MECHANISM - OPERATIONAL TE OVERWING-ESCAPE-HATCH STOPS AND FITTINGS COMPONENTS - INSPECTION OVERWING-ESCAPE-HATCH STOPS AND FITTINGS COMPONENTS - INSPECTION FORWARD CARGO-DOOR VENT-FLAP-BEARINGS - INSPECTION 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 FORWARD CARGO-DOOR TERMINAL-SHAFTS - INSPECTION FORWARD CARGO DOOR FITTINGS - INSPECTION FORWARD CARGO-DOOR HOOK - INSPECTION FORWARD CARGO-DOOR VENT-FLAP - INSPECTION FORWARD CARGO-DOOR ACTUATOR - INSPECTION FORWARD-CARGO-DOOR ACTUATORS - FUNCTIONAL TEST FORWARD CARGO-DOOR DRIVE-ROD - INSPECTION AFT CARGO-DOOR VENT-FLAP-BEARINGS - INSPECTION AFT CARGO-DOOR DRAIN HOLES - INSPECTION AFT CARGO-DOOR TERMINAL-SHAFTS - INSPECTION AFT CARGO DOOR FITTINGS - INSPECTION AFT CARGO-DOOR HOOK - INSPECTION AFT CARGO-DOOR VENT-FLAP - INSPECTION AFT CARGO-DOOR ACTUATOR - INSPECTION AFT-CARGO-DOOR ACTUATORS - FUNCTIONAL TEST AFT CARGO-DOOR DRIVE-ROD - INSPECTION FORWARD SERVICE-DOOR MAIN-SHAFTS - INSPECTION FORWARD SERVICE-DOOR BOX-MECHANISM - INSPECTION FORWARD SERVICE-DOOR VENT-FLAP - INSPECTION FORWARD SERVICE DOOR DAMPER - OPERATIONAL TEST 03 APR 2015 Page 24 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK 164 170 171 172 173 174 175 176 177 178 179 180 52-41-30-003FWDRH 52-41-40-001FWDRH 52-41-40-003FWDRH 52-41-40-004FWDRH 52-41-51-001FWDRH 52-41-52-001FWDRH 52-42-20-003-AFTRH 52-42-22-001-AFTRH 52-42-25-001-AFTRH 52-42-27-001-AFTRH 52-42-30-003-AFTRH 52-42-40-001-AFTRH 52-42-40-003-AFTRH 52-42-40-004-AFTRH 52-42-51-001-AFTRH 52-42-52-001-AFTRH 52-43-20-001-FWD 181 52-43-20-002-FWD 182 183 184 185 186 52-46-20-001-M 52-46-20-002-M 52-73-00-001-U 53-05-00-001-U 53-10-21-001FWDLH 53-10-21-002FWDLH 53-10-21-003FWDLH 53-10-25-001FWDRH 53-10-25-002FWDRH 53-10-25-003FWDRH 53-21-29-001FWDRH 53-21-29-002FWDRH 53-21-29-003FWDRH 53-21-29-004FWDRH 53-22-11-001-LH 53-22-11-001-RH 53-23-21-001-AFTLH 165 166 167 168 169 187 188 189 190 191 192 193 194 195 196 197 198 FORWARD SERVICE DOOR ACTUATOR ASSEMBLY - INSPECTION FORWARD-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM - INSPECTION FORWARD-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN EMERGENCY FORWARD-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN NORMAL CO FORWARD SERVICE DOOR PNEUMATIC ASSEMBLY - INSPECTION FORWARD-SERVICE-DOOR CONTROL MECHANISM - INSPECTION AFT SERVICE-DOOR MAIN-SHAFTS - INSPECTION AFT SERVICE-DOOR BOX-MECHANISM - INSPECTION AFT SERVICE-DOOR VENT-FLAP - INSPECTION AFT SERVICE DOOR DAMPER - OPERATIONAL TEST AFT SERVICE DOOR ACTUATOR ASSEMBLY - INSPECTION AFT-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM - INSPECTION AFT-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN EMERGENCY CON AFT-SERVICE-DOOR EMERGENCY-EVACUATION-SLIDE MECHANISM IN NORMAL CONFIG AFT SERVICE DOOR PNEUMATIC ASSEMBLY - INSPECTION AFT-SERVICE-DOOR CONTROL MECHANISM - INSPECTION FORWARD-AVIONICS-COMPARTMENT ACCESS-HATCH ACTUATING AND LOCKING MECHAN FORWARD AVIONICS COMPARTMENT ACCESS HATCH ACTUATING AND LOCKING MECHAN MIDDLE-AVIONICS-COMPARTMENT ACCESS-DOOR ACTUATING AND LOCKING MECHANIS MIDDLE AVIONICS COMPARTMENT ACCESS DOOR ACTUATING AND LOCKING MECHANIS OPERATIONAL CHECK OF FORWARD/AFT CARGO DOOR WARNING SENSOR (LOCKED). FUSELAGE DRAINS - DETAILED INSPECTION FORWARD-PASSENGER-DOOR KEEPER KIT - INSPECTION FORWARD-PASSENGER-DOOR COMMAND RAMP - INSPECTION FORWARD-PASSENGER-DOOR EVACUATION SLIDE-FITTING - INSPECTION FORWARD-SERVICE-DOOR KEEPER KIT - INSPECTION FORWARD-SERVICE-DOOR COMMAND RAMP - INSPECTION FORWARD-SERVICE-DOOR EVACUATION SLIDE-FITTING - INSPECTION FORWARD CARGO-DOOR UPLOCK ON THE FUSELAGE - INSPECTION FORWARD CARGO-DOOR LATCH-FITTINGS ON THE FUSELAGE - INSPECTION FORWARD CARGO-DOOR LATCH-FITTINGS - FUNCTIONAL CHECK FORWARD CARGO-DOOR LATCH FITTINGS - LUBRICATION OVERWING SCAPE HATCH SURROUNDING STRUCTURE COMPONENTS - GENERAL VISUAL OVERWING SCAPE HATCH SURROUNDING STRUCTURE COMPONENTS - GENERAL VISUAL AFT PASSENGER-DOOR KEEPER-KIT ON THE FUSELAGE - INSPECTION 03 APR 2015 Page 25 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 53-23-21-002-AFTLH 53-23-21-003-AFTLH 53-23-25-001-AFTRH 53-23-25-002-AFTRH 53-23-25-003-AFTRH 53-23-29-001-AFTRH 53-23-29-002-AFTRH 53-23-29-003-AFTRH 53-23-29-004-AFTRH 56-30-00-001FWDLH 56-30-00-002-AFTLH 56-30-00-003FWDRH 56-30-00-004-AFTRH 71-00-00-002-U 71-31-00-001-LH 71-31-00-001-RH 72-00-00-003-U 72-23-00-001-LH 72-23-00-001-RH 72-23-00-003-LH 72-23-00-003-RH 72-30-00-001-LH 72-30-00-001-RH 72-32-00-002-LH 72-32-00-002-RH 73-11-00-001-LH 73-11-00-001-RH 73-11-04-001-LH 73-11-04-001-RH 73-31-01-001-LH 73-31-01-001-RH 74-11-02-001-LH 74-11-02-001-RH 75-31-00-001-LH 75-31-00-001-RH 75-31-00-002-LH 75-31-00-002-RH 78-31-00-002-LH 78-31-00-002-RH 78-32-00-001-LH 78-32-00-001-RH 78-32-00-002-LH 78-32-00-002-RH 79-34-01-001-LH 79-34-01-001-RH 79-35-01-001-LH AFT PASSENGER-DOOR COMMAND-RAMP ON THE FUSELAGE - INSPECTION AFT PASSENGER-DOOR EVACUATION-SLIDE-FITTING - INSPECTION AFT SERVICE-DOOR KEEPER-KIT ON THE FUSELAGE - INSPECTION AFT SERVICE-DOOR COMMAND-RAMP ON THE FUSELAGE - INSPECTION AFT SERVICE-DOOR EVACUATION-SLIDE-FITTING - INSPECTION AFT CARGO-DOOR UPLOCK ON THE FUSELAGE - INSPECTION AFT CARGO-DOOR LATCH-FITTINGS ON THE FUSELAGE - INSPECTION AFT CARGO-DOOR LATCH-FITTINGS - FUNCTIONAL CHECK AFT CARGO-DOOR LATCH FITTINGS - LUBRICATION DOORS WINDOW - INSPECTION/CHECK DOORS WINDOW - INSPECTION/CHECK DOORS WINDOW - INSPECTION/CHECK DOORS WINDOW - INSPECTION/CHECK POWERPLANT SYSTEM - FAULT MESSAGES CHECK ENGINE FIREZONE - INSPECTION/CHECK (CR) ENGINE FIREZONE - INSPECTION/CHECK (CR) ENGINE TREND-MONITORING HISTORY - DATA RECORDING ENGINE AFT FAN CASE MOUNT CLEVIS - DETAILED INSPECTION (CR) ENGINE AFT FAN CASE MOUNT CLEVIS - DETAILED INSPECTION (CR) ENGINE FORWARD FAN CASE - EXTERNAL GENERAL VISUAL INSPECTION ENGINE FORWARD FAN CASE - EXTERNAL GENERAL VISUAL INSPECTION ENGINE COMPRESSOR ROTOR BLADES AND STATOR VANES - BORESCOPE INSP (CR) ENGINE COMPRESSOR ROTOR BLADES AND STATOR VANES - BORESCOPE INSP (CR) ENGINE COMPRESSOR CASE - EXTERNAL GENERAL VISUAL INSPECTION (CR) ENGINE COMPRESSOR CASE - EXTERNAL GENERAL VISUAL INSPECTION (CR) ENGINE FUEL DISTRIBUTION SYSTEM - INSPECTION ENGINE FUEL DISTRIBUTION SYSTEM - INSPECTION ENGINE FUEL FILTER ELEMENT - DISCARD (CR) ENGINE FUEL FILTER ELEMENT - DISCARD (CR) FUEL-FILTER IMPENDING-BYPASS SWITCH - REMOVAL FOR RESTORATION (CR) FUEL-FILTER IMPENDING-BYPASS SWITCH - REMOVAL FOR RESTORATION (CR) IGNITION - STATIC CHECK IGNITION - STATIC CHECK COMPRESSOR CONTROL ACTUATION - DETAILED INSPECTION COMPRESSOR CONTROL ACTUATION - DETAILED INSPECTION COMPRESSOR BLEED-CONTROL-SYSTEM - DETAILED INSPECTION COMPRESSOR BLEED-CONTROL-SYSTEM - DETAILED INSPECTION THRUST-REVERSER FIRE ZONE - GENERAL VISUAL INSPECTION THRUST-REVERSER FIRE ZONE - GENERAL VISUAL INSPECTION THRUST-REVERSER LOCKING SYSTEM - OPERATIONAL TEST THRUST-REVERSER LOCKING SYSTEM - OPERATIONAL TEST THRUST-REVERSER ACTUATION SYSTEM - DETAILED INSPECTION THRUST-REVERSER ACTUATION SYSTEM - DETAILED INSPECTION OIL FILTER BYPASS SENSOR - FUNCTIONAL TEST OIL FILTER BYPASS SENSOR - FUNCTIONAL TEST CHIP DETECTOR - FUNCTIONAL CHECK 03 APR 2015 Page 26 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 79-35-01-001-RH Z198-001-U Z200-001-U Z310-001-U Z350-001-U Z400-001-U Z400-002-U Z500-002-U Z510-001-U Z700-001-U Z700-002-U Z811-001-LH Z811-002-LH Z812-001-U Z812-002-U Z813-001-LH Z821-001-U Z821-002-RH Z822-001-RH Z822-002-RH Z823-001-RH Z823-002-U Z824-001-U Z824-002-RH Z825-001-RH CHIP DETECTOR - FUNCTIONAL CHECK CENTER FUSELAGE II AND III LOWER PORTION AND KEEL BEAM AT AREAS COVERE FORWARD AND CENTER FUSELAGE I, II AND III TOP AND SIDE AREAS - EXTERNA REAR FUSELAGE, REAR PRESSURE BULKHEAD, HORIZONTAL STABILIZER ROOT AREA TAIL CONE AND AUXILIARY POWER UNIT (APU) - INTERNAL GENERAL VISUAL INS PYLON, INLET COWL, FAN COWL AND AFT CORE COWL, THRUST REVERSER AND ENG FAN COWL, THRUST REVERSER, AFT CORE COWL AND ENGINE - INTERNAL FLAP, AILERON, SPOILERS, WING TRAILING EDGE, FLAP TRACK FAIRINGS AND S WING LEADING EDGE, WING SLATS, WING ROOT LANDING LIGHT FAIRING, WINGLE NOSE LANDING GEAR, NOSE LANDING GEAR DOORS AND NOSE LANDING GEAR BAY MAIN LANDING GEAR, MAIN LANDING GEAR COMPARTMENT AND DOORS - EXTERNAL FORWARD PASSENGER DOOR - EXTERNAL GENERAL VISUAL INSPECTION FORWARD PASSENGER DOOR - INTERNAL GENERAL VISUAL INSPECTION AFT PASSENGER DOOR - EXTERNAL GENERAL VISUAL INSPECTION AFT PASSENGER DOOR - INTERNAL GENERAL VISUAL INSPECTION LEFT OVERWING DOOR - EXTERNAL GENERAL VISUAL INSPECTION FORWARD SERVICE DOOR - EXTERNAL GENERAL VISUAL INSPECTION FORWARD SERVICE DOOR - INTERNAL GENERAL VISUAL INSPECTION FORWARD CARGO DOOR - EXTERNAL GENERAL VISUAL INSPECTION FORWARD CARGO DOOR - INTERNAL GENERAL VISUAL INSPECTION AFT CARGO DOOR - EXTERNAL GENERAL VISUAL INSPECTION AFT CARGO DOOR - INTERNAL GENERAL VISUAL INSPECTION AFT SERVICE DOOR - EXTERNAL GENERAL VISUAL INSPECTION AFT SERVICE DOOR - INTERNAL GENERAL VISUAL INSPECTION RIGHT OVERWING DOOR - EXTERNAL GENERAL VISUAL INSPECTION 03 APR 2015 Page 27 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK Annex 4 Tender proposal should contain, but not limited to, the following information: 1 COMPANY INFORMATION 1.1 Company trading name: 1.2 Contact name: 1.3 Head office address: 1.4 Postcode: 1.5 Telephone number: 1.6 Fax number: 1.7 Email address: 1.8 How long has your company been established? 1.9 Registration number: 1.10 Date of registration: 1.11 Address of registered office (if different from above): 1.13 What is the ownership structure of the business? Sole Trader Public Ltd Company Partnership Public Sector Limited Company Subsidiary If you are a Subsidiary, please provide: 1.14 Holding Company Name: 1.15 Names of other Divisions / Subsidiary companies within the same group: 2 CERTIFICATION AND QUALITY PROCESSES 03 APR 2015 Page 28 of 29 RFP from UIA: EMBRAER E190 BASE-1C CHEK 2.1 Please describe any relevant certifications and approvals held by your company. 2.2 Please describe your quality assurance systems in your company’s processes. Include in your response details of any relevant quality programmes (e.g. ISO 9000, date achieved, etc.). 3. EXPERIENCE 3.1 What experience does your organisation have in managing contracts such as this? 4 REFERENCES Please provide at least two references and contact details (below) from organisations you have done work of a similar scale for. Referee Name: Company Name: Address: Postcode: Telephone: Referee Name: Company Name: Address: Postcode: Telephone: 03 APR 2015 Page 29 of 29