Quarterly Progress Report July - Sep, 2013 Post Crisis Needs Assessment – ISU Governance Support Project, Government of Khyber Pakhtunkhwa 1 PCNA-ISU, GSP, Khyber Pakhtunkhwa July - Sep 2013 Quarterly Progress Report Table of Contents 1 INTRODUCTION ...................................................................................................................................................... 4 1.1 PROJECT DEVELOPMENT OBJECTIVE...................................................................................................................................... 4 1.1.1 Component-1: Strengthening of PCNA ISUs, provision of Technical Assistance, and institutional Building of government departments/directorates ............................................................................................................................... 4 1.1.2 Component II: Rapid Response Facility (RRF) ....................................................................................................... 4 1.2 PROJECT OBJECTIVES AND ITS RELATIONSHIP WITH SECTORAL OBJECTIVES ..................................................................................... 4 1.3 OUTPUTS ........................................................................................................................................................................ 5 2 BUDGET DISBURSEMENT ................................................................................................................................... 18 3 KEY STAFFING POSITION TILL 31ST JULY-2013 ............................................................................................. 20 4 ACTIVITIES OF MONTH ENDING 31ST JULY-2013 ........................................................................................... 21 4.1 PROJECT PLANNING:........................................................................................................................................................ 21 4.1.1 Concept Notes .................................................................................................................................................... 21 4.2 PROJECT IMPLEMENTATION:.............................................................................................................................................. 22 4.2.1 Technical Support to Line Departments and MDTF Projects and Sector Updates ............................................. 22 4.2.2 Ombudsman ....................................................................................................................................................... 31 4.2.3 Anti-Corruption Establishment ........................................................................................................................... 31 5 PROCUREMENT MANAGEMENT AND CONTRACT ADMINISTRATION ......................................................................... 31 6 RISKS MITIGATION ACTIONS ...................................................................................................................................... 37 2 PCNA-ISU, GSP, Khyber Pakhtunkhwa Quarterly Progress Report July - Sep 2013 Acronyms and Abbreviations BoS CDD CN DPMS DoP eCGRS ERKF FABS FATA FMS FR GSP ISU IUFR KP M&E MDGs MDTF NOL O&M P&D PCNA PDO PHE PIFRA PMU PPRA R&DC RFP RRF SAP ToR W&S WB 3 Bureau of Statistics Community-Driven Development Concept Note Development Projects Management System Directorate of Projects e- Citizen Grievance Redressal System Economic Revitalization of KP and FATA Financial Accounting and Budgeting System Federally Administered Tribal Areas Financial Management Specialist Frontier Regions Governance Support Project Implementation Support Unit Interim Un-audited Financial Report Khyber Pakhtunkhwa Monitoring and Evaluation Millennium Development Goals Multi-Donor Trust Fund No Objection Letter Operation and Maintenance Planning and Development Post Crisis Needs Assessment Project Development Objective Public Health Engineering Project to Improve Financial Reporting and Auditing Project Management Unit Public Procurement Regulatory Authority Review and Decision Committee Request for Proposal Rapid Response Facility System Application and Products Terms of Reference Works and Services The World Bank PCNA-ISU, GSP, Khyber Pakhtunkhwa Quarterly Progress Report July - Sep 2013 1 INTRODUCTION The project is part of the MDTF established in September 2010, as one of the key instruments to support the reconstruction, rehabilitation, reforms and other interventions needed to build peace and stability and create the conditions for sustainable development in the aftermath of the 2009 crisis.1 1.1 Project Development Objective The Project Development Objective (PDO) is to strengthen the capacity of Line Departments in Khyber Pakhtunkhwa Secretariat to help support efficient delivery of the PCNA program in Khyber Pakhtunkhwa. 1.1.1 Component-1: Strengthening of PCNA ISUs, provision of Technical Assistance, and institutional Building of government departments/directorates Component-1 will ensure sufficient capacities in FATA and Khyber Pakhtunkhwa governments are in place to enhance overall coordination and implementation of the PCNA program. The activities envisaged under Component-1 are to provide urgently needed technical assistance (consultants, training, goods and services) to support the government departments/directorates to put in place implementation mechanisms to effectively deliver the PCNA program and enhance the coordination and implementation of projects and programs proposed under the PCNA. This action will thereby enhance the efficiency with which the MDTF, and other donor assistance, is managed by provincial government, line departments / directorates and public entities. 1.1.2 Component II: Rapid Response Facility (RRF) Component-2 will facilitate implementation support to governance specific interventions (Annex 1) according to the PCNA in Khyber Pakhtunkhwa and FATA, as identified and implemented by Line Departments / Directorates, to remove key governance constraints. 1.2 Project objectives and its relationship with Sectoral objectives Objectives of the Project: a. Strengthening the institutional capacity of Line Departments and, as well as Khyber Pakhtunkhwa ISU, in order to: (1) identify, design, prepare, appraise and implement the recommendations set forth in the PCNA; (ii) development and implement data collection, communication, and monitoring and evaluating methodologies, ensure coordination with donors; and (iv) fulfill their fiduciary duties hereunder. b. Developing Khyber Pakhtunkhwa’s systems and processes for the coordination and implementation of PCNA and/or governance activities, as the case may be, as well as management interventions in their respective territories. c. Identifying a pipeline of projects for the development of Line Departments in Khyber Pakhtunkhwa. d. Operation and management of Khyber Pakhtunkhwa PCNA ISU. e. Finally under Rapid response facility implementation support to governance specific interventions in Khyber Pakhtunkhwa, as identified and implemented by Line Departments in order to remove key governance constraints. 1 The MDTF is administered by the World Bank and supported by ten donors - Australia, Denmark, European Union, Finland, Germany, Italy, Sweden, Turkey, UK, and the USA. It is one of the instruments for operationalization of PCNA. 4 PCNA-ISU, GSP, Khyber Pakhtunkhwa Quarterly Progress Report July - Sep 2013 1.3 Outputs a. b. c. d. e. f. 5 Systems established to monitor progress of PCNA program Five Project concept notes developed for interventions Development Partners Forum established Overall 10 years Governance Program designed after consultation with stakeholders and agreed at the Development Partners Forum Five Governance interventions funded in a timely manner Three reform actions implemented. PCNA-ISU, GSP, Khyber Pakhtunkhwa Results Matrix Key Outputs by Project Components Baselin e TABLE-1A: Project Level Output Indicators with Targets and Definitions Source Definition of the Indicators Total Component-1: Strengthening PCNA Implementation Support Units, provision of Technical Assistance, and Institutional Building of Government Departments Indicator 1: PCNA Implementation Support Unit in Khyber Pakhtunkhwa set-up and operationalized 0 Indicator 2: Overall 10 years Governance Program designed 0 6 ISU Setting-up: 11th Oct. 2011 Operationalization: (1) Staffed: PCNA Coordinator and eight of ten ISU Specialists are on board (2) Equipped (i) Office space occupied (ii) All equipment procured (computers, vehicle, furniture etc.) Based on the Bank shared guidelines a draft concept paper highlighting optional methodologies for designing a long-term Governance Program along with PowerPoint presentation prepared and presented to the Bank during a meeting that was held on 5th December. Core Committee has been formed Weekly meetings are being held Fortnightly meeting with WB team are being held Action Plan drafted Key documents have been reviewed PCNA-ISU, GSP, Khyber Pakhtunkhwa Two sub-indicators are (i) Setting-up: Date of setting-up (ii) Operationalization: PCNA Units are (1) Staffed (2), Equipped, (3) Provided with O&M budget (4), Interact with development partners, and (5) Interact with the relevant Government Departments and MDTF Projects 10 years Governance Plan –Subindicators are: (i)Design of the sub-projects (ii) Stakeholders’ Consultation July - Sep 2013 Quarterly Progress Report Indicator 3: Five Project Concept Notes developed for interventions 0 Concept Notes developed Total nine Concept Notes were developed: i. Judicial Academy: Support to the operationalization of Judicial Academy, Phase-1 ii. Ombudsman: Strengthening the Khyber Pakhtunkhwa provincial ombudsman office,Phase-1 iii. Directorate of M&E: Strengthening of M&E Directorate of Khyber Pakhtunkhwa iv. Home Department: Decision Support System for Provincial Government of Khyber Pakhtunkhwa v. Anti-Corruption Establishment (ACE): Strengthening restructuring & re-organization of Anti-Corruption Establishment (ACE) Khyber Pakhtunkhwa vi. Information Department: Formulation of Strategic Communication Strategy for Peace Building in Khyber Pakhtunkhwa vii. TA Implementation Readiness - Southern Area Development Project (SADP) viii. Initial Start-up Support –Southern Area Development Project (SADP) ix. Department of Agriculture, GOKP: Reformation & Reorganization of Model Farm Service Centers, (MFSC) x. Peshawar High Court: Establishment of e-Citizen Grievance Redressal System xi. Finance Department: Operationalizing Khyber Pakhtunkhwa Public Procurement Regulatory Authority (PPRA) Status of the above listed Concept Notes: Approved CNs are i, ii, iii, v, vii , x and xi CN # iv was declined by the Bank. CN# ix returned by WB for revision CNs # vi and vii are still awaited for the Bank’s NOL. 7 PCNA-ISU, GSP, Khyber Pakhtunkhwa This activity includes establishment of a pipeline of projects for future financingSub-indicators are (i)Concept Note developed (ii) Concept note approved by the Government and ready for financing/further intervention. July - Sep 2013 Quarterly Progress Report Indicator 4: Development Partners Consultative Forum established 0 Formation of donor’s coordination forum initiated following the recommendation of the World Bank supervision mission AideMemoire. Two sub-indicators are: (1) Development Partners Forum include Government, Donors, and Civil Society Organizations (CSOs) (2) Meeting at least twice a year. Indicator 5: Systems established to monitor progress of PCNA program 0 M&E Specialist on board, effective 1st January, 2013. Two sub-indicators are 8 PCNA-ISU, GSP, Khyber Pakhtunkhwa Steps taken: (i) Concept note on Strengthening M&E Directorate has got the Bank’s NOL. (ii) Procurement Plan developed; M&E MIS TOR’s prepared and shared with the Bank. (iii) Three workshops held at World Bank Office and MDTF Secretariat for the establishment and implementation of PCNA M&E System. (iv) Meetings held with Directorate of M&E for the design and development of M&E Framework (v) Short listing in progress for selection of support staff for Directorate of M&E (vi) Short listed CVs have been submitted with WB for NOL (vii) IT assistants are on board (viii) NOL received from WB for ADMOs and MIS Officers (1) M&E Unit with adequate staffing and resources (2) Production of semi-annual progress reports to MDTF July - Sep 2013 Quarterly Progress Report Indicator 6: Five studies completed and disseminated 0 Special Studies as determined by the priority needs and topics of interest and relevance- Sub-indicators are (1) Completion of the study (2) Dissemination of the completed studies 9 PCNA-ISU, GSP, Khyber Pakhtunkhwa July - Sep 2013 Quarterly Progress Report Indicator 7: Ten workshops 0 Conducted (1) Total number of 7 workshops (i) Orientation Workshop at Dongagali and the World Bank Office Islamabad(10th to 13th July2012) (ii) Orientation workshop at MDTF Secretariat, Islamabad (19th July2012) (iii) Results Based Monitoring Workshop at the World Bank Office(7th Sept. 2012) (iv) M&E Workshop at MDTF Secretariat, Islamabad(19th Sept. 2012) (v) Financial Management Statement Workshop(27th September 2012) (vi) World Bank Procurement Guideline (29th January 2013) (vii) Country Systems Based Monitoring and Evaluation (PCNA & BDNA) Validation Workshop – Institutional Needs Assessment of The Fata Khyber Pakhtunkhwa and Baluchistan M&E Directorates (19th to 22nd February) (2) Number of participants in the workshops with gender disaggregation. Workshop S.No I II III IV V VI VII 10 PCNA-ISU, GSP, Khyber Pakhtunkhwa Male Participants 21 20 14 21 20 23 59 Female Participants 1 1 3 3 0 1 7 The data will include: Number of workshops and (2) Number of participants in the workshops with gender disaggregation July - Sep 2013 Quarterly Progress Report Baseli ne Key Outputs by Project Components Target Value for each year Definition of the Indicator YR1 YR2 YR3 Total Component 2: Rapid Response Facility (RRF) Indicator 1:At least 5 Governance Interventions funded in a timely manner NA Total number of 5 projects were funded under GSP intervention i. Support to operationalization of Judicial Academy Phase I ii. Ombudsman: “Strengthening the Khyber Pakhtunkhwa provincial ombudsman office phase 1” iii. Strengthening of M&E Directorate Khyber Pakhtunkhwa iv. Strengthening restructuring & re-organization of Anti-Corruption Establishment (ACE) Khyber Pakhtunkhwa v. Establishment of e-Citizen Grievance Redressal System Timeliness A. Topic selected as above 11 PCNA-ISU, GSP, Khyber Pakhtunkhwa Some of the activities in Component 1 will precede this output. Sub-indicators are (1)Number of governance interventions funded (2) Timeliness – (a) Topics selected, (b) Date and time of receipt of project proposals by ISU, (c) Date and time of project approval, (d) Information on funds allocation to the Line departments, (e) Planned vs. Actual disbursement of funds July - Sep 2013 Quarterly Progress Report B. Date and time of receipt of project proposals by ISU Sr.No i. May, 2012 iii. Directorate of M&E: “Strengthening of M&E Directorate Khyber Pakhtunkhwa” August 7, 2012 iv. Home Department: “Decision Support System for Provincial Government of Khyber Pakhtunkhwa” Anti-Corruption Establishment (ACE): “Strengthening restructuring & reorganization of Anti-Corruption Establishment (ACE) Khyber Information Pakhtunkhwa”Department: “Formulation of Strategic Communication Strategy for Peace Building in Khyber Pakhtunkhwa” TA Implementation Readiness Southern Area Development Project (SADP)Support –Southern Area Initial September, 2012 v. vi. vii. viii. ix. x. xi. PCNA-ISU, GSP, Khyber Pakhtunkhwa Date dd/mm/yyyy Judicial Academy: Support to operationalization of the Judicial Academy, Phase-I Ombudsman: “Strengthening the Khyber Pakhtunkhwa provincial ombudsman office phase 1” ii. 12 Project Proposal/Concept Note Title 5:06 p.m. 9:00 a.m. 10:05 a.m. October 9, 2012 1:52 p.m. October 20, 2012 October 17, 2012 October 19, 2012 Department of Agriculture, GOKP: Reformation & Reorganization of Model Farm Service Centers, (MFSC). December 17, 2012 Finance Department: Operationalizing Khyber Pakhtunkhwa Public Procurement Regulatory Authority (PPRA) 4:25 p.m. May 20, 2012 Development Project (SADP) Peshawar High Court: Establishment of e-Citizen Grievance Redressal System Time February 11, 2013 3:00 p.m 1:47 p.m. 11:00 a.m. 12:30 p.m. March 8, 2013 11:00 a.m July - Sep 2013 Quarterly Progress Report C. Date and time of project approval – Date when proposal send to the Bank for NOL Sr.No 13 PCNA-ISU, GSP, Khyber Pakhtunkhwa Project Proposal/Concept Note Title Date dd/mm/yyyy Time i. Judicial Academy: Support to operationalization of Judicial Academy Phase I May 15, 2012 4:28 p.m. ii. Ombudsman: Strengthening the Khyber Pakhtunkhwa provincial ombudsman office, Phase- 1 May 25, 2012 5:16 p.m. iii. Directorate of M&E: Strengthening of M&E Directorate Khyber Pakhtunkhwa September 24, 2012 5:05 p.m. iv. Home Department: Decision Support System for Provincial Government of Khyber Pakhtunkhwa September 11, 2012 12:49 p.m. v. Anti-Corruption Establishment (ACE): Strengthening restructuring and reorganization of Anti-Corruption Establishment (ACE) Khyber Pakhtunkhwa November 19, 2012 10:47 a.m. vi. Information Department: Formulation of Strategic Communication Strategy for Peace Building in Khyber Pakhtunkhwa November 30, 2012 6:12 p.m. vii. TA Implementation Readiness - Southern Area Development Project (SADP) October 30, 2012 7:13 p.m. viii. Initial Support –Southern Area Development Project (SADP) November 13, 2012 ix. Department of Agriculture, GOKP: Reformation & Reorganization of Model Farm Service Centers, (MFSC). January 02, 2013 3:38 p.m. x. Peshawar High Court: Establishment of eCitizen Grievance Redressal System February 19, 2013 2:54 p.m. i. Finance Department: Operationalizing KP Public Procurement Regulatory Authority (PPRA) April 21, 2013 01:35 p.m. July - Sep 2013 Quarterly Progress Report CN ISU PROCESSING SNO Project Proposal/Concept Note Title CN APPROVAL PROCESSING Received at ISU, Date Time dd/mm/yy i Judicial Academy: Support to operationalization of Judicial Academy Phase I ii Ombudsman: Strengthening the Khyber Pakhtunkhwa provincial ombudsman office, Phase1 Directorate of M&E: Strengthening of M&E Directorate Khyber Pakhtunkhwa iii TOTAL TIME May 15, 2012 May 25, 2012 July 17, 2012 May 25, 2012 June 1, 2012 30 days 9:00 a.m. September 24, 2012 October 15, 2012 10:05 a.m. September 11, 2012 Oct. 4, 2012 (Declined) October 18, 2012 November 19, 2012 41 days October 30, 2012 13 days v Anti-Corruption Establishment (ACE): Strengthening restructuring & re-organization of Anti-Corruption Establishment (ACE) Khyber Pakhtunkhwa Information Department: Formulation of Strategic Communication Strategy for Peace Building in Khyber Pakhtunkhwa October 9, 2012 vii TA Implementation Readiness - Southern Area Development Project (SADP) October 17, 2012 viii Initial Support –Southern Area Development Project (SADP) October 19, 2012 Department of Agriculture, GOKP: Reformation & Reorganization of Model Farm Service Centers, (MFSC). December 17, 2012 x Peshawar High Court: Establishment of e-Citizen Grievance Redressal System February 11, 2013 xi Finance Department: Operationalizing Khyber Pakhtunkhwa Public Procurement Regulatory Authority (PPRA) March 8, 2013 PCNA-ISU, GSP, Khyber Pakhtunkhwa Revised CN NOL August 7, 2012 September 01 , 2012 14 Date Revised CN Submitted 4:25 p.m. Home Department: Decision Support System for Provincial Government of Khyber Pakhtunkhwa ii Date Proposal Returned for Revision / NOL issued May 01, 2012 May 20, 2012 iv vi Date When Proposal Send to the Bank October 20, 2012 5:06 p.m. 1:52 p.m. 3:00 p.m 1:47 p.m. 11:00 a.m. 12:30 p.m. 11:00 a.m. May 25, 2012 58 days 68 days November 30, 2012 October 19, 2012 November 13, 2012 January 02, 2013 February 19, 2013 April 21, 2013 January 03, 2013 February 26, 2013 May 02, 2013 15 days 55 days July - Sep 2013 Quarterly Progress Report Service Delivery Result (i) Judicial Academy: Support to operationalization of Judicial Academy Phase-I Indicator 2: At least 2 reform actions implemented NA These sub-indicators will have to be measured for each intervention separately Qualitative result /Service Delivery result* A historic moment in the cotemporary judicial history of the Khyber Pakhtunkhwa Province “A milestone on the way to the rule of law” Training: Conducted first round of training on judgment writing from 27th September 2012 to 1st September 2012 Second round of Trainings has commenced in June Note: 1. Targets are as given in the Emergency Project Paper – April 2011. 2. NA means Not Applicable. 15 PCNA-ISU, GSP, Khyber Pakhtunkhwa Some of the activities in Component-1 will precede this output. Sub-indicators are: (1) Number of governance reforms approved by the Government for implementation (2) Actual implementation of the reforms by the Government. (3) Service delivery result July - Sep 2013 Quarterly Progress Report TABLE 1B: PROJECT LEVEL OUTPUT INDICATORS WITH DATA COLLECTION METHODOLOGY Key Outputs by Project Components Type of Data Data Source/Methodology Frequency of Data Collection Responsibility for Data Collection/Synthesis Component 1: Strengthening of the PCNA Implementation Support Units, provision of Technical Assistance, and Institutional Building of Government Departments Qualitative and quantitative indicators as relevant Indicator 1: PCNA Implementation Support Unit in Khyber Pakhtunkhwa and FATA set up and operationalized Based on Progress Reports detailing target (Annual Work Plan) vs. achievement Semi-annual to MDTF Secretariat PCNA ISUs in KP and FATA Semi-annual to MDTF Secretariat PCNA ISUs in KP and FATA Indicator 2: Overall 10 years Governance Program designed Indicator 3: Five Project Concept Notes developed for interventions Indicator 4: Development Partners Consultative Forum established Indicator 5: Systems established to monitor progress of PCNA program Indicator 6: Five studies completed and disseminated Indicator 7: Ten workshops conducted Component 2: Rapid Response Facility (RRF) Indicator 1:At least 5 Governance Interventions funded in a timely manner Indicator 2: At least 2 reform actions implemented 16 PCNA-ISU, GSP, Khyber Pakhtunkhwa Qualitative and quantitative indicators as relevant Based on Progress Reports detailing target (Annual Work Plan) vs. achievement July - Sep 2013 Quarterly Progress Report TABLE 2: LINKAGE BETWEEN PROJECT LEVEL OUTCOME/OUTPUT INDICATORS AND MDTF/PCNA OUTCOME INDICATORS SO1: BUILD RESPONSIVENESS AND EFFECTIVENESS OF THE STATE TO RESTORE CITIZEN TRUST MDTF/PCNA Level Outcomes 1.1 Citizens have access to avenues to influence government decision making Project Level Outcome/Output Indicators Contributing to the MDTF/PCNA Level Outcomes Relevant Project Component containing the Outcome/Output Indicators 1. Governance program endorsed by the stakeholders Component 1: Strengthening of the PCNA Implementation Support Units, provision of Technical Assistance, and Institutional Building of government departments 2. Key stakeholders successfully included in consultations Remarks This is an outcome indicator This is an outcome indicator Component 1 1.2 Citizens understand their rights and entitlements 1. Development Partners Consultative Forum convened as needed 1.3 There is transparency of, and accountability for the management of public resources 1. Improved transparency and accountability of the PCNA Program Component 1 This is an outcome indicator Component 2: Rapid Response Facility (RRF) This is an outcome indicator SO4: COUNTER RADICALISM AND FOSTER RECONCILIATION MDTF/PCNA Level Outcomes Project Level Outcome/Output Indicators Contributing to the MDTF/PCNA Level Outcomes 4.1 Activities are being implemented in areas previously affected by serious conflict Since the project covers the conflict affected areas output and outcomes under SO1 can be addressed here as a brief narrative 4.2 Civil society oversight of state functions broad and representative Development Partners Consultative Forum convened as needed Key stakeholders successfully included in consultations Relevant Project Component containing the Outcome/Output Indicators All the project components Component 1: Strengthening of the PCNA ISUs, provision of Technical Assistance, and Institutional Building of Government Departments Component 1 17 PCNA-ISU, GSP, Khyber Pakhtunkhwa Remarks This is an outcome indicator This is an outcome indicator 2 Budget Disbursement Total budget of US $ 3.9 Million was earmarked for GSP ISU Khyber Pakhtunkhwa (Both Component 1 & 2). The agreement was amended in May 2012. Additional funds of US $ 500,000 were earmarked for Project Preparation Facility in order to expedite the preparation of a pipeline of projects consistent with the GSP strategy for funding under the MDTF. The revised budget earmarked for GSP ISU Khyber Pakhtunkhwa is now US $ 4.4 Million (PKR 376.256 Million at rate of 85.5128USD) Component wise detail is given below. Component-1: a. Strengthening of PCNA ISU: b. Project preparation facility: $ 2.125 Million $ 1.625 Million $ 0.500 Million Component-2: Rapid Response Facility (RRF): $ 2.275 Million Total: $ 4.400 Million The project closing date has now been extended from June 30 2014 to June 30 2015. An amount of US$ 1,648,166.6800 has been released up to 30.09.2013. Expenditure till 30th September, 2013 is US $ 908,190.8881: (PKR 88.277 million) which is 55.10% of the released amount. Componentwise breakup of the expenditure is given below: 2012-13 US $ Pak Rs. Component1: a. Establishment ISU Goods Consulting Services Incremental Operating Cost Training and Workshop b. PPF Sub Total Component 1 Component 2: Goods Consulting Services Incremental Operating Cost Training and Workshop Sub Total Component 2 Total Expd (Comp I & 2) 18 9.464 13.602 7.146 1.232 0.415 31.859 24.879 4.480 9.177 38.536 70.395 PCNA-ISU, GSP, Khyber Pakhtunkhwa 2013-14 US $ Pak Rs. 0.330 2.647 3.336 2.876 1.123 1.848 11.830 0.399 0.729 1.488 0.855 1.851 1.858 6.052 17.882 Amount (Rs. In Millions) Total since Inception US $ Pak Rs. 0.118 12.110 16.938 10.023 2.355 2.263 43.6689 0.448 0.061 0.179 26.367 0.855 6.331 11.035 44.589 88.277 0.460 0.908 Monthly Progress Report July - Sep 2013 GSP/PCNA CASH INFLOW AND OUTFLOW Monthly Cash Inflow and Outflow since inception of project is given below table and graph. Month March 2012 April 2012 May 2012 June 2012 July 2012 August 2012 September 2012 October 2012 November 2012 December 2012 January 2013 February 2013 March 2013 April 2013 May 2013 June 2013 July 2013 August 2013 September 19 Receipts (Million) Balance as per book 76.953 72.553 70.953 63.220 62.371 59.106 56.866 46.464 45.178 73.251 69.380 64.665 57.316 77.563 71.679 84.881 78.108 73.472 88.277 PCNA-ISU, GSP, Khyber Pakhtunkhwa Progressive Payments (Million) 4.400 6.000 13.733 14.582 17.847 20.087 30.489 31.775 33.630 37.501 42.216 49.565 59.087 64.971 70.395 77.168 81.805 66.999 Monthly Progress Report 3 July - Sep 2013 Project Effectiveness Date 11 Oct 2011 Project End Date 30 June 2015 Last Steering Committee Meeting Date 7th June 2012 Date of Last Audit by AGP Office The audit for the year 2011-12 conducted by DG Audit during Nov. 2012 Date of Last DAC Meeting NA KEY STAFFING POSITION TILL 30th SEPTEMBER-2013 Tick the status as applicable Position Occupied Position Vacant ISU Coordinator X Communications Specialist X Financial Management Specialist X Governance Specialist X M&E Specialist X Procurement Specialist X MIS Specialist X Off farm Economist X NRM Specialist X Infrastructure Specialist X X Social Sector Development Specialist X Two Sectors Specialists (M&E and Infrastructure) on board since 1 st January, 2013. Off farm Economist, NRM and Infrastructure positions are vacant as the relevant specialists have resigned. Social Sector Specialist on board as of 15th February, 2013. Designation 20 PCNA-ISU, GSP, Khyber Pakhtunkhwa Monthly Progress Report 4 July - Sep 2013 ACTIVITIES OF MONTH ENDING 30th SEPTEMBER-2013 4.1 Project Planning: 4.1.1 Concept Notes Component-II Status # Title of CN Amount of CN (Amount in millions) PKR 1 2 3 4 Approved / NOL by Bank 5 6 7 8 CN under preparation by ISU/ Deptt. but not review by PST / R&DC 1 Strengthening the Khyber Pakhtunkhwa Provincial Ombudsman Office Phase-I Support to Operationalize Khyber Pakhtunkhwa Judicial Academy Strengthening, Restructuring and reorganization of AntiCorruption Khyber Pakhtunkhwa PCNA Monitoring and Evaluation through Country System-Strengthening of Directorate of Monitoring and Evaluation, P&D Department KP Phase-I Establishing E-Citizen Grievance Redressal System Programme Peshawar High Court Community Driven Development (CDD) Khyber Pakhtunkhwa Training Programme Strengthening of PPRA KP PKR USD Balance (Amount in millions) PKR USD 96.5391 33.3370 $0.3437 7.874 $0.081 25.4630 $0.2627 21.9404 $0.2262 19.419 $0.200 2.5214 $0.0262 22.2500 $0.2294 6.148 $0.063 16.1020 $0.1664 25.6830 $0.2648 3.334 $0.034 22.3490 $0.2308 26.9550 $0.2779 3.190 $0.033 23.7650 $0.2449 4.6000 $0.0474 4.200 $0.043 0.4000 $0.0044 53.660 $0.5532 0.424 $0.005 53.236 $0.5482 12.0600 $0.1243 24.5150 $0.2527 200.4854 $2.0669 155.8964 $1.6079 Ten Year Governance Support Programme 20.1896 $0.2081 20.1896 $0.2081 Sub Total 20.1896 $0.2081 20.1896 $0.2081 220.6750 $2.2750 176.0860 $1.8160 Reform of Foreign Aid Section and Training Section at P&DD Khyber Pakhtunkhwa Sub Total Total Component II 21 USD 85.5128 Actual Expenditure till 30/09/2013 (Amount in millions) PCNA-ISU, GSP, Khyber Pakhtunkhwa 44.589 44.589 $0.459 $0.459 Monthly Progress Report July - Sep 2013 Component-I Stat us 1 # Description 2 3 Expenditure up to 30/06/2012 Amount of Approved Contracts/ Budget 2012-13 1 USD = PKR 85.5180 1 USD = PKR 85.5180 Actual Expenditure from 1st Jul 2012 to 30/06/2013 PKR (M) USD (M) PKR (M) USD (M) PKR (M) USD (M) 4 5 6 7 8 9 7.8864 0.0837 Requirements during the period 1st May to Jun 2013 1 US$= PKR 97.5824 PKR (M) USD (M) Total Requirement Inception till 2012-13 30-Jun-13 PKR (M) USD (M) PKR (M) USD (M) (8+10) (9+11) (4+12) (5+13) 11 12 13 14 15 (6-8) 10 Total Requirement for the year a. ISU 1 Goods 3.9094 0.0457 1.5693 0.0161 2.3401 0.0296 3.9094 0.0457 11.7958 0.1294 2 Consult 19.5731 0.2289 12.5524 0.1286 7.0207 0.1002 19.5731 0.2289 19.5731 0.2289 i. PCNA Speci 17.8871 0.2092 12.5524 0.1286 5.3347 0.0805 17.8871 0.2092 17.8871 0.2092 NOL By ii. Internal Audit 1.6860 0.0197 1.6860 0.0197 1.6860 0.0197 1.6860 0.0197 Bank 3 IOC 1.2008 0.0130 10.9384 0.1279 5.2689 0.0540 5.6695 0.0739 10.9384 0.1279 12.1392 0.1409 4 Trw & W 0.4462 0.0049 2.8973 0.0339 0.7856 0.0081 2.1117 0.0258 2.8973 0.0339 3.3435 0.0388 4.6467 0.0543 0.4147 0.0042 4.2320 0.0501 4.6467 0.0543 4.6467 0.0543 4.6467 0.0543 0.4147 0.0042 4.2320 0.0501 4.6467 0.0543 4.6467 0.0543 41.9649 0.4907 20.5909 0.2110 21.3740 0.2797 41.9649 0.4907 51.4983 0.5923 b. Project Prep Facility TA for Implementation Read lines of SADP KP 9.5334 Total Component I 0.1016 4.2 Project implementation: 4.2.1 Technical Support to Line Departments and MDTF Projects and Sector Updates Financial Management Specialist 1st July, 2013 Attended MDTF Coordination Meeting at Islamabad. 8th July, 2013 Attended Procurement Committee meeting of UPU along with Procurement specialist on the directions of Secretary P&D Department. 15th to 16th July, 2013 PC-I of GSP ISU revised and approved by PDWP on 16.07.2013 Attended Technical Review Committee meeting of Health Revitalization Project. 22 PCNA-ISU, GSP, Khyber Pakhtunkhwa Monthly Progress Report 18th July, 2013 July - Sep 2013 Conducted Evaluation of the Technical Proposal, submitted by consultant firm for Health Revitalization Project D.I.Khan, Dir Lower and Kohistan. Liaised with Internal Audit (KPMG) 1st to 2nd August, 2013 i. ii. iii. Concept Note of the following project reviewed: Reform Implementation Cell Change Management Unit Chief Foreign Aid Section IFR for the quarter ending 30.06.2013 and sent to the World Bank 3rd August, 2013 Concept Note of the Judicial Academy revised 5th August, 2013 i. Attended the meeting of UPU Enquiry Committee ii. RFPs of UPU for hiring of consultant discussed and finalized as member subcommittee of Departmental Consultant Selection Committee 6th & 7th August, 2013 Pre-audit of bills 8th to 15th August, 2013 As member of the Enquiry Committee, conducted enquiry along with Additional Secretary P&DD. 21st August, 2013 Attended the Department selection Committee Meeting of UPU 26th to 28th August, 2013 Attended three days Workshop on Preparation of Financial Statements arranged by the World Bank at Islamabad. 30th August, 2013 Attended meeting of Technical Evaluation Committee of the Health Revitalization Project 29th to 31st August, 2013 Pre-Audit of bills Social Sector Specialist: 23 Attended presentation regarding Ten Years Governance Plan to the Secretary Planning & Development Department, Government of Khyber Pakhtunkhwa. Attended MDTF Projects coordination meeting held under the Chairmanship of Coordinator PCNA/GSP ISU-KP, organized and conducted at the Implementation Support Unit, where the progress, issues and way forward regarding the MTDF Projects were discussed. Attended Internal meeting regarding ten Years Governance Plan held at Implementation Support Unit FATA. Held a series of meetings with Social Welfare Department regarding development of Concept Note “Strengthening and Capacity Building of Social Welfare Department”. The draft copy has been developed which will be fine tuned and further improved before placing it on the agenda of the Project Scrutiny Team. Developed a Concept Note “Ten Years Governance Plan “and submitted it to the Project Scrutiny Team.” Developed Concept Note “Establishment of Reform Implementation Cell in the Chief Secretary Office”. Facilitated the Anti Corruption Workshop held in Peshawar at Pearl Continental. Held meeting with Secretary Higher Education and Secretary Public Health Engineering Government of Khyber Pakhtunkhwa. PCNA-ISU, GSP, Khyber Pakhtunkhwa Monthly Progress Report July - Sep 2013 Attended Ten Years Governance Program meeting held at World Bank Islamabad. Held a series of meetings with Social Welfare Department regarding development of Concept Note “Strengthening and Capacity Building of Social Welfare Department”. The draft copy has been developed and placed at the agenda of the Project Scrutiny Team. Developed Concept Note “Establishment of Reform Implementation Cell in the Chief Secretary Office”. The concept note has been presented to the PST for onward recommendation to the Review and Decision Committee. The DRC has proposed certain changes in the proposal which have been incorporated and resubmitted to the Committee for approval. Attended pre event meeting at the World Bank Islamabad for finalization of roles and responsibilities that are to be assigned for the Reforms Retreat Workshop. Attended and participated in the two days “Retreat Reforms Workshop” held in Serena Hotel Islamabad. The Concept Note for the Foreign Aid Section was resubmitted to the Coordinator PCNA/GSP after incorporating the suggestions proposed by the Task team Leader, Governance Support Project World bank Held series of meetings with the focal person of the Provincial Ombudsman Office and requested for holding a meeting regarding Technical Evaluation Committee meeting of the Citizen Report Card an activity which will be conducted as a part of the Concept Note in order to get the feedback of the service delivery of the ombudsman Office. The CRC was being kept pending for no reasons by the department. During the meeting the focal person was persuaded to resubmit the request to the Provincial Ombudsman for holing of the Technical Evaluation Committee Meeting for carrying out the survey. However on September 17th, 2013 the meeting of the Technical Committee was convened where the lowest bidder was asked to revised the cost and resubmits the proposal for final approval to the competent authority. Held a series of meetings with Social Welfare Department regarding development of Concept Note “Strengthening and Capacity Building of Social Welfare Department”. The draft copy was reviewed by the committee and returned with few suggestions/observations. The department has been requested to incorporate the suggestions before placing the proposal of the Concept Note to the PST. Held meeting with the Advisor to the Chief Minister for Investment Portfolio regarding developing priority projects for the KP Government in consultation with the line departments. Developed Concept Note “Establishment of Reform Implementation Cell in the Chief Secretary Office”. The concept note has been fine tuned and submitted to the World Bank for according approval. Attended three days workshop “Rethinking GSP” held in Nathia Galli. Attended the MDTF Projects Review meeting with the Secretary planning & Development Department in the Khyber Pakhtunkhwa Secretariat. Attended the MDTF Projects Review meeting with the World Bank Mission and the Secretary Planning & Development Department in the Khyber Pakhtunkhwa Secretariat. The Concept Note for the Foreign Aid Section has been modified and tailored out after incorporating the suggestions proposed by the Task team Leader, Governance Support Project World Bank. The Concept Note has been submitted to the Bank for approval. Accomplished the tasks that are assigned in handing the day to day office work. Communication Specialist: S.No 24 Activity PCNA-ISU, GSP, Khyber Pakhtunkhwa Action Monthly Progress Report July - Sep 2013 1 RTI Re-examined draft RTI with Secretary Information after approval of the Cabinet. Draft RTI prepared by International Expert with support of WB was discussed with the Chief Secretary GoKP and approved from CS. Revised RTI was circulated to Provincial Ministers for approval. 2 Booklet for Chief Minister Prepared Development priorities booklet for Chief Minister Khyber Pakhtunkhwa on the request of Secretary P & DD. The Booklet is under review with Government and will be published after approval. 3 Strategic Communication Cell at CM Office Provided Technical Support to the Provincial Information Department (Preparation of TORs for Cell) 4 Communication Coverage Provided Communication coverage to ACE Workshop on Policy Input for Development of Anti Corruption Strategy Prepared TORs for Communication Officer 5 Newsletter Prepared Material for newsletter. Newsletter is in process of Publishing. 6 PSP Programme on Communication Communication activities under PSP Programme were discussed in a meeting with Secretary Information and Director Information. Communication Team of Coffey International presented the progress. 7 RTI 25 PCNA-ISU, GSP, Khyber Pakhtunkhwa Revised draft RTI Act 2013 was discussed with Chief Secretary and Cabinet members approved the RTI Act 2013.The Governor Khyber Pakhtunkhwa has signed the RTI Ordinance on August 13,2013. Number of Meetings was held with Secretary Information for launching of RTI in big event and plan was made to give wide publicity the RTI Act 2013. CN for RTI publicity/launching event was prepared. RTI launching event was organized with the support of Provincial Information Department and Change Management Cell. The launching event was held in PC Hotel Peshawar in which Chief Minister, Chief of PTI Imran Khan, Provincial Ministers, Chief Secretary, Secretaries, DGs, Lawyers, Judges, Police Officers, NGOs, Journalists, Civil Societies attended the event. The event was given wide publicity in print and electronic Media. Another event was also organized in Islamabad for awareness of Diplomats, Development Partners, Journalists and Civil Society with the financial support of an NGO. Monthly Progress Report July - Sep 2013 Khyber Pakhtunkhwa Priorities Reforms Results Retreat 8 Provided Technical Support to organizing the Results Retreat in Serena Hotel Islamabad. Recorded interviews of different personalities being engaged in different Working Groups. 9 Newsletter 6th Newsletter was published and circulated among the stakeholders. 10 PSP Programme Need Analysis of the Provincial Information Department was carried out with Communication lead of PSP programme. 11 Interview A detailed Report on GSP/PCNA intervention was broadcasted on Radio Dewa (VOA) 12 Awareness Activity on Radio Mezan (Peshawar High Court) Radio Meezan was visited and discussed in details the content of different programmes under CN of Peshawar High Court Peshawar. Technical input was given and Program was monitored which was going very well. 13 GSP Rethinking Retreat Participated in three days GSP Rethinking Retreat in Muree/Nathia Gali. Recorded Interviews of the Participants. Provided technical inputs in the Retreat. Given technical input in preparation of presentation. 14 Podcasting KP Ombudsman Podcast uploaded on Website 15 PSP Programme A Meeting of Aitbar team (PSP) and Director Information were arranged and facilitated. Certain concrete measures like time line and support under PSP were discussed. 16 Visit to Tanzania The Coordinator GSP and Communication Specialist have visited the Arusha Tanzania for two weeks training in ESAMI Arosha Tanzania on Strategic Communication MIS Specialist: Activities 26 Description PCNA-ISU, GSP, Khyber Pakhtunkhwa Monthly Progress Report PCNA website design and development Line Departments – Concept Notes and Technical Support 27 July - Sep 2013 Performed PCNA website (www.pcna.gkp.pk) administration, development and web content being updated on day-to-day basis. i. Collected data/information from respective sector specialist for the PCNA website and uploaded the information. a. Uploaded TORs, EOIs, Jobs ii. Improved PEFA rating of the website Technically lead, developed and Implementation support to following Line Departments Concept Notes: Line Departments Concept Notes Focal Person CN Status Chief Minister Secretariat , Government of Khyber Pakhtunkhwa Establishing Government Complaint Redressal System (GCRS) Dilroze Khan, Chairman CMCRC (Chief Minister’s Complaint & Redressal Cell) In process with PST Chief Secretary Office, Gov. of Khyber Pakhtunkhwa Establishing Citizen Feedback Model (CFM) Siraj ul Haq Deputy Secretary Aviation Administration Department Submitted for Bank’s NOL A meeting was held with the Zubair Bhatti for the discussion on CFM (Citizen Feedback Model) in WB office. Participated in presentation given to Chief Minister on CFM in CM House KP. P&D Department Establishment of e-P&D Department , Khyber Pakhtunkhwa Khaliq Sb, Incharge Resource Center In process with R&DC PCNA-ISU, GSP, Khyber Pakhtunkhwa Monthly Progress Report July - Sep 2013 Technical input given to the Concept Notes: Assisted and Technical Evaluation in Procurement of Hardware/Software Line Departments Concept Notes Delivered Foreign Aid, P&DD Strengthening Foreign Aid (Donor Coordination Wing), P&DD Developed TORs for the ICT Human Resource Provided technical evaluation and quality assurance in procurement process to following Line Departments Line Departments Peshawar High Court Concept Notes e-Citizen Grievances Redressal System Focal Person Director HRD Directorate of M&E Concept Notes Strengthening of Directorate M&E Focal Person 28 Developed Cost estimation for the ICT resources Procurement Activities o MIS Consultancy Firm TOR’s have Bank’s NOL and advertised. o MIS Consultancy Firm is shortlisted and RFP send to top Firm. The firm expected to be onboard by 1 st week of October 2013 o Call Center Agents interview conducted and short listed. o Call Center Agents hired o Procured all Goods except Servers o Number of meetings held regarding above activities with: Director HRD BPR Consultant Peshawar High Court Procurement personals Accountants and IT Manager Technical support in selection of MIS/DPMS Consultant Firm o RFP submitted by the consultancy firm, evaluated and negotiated in coordination with the Procurement Specialist. o Contract signed with the consultancy firm. o MIS Consultancy firm is on board and in process of finalization of Requirements document for the development of DPMS M&E MIS. o Number of meetings held with the consultancy firm PCNA-ISU, GSP, Khyber Pakhtunkhwa Monthly Progress Report July - Sep 2013 Director Evaluation regarding system analysis and requirements gathering. The member of the committee are: Akhtar Shahzad (DBA M&E) Web Administrator (M&E) Mazhar Amir (MIS GSP-KP) Khaliq sb (In-charge Resource Center, P&DD) Waqar Khan (Procurement Specialist) Support to ISU Team Provided technical support in solving problems and helping other Sector Specialist in IT related issues on day-to-day basis. IT Support Support to CMU (Change Management Unit) and RIC (Reforms Information Cell) P&D Department, Peshawar. Developed various Presentations, booklets and documents in support to CMU and RIC unit of P&D Department Participated and facilitated as Member of E-Government Working Group Support to RTI (Right to Information) GoKP, Peshawar. Developed various Presentations Participated RTI seminars and workshops Other Activities Prepared and coordinated in Mapping exercise Performed as Member PST (Project Scrutiny Team) Performed as Member Short Listing Committee M&E Specialist: Sr.# Activities Action/output 1. Annual Review of Foreign Aided Project Drafted a report for the Foreign Aid office for Annual Review of ADP 2013-2014. 2. Concept Matrix 3. notes - Results Developed Results Matrix for Concept Notes: MDTF Advisory Committee Establishing Government Compliant Redressal System Establishing e-P&DD Reforms Implementation Cell Change Management Unit Held meetings with ISU FATA for preparation of combined presentation on mapping methodology Shared brief of presentation with coordinator ISU 4. Concept Notes Indicators 29 Held sessions with implementing partners and shared the indicators templates for reporting on qualitative indicators PCNA-ISU, GSP, Khyber Pakhtunkhwa Monthly Progress Report 5. Meetings July - Sep 2013 Held individual sessions with Anti- Corruption Establishment staff and e-Citizen Grievance Redressal Staff Participated in weekly meeting of Ten Years Governance program Organized and participated in MDTF Coordination Committee Monthly meetings. Drafted and circulated minutes of meeting Organized and participated in GSP Coordination Committee monthly meetings. Drafted and circulated minutes of meeting. Participated in the Strategic Development Partnership Framework meeting held at KPK house Islamabad Coordinated and facilitated preparation for GSP Results Retreat Acted as moderator for the e-Governance working group in finalization of action plan for the Government of Khyber Pakhtunkhwa results retreat Procurement Specialist: 30 Finalized draft contract for hiring of consultants firm on “Enhancement of DPMS” for Directorate General M&E,KP Took part in the Short listing and Interview process of hiring “Institutional Development Specialist (Domestic)” for Provincial Ombudsman Office, KP. Evaluation of EOIs made, submitted by various firms for the assignment “Citizen Score Cards” for Ombudsman Office KP being member Procurement Committee. Took part in the interview process of Call Centre Agents for Human Rights, Directorate, Peshawar High Court. Finalized draft contract for hiring of consultants firm on “Sale tax on Services” for KP PPRA Finalized Terms of Reference for hiring consultants firm on “MIS/Software Development” for Peshawar High Court. Facilitated the Internal Audit firm of KPMG in the internal audit of GSP ISU KP. Input provided in the preparation of Concept Note for the Foreign Aid Wing of P&D Department. Input provided in the preparation of Concept Note “E- P&D, Khyber Pakhtunkhwa”. Represented GSP ISU in the Evaluation of Technical and Financial Proposals of the MDTF project namely “ Revitalizing Health Services in KP” Compilation of procurement data on prescribed format for the monitoring of activities through Caliper. Prepared draft contract for hiring the services of consultants firm for the assignment, “Restructuring/re-organization of Anti Corruption Establishment” Input provided in the preparation of Concept Note for “Change Management Unit (CMU)”. Finalized long list & short list of sector specialists for GSP ISU. Input provided in the preparation of Concept Note for “10 years governance program”. PCNA-ISU, GSP, Khyber Pakhtunkhwa Monthly Progress Report July - Sep 2013 Input provided in the preparation of Concept Note for “Foreign Aid”. Input provided in the preparation of Concept Note for establishing Citizen Feedback Model (CFM), KP. Evaluation of EOIs made , submitted by various firms for the assignment “Citizen Score Cards” for Ombudsman Office KP being member Procurement Committee. Finalized draft advertisement for hiring of various positions in KPPRA. Finalized draft advertisement for hiring of Finance Officer in GSP ISU KP. Finalized RFPs for hiring consultants firm on “MIS/Software Development” for Peshawar High Court. Facilitated the Internal Audit firm of KPMG in the internal audit of GSP ISU KP. Input provided in the preparation of Concept Note for the Foreign Aid Wing of P&D Department. Input provided in the preparation of Concept Note “E- P&D, Khyber Pakhtunkhwa”. Represented GSP ISU in the Evaluation of Technical and Financial Proposals of the MDTF project namely “ Revitalizing Health Services in KP” 4.2.2 Ombudsman 4.2.2.1 Complaints: Complaints figures have not been shared by the deadline i.e. July 6, 2013. 4.2.3 Anti-Corruption Establishment 4.2.3.1 Complaints Status 5 Procurement management and contract administration Table 2 Status of Procurement PCNA ISU KP PROCUREMENT STATUS OF PCNA GSP ISU KHYBER PAKHTUNKHWA-Sep 2013 S. N o A Contract signed or to be signed as per Procurement Plan Plan ed Valu e Expect Actua ed Status as per the Procurement l Signat Plan; Next step Value ure date Goods PAK Rs. (M) PAK Rs. (M) PCNA ISU 31 PCNA-ISU, GSP, Khyber Pakhtunkhwa Monthly Progress Report July - Sep 2013 1 Two Vehicle for PCNA ISU 3.50 0 3.538 Signed Completed 2 IT Equipments for PCNA ISU 4.72 0 4.068 Signed Completed 3 Furniture for PCNA ISU 1.20 0 0.73 Signed Completed 4 Electric Appliance for PCNA ISU 2.00 0 0.376 Signed Completed 5 Office Peripherals for PCNA ISU 1.40 0 0.489 Signed Completed 6 IT Equipments for new office PCNA ISU 1.08 0 0.732 Signed Completed 7 Office Peripherals for new office PCNA ISU 0.26 0 Signed Completed 8 Electric Appliance for new office PCNA ISU 2.15 2 0.668 Signed Completed 9 Furniture for new office PCNA ISU 1.10 8 0.961 Signed Completed 0 .18 6 Judicial Academy Khyber Pakhtunkhwa 1 IT Equipments for Judicial Academy 6.12 0 8.296 Signed Completed 2 Electric Equipments for Judicial Academy 2.24 0 2.445 Signed Completed 3 Office Peripherals for Judicial Academy 2.54 5 0.399 Signed Completed 1.880 Signed Completed Ombudsman Office Khyber Pakhtunkhwa 1 IT Equipments for Ombudsman Office 3.120 2 Electric Equipments for Ombudsman Office 1.300 3 Office Peripherals for Ombudsman Office 1.855 32 Under progress 1.871 PCNA-ISU, GSP, Khyber Pakhtunkhwa Signed Completed Monthly Progress Report 4 Furniture & Fixture July - Sep 2013 1.100 1.100 Signed In Progress DG M&E Khyber Pakhtunkhwa 1 IT Equipments for DG M&E 0.645 0.602 Signed Completed 2 Furniture for DG M&E 0.300 0.299 Signed Completed Anti Corruption Establishment(ACE) Khyber Pakhtunkhwa 1 IT Equipments for ACE 7.800 5.056 Signed Completed 2 Office Peripherals for ACE 1.050 0.924 Signed Completed 3 Equipment/Software for ACE 3.000 Under progress Peshawar High Court eCitizen Grievance 1 IT Equipment for PHC 7.710 Under progress 2 Office Peripherals for PHC 1.545 Under progress 3 Electric Equipment for PHC 0.150 4 Furniture & Fixture for PHC 1.100 B Consultancy services 0.154 1.099 Signed Completed Signed Completed Contract has been made with KPMG Taseer Hadi & Co.The firm Prepared draft audit Plan and is in the process of audit of GSP ISU and MDTF projects. PCNA ISU 1 Hiring of consultancy firm for Internal Audit 9.62 7 9.627 Signed 2 TA-Implementation Support to KP-SADP 4.14 6 4.146 Signed Contract under execution Ombudsman Office Khyber Pakhtunkhwa 1 Perception Surveys and Citizen Scorecards for Ombudsman Office 2.000 DG M&E Khyber Pakhtunkhwa 33 PCNA-ISU, GSP, Khyber Pakhtunkhwa By Oct, 2013 RFP has been sent to Top ranked firm for submitting Technical and Financial proposals Monthly Progress Report 1 DPMS Development and Strengthening(Lump Sum) for DG M&E July - Sep 2013 5.000 5.00 Signed Contract under execution Anti Corruption Establishment(ACE) Khyber Pakhtunkhwa 1 Strengthening,Restructuring and Reorganization of ACE C Individual consultants 4.000 5.000 Signed Contract under execution PCNA ISU 1 Procurement Specialist 9.45 8 Signed Completed 2 Financial Management Specialist 9.45 8 Signed Completed 3 Communication Specialist 9.45 8 Signed Completed 4 NRM Specialist 9.45 8 Signed Vacant due to resignation. Advertisement floated in National Dailies. Interviews to be conducted shortly 5 MIS Specialist 9.45 8 Signed Completed 6 Off Farm Economist 9.45 8 Vacant due to resignation. Advertisement floated in National Vacant Dailies. Interviews to be conducted shortly 7 Governance Sector Specialist 9.45 8 Vacant Vacant. Advertisement floated in National Dailies. Interviews to be conducted shortly 8 Infrastructure Specialist 9.45 8 Signed Vacant due to resignation. Advertisement floated in National Dailies. Interviews to be conducted shortly 9 Monitoring & Evaluation Specialist 9.45 8 Signed Completed 1 Social Sector Specialist 9.45 Signed Completed 34 PCNA-ISU, GSP, Khyber Pakhtunkhwa Monthly Progress Report 0 July - Sep 2013 8 Ombudsman Office Khyber Pakhtunkhwa 1 Institutional Development Specialist for Ombudsman Office 1.500 1.500 Signed Contract under execution 2.160 2.160 Signed Contract in progress By October ,2013 Contract will be made Top Ranked firm shortly Signed Contract under execution Peshawar High court 1 BPR Consultant 2 Development of Management Information System(MIS) 4.500 KPPPRA 1 Sales Tax on Services 35 2.700 2.700 PCNA-ISU, GSP, Khyber Pakhtunkhwa Monthly Progress Report July - Sep 2013 Table 3: Cumulative Information on procurement and contract administration Concept Notes Approved by R&DC from day 1 till the end of September 2013 Total contracts awarded from day 1 till the end of September Total contracts completed from day 1 till the end of September Contracts under execution Number Amount Number Amount Number Amount Number 12 Rs 294.898 M 16 Rs 34.709 13 23.349M 4 Remarks Amount Rs 11.36 M Table 4: Status of withdrawal applications from day 1 till the 30th September 2013 Date of submission to the bank (dd/mm/yy) Amount requested Date of approval/disbursement by the bank (dd/mm/yy) Amount approved/released Amount withheld 1st Withdrawal application $ 848,000 01/03/2012 $ 848,000 - $ 319,000 20/12/2012 $ 308,216.67 $ 107,83.33 $ 302,950.01 17/04/2013 $ 302,950.01 $ 10783.33 02/02/2012 2nd Withdrawal application 22/11/2012 3rd Withdrawal application 19/03/2013 adjusted in the withdrawal application 4th Withdrawal Application June 2013 $ 189,000 June 2013 $ 189,000 Table 5: Fund management status during the month of September 2013 MDTF grant disbursed by the bank during this month - Cumulative MDTF grant disbursed from day 1 till the end of May 2013 Total fund contracted (total amount of contracts signed) during May 2013 $ 1,648,166.68 Total expenditure during the month Cumulative expenditure from day 1 till the end of May 2013 $64,792.4149 $908,190.881 RS 6,472,700 RS 88,277,328 Table 6: Status of fund management RS in million ii iii iv Vi vii viii 116.02 150 76.953 76.953 11.62 13.733 64.971 PCNA-ISU, GSP, Khyber Pakhtunkhwa ix 47.54% Cumulative expenditure to funds committed (viii/vx100) I Cumulative expenditure to cumulative disbursement (viii/ivx100) Cumulative expenditure grant Total expenditure during the year MDTF Total fund contracted (total amount of contracts signed) Cumulative disbursed 36 MDTF grant disbursed by the bank during the year 2011-12 Budget Allocated for the year Allocation as per PCI for the year Fiscal year % X Monthly Progress Report July - Sep 2013 2012-13 106.472 156.180 78.324 155.277 2013-14 207.813 246.700 - 155.277 72.996 56.6627 17.881 88.277 56.85% Note: Assistance taken from Financial Management Specialist (Table 4, 5, 6) and Procurement Specialist (Table 2, Table 3, Table 6-vi) in collection of data and analysis. 6 RISKS MITIGATION ACTIONS Major risks have not been yet indentified. Funds allocated under RRF are however, not sufficient to meet the urgent requirements of the implementing partners. Prepared By: Pir Imran Reviewed By: Omer Khan M&E Specialist Coordinator 37 PCNA-ISU, GSP, Khyber Pakhtunkhwa