Revised 1/21/11 C. Technology Resources (e.g. Computers and

advertisement
Revised 1/21/11
C. Technology Resources (e.g. Computers and computer related equipment, equipment, laboratory
equipment, web-based tools, software, and multimedia equipment)
1) Please describe the technology resources used by the program.
Discussion and Analysis:
Housed in many different buildings, the I&T Division offers a variety of
technology resources designed to augment student educational goals.
Buckeye Building #6: Room 401 has 20 student computers, 1 instructor
computer, a larger format scanner, small desktop scanner, LCD projector,
lamination machine, binding machine, large light table, small light table, and 2
printers. Room 403 has 20 student computers, 1 instructor computer, a small
desktop scanner, LCD projector, and 2 printers. Room 204A has 40 student
computers, 1 instructor computer, an LCD projector and a printer. The computer
software utilized in the student classrooms / labs includes Graphisoft ArchiCAD,
Autodesk AutoCAD, Autodesk AutoCAD Architecture, SolidWorks, SketchUp,
Adobe Illustrator, Adobe PhotoShop, Adobe InDesign, and Adobe Maya. All
technology resources are maintained by Computer Services. Maintenance
includes installation of software, operating systems, and upgrades to campus
standards. Computer refreshes occur during the summer and are pre-scheduled by
Computer Services. Rooms 402A and 402B have student computers and an LCD
projector. All computers are currently running up-to-date training simulators with
6 design software programs. Rooms 412 and 408 have LCD projector, 3
programmable logic computer control units, and 1 cart mounted laptop. Room
408/412 have three network connected computers. There are eight other
computers in the rooms that are used for various trainers. The eight have
proprietary software that is used. The software is twenty years old but works
perfectly. Room 405 has an overhead projector and a DVD/VHS player, a large
format plotter, large format plan copier, an overhead projector, and 24 computers
with Autodesk AutoCAD Architecture and links to construction industry journals.
Within this building there are 6 faculty offices each equipped with computers and
some have office printers.
Cedar Building #7: Rooms 421 and 424 have smart classrooms with projectors,
smart boards, cameras, and audio capability. Room 421 has 24 Apple MAC
student computers and 4 instructor computers. Room 424 has 32 PC student
computers and 2 instructor computers. Three additional servers are in an upstairs
storage area. About 90 computers and 20 printers are stored in room 421 and are
used in various classes. Room 422 (laboratory) has a portable projector and screen
and has 20 laptops. Room 423 (classroom) has an overhead projector and sound
system. Programs used in automotive courses are; “Mitchel On Demand”,
“AllData Systems”, and “IdentiFix”. Faculty offices in room 422 also have two
PC’s. Room 425 has 1 classroom lab with no computer . Within this building
there are 7 faculty offices each equipped with computers and some have office
III.C. Technology Resources/ Academic Program Review
Page 1 of 11
Revised 1/21/11
printers. One of these offices serves as the division office and houses the division
copy machine.
Kaweah Building #29: Room 204A has 40 student computers, 1 instructor
computer, several printers, and an LCD projector. The part-time division
secretary is housed in this building. This office is equipped with a computer and
printer.
Buckeye Building room 408: Room 408 has three internet connected computers
that are part of the campus network and that students use for classroom research
assignments. There is a combination VHS/DVD player and display unit in the
classroom. The room has six motor control trainers that each have computer that
operate them. There are six Dell laptop computers that are used for programming
the industrial controllers that are part of the curriculum that is taught is this room.
There are six other desktop computers used at various trainers throughout the
room. The principle program used is RSLogix from Rockwell software, and it is
the free demo version
Blue Sky Aviation Building: The Aeronautics Program has no computers
available for student use since the classes take place at Blue Sky Aviation in
Tulare.
TCOVE Building, Hanford Vocational Education Building, and Bakersfield
Associated Builders and Contractors (ABC): The Electrician Program has no
classroom computers available for student use.
Agriculture Building Laboratory: Room 2001 has no student computers. A
dedicated laptop is used along with an LCD projector for instructional PowerPoint
presentations, and a dedicated computer is used to operate a plasma cutting
system. Many of the welding apparatuses used in the shop have computerized
controls. This room also houses the faculty office with computer and printer.
2) Please provide an analysis of the utilization and effectiveness of technology
resources. Include any accessibility issues.
Discussion and Analysis:
Buckeye Building #6: Rooms 401 and 403 utilize cutting-edge technology
resources including computers and software. The students are well served by this
technology and the knowledge it brings. These rooms are open Fridays as part of
an open lab environment. This greatly improves accessibility for students.
Rooms 402A and 402B are current in their technology resources and software.
All computers are currently running up-to-date training simulators and 6 design
software programs. The students have the same software available for use in the
library and the Hanford Center campus, providing students with easy access for
additional training after class hours. The instructor utilizes lab training videos
III.C. Technology Resources/ Academic Program Review
Page 2 of 11
Revised 1/21/11
available on iTunes to view lecture/ lab demonstrations. The LCD projector
needs to be replaced to view these lab training videos. Room 405 computers
allow students to utilize industry standard construction control programs for
inventory and building progress management. These programs give the CT
students a very good technology experience as part of the CT curriculum. New As
part of the college’s implementation policy when the Pharos System was installed
all existing printers were removed without consulting instructors. This resulted in
the loss of our 11x17 format laser printer. Due to this, an upgrade is needed to a
new multi-size format laser copier printer to meet industry standards of size and
quality for building plan sets and portfolios. Rooms 408 and 412 have computers
that are fully utilized daily. However 10 additional computers are needed to fully
serve student’s needs. Industry training demands have increased in the area of
programmable logic and motor drives, presenting a critical need for the addition
of 6 new laptop computers to give all students this vital industry-based training.
Faculty offices equipped with computers and printers are utilized by both fulltime and adjunct faculty and are effective for teaching resources.
Cedar Building #7: Rooms 421 and 424 can serve as lab or lecture classrooms.
Both rooms have adequate space, but are crowded at the current enrollment rates.
The equipment is adequate for the instruction of computer repair and networking
courses. This room also accommodates multiple open lab sessions where students
may gain access to the technology to complete classroom assignments. In
addition, this classroom is also utilized by the Computer Club for multiple
industry related club activities. Equipment for the CISCO curriculum is outdated
and inadequate. At present we are using simulator software to fill the gap, but
simulation software fails to give completers real-world experience. Rooms 422
and 423, laboratory and classroom respectively have limited space for students
and equipment. Equipment is outdated and does not run some current software
programs. Room 425 (Wood Shop) the equipment in the wood shop is utilized to
teach fundamentals of machine operations for millwork and cabinet construction
the nature of the dust in the lab is not compatible with keyboards and computers.
The lecture portion of the millwork and cabinet design are done in room 405.
Faculty offices equipped with computers and printers are utilized by full-time
faculty, adjunct faculty, and the part-time division secretary and are effective for
teaching resources.
Kaweah Building #29: Room 204A utilizes cutting-edge technology resources
including computers and software. The students are well served by this
technology and the knowledge it brings. The part-time division secretary office is
equipped with a computer and printer which serve the needs of the division.
Bly Sky Aviation Building: The Aeronautics Program has limited access to
technology resources since both programs are mostly offered off campus.
Because the program is limited in numbers, Blue Sky Aviation provides all of the
computer and other technology necessary for students to utilize.
III.C. Technology Resources/ Academic Program Review
Page 3 of 11
Revised 1/21/11
TCOVE Building, Hanford Vocational Education Building, and Bakersfield
Associated Builders and Contractors (ABC): The Electrician Program contains
numerous laboratory activities involved with NCCER certification. The district
provides all of the tools and supplies necessary for the students to complete these
certification assignments to become NCCER certified.
Agriculture Building Laboratory: Room 2001 lacks any student computers.
Effective use of many computer aided welding apparatuses is at industry levels.
These include computerized plasma cutting systems and computer controlled
orbital GTAW welding apparatus. The welding lab is used for instruction six
days a week and five nights a week. The faculty office is equipped with computer
and printer that are utilized by both full-time faculty and adjunct faculty, and are
effective for teaching resources.
Room 408 is adequately serviced with technology resources for this year.
3) Please describe any progress in achieving program plan measurable outcomes
or implementing your program plans in Technology Resources from your
previous Program Review and Annual Updates. Describe alternative solutions to
achieve the measurable outcomes for your program plans.
Discussion and Analysis:
Since the last Program Review and Annual Update the I&T Division has made
progress in achieving program plan outcomes in technology resources. The
following represents the technology resources obtained by each program: The
Architecture, Drafting Technology, and Graphic Design Programs have acquired
a new large format plotter, a new large format scanner, and a small desktop
scanner. The Environmental Control Technology Program has obtained an
upgraded energy management system for the environmental controls classes and
continues to add video lab demonstrations to assist students. The Electronics and
Information Technology programs have acquired several updated switches and
routers for the CISCO program. The Electronics and IT programs are relying on
discarded district computers for its labs. The Automotive Program has acquired
an on-car brake lathe for turning brake rotors on the vehicle. We have also
acquired a virtual laboratory program for our core course offerings. Construction
Technology Program has acquired a computer refresh for room 405 . The
Aeronautics Program has acquired two new helicopters, classroom facility and
computers to support students. The Electricians Program has acquired new
equipment such as conduit benders, electrical instrumentation and other supplies
necessary for NCCER Certification. The Welding Program has acquired four new
Lincoln L35 GMAW welders, Simco Plasma Cam Cutting System, and used three
ton Toyota forklift.
The I&T Division, utilizing the program plan process identified needs and have
utilized VTEA and Above Base Budget Funding processes to meet some program
plans in technology resources. This division’s greatest strength is its close ties to
III.C. Technology Resources/ Academic Program Review
Page 4 of 11
Revised 1/21/11
the industry it trains students to enter. These ties are built and maintained by the
faculty members. These close relationships have resulted in many donations of
technology resources and material. These donations and alternative funding
sources have allowed for the completion of multiple program plans.
4) Please describe your program’s plans for Technology Resources (plan
description, responsible party, resources needed, plan timeline, measurable
outcomes, indicate if a plan supports a strategic plan). Your plans should be
prioritized within each year.
Year 1
Plan Description
1.Scheduling time for use
of Ag Division computer
lab.
2. Upgrade Architecture
Department computer
software
3. Upgrade Drafting
Technology computer
Software
4. Upgrade Graphic
Design computer
Software
5. Obtain additional
laptop computers.
Responsible
Party(s)
Frank Tebeau
and Ag Director
Resources
Needed
Scheduling with
Ag Division
Director
Plan
Timeline
Fall 2011
Measurable
Outcomes
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Rolando
Gonzalez
Apply for VTEA
funding.
Summer 2011
Tim Hollabaugh
& Ray Larson of
Computer
Services
ArchiCAD: None
AutoCAD
Architecture:
$5,500
SketchUp: $1,285
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
Summer 2011
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
Summer 2011
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
Fall 2011
Improves
productivity,
quality, and
knowledge of
instructors and
Yes, supports
strategic plan.
Item I A, II B
and IV C
Rolando
Gonzalez
Plus additional
resources per
Computer
Services.
Apply for VTEA
funding.
Tim Hollabaugh
& Ray Larson of
Computer
Services
SolidWorks: $498
Rolando
Gonzalez
Apply for VTEA
funding.
Tim Hollabaugh
& Ray Larson of
Computer
Services
Maya: $1,800
Scott Williams,
division chair,
and area dean
Plus additional
resources per
Computer
Services.
Plus additional
resources per
Computer
Services.
Apply for VTEA
and Above Base
Budget Funding.
III.C. Technology Resources/ Academic Program Review
Strategic Plan
Yes, meets
strategic plan
number I A, I C,
and IV C
Page 5 of 11
Revised 1/21/11
students.
6. Obtain a computer and
projector that can be used
during lecture and
displayed on white board.
Scott Williams,
division chair,
and area dean
Apply for VTEA
and Above Base
Budget Funding.
Fall 2011
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
7. Obtain computers able
to run current server
software.
John Winterton,
division chair,
and area dean
To be determined
by Computer
Services
Fall 2011
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
8. Obtain server software
John Winterton,
division chair,
and area dean
To be determined
by Computer
Services
Fall 2011
Yes, supports
strategic plan.
Item I A, II B
and IV C
9. Improve infrastructure
By rewiring rooms 421
and 424 with CAT 6
wiring and 1000 GB
switches.
John Winterton,
division chair,
and area dean
To be determined
by Computer
Services
Fall 2011
10. Obtain equipment
For instruction in
microcontroller
instruction.
John Winterton,
division chair,
and area dean
Apply for VTEA
and Above Base
Budget Funding.
Fall 2011
Improves
productivity,
quality, and
knowledge of
instructors and
students
Improves
productivity,
quality, and
knowledge of
instructors and
students
Improves
productivity,
quality, and
knowledge of
instructors and
students
Responsible
Party(s)
Frank Tebeau
and Ag Director
Resources
Needed
Scheduling with
Ag Division
Director
Plan
Timeline
Fall 2012
Measurable
Outcomes
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Rolando
Gonzalez
Summer 2012
Tim Hollabaugh
& Ray Larson of
Computer
Services
Apply for VTEA
funding.
ArchiCAD: None
AutoCAD
Architecture:
$5,500
SketchUp: $1,285
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
Rolando
Gonzalez
Plus additional
resources per
Computer
Services.
Apply for VTEA
funding.
Summer 2012
Tim Hollabaugh
SolidWorks: $498
Improves
productivity,
quality, and
knowledge of
Yes, supports
strategic plan.
Item I A, II B
and IV C
Yes, supports
strategic plan.
Item I A, II B
and IV C
Yes, supports
strategic plan.
Item I A, II B
and IV C
Year 2
Plan Description
1. Reschedule time for
use of Ag Division
computer lab.
2. Re-request upgrade
Architecture Department
computer software
3. Re-request upgrade
Drafting Technology
computer Software
III.C. Technology Resources/ Academic Program Review
Strategic Plan
Yes, meets
strategic plan
number I A, I C,
and IV C
Page 6 of 11
Revised 1/21/11
& Ray Larson of
Computer
Services
4. Re-request upgrade
Graphic Design computer
Software
Rolando
Gonzalez
Tim Hollabaugh
& Ray Larson of
Computer
Services
Plus additional
resources per
Computer
Services.
Apply for VTEA
funding.
instructors and
students.
Summer 2012
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
Fall 2012
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
Maya: $1,800
5. Obtain additional
laptop computers.
Scott Williams,
division chair,
and area dean
Plus additional
resources per
Computer
Services.
Apply for VTEA
and Above Base
Budget Funding.
6. Begin to replace
antiquated Motor Control
trainers.
Scott Williams,
division chair,
and area dean
Apply for VTEA
and Above Base
Budget Funding.
Fall 2012
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
7. Obtain laptop
computers running
windows latest operating
system for use in all
classes.
John Winterton,
division chair,
and area dean
To be determined
by Computer
Services
Fall 2012
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
8. Obtain servers
John Winterton,
division chair,
and area dean
To be determined
by Computer
Services
Fall 2012
Yes, supports
strategic plan.
Item I A, II B
and IV C
9. Improve infrastructure
By rewiring rooms 421
and 424 with CAT 6
wiring and 1000 GB
switches.
John Winterton,
division chair,
and area dean
To be determined
by Computer
Services
Fall 2012
10. Obtain equipment
For instruction in
microcontroller
instruction.
John Winterton,
division chair,
and area dean
Apply for VTEA
and Above Base
Budget Funding.
Fall 2012
Improves
productivity,
quality, and
knowledge of
instructors and
students
Improves
productivity,
quality, and
knowledge of
instructors and
students
Improves
productivity,
quality, and
knowledge of
instructors and
students
Responsible
Party(s)
Frank Tebeau
and Ag Director
Resources
Needed
Scheduling with
Ag Division
Director
Plan
Timeline
Fall 2013
Yes, supports
strategic plan.
Item I A, II B
and IV C
Yes, supports
strategic plan.
Item I A, II B
and IV C
Year 3
Plan Description
1. Reschedule time for
use of Ag Division
computer lab.
III.C. Technology Resources/ Academic Program Review
Measurable
Outcomes
Improves
productivity,
quality, and
knowledge of
Strategic Plan
Yes, meets
strategic plan
number I A, I C,
and IV C
Page 7 of 11
Revised 1/21/11
instructors and
students.
2. Re-request upgrade
Architecture Department
computer software
3. Re-request upgrade
Drafting Technology
computer Software
Rolando
Gonzalez
Apply for VTEA
funding.
Tim Hollabaugh
& Ray Larson of
Computer
Services
ArchiCAD: None
AutoCAD
Architecture:
$5,500
SketchUp: $1,285
Rolando
Gonzalez
Tim Hollabaugh
& Ray Larson of
Computer
Services
4. Re-request upgrade
Graphic Design computer
Software
Rolando
Gonzalez
Tim Hollabaugh
& Ray Larson of
Computer
Services
Plus additional
resources per
Computer
Services.
Apply for VTEA
funding.
Summer 2013
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
Summer 2013
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
Summer 2013
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
Fall 2013
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
SolidWorks: $498
Plus additional
resources per
Computer
Services.
Apply for VTEA
funding.
Maya: $1,800
5. Obtain additional
laptop computers.
Scott Williams,
division chair,
and area dean
Plus additional
resources per
Computer
Services.
Apply for VTEA
and Above Base
Budget Funding.
6. Complete the
replacement of antiquated
motor control trainers.
Scott Williams,
division chair,
and area dean
Apply for VTEA
and Above Base
Budget Funding.
Fall 2013
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
7. Obtain computers able
to run current server
software
John Winterton,
division chair,
and area dean
To be determined
by Computer
Services
Fall 2013
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
8. Obtain servers
John Winterton,
division chair,
and area dean
To be determined
by Computer
Services
Fall 2013
Yes, supports
strategic plan.
Item I A, II B
and IV C
9. Improve infrastructure
John Winterton,
To be determined
Fall 2013
Improves
productivity,
quality, and
knowledge of
instructors and
students
Improves
III.C. Technology Resources/ Academic Program Review
Yes, supports
Page 8 of 11
Revised 1/21/11
By rewiring rooms 421
and 424 with CAT 6
wiring and 1000 GB
switches.
division chair,
and area dean
by Computer
Services
productivity,
quality, and
knowledge of
instructors and
students
Improves
productivity,
quality, and
knowledge of
instructors and
students
strategic plan.
Item I A, II B
and IV C
10. Obtain equipment
For instruction in
microcontroller
instruction.
John Winterton,
division chair,
and area dean
Apply for VTEA
and Above Base
Budget Funding.
Fall 2013
Responsible
Party(s)
Frank Tebeau
and Ag Director
Resources
Needed
Scheduling with
Ag Division
Director
Plan
Timeline
Fall 2014
Measurable
Outcomes
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Rolando
Gonzalez
Apply for VTEA
funding.
Summer 2014
Tim Hollabaugh
& Ray Larson of
Computer
Services
ArchiCAD: None
AutoCAD
Architecture:
$5,500
SketchUp: $1,285
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
Summer 2014
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
Summer 2014
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
Fall 2014
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
Fall 2014
Improves
Yes, supports
Yes, supports
strategic plan.
Item I A, II B
and IV C
Year 4
Plan Description
1. Reschedule time for
use of Ag Division
computer lab.
2. Re-request upgrade
Architecture Department
computer software
3. Re-request upgrade
Drafting Technology
computer Software
Rolando
Gonzalez
Tim Hollabaugh
& Ray Larson of
Computer
Services
4. Re-request upgrade
Graphic Design computer
Software
Rolando
Gonzalez
Tim Hollabaugh
& Ray Larson of
Computer
Services
Plus additional
resources per
Computer
Services.
Apply for VTEA
funding.
SolidWorks: $498
Plus additional
resources per
Computer
Services.
Apply for VTEA
funding.
Maya: $1,800
5. Obtain additional
laptop computers.
Scott Williams,
division chair,
and area dean
Plus additional
resources per
Computer
Services.
Apply for VTEA
and Above Base
Budget Funding.
6. Obtain additional
Scott Williams,
Apply for VTEA
III.C. Technology Resources/ Academic Program Review
Strategic Plan
Yes, meets
strategic plan
number I A, I C,
and IV C
Page 9 of 11
Revised 1/21/11
laptop computers to be
used in motor control
programming.
division chair,
and area dean
and Above Base
Budget Funding.
productivity,
quality, and
knowledge of
instructors and
students.
strategic plan.
Item I A, II B
and IV C
7. Obtain computers able
to run current server
software
John Winterton,
division chair,
and area dean
To be determined
by Computer
Services
Fall 2014
Improves
productivity,
quality, and
knowledge of
instructors and
students.
Yes, supports
strategic plan.
Item I A, II B
and IV C
8. Obtain server software
John Winterton,
division chair,
and area dean
To be determined
by Computer
Services
Fall 2014
Yes, supports
strategic plan.
Item I A, II B
and IV C
John Winterton,
division chair,
and area dean
To be determined
by Computer
Services
Fall 2014
John Winterton,
division chair,
and area dean
Apply for VTEA
and Above Base
Budget Funding.
Fall 2014
Improves
productivity,
quality, and
knowledge of
instructors and
students
Improves
productivity,
quality, and
knowledge of
instructors and
students
Improves
productivity,
quality, and
knowledge of
instructors and
students
9. Improve infrastructure
By rewiring rooms 421
and 424 with CAT 6
wiring and 1000 GB
switches.
10. Obtain equipment
For instruction in
microcontroller
instruction.
Yes, supports
strategic plan.
Item I A, II B
and IV C
Yes, supports
strategic plan.
Item I A, II B
and IV C
5) Please provide a narrative describing your plans to improve Technology
Resources. The narrative should identify key needs or issues, describe how the
plans will address the issues and describe how the plans will be implemented over
the next several years. Describe how your plans will support any strategic plan
indicated in the table.
The I&T Division faculty members will continue to keep instructional technology
current meeting the needs of both faculty and students. The I&T Division faculty
members will continue to participate in the campus refresh program as well as
VTEA and Above Base Budget Funding Programs. These efforts will maintain
the currency of hardware and software. Financial resources and budget
constraints are likely to be the biggest obstacles in maintaining and improving the
division’s current technology. Through continued partnerships with industry,
faculty members will continue to cultivate support for the division’s diverse
programs. The promise of a new Tulare Campus for some programs holds the
possibility of many upgrades to needed technology.
The strategic plan will be supported through enhanced technology access, by
expanding avenues of opportunities for students to achieve their educational goals
and by improving the use of campus technology.
Evaluation Criteria for Technology Resources
III.C. Technology Resources/ Academic Program Review
Page 10 of 11
Revised 1/21/11
Evaluation Criterion
Excellent
Satisfactory
Not Satisfactory
Descriptions of resources
(C.1)
Complete description of
resources employed by the
program.
Clear analysis of utilization
of all resources.
Description of most of the
resources utilized by the
program.
Analysis of most program
resources.
Superficial description of
program resources.
Clear, specific and realistic
plans for resources. Plans
based on valid assessment of
program resources and their
utilization.
Plans address identified
issues related to resource
utilization.
Plans not connected to
validated need and/or will not
alleviate the identified issue.
Evaluation Criterion
Excellent
Satisfactory
Not Satisfactory
Strategic plan support
If a program plan has been
identified as supporting the
college’s strategic plan, a
reasonable and specific
rationale has been developed
describing the relationship
between each
Each program plan identified
as supporting the college’s
strategic plan has been
explained. However, some
explanations only loosely
connect the program’s efforts
to the strategic plan of the
college.
There are some details
regarding the relationships
between program and
strategic plans, but they are
too general or may not really
help to explain how the
former supports the latter;
Or,
Few identified program plans
are specifically and rationally
tied to the strategic plan
specified.
Analysis of effectiveness of
resources
(C.2)
Plans for improving resources
and/or resource utilization.
(C.4, C.5)
(C.4, C.5)
III.C. Technology Resources/ Academic Program Review
Incomplete analysis of some
program resources.
Page 11 of 11