Excavation, Earthwork and Filling Method Statement WORK PROCEDURE SUBJECT: EXCAVATION, EARTHWORK AND FILLING BY: QA/QC ENGINEER APPROVED BY: QEHS MANAGER ACTION 1. VERIFY SCOPE This procedure provides a standardised framework for the control of excavation, earthwork and filling to ensure compliance with conditions of contract and contract specifications. 2. PROCEDURE .1 All excavation, earthwork and filling will be carried out in accordance with the specification detailed in the project contract documentation. Project In any circumstances where specifications are not provided or they Manager are in any way incomplete, the matter shall be referred back to consultant for additional information. .2 Method Statement A method statement will be prepared and approved where deemed Project Manager necessary, and may include: i) ii) iii) iv) v) vi) vii) viii) ix) Site plan showing the location of spoil heaps for temporary storage and if appropriate permanent storage area. Type of plant and equipment to be used. Means for keeping excavations free of water. Method of trench supports. Method and sequence of excavation to ensure that no damage is caused to adjoining structures and property. If there is potential for damage to adjoining structures and property, the type of preventative measures should be indicated. Temporary support arrangement of adjacent structures and services passing through the site. Method of compacting fill and testing procedure. Health and Safety requirements. Any other special requirements. Method Statement .3 .4 Existing Utilities i) Liaise with all public utility companies e.g. water, electricity, Project telephone sewerage and surface water etc. to ensure that all Manager the available information on the location of utilities and underground services through and adjacent to the site of the excavation is obtained. Drawing/ N.O.C. ii) Ensure that utilities and underground services are located on Project site using markings, which are clearly visible. Ensure those Engineer plant operators and operatives involved with the activity are fully aware of the location of the various utilities and underground services and their respective depths. Markings iii) Where deemed necessary, excavate trial holes to establish Project Engineer the precise location and depth of services. Trial Holes iv) Plant operators must be aware of overhead cables. Use height control indicators where necessary. Site Survey and Grid of Levels Prior to commencement of any excavation work, a level survey will be Site carried out to confirm the information included on the contract Engr./ drawings and to provide an accurate record of existing ground levels Surveyor for the calculation of quantities. .5 Disposal of Surplus Excavated Material Prior to any surplus excavated material being removed from the site, documentary evidence of “approval to tip” must be obtained Project beforehand from the relevant government/municipal departments and Manager the owner of the land where the material is to be tipped. .6 Survey Adjoining Structures and Property Prior to the commencement of excavation work, a detailed dilapidation survey will be undertaken to record the existing condition of the adjoining structures and property. Where necessary the survey may include photographic records. Approval to Tip This survey should be carried out in co-ordination with and involving Const. the participation of the Consultant’s representative and the Manager representative of the owners/occupiers of the adjacent property. .7 .8 Dilapidation Survey Excavation Work i) Excavation shall be allowed to progress to the designed Project formation level less 50mm (unless specified otherwise). The Engineer remaining 50mm shall be carried out by further careful excavation to avoid disturbing the formation level. ii) After reaching the designed formation level, Consultant’s QA/QC representative shall be requested in writing to inspect and Project approve the formation prior to the commencement of any Engineer/ subsequent activities. iii) Great care shall be taken to minimise noise, vibration and dust Site pollution, which can cause nuisance and damage, particularly Safety if the site is located in a built-up area. iv) Sides of all excavations should be properly supported using an appropriate method as detailed in the Method Statement. Filling Project Engineer/ Site Safety Consultant’s QA/QC Survey Inspection Request Method Statement Method Statement Inspection Request i) Prior to commencement of filling, the representative shall be requested in writing to inspect and approve the fill starting level. ii) Filling shall be carried out using approved materials in Project accordance with the specification which can either be selected Engineer from the material on site or imported from selected and approved sources. Source Documents Project Filling shall be carried out as per approved method and as per Engineer Method Statement iii) the contract specification. PROJECT: SITE NO.: CHECK SHEET FOR EXCAVATION AND FILL TO FORMATION SUBCONTRACTOR Sheet No. MAIN CONTRACTOR SECTION OF WORK _____________________________ LOCATION _________________ STAGE EXCAVATION TO FORMATION ITEM 1. Record existing GLs before excavation. 2. Check level profiles. 3. Check for location of buried utilities e.g. foundations, drains, cables, duct, telephone lines, sewerage lines. 4. Check temporary support/batters to sides of excavation. 5. Record soft spots, obstructions, groundwater etc. and how dealt with. 6. Check suitability of formation including test results (CBRs, PLT etc). 7. Check and record final levels. FILL TO FORMATION Checked by SE SU SE SE/SSO SE SE 8. Obtain consultant’s approval for founding level. 9. Check approval to tip. SU QA/QC PE APPROVAL TO PROCEED CM 1. 2. SU 3. 4. 5. 6. 7. Record existing GLs before fill. Check existing services located, protected or raised as specified. Check level profiles. Check fill material is as specified. Record source and approval. Check fill material laid and compacted to specification. Record test results. Check final levels and record. Obtain consultant’s approval. APPROVAL TO PROCEED DATE SE SU PE PE SU QA/QC CM CM – Construction Manager, QA/QC – Quality Assurance/Quality Control, PE - Project Engineer, SE - Site Engineer, SU – Surveyor, SSO – Site Safety Officer