IDTS

advertisement

IDTS – Financial Bid

25 Financial Bid

25.1 Schedule of Quantities for LMV & Two Wheeler Vehicles

IDTS

Sr.

No.

Items Qty UoM

Unit Rate

Without Tax

Total

Without Tax

1

INNOVATIVE DRIVING TEST SYSTEMS

ADMINISTRATION MODULE

1.1

1.2

Admin Software App (User Registration Module With

Photo, Details of Candidate)

Megapixel IP Video Surveillance Cameras for Driver

Photo

1.3 Poles for mounting Cameras

1.4

Signaling Equipment with wireless control (Red and

Green) with poles and Accessories

1.5 RFID Tag Writer / Bar Code Reader

1.6

Networking equipment with accessories for Admin module

1.7

1.8

Power cabling material with accessories for Admin module

Installation Charges (Hardware and Software) for Admin module

1.9 Integration of RFID and signal with Admin Software App

1.10 Genuine SQL Database (With 10 users license)

2 TRACK TYPE - Reverse Parking / T-Test

2.1 Intelligent Driver Test Software -LMV

Megapixel IP Video Surveillance Cameras for Driver Test

2.2 Video analytics

2.3 Poles for mounting Cameras

2.4 RFID Reader with Accessories Poles if any

2.5 Induction loop Equipment with accessories

2.6 Networking equipment with accessories

2.7 Power cabling material with accessories

2.8 Installation Charges (Hardware and Software)

Integration of RFID, Signal System, Induction loop /

2.9 Sensors with IDTS App

3 TRACK TYPE - U-Turn

3.1 Intelligent Driver Test Software App Module -LMV

Intelligent Driver Test Software App Module -Two

3.2 Wheeler

Megapixel IP Video Surveillance Cameras for Driver Test

3.3 Video analytics

3.4 Poles for mounting Cameras

Signaling Equipment (Red and Green) with poles and

3.5 Accessories

3.6 RFID Reader with Accessories Poles if any

3.7 Induction loop / Sensors Equipment with accessories

3.8 Networking equipment with accessories

3.9 Power cabling material with accessories

3.10 Installation Charges Hardware and Software

1

1

1

1

1

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

2

2

Nos nos nos set nos set set nos nos nos set set set set job nos nos nos nos set nos set set set set set job

Nos nos

Add Tax

Total

Inclusive of all taxes

Company Seal : Signature Date:

IDTS

Sr.

No.

Items

3.11

4

Integration of RFID, Signal System, Induction loop /

Sensors with IDTS App

TRACK TYPE - Wrong Entry Detection

4.1 Intelligent Driver Test Software App Module -LMV

Intelligent Driver Test Software App Module -Two

4.2 Wheeler

4.3

Megapixel IP Video Surveillance Cameras for Driver Test

Video analytics

4.4 Poles for mounting Cameras

4.5 RFID Reader with Accessories Poles if any

4.6 Networking equipment with accessories

4.7 Power cabling material with accessories

4.8 Installation Charges Hardware and Software

4.9

5

Integration of RFID, Signal System, Induction loop /

Sensors with IDTS App

Track Type- 4 Point Junction Module

5.1 Intelligent Driver Test Software App Module -LMV

Intelligent Driver Test Software App Module -Two

5.2 Wheeler

Megapixel IP Video Surveillance Cameras for Driver Test

5.3 Video analytics

5.4 Poles for mounting Cameras

Signaling Equipment (Red and Green) with poles and

5.5 Accessories

5.6 RFID Reader with Accessories Poles if any

5.7 Induction loop / Sensors Equipment with accessories

5.8 Networking equipment with accessories

5.9 Power cabling material with accessories

5.10 Installation Charges Hardware and Software

5.11

6

Integration of RFID, Signal System, Induction loop /

Sensors with IDTS App

TRACK TYPE - Round About

6.1 Intelligent Driver Test Software App Module -LMV

Intelligent Driver Test Software App Module -Two

6.2 Wheeler

Megapixel IP Video Surveillance Cameras for Driver Test

6.3 Video analytics

6.4 Poles for mounting Cameras

6.5

Signaling Equipment (Red and Green) with poles and

Accessories

6.6 RFID Reader with Accessories Poles if any

6.7 Induction loop / Sensors Equipment with accessories

6.8 Networking equipment with accessories

6.9 Power cabling material with accessories

6.10 Installation Charges Hardware and Software

6.11

Integration of RFID, Signal System, Induction loop /

Sensors with IDTS App

7 TRACK TYPE - Hair Pin Bend

7.1 Intelligent Driver Test Software App Module -LMV

7.2

Intelligent Driver Test Software App Module -Two

Wheeler

Qty UoM

1

2

2

2

2

2

1

1

1

1

1

1 job nos nos nos nos nos set set set job nos nos

1

3

3

1

1

0

1

1

1

1

1 job nos nos nos nos set nos set set set set job nos nos set nos set set set set

1

1

1

1

2

1

1

3

3

Unit Rate

Without Tax

Total

Without Tax

Add Tax

Total

Inclusive of all taxes

Company Seal : Signature Date:

IDTS

Sr.

No.

Items

7.3

Megapixel IP Video Surveillance Cameras for Driver Test

Video analytics

7.4 Poles for mounting Cameras

7.5

Signaling Equipment (Red and Green) with poles and

Accessories

7.6 RFID Reader with Accessories Poles if any

7.7 Induction loop / Sensors Equipment with accessories

7.8 Networking equipment with accessories

7.9 Power cabling material with accessories

7.10 Installation Charges Hardware and Software

7.11

Integration of RFID, Signal System, Induction loop /

Sensors with IDTS App

7.12 OEM Workstation Branded

8 TRACK TYPE - Gradient Track

8.1 Intelligent Driver Test Software App Module -LMV

8.2

8.3

Intelligent Driver Test Software App Module -Two

Wheeler

Megapixel IP Video Surveillance Cameras for Driver Test

Video analytics

8.4 Poles for mounting Cameras

Signaling Equipment (Red and Green) with poles and

8.5 Accessories

8.6 RFID Reader with Accessories Poles if any

8.7 Induction loop Equipment with accessories for Track

8.8 Networking equipment with accessories

8.9 Power cabling material with accessories for

8.10 Installation Charges (Hardware and Software)

8.11

Integration of RFID, Signal System, Induction loop /

Sensors with IDTS App

8.12 OEM Workstation Branded

9 Integration of above All modules

9.1

Integration of Software Apps , Configuration and

Commissioning charges for complete system

9.2 Any other Misc Components Charges

9.3 MIS Software approx 30 reports

9.4

On Line Manual – System Help (Accessible in all system),

Cost inclusive of Animated Video of Pass & Fail Test.

11 Civil Work

11.1 Civil Work Costing as per F3 -Page Number 39

12 Man Power Resource

12.1 On Site Man Resource ( 2 Person Full Time)

Server / Workstation / Network Switch (Qty. to be

13 decided by the bidder as per application requirements )

13.1 Original Equipment Manufacturer (OEM) - Servers

13.2 Original Equipment Manufacturer (OEM) - Workstations

13.3 Original Equipment Manufacturer (OEM) - Desktop

Original Equipment Manufacturer (OEM) - Storage

13.4 Network Device

OEM Network Managed Switch of 1 GBPS or higher at

13.5 the Control Room

13.6 OEM Unified Threat Mgt. (UTM) / Firewall

Qty UoM

2

2

1

1

1

1

1

1

1

1

1

1

4

4

1

1

1

1

1

1

1

1

1

1

1

1 nos nos set nos nos set set set set nos nos nos nos nos set nos set set set set job nos

Nos

Nos

Job job

12 Months

Nos

Nos

Nos

Nos

Unit Rate

Without Tax

Total

Without Tax

Add Tax

Total

Inclusive of all taxes

Company Seal : Signature Date:

Company Seal : Signature Date :

IDTS

Sr.

No.

Items Qty UoM

13.7 OEM Make On Line UPS 10 KVA with 60 minute backup

13.8 OEM Original Inkjet Tank Single Function Colour Printer

13.9

Antivirus with features like Antivirus, Antispam,

Intrusion prevention, Internet Protection etc

14 Any Other Expenses

15 Tower Ladder

16

Per Day Man Day Charges (Cost Inclusive of Project

Manager, Team Leader, Database Programmer etc)

1

2

30

TOTAL Project Cost ( 1 to 16)

*One Full Time Resident engineer Monday to Friday.

Nos

Nos

Lumsum

1 nos days

Unit Rate

Without Tax

Total

Without Tax

Add Tax

Total

Inclusive of all taxes

25.2

Sr.

No.

Comprehensive AMC Cost for next four years.

AMC Cost Hardware Software *Resident engineer

(D)

0

(E)

Amount

(C+D+E)

(F)

Add taxes if any

(G)

Total inclusive of all taxes

(G+H)

(H)

5

(A)

1

2

3

4

(B)

Comprehensive

AMC 2 nd year

Comprehensive

AMC 3 rd year

Comprehensive

AMC 4 th year

Comprehensive

AMC 5 th year

Total AMC

(C)

0

Company Seal : Signature Date:

25.3 Final Project Cost

Sr.

No.

Desc Project Cost Add Taxes Total Project

Cost Inclusive of all taxes

1

2

Schedule of Quantities for LMV &

Two Wheeler

Comprehensive AMC Cost for four years

Grand Total of Final Project Cost 3

Rs. _______________ (In words Rupees ______________________________ ______________only)

Inclusive of all Taxes.

I / We agree to abide by the terms and conditions of tender as laid down by the Director, CIRT.

Name:

Signature with rubber stamp

Of the firm & phone number

Date: Company Name

Note: Financial bid to accompany covering letter.

25.4 Civil Works Specification & Schedule of Quantities

Sr.

No.

1

2

3

4

Item Description / specification

Excavation for foundation in earth, soil of all types, sand gravel and soft murum, including removing the excavated material upto a distance of

50m beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete

Spec. No. : Bd A1, Page No. 259

(Ref. : 7P/Item-1)

Work

HDPE pipe excavation

Refilling Extra measured

Chamber: Providing & constructing

Brick Masonry Inspection Chamber 90 cm x 45 cm x 90cm including 1:4:8 cement concrete foundation 1:2:4 cement concrete channels half round

G.S.W. pipes, Brick Masonry, plastering from inside and with frame fixed in cement concrete with R.C.C. cover. Spec. No.: Bd. V. 43 Page No.

574

Providing and laying concrete pipes of

I.S.NP class of 150mm diameter in proper line, level and slope including necessary collars, excavation, laying fixing with colloars in cement mortar

1:1 and refilling the trench complete.

Spec No. :Bd. V. 41 Page No. 573

For Camera Pole Soloing :Providing and laying in position trap rubble stone soling of approved quality in layers not exceeding 230 mm, over compacted foundation bedding, including supplying of sand and filling interstices with sand, dewatering as directed by Engineer with all leads and lifts complete. crossing chamber pole

Road crossing pipe

UNIT cum

Cum

No.

Rm

Cum.

Qty

Approx

400.00

18.00

29.00

447.00

16.00

70.00

5.52

Rate Amount

Company Seal : Signature Date:

Sr.

No.

5

6

7

8

Item Description / specification

For Camera Pole Foundation

Concreting Providing and laying in situ cement concrete of trap/granite/quartzite/gneiss metal for RCC work in Foundations like Raft,

Strip, foundations, grillage and footings of RCC Columns, and steel stanchions etc. as per detailed designs, and drawing or as directed including bailingout water, formwork, compaction, curing and roughening the surface if any special finish is to be provided (Excluding reinforcement and structural steel) complete. (M20

Mix, with Natural Sand and Crushed

Sand, 50% each)

Spec. No. : Bd F3, Page No. 298 & B-7,

Page No. 38

(Ref. : 15P/Item-1-(b)

Trench filing material burn brick bat

250mm

Road Resurfacing : Providing and laying Plain / Reinforced Cement concrete of M15 grade for road as required including necessary form work, centering, mixing in mechanical mixers, compacting, curing by sprinkling /ponding of water and finishing as directed with all leads and lifts etc. complete.

For Pole Foundation : Providing and fixing in position TMT-FE-500 bar reinforcement of various diameters for all RCC Items as per detailed designs, drawings and schedules including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete.

Spec. No. : Bd F17, Page No. 306

(Ref. : 18P/Item-9) raft

Work column and

JB.

For Cable

Trench pole foundation

UNIT

Cum cum cum

Cum.

Mt.

Qty

Approx

4.86

3.47

60.00

4.00

0.63

Rate Amount

Company Seal : Signature Date:

Sr.

No.

9

Item Description / specification

Pole Protection Plinth : Providing second class Burnt brick masonry with conventional/ I.S type bricks in cement mortar 1:6 in superstructure including striking joints, raking out joints, watering and scaffolding complete. Spec. No.: bd G5, page

No.135 (Ref.: 21 P/Item-4

Work for pole protection

11

12

10

Pole Protection Plinth : Providing and laying in situ Cement Concrete in M10 of trap/granite/quartzite/ gneiss metal for foundation and bedding including bailing out water, formwork, compacting and curing etc. complete (with natural sand ) (same for floor PCC)

Spec.No. :Bd E1a, Page No. 287 ( Ref.

: 13P/Item-1a)

Pole Protection Plinth : Providing internal cement plaster 12mm thick in a single coat in cement mortar 1.4 without neeru finish to concrete or brick surfaces in all positions including scaffolding and curing completed Spec. No.: Bd L2, page No

368 ( Ref. : 37P/Item-4)

Total Civil Work Costing Without

Taxes for pole protection top and bottom for pole protection

UNIT

Cum

Cum

Cum

Cum

Qty

Approx

Rate Amount

19.87

1.62

2.16

72.00

Company Seal : Signature Date:

Important instructions before filing the Financial Bid i) Indicate rate against each individual item and do not merge columns. ii) It is recommended to submit computer generated prints of the financial bid. Please avoid filing handwritten financial bids. iii) The Schedule of Quantities gives an approximate presumption of the minimum requirements

(Ex: Cameras, Network switches and accessories etc). If additional items are required, the

same may be indicated against each item. The bidder should clearly indicate the number of hardware components required for the project. Any additional components if found required during/after installation to give the desired results, no additional payments shall be incurred by

CIRT and will have to be borne by the bidder. iv) Please refer general specification for all networking components, installations. v) All items to be installed and delivered at Chandigarh Traffic Park Sector 23-A. vi) Bidder may indicate expenses for items not listed in the above Schedule of Quantities under

Item No. 13. Payments shall be made accordingly. Additional expenses not indicated in the financial bid will not be made and will have to be borne by the bidder to ensure successful implementation/execution of the project. v) Any software / hardware failure should not hamper smooth functioning of the system.

Download