Annexure - IV
ESSEL GWALIOR SHIVPURITOLL ROADS PRIVATE LIMITED
(A Special Purpose Vehicle of Essel Infra Projects Limited)
FOUR LANING OF GWALIOR-SHIVPURI SECTION OF NH-3 FROM KM.
15.600 OF NH-75 (END OF GWALIOR BYPASS) TO KM. 236.000 OF NH-3
IN THE STATE OF MADHYA PRADESH UNDER NHDP PHASE IV ON
BOT (TOLL) ON DBFOT PATTERN
Concessionaire
TT
TPMC
EPC Contractor
Pan India Infra Structures Pvt. Ltd
Independent Engineer
Four laning of Gwalior-Shivpuri Section of NH-3
India from km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of
M/s Essel GwaliorShivpuri Toll Roads Pvt.. Ltd.
ROUTE MAP
March-2014
2
Four laning of Gwalior-Shivpuri Section of NH-3
from km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of India
M/s Essel GwaliorShivpuri Toll Roads Pvt.. Ltd.
TABLE OF CONTENT
INDEX
1.
2.
3.
4.
5
6
7
8
9
10
11
12
13
14
15
Executive Summary
Salient Features and Contract Data
General Features of Works
Progress
4.1 Progress of Pre-Construction Activities
4.2 Progress of Physical Construction Activities
4.3 Financial Progress
4.4 Materials
4.5 Construction Programme
4.6 Mobilization of Plant and Equipment
Quality Control and Materials
5.1. Testing of Materials
5.2. Testing and Approval of Plants and Equipments
5.3. Construction Methodology
5.4. Crushed Stone Aggregate
5.5. Borrow Areas (Soil)
5.6. Mix Designs (JMF)
5.7. Granular Sub Base
5.8. Wet Mix Macadam
5.9. Dense Bitumen Macadam
5.10. Source Approval of Materials
5.11. Cement
5.12. Admixtures
5.13. Steel
5.14. Bitumen
Details of Plant and Equipment, Machinery
Status of Land Acquisition
Status of Removal of Encumbrances
Permits, Approval and Insurance
Safety and Environmental
10.1. Safety
10.2. Tree Cutting
10.3. Compensatory plantation of Trees.
10.4. Pollution control on site.
10.5. Dust Control at Site & Crusher Locations.
Maintenance of Exisiting Carriagway
Change of Scope
Site Visit
Weather
Issues Requires Attention
I.
II.
III.
IV.
V.
VI.
VII.
VIII.
IX.
X.
XI.
XII.
XIII.
XIV.
APPENDICES
Strip Chart of Physical Progress (Highway)
S-Curve (Financial Progress)
Mobilization of Plant, Equipment, Site Laboratory & Office
List of Plant, Equipment and Machinery
List of Laboratory Equipment
Summary of Approved Mix Design of Concrete
Independent Lab Test Summary
Summary of Quality control Test Result
Details of land availability and un-cleared land
Applicable Permits
Obstruction details
Weather Report(Temperature & Rain Fall)
Physical Progress of Highway
Site photos
March-2014
02
02
04
04
05
08
08
08
09
09
09
09
09
10
10
10
10
10
10
11
11
11
11
11
12
13
13
14
14
14
14
14
14
14
15
15
16
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1
Four laning of Gwalior-Shivpuri Section of NH-3
from km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV

National Highway Authority of India
M/s Essel GwaliorShivpuri Toll Roads Pvt.. Ltd.
Executive Summary
National Highway Authority of India has taken up four laning of NH-3 between Gwalior to
Shivpuri for a design length of 125+300 Kms. Under NHDP Phase –IV.
The Project consists of construction of four lane road with Gwalior-Shivpuri of Section NH-3
from Km.15+600 (NH-75) to km.236+000 (NH-3). The project road stretch is a part of AgraGwalior-Shivpuri-Indore-Mumbai Road. Major built up areas along the development stretch are
Gwalior, Ghatigaon, Mohana, Shivpuri. The proposed development follows the 5.65 km of
realignment, 36.900 km of 3 Nos By-passes & 82.750km of Existing alignment. The road
generally passes through plain & Rolling terrain & also passes through Forest area SON BIRD
Sanctuary & Madhav National Park ,Land use along the road is of mixed nature with presence of
agricultural, forest, vacant land & interspersed built up area.
Constructions of service roads at urban areas, Truck lay byes, Bus bays and Toll Plazas are
included in the project. Independent structures are proposed for each two lane carriage way for
minor bridges, Major bridges, Rail over bridge.
Land required for development under this project as per concession agreement 60m ROW is
required; 85.00% of land has been handed over.
The concessionaire has achieved financial closure on 13.12.2012 and complied all conditions of
precedent stipulated in the Concessionaire agreement. The authority has declared the appointed
date on 16.05.2013.
EPC Contractors has mobilized.
Detailed survey for road and structures has been completed.
2 Salient Features and Contract Data
Employer
:
National Highways Authority of India
Independent Engineer
:
.M/S CDM Smith Inc.
Safety Consultant
:
Yet to Appoint.
Concessionaire
:
Design Consultant
:
Essel Gwalior-Shivpuri Toll Roads
Pvt. Ltd
Sai Consulting Engineers Pvt Ltd.
Project Management Consultant
:
Egis India Consulting Engineers Pvt. Ltd.
EPC Contractor
:
Pan India Infrastructures Pvt. Ltd
Name of Work
:
Four Lanning of Gwalior-Shivpuri from
Km 15+600 (NH-75) to km 236+000 (NH-3)
in the state of MP, to be executed on BOT
(TOLL) on DBFOT basis under NHDP
Phase IV
Length of Road (Design Length)
:
125.300 Km.
March-2014
2
Four laning of Gwalior-Shivpuri Section of NH-3
from km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
3.0
National Highway Authority of India
M/s Essel GwaliorShivpuri Toll Roads Pvt.. Ltd.
Total Capital Cost
:
Rs. 1601.77 cr.
Total Project Cost as per
Concession Agreement
:
Rs.1055 cr.
Appointed Date
:
16.05.2013
Date of Concession Agreement
:
9th Jan. 2012
Concession Period
:
29 yrs.
Construction Period
:
910 days from Appointed date
Completion Date
:
11.11.2015
Amount of liquidated damages as per CA
:
Major Bridge
:
0.1% of the amount of Performance Security
For delay of each day until such Milestone is
Achieved.
4 Nos.
Minor Bridge
:
49 Nos.
ROB
:
3 No.
Cattle/Pedestrian Underpass
:
9 Nos.
Vehicular Underpass
:
1 Nos.
No. of Box Culverts
:
71 Nos.
No. of Pipe Culverts
:
75 Nos.
Truck lay byes
:
2 Nos.
Major Intersections
:
6 Nos.
Minor Intersections
:
30 Nos.
Bus Bays
:
13 Nos.
Toll Plaza
:
2 Nos.
General Feature of works
3.1
4 - Lane Divided Carriage Way
-
2 x 7.60m
3.2
1.5 m Width Paved Shoulder
-
2 x 1.50 m
3.3
2.00 m Width Earthen/Granular
March-2014
3
Four laning of Gwalior-Shivpuri Section of NH-3
from km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
3.4
3.5
3.6
National Highway Authority of India
M/s Essel GwaliorShivpuri Toll Roads Pvt.. Ltd.
Shoulder
-
2 x (1.00 to 2.00) m
Central Median:
Urban/ Built up Section
Rural Section
-
12.0m & 4.5m & 2.50m
Service Road
Built up Section
Approaches of VUP/ Flyover
-
7.0 m
7.0 m
Footpath/Sidewalk
Built up Section
-
1.5 m
4.0 Progress
4.1
Progress of Pre-Construction Activities:The preconstruction activities like mobilization of plants and equipments, construction of camps,
construction of laboratories, erection, and commissioning of plants have been completed.
Marking of centreline, erections of GPS pillars, benchmarks are also completed based on the
topographic survey.
Mobilization of man power, vehicle/equipments/plants by EPC Contractor Completed.
The Design Consultant has completed independently/ jointly with the EPC Contractor the predesign survey works and inventories of highways and structures. Bore whole drilling for sub soil
investigation for minor bridges and major bridges and ROB has been completed.
Railway authority has approved the GAD of ROB at km.02+050 dated 20.0812, 109+900 dated
24.05.12, 121+040 dated 24.05.12. The status of project design submission & GAD of
Structures given by Design consultant are in table 4.1
Table 4.1 : Status of Design and Drawings-Highway
Sl
No
1
2
3
4
5
Description
Pavement Design
Plan & Profile
Typical Cross Sections
Major Intersections
Minor Intersections
Toll Plazas (Typical
6 Details)
7 Toll Plaza (Aid Posts)
Total
Scope Design
Unit
completed
Sch. B
Review By IE
GFC
as per CA
Drawing
12.3
12.3
Reviewed Issued
(c)
(d)
No
2
-
125.30
125.3
11
Nil
Nil
Nil
No
2
-
Nil
Km 125.300
Km 125.300
Type
11
No
6
No
30
125.300
125.300
11
-
March-2014
Remarks
4
Four laning of Gwalior-Shivpuri Section of NH-3
from km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of India
M/s Essel GwaliorShivpuri Toll Roads Pvt.. Ltd.
8 Truck Lay Bye
No
2
-
9 Bus Bay with Bus Shelter
No
13
-
Nil
Nil
Nil
10 Road Signs
Km
-
11 Street Lighting
Km
-
Nil
Medians,GSI Location,
Km At grade island & Toll
plaza location
Land Scaping
12 & Plantation
Nil
Table 4.2: Status of Design and Drawings –Structures
Sr.
No
Description
Total
Review By IE
Good for
Scope Design
as per CA
Construction
Unit
comple
Drawing
12.3 12.3
ted
Sch. B
Reviewed
Issued
(c) (d)
1
Rail Over Bridge
No
3
2
MJB
No
4
3
MNB
No
49
4
VUP
No
1
5
PUP
No
9
6
Pipe Culverts
No
75
75
7
Box Culverts
No
71
63
8
RE Wall Panel
Remarks
Nil
Nil
-
Nil
Nil
Nil
Nil
Nil
Nil
Sqm.
4.2 Progress of Physical Construction Activities
The Contractor has divided the project road in to three sections for the purpose of construction
management is described below.
km 0+000 to km 44+000 (44km)
km 44+000 to km 88+000 (44km)
SECTION - I
km 88+000 to km 125+300 (37.30km)
SECTION -III
SECTION - II
Table 4.3 Progress of Highway
Progress of highway LHS
Achieved
Sr.
No.
Description Unit
Total
Scope
Up to Feb -14
In March -14
Total Up
to Date
Qty.
1
Tree Cutting
km
125.30
0
0
0
0
2
Clearing and
Grubbing
Km
125.300
24.90
0
24.90
19.87
March-2014
Achieved Remarks
%
5
Four laning of Gwalior-Shivpuri Section of NH-3
from km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of India
M/s Essel GwaliorShivpuri Toll Roads Pvt.. Ltd.
3
Embankment
Km
125.300
0
0
0
0
4
Sub grade
Km
125.300
0
0
0
0
5
GSB
Km
125.300
0
3.50
3.50
2.79
6
WMM
Km
125.300
0
3.50
3.50
2.79
7
DBM
Km
125.300
0
0
0
0
8
BC
Km
125.300
0
0
0
0
9
Road
Furniture
km
125.300
0
0
0
0
Progress of highway RHS
Achieved
Sr.
No.
Description Unit
Total
Scope
Up to Feb -14
In March -14
Total Up
to Date
Achieved
%
1
Tree Cutting
km
125.300
0
0
0
0
2
Clearing and
Grubbing
Km
125.300
24.90
0
24.90
19.87
3
Embankment
Km
125.300
0
0
0
4
Sub grade
Km
125.300
0
0
0
5
6
7
8
GSB
WMM
DBM
BC
Road
Furniture
Km
Km
Km
Km
125.300
125.300
125.300
125.300
0
0
0
0
0
0
0
0
0
0
0
0
km
125.300
0
0
0
9
Remarks
0
0
0
0
0
0
0
Progress of Service Road
Achieved
Sl
No
Description
Unit
Total
Scope
(2 lane)*
Up to Feb
-14
In March
-14
Remarks
Total
%
1
Site Clearance
km
12.80
-
0
2
Embankment
km
12.80
-
0
3
Sub grade
km
12.80
-
0
March-2014
6
Four laning of Gwalior-Shivpuri Section of NH-3
from km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of India
M/s Essel GwaliorShivpuri Toll Roads Pvt.. Ltd.
4
GSB
km
12.80
-
0
5
WMM
km
12.80
-
0
6
DBM
km
12.80
-
-
-
0
7
SDBC
km
12.80
-
-
-
0
Table 4.4 Progress of Structure
Left Carriageway (New Construction)
Structure
Pipe
(Culverts)
Box
(Culverts)
Minor
Bridge
VUP
Un
it
Total
Scope
Sch. B
As per
Design
Total
Started
Completed
In
In
Completed Rema
Progress
Progress
%
rks
(Av.) %
0.00%
No
75
75
0.00%
No
71
71
0.00%
No
49
49
0.00%
No
1
1
0.00%
0.00%
PUP
No
9
9
0.00%
0.00 %
MJB
No
4
4
0.00%
0.00 %
ROB
No
3
3
0.00%
0.00 %
0.00%
0.00%
Right Carriageway (New Construction)
Total Scope
Structure
Unit
Pipe
(Culverts)
In
Total
In
Completed
Progress
Started
Progress
(Av.) %
Completed Rema
%
rks
Sch. B
As per
Design
No
75
75
0.00%
0.00%
No
71
71
0.00%
0.00%
No
49
49
0.00%
0.00%
No
1
1
0.00%
0.00%
PUP
No
9
9
0.00%
0.00 %
MJB
ROB
No
No
4
3
4
3
0.00%
0.00%
0.00 %
0.00 %
Box
(Culverts)
Minor
Bridge
VUP
March-2014
7
Four laning of Gwalior-Shivpuri Section of NH-3
from km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
4.3
National Highway Authority of India
M/s Essel GwaliorShivpuri Toll Roads Pvt.. Ltd.
Financial Progress
The achieved financial cumulative progress is. 17.85% against the cumulative targeted progress of
25.45 % as per the financial programme.
Financial Achievement:The Cash Flow details are shown in the S-Curve in Appendix II.
4.4
Materials
Construction materials like aggregates, sand, GSB materials are being produced by stone crusher
located at the Mohana & Kheria town in Gwalior dist. materials are being tested in Contractors
Laboratory.
Production and stocking of aggregates, procurement of all other construction materials are in
progress. The stock details of materials are in
Table 4.5
SR.
No.
ITEMS
UNIT
SCOPE
1
2
3
4
5
7
(a)
(b)
(c)
AGGREGATES
STEEL
BITUMEN
CEMENT
GSB
RCC Hume pipe
1200mm Dia
1000mm Dia
600mm Dia
MT
MT
MT
MT
MT
2855500
17187
55000
136000
1560000
No.
No.
No.
570
820
2250
4.5
Status of Material
QTY
Cumulative
procured
QTY
during
Procured up to
month of
Feb.-14
March-14
1787847
110220
635860
248
500
695
Cumulative
QTY
procured up
to March - 14
%
1898067
635860
66.47%
40.76%
248
500
695
43.50%
60.97%
30.88%
-
Remarks
Construction Programme
The detailed Engineering, Procurement, and Construction time schedule with respect to the project
completion schedule.
Project Completion Schedules (Milestones)
Mile
Stone
Mile
Stone -I
Target Date &
Amount
Description
Commencement of Highway Construction and not less than 10
th
% expenditure of the Total Capital Cost on 180 day from the
Appointed Date
March-2014
Date-11.11.2013. &
160.00 Cr.
8
Four laning of Gwalior-Shivpuri Section of NH-3
from km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
Mile
Stone -II
Mile
Stone -III
Scheduled
4 Laning
date
National Highway Authority of India
M/s Essel GwaliorShivpuri Toll Roads Pvt.. Ltd.
Commencement of all Bridges Construction and not less than 30
th
& 481.00 Cr)
% of the Total Capital Cost on 365 day from the Appointed
Date
Commencement of all Project Facilities and
th
not less than 70% expenditure of the Total Capital Cost on 730
day from the Appointed Date
th
Scheduled four laning date shall occur on 910
Appointed Date
day from the
Date-15.05.2014
Date-15.05.2015
& 1121.00 Cr.
Date-11.11.2015
& 1601.77 Cr.
4.6 Mobilization of Plant and Equipment
EPC Contractor has mobilized good number of plants and equipments at project site to perform the
construction activities. Two RMC plants, two WMM plants, and two stone crusher and two Hot Mix
plants have been mobilized and they are in operation. The list of Plant and Equipments procured is
enclosed at Appendix ‘III’
5. Quality Control and Materials
5.1 Testing of Materials
The EPC Contractor has procured majority of Lab equipments required for soil, GSB, WMM,
Bitumen, aggregate and concrete testing. The list of Lab equipments procured is enclosed at
Appendix ‘V’. GSB material, soil samples from borrow areas, aggregates, cement and bitumen are
being tested regularly at the site laboratory. Nos. of tests conducted on materials is detailed in
Appendix ‘VII’ & ‘VIII’. Trial mix design for concrete with different admixtures is also being done
in the site lab.
5.2 Testing and Approval of Plants and Equipments
All plants and equipments used for testing, and production of materials confirms requirements of the
specification and quality assurance procedure.
5.3 Construction Methodology
The detailed construction methodology for all items of works as per specification has been submitted
to IE date 22.01.14.
5.4 Crushed Stone Aggregates
Samples of aggregate from source Mohana & Kheria have been tested at Contractor’s Lab. The test
results have been communicated to the EPC Contractors for taking remedial measures conform to
desired standards and specification, before incorporating in works. Aggregates received at base camp
are being tested in laboratory on daily basis.
March-2014
9
Four laning of Gwalior-Shivpuri Section of NH-3
from km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of India
M/s Essel GwaliorShivpuri Toll Roads Pvt.. Ltd.
5.5 Borrow Areas (Soil)
33 Nos. borrow area have been selected. Soil sample of all borrow area were tested in laboratory
and found conforming to specifications.
5.6 Concrete Mix Designs (JMF)
Concrete mix designs of M15, M20 grades for PCC, M20 M25, M30, M35 grades for RCC and
M35 grade for Bored Piles are being conducted.
List is appended in Appendix- VI.
5.7 Granular Sub Base
Samples collected jointly by concessionaire & EPC Contractor and getting tested in contractor’s
Lab. Test results have been communicated to the EPC Contractors for needful action. Frequency
tests are being carried out and records are maintained.
5.8 Wet Mix Macadam
The mix design of WMM (JMF) from Crusher sources are being carried out jointly by
Concessionaire & EPC Contractor and records are maintained.
5.9 Dense Bitumen Macadam
The mix design of DBM Grade II from Crusher sources are being carried out jointly by
Concessionaire & EPC Contractor and records are being maintained.
5.10 Source Approval of Materials
The following sources of materials have been approved by Concessionaire.
Sr.
No
1
2
Coarse Aggregate
Fine Aggregate
Mohana & Kheria
Mohana & Kheria
3
GSB
Mohana & Kheria
4
Stone Dust
Mohana & Kheria
5
Steel
TATA Tiscon Fe500 D
SAIL Fe500D
RINL TMT
JSPL TMT
-
6
Material
Admixture
Source
March-2014
Remarks
Materials conform to
Specification
Test results conform to
Specification
To be submitted
To be submitted
10
Four laning of Gwalior-Shivpuri Section of NH-3
from km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of India
M/s Essel GwaliorShivpuri Toll Roads Pvt.. Ltd.
7
Cement
Jaypee & Vikram Premium, ACC ( OPC 43 ), Shree To be submitted
Ultra(OPC 43), Ultra Tech(OPC 43) & Ambuja OPC
43 Grade
To be submitted
8
Bitumen (VG-30)
9
Emulsion (RS-1
& SS1)
-
To be submitted
10
11
Curing Compound
Water
Bore Well Mohana Camp
Bore Well Kheria Camp
To be submitted
To be submitted
5.11 Cement:Sample material tested at EPC contractor’s lab & results are found confirming to specifications.
& have to be submitted for third party testing.
5.12 Admixtures:Sample material tested at EPC contractor’s lab & results are found confirming to specifications.
& have to be submitted for third party testing.
5.13 Steel:Sample material tested at EPC contractor’s lab & results are found confirming to specifications.
& have to be submitted for third party testing.
5.14 Bitumen:Sample material tested at EPC contractor’s lab & results are found confirming to specifications.
& have to be submitted for third party testing
6.
Plant, Equipment and Machinery
The contractor has mobilized sufficient number of plants equipments and machineries at
site/camp for the construction activities. Detailed list of plants, equipments and machineries are
given in Appendix-III.
March-2014
11
Four laning of Gwalior-Shivpuri Section of NH-3
from km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
7.
National Highway Authority of India
M/s Essel GwaliorShivpuri Toll Roads Pvt.. Ltd.
Status of Land Acquisition
Land Availability Status as on 31.03.2014
Sr.
No.
1
2
3
4
Description
Private Land Vested with Central Govt.
as per 3a Notifications
Clear land of Existing Road Carriageway
available
Reserve /Protected forest formal
approval from MOEF
Reserve/ Protected forest (Not
Requiring Diversion of Land
Land
Acquisition
Area in Ha.
Land
available
for work
in Ha.
Land Not
Cleared/
Encumbr
ance in
Ha.
Remarks
263.776
256.011
7.765
3D under
process
238.06
238.060
80.289
Stage-I approval
acquired(64.259)
12.371
3D under
process
80.289
-
0
135.008
5
Govt. land to be transferred
147.379
6
Wild life land
15.540
Total
%
15.540
745.044
100%
629.079
84.43%
115.965
6.94%
Update status on 3A, 3D & 3G
Status
Chainage
Sr.
No.
3A
From
To
1
0
61+700
2
61+700
125+300
3D
3G
Gazeette
of India
Published
in News
Paper
Gazeette of
India
Publishe
d in
News
Paper
Gwalior
236.527
hact.
236.527
hact.
236.527
hact.
236.527
hact.
226.147
hact.
226.147
hact.
Shivpuri
174.628
hact
174.628
hact
174.628
hact
174.628
hact
164.872
hact
164.872
hact
District
March-2014
Gazeette
of India
Published
in News
Paper
Notic
es of
Awar
d
Issue
d
Date
12
Four laning of Gwalior-Shivpuri Section of NH-3
from km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
8.
National Highway Authority of India
M/s Essel GwaliorShivpuri Toll Roads Pvt.. Ltd.
Status of Removal of Encumbrances
Electrical Shifting
Estimate - (1) Gwalior = 6.73 cr.
(2) Shivpuri = 7.60 cr.
Pending for NHAI approval
Pending for NHAI approval
Description Unit Total Scope Work Done
Sr.No
Authority
1
MPMKVV
HT line
Km
34.40
Nil
34.40
2
MPMKVV
LT line
km
4.65
Nil
4.65
3
MPMKVV
33kva line Km
6.10
Nil
6.10
4
MPPHE
0.800
Nil
0.800
5
MPPHE
90
Nil
90
Water
Km
supply line
Hand
pump &
No
Tube well
Balance
Remarks
PHE Shifting
S.no
1
Dist.
Gwalior
Estimate
23.74 lakh
2
Shivpuri
26.78 lakh
Work done
0
Balance
23.74 lakh
In progress
Remark
To be executed
Department
by
Temporary Structures / Permanent Structures
List of Temples/Mazaar
9.
Particulars
Total
Total No. of Temples/Mazaar
22
Total No. of Temples Shifted
0
Balance
22
Permit / Approval and Insurance
All applicable permits regarding condition precedent detailed in Appendix-X.
1. Environment clearance: - Environmental clearance for the project has been granted by the
Ministry of Environment & forest on 10th may 2013.
March-2014
13
Four laning of Gwalior-Shivpuri Section of NH-3
from km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of India
M/s Essel GwaliorShivpuri Toll Roads Pvt.. Ltd.
2. NBWL clearance: - National wild life board clearance for SON BIRD sanctuary has been
recommended dated 20.03.2013. & for Madhav national park is awaited
3. Forest clearance: - Stage-I forest clearance for 64.259 hact. Has been obtained dt.
21.11.2013
10.
Safety and Environment
10.1 Status of various issues related Safety & Environment are given hereunder Sr. No
Description
Status
Remarks
1
2
Traffic management plan
Safety Sign Boards
To be implemented
3
Personal Protection Equipment (PPE)
To be implemented
4
To be implemented
5
Disposal of Waste Materials
& Oil Spillage
Housekeeping in Camps
6
Area Barricading & Diversion Plan
To be implemented
Km 156.03 (6 nos)
Diversion work
To be implemented
10.2 Tree Cutting
Status of tree cutting is given in the Table. 10.2.
Status of Tree Cutting
Particulars
Unit
Total
Permission
obtained
Tree to be cut
No
17000
Cutting completed
No
0
0
Balance
No
17000
0
4599
10.3 Compensatory Plantation of Trees
Compensatory plantation programme of trees as per guidelines of MOEF approval is under review.
10.4 Pollution Control on Site
Detailed programme for pollution control and mitigation would be submitted to Independent Engineer
with Environmental Management Application Plan (EMAP) for review.
10.5 Dust Control at Site & Crusher Locations
The contractor has make arrangements for regular sprinkling of water for controlling dust at
constructions site and at quarry while crushing provision of dust bags at unloading points in crusher
dust bins.
March-2014
14
Four laning of Gwalior-Shivpuri Section of NH-3
from km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
11.
National Highway Authority of India
M/s Essel GwaliorShivpuri Toll Roads Pvt.. Ltd.
Maintenance of existing carriageway
The existing carriageway maintenance like pot holes, patch work etc. Is in progress along the project
Highway.
Progress of highway maintenance (LHS/RHS)
Achieved
Sr.
No.
Description
Unit
Total
Up to Feb -14
In March -14
Total Up
to Date
Qty.
Achieved
%
2
Earthwork in
shoulder
GSB
3
WMM
Km
4
BM
Km
133
124
7
131
98.49%
5
SDBC
Km
133
36
7
43
32.33%
6
Structures
repair/culvert
No
146
0
6
6
4.10%
1
Km
133
0
0
0
0
Km
133
1.5
0.30
2.00
2.79
133
1.5
0.30
2.00
2.79
12. Change of scope
Notification / Approvals for change of scope is appended hereunder in tabulated form
Sr.
No
Descriptio
n
Notification from
Concessionaire
Action from IE
Action from
Authority
Chainage
Date
Reference
No
Date
Refere
nce No
Date
Remarks
Refer
ence
No
Not applicable
13.
Site Visit & Review Meetings
 Review meeting chaired by the member PPP held at New delhi dated 25.03.2014
 Review meeting chaired by the P.D. (P.I.U. Shivpuri) held dated 04.02.2014
 Review meeting chaired by the Regional officer regarding progress of work held at
Bhopal dated 05.12.2013.
 Review meeting chaired by the Regional officer regarding progress of work held at
Bhopal dated 17.09.2013.
 Review meeting by the member (PPP) held at Radisson hotel Nagpur dated 05.07.2013.
 Review meeting chaired by the Regional officer regarding progress of work held at
Bhopal dated 18.05.2013.
 Review meeting chaired by the Regional officer regarding progress of work held at
Bhopal dated 25.04.2013
 Review meeting chaired by the member (Finance) held at Bhopal dated 08.03.2013
March-2014
15
Four laning of Gwalior-Shivpuri Section of NH-3
from km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
14.
National Highway Authority of India
M/s Essel GwaliorShivpuri Toll Roads Pvt.. Ltd.
Weather

15.
S.No
Weather reports for the month of March. 2014 is appended vide Appendix-XII.
Issues Requires Attention
Activity
Present status
Nil
March-2014
16
Four laning of Gwalior-Shivpuri Section of NH-3
from km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of India
M/s Essel GwaliorShivpuri Toll Roads Pvt.. Ltd.
APPENDICES
March-2014
17
Appendix – I Strip Cart (Highway)
Page 18
Appendix – II-S-Curve (Physical & Financial Progress)
Page 19
Appendix – III – Mobilization of Plant, Equipment, Site Laboratory & Office
Page 20
Four laning of Gwalior-Shivpuri Section of NH-3
km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of India from
M/s Essel GwaliorShivpuri Toll Roads Pvt.. Ltd.
Appendix –IV - List of Plant, Equipment and Machinery
Page 21
Four laning of Gwalior-Shivpuri Section of NH-3
km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300 km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of India from
M/s Essel Gwalior Shivpuri Toll Roads Pvt.. Ltd.
Appendix –V – List of Laboratory Equipment
Page 22
Four laning of Gwalior-Shivpuri Section of NH-3
km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300 km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of India from
M/s Essel Gwalior Shivpuri Toll Roads Pvt.. Ltd.
Appendix-VI. Summary of Approved Mix Designs (Concrete)
Page 23
Four laning of Gwalior-Shivpuri Section of NH-3
km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of India from
M /s Essel GwaliorShivpuri Toll Roads Pvt. Ltd.
Appendix-VII. Independent Lab Tests Summary
Page 24
Four laning of Gwalior-Shivpuri Section of NH-3
km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of India from
M /s Essel GwaliorShivpuri Toll Roads Pvt. Ltd
Appendix-VIII. Summary of Quality Control Test Results
Page 25
Four laning of Gwalior-Shivpuri Section of NH-3
km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of India from
M /s Essel GwaliorShivpuri Toll Roads Pvt. Ltd
Appendix-IX. Details of Land Availability and un-cleared Land
Page 26
Four laning of Gwalior-Shivpuri Section of NH-3
km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of India from
M /s Essel GwaliorShivpuri Toll Roads Pvt. Ltd
Appendix-X. Applicable Permits
Page 27
Four laning of Gwalior-Shivpuri Section of NH-3
km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of India from
M /s Essel Gwalior Shivpuri Toll Roads Pvt. Ltd.
Appendix-XI- Obstruction Details
Page 28
Four laning of Gwalior-Shivpuri Section of NH-3
km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of India from
M /s Essel Gwalior Shivpuri Toll Roads Pvt. Ltd.
Appendix-XII. Weather Record (Rain Gauge Installed at Base Camp)
Page 29
Four laning of Gwalior-Shivpuri Section of NH-3
km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of India from
M /s Essel Gwalior Shivpuri Toll Roads Pvt. Ltd.
Appendix-XIII- Physical Progress of Highway
Page 30
Four laning of Gwalior-Shivpuri Section of NH-3
km.15+600 (NH-75) to km 236+000( NH-3)
Length 125.300km in the state of MP to be Executed
On BOT (TOLL) on DBFOT basis under NHDP Phase-IV
National Highway Authority of India from
M /s Essel Gwalior Shivpuri Toll Roads Pvt. Ltd.
Appendix-XIV- Site Photos
Page 31