2010 Soccer World Cup Feedback from the 2010 Electricity Supply Industry Forum 15 October 2007 Dr Clinton Carter-Brown Eskom & Chairperson 2010 ESI forum 1 Introduction Winter of 2010 the eyes of the world will be on South Africa Billions of viewers will watch live broadcasts Estimated 300 000 to 500 000 foreign visitors South Africa will be showcased 2 Event Cum TV audience 2003 Rugby World Cup 3.4 billion 2002 Winter Olympic Games 12 billion 2000 Summer Olympic Games 25 billion 2002 FIFA World Cup 28.8 billion Stadia City Capacity Cape Town 65 000 Durban 60 000 Port Elizabeth 50 000 Nelspruit 40 000 Ellis Park Stadium Johannesburg 60 000 Soccer City Stadium Johannesburg 95 000 Pretoria 45 000 Bloemfontein 40 000 Green Point Stadium Moses Mabhida Stadium Nelson Mandela Bay Stadium Mbombela Stadium Loftus Versfeld Stadium Free State Stadium Royal Bafokeng Stadium Rustenburg 40 000 Peter Mokaba Stadium Polokwane 40 000 Port Elizabeth Pretoria 3 Rustenburg Johannesburg Durban NUMBER OF MATCHES: 64 NUMBER OF TEAMS: 32 EXPECTED NUMBER OF VISITORS: 300 000 – 500 000 Bloemfontein Nelspruit Polokwane Main 2010 loads Stadiums Training venues Base camps Fan parks FIFA hotels Media centres Supporters Well defined Uncertain Spatial location Total load is small relative to national system peak Certain loads have onerous power quality requirements 4 Electrical supply chain Eskom Generation 5 Eskom Transmission Eskom Distribution Host Cities & KEY 2010 Installations Electrical supply chain continued Eskom Generation Problems in any link in the chain can disrupt supply Eskom Transmission Eskom Distribution Municipal Distribution Stadiums Visitor accommodation, tourism and transport Training venues, fan parks, FIFA hotels, media centres Multiple role players! 6 Base Camps Broadcast Main role players with the ESI It is critical that all role players in the ESI work together to minimise risks & optimise approaches. Role players include: 7 Host Cities and Municipalities Eskom Owners of the 2010 event stadiums 2010 Local Organising Committee (LOC) Association of Municipal Electrical Undertakings (AMEU) National Energy Regulator of South Africa (NERSA) South African Local Government Association (SALGA) Department of Mineral and Energy (DME) Strategy to deal with 2010 Eskom and the AMEU established a 2010 ESI forum in August 2006: Six meetings attended by representatives from the 2010 Host Cities, AMEU, Eskom, DME and NERSA Limited LOC participation SALGA has recently become involved No formal decision making capacity Purpose is for information sharing and facilitation Where necessary, issues and risks are escalated to other role players 8 Key electrical 2010 risks The following 2010 related electrical supply risks have been identified: Increased load due to general load growth Power quality and security of supply for stadiums Power quality and security of supply for other critical FIFA loads Base camps Increased load associated with visitors 9 2010 ESI forum progress Progress of the 2010 ESI forum can be summarised as follows: 10 Stadium supply recommendations DME business plan submission Eskom project identification Project summary report Position paper on base camps Media statement Minutes, documents etc stored on AMEU and Eskom websites http://www.ameu.co.za/mediacentre/worldcup/ Progress to date continued… Project Location Project Cost Host City Municipality Eskom Distribution Region Eskom Transmission Project Cost Eskom Distribution Project Cost Host City Project Cost Cape Town (new stadium) City of Cape Town Western R 81m R 281m R 159m Port Elizabeth (new stadium) Nelson Mandela Southern R 6,496m(1) R 26m R 61m Durban (new stadium) eThekweni Eastern R 1,210m R 0m R 99m Nelspruit (new stadium) Mbombela Northern R 204m R 88m R200m Polokwane (new stadium) Polokwane Northern R 372m R 92m R 130m Loftus (Tshwane) Tshwane Northern R 66m(2) R 0m R 171m(2) Royal Bafokeng (Rustenburg) Rustenburg Northern R 261m R 12m R 64m City Power Central R406m R 211m R 1081m Mangaung (Centlec) North West R 0m R 0m R 15m(3) R 9,095m R 709m R 1,979m Soccer City (FNB) Ellis Park 11 Vodacom Park (Bloemfontein) Total 2010 ESI forum stadium supply recommendations Firm grid supply Local generation UPS Non critical Stadium loads 12 Important Lighting & Stadium Broadcasting loads Activities going forward The following need to be addressed by the forum in consultation with key stakeholders: Municipal bulk infrastructure funding Oct 2006, DME requested Host Cities to submit electrical 13 infrastructure business plans Total submission exceeded R2billion Projects have estimated lead times 1 to 3 years MFMA: Difficult to order long lead materials without budget DME funding of R7.5million per Host City for 2007/8 No funding commitment beyond this year Running out of time Informed LOC, FIFA & NERSA Provided feedback to Dept. of Sports and Recreation Activities going forward continued Stadium supply recommendations Clarify FIFA requirements Disseminate requirements and recommendations LOC “Audit” Base camps Identify likely base camp locations Sensitise possible base camp hosts to electrical supply risks (position paper) LOC assessment of base camp bidders Other FIFA loads 14 Activities going forward continued Visitor locations and movement Scenarios for visitor numbers, location and movement Translate into load Track progress of key 2010 projects Integrate operational and risk planning between Eskom and Municipalities (separate presentation by P Fowles) Stakeholder liaison 15 Conclusions Major challenges within the EDI for 2010 2010 ESI forum provides environment for role players to share experiences, concerns, requirements and plans Activities have been identified for further action via the 2010 ESI forum, and will need to be driven via interaction with key stakeholders such as the 2010 LOC Acknowledge contributions of all 2010 ESI forum members 16 THANK YOU 17 Eskom Business Strategy “Together building the power-base for sustainable growth and development” Vision Our core business is electricity South Africa Target market Strategic Initiatives 18 Capacity Expansion Generation Projects Generating Transporting Trading Retail SADC and the rest of Africa connected to the SA grid Transmission Projects Distribution Projects 2010MW Project Rest of Africa DSM Climate Change The Eskom Structure: 2010MW Project 2010MW Project Finance and Risk Management Market Intelligence FIFA issues SA Govt Issues Project Management Project Coordination Host City Coordinators Project Monitoring & Tracking 19 Project Platforms Marketing & Communication Stakeholder Relations Branding Dedicated Project office Technical & Capacity 2010 DSM Greening 2010 ICT Marketing & Communication Collaboration Discussions are underway with the various stakeholders to form: Joint 2010 energy TASK TEAMS comprising of: Eskom Provincial Government Municipal /Metro /Host City Regional LOC Task team to focus on: Information sharing on : 2010 Plans 2010 Projects Progress on 2010 projects: Monitoring and tracking Identify 2010 risks and agree on mitigating strategies Location of: base camps, training venue, key 2010 installations, etc. Establish an “Event Operations Center”: Pre-event checks Emergency response 20