POST CRISIS NEEDS ASSESSMENT (PCNA) MDTF 5TH STEERING COMMITTEE MEETING ISU Planning & Development Department Government of Khyber Pakhtunkhwa 7th June, 2012 1 AGENDA Background Progress PCNA reflection in ADP 2012-13 Government’s Actions on PCNA Recommendations Projects under MDTF Issues and Challenges PCNA Strategy BACKGROUND Peace-building strategy of the Govt. in collaboration with the four Multilaterals (ADB, EU, WB & UN) Adopted, endorsed and fully owned by the Govt. An integrated proposal on how to build peace in Khyber Pakhtunkhwa and FATA. Success depends on effective implementation of the strategy with a holistic approach. A working strategy that should be continuously monitored and evaluated. PROGRESS Milestones Achieved: PCNA Implementation Support Unit (ISU) in Planning & Development Department set up and operationalized. Recruitment in final stage to fully staff the ISU. Strengthening of Health Services in Crisis Affected Districts at implementation stage. -Cont- PROGRESS Milestones Achieved: Approval of the Simplified Procedure for processing/approval of projects funded under MDTF by Finance Minister/Chairman ECNEC on 1st December, 2011. Ongoing interventions of the Government as well as its International Partners being aligned with the recommendations of PCNA, CDS and Economic Growth Policy. PCNA Reflection in ADP 2012-13 (Billion Rs.) PCNA Objectives Cost Allocation Build State Responsiveness & Effectiveness to restore citizens trust 23.05286 3.563 Employment & Livelihood opportunities 5.587357 0.652 Ensure the Delivery of Basic Services 70.56673 4.053 0.094 0.071 Cross Cutting 17.94332 3.176 Total (PCNA Reflection) 117.2443 11.516 368.600 63.323 Counter Radicalism & Fostering Reconciliation TOTAL ADP GOVERNMENT’S ACTIONS ON PCNA RECOMMENDATIONS: PCNA – Objective 1 (Million Rs.) Sector Project Arid Zone Small Ruminants Res. and Development Institute, Agriculture Kohat Agriculture Monitoring of Crops through Satellite Technology. TotalCost Allocation 70 8 12.977 2.079 Strengthening of Planning & Monitoring Capacity of Agriculture Agriculture Department. 15 6.059 Research & Development on European Olive and Maintenance of Agriculture Model Farm, Sangbhatti. 100 14.999 Indigenization of hybrid research and development technology for Agriculture crops, fruits & vegetables 40 20 297.86 63.694 99.12 70 35 10 32.96 15 97.14 30 25.219 10 30 10 Standardization of improved techniques in Agricultural Research Agriculture System of Khyber Pakhtunkhwa. Agriculture Establishment of Agriculture Research Station at Charsadda . Building Strengthening & Capacity Building of C&W Department . Building Establishment of Project Unit for PaRSSA/USAID Project in C&W Department. Construction of Directorate of anti-corruption establishment (ACE) Enhancement of existing facility of MIS/GIS for C&W Department DWSS Awareness campaign for preservation of water, Health Hygiene Promotion & BCC Strategy Building Building PCNA – Objective 1 (Million Rs.) Sector Project E & SE Education Sector Reforms Programme.(EU Assisted) Capacity Building / Training of Parent Teacher Councils in Khyber Pakhtunkhwa. Multi Level Integrated Teacher Supervision and In-service Training System Education Sector Reform Programme-EU Assisted (3rd and 4th Tranches). DFID support to the Khyber Pakhtunkhwa Education Sector Programme (1st Tranche). E & SE E & SE E & SE E & SE E&P Forestry Creation of Planning & Monitoring Cell. Raising of Environmental Awareness Among the Masses Regarding Environmental Pollution Strengthening of Legal / Prosecution Unit, EPA of Khyber Pakhtunkhwa. Strengthening of Planning Section in Khyber Pakhtunkhwa, Forest Department Health Strengthening Health Management Information System/District Information System in Khyber Pakhtunkhwa. Health Structured Human Resource Development Project Health Health Sector Reform Unit in Health Department (Phase-II) Env: Env Total Cost Allocation 616.02 0.02 65.945 23.422 55.29 26.227 2520.02 0.02 1111.993 0.02 26.08 5 16 3.676 5.102 2.206 4.157 0.87 90.72 20 90 15 37.052 3.293 PCNA – Objective 1 (Million Rs.) Sector Hig: Edu: Hig: Edu: Hig: Edu: Hig: Edu: Home Home Home Home Home Home Project Establishment of Pre-service Academy through Quality Assurance Programme in Higher Education Department. Re-engineering of Teachers engagement methodology for BS-4 Year Degree Program in Govt. Colleges in Khyber Pakhtunkhwa.(Phase II). In-Service and Pre-Service training for teachers of Govt. Colleges in Khyber Pakhtunkhwa PERN Connectivity to Govt Colleges of Khyber Pakhtunkhwa Enhancing Security of Jails in Khyber Pakhtunkhwa. Construction of Sub Jail Tank Special Development Support for Khyber Pakhtunkhwa Police (Phase-III) 23 Secure armories across province and Mini Police line Hangu (P.M Package, 2nd and 3rd Tranch) Special Development Support for Khyber Pakhtunkhwa Police. (Phase-II) Project Coordination Unit for Implementation of Law & Order initiatives in Khyber Pakhtunkhwa. Total Cost Allocation 100 16 55 55 60 20 350 150 25 20 350 20 1600 200 550 100 2400 700 153.79 29.702 PCNA – Objective 1 (Million Rs.) Sector Project Home Special Development Support for Khyber Pakhtunkhwa Police (Scheme will be completed in less than approved Cost- Rs. 325.0 Million Savings). Total Cost Allocation 4500 753.3 Home Construction of Three Police Stations and One Police Line in Swat (NAS Assisted). 622.715 0.001 Home Construction of Joint Police Training Centre at Nowshera PhaseI (NAS Assisted). 773.843 0.001 Home Construction of Central Police Office in Peshawar. 395.21 80 Home Improvement of facilities at PTC Hangu 274.125 30 Home Strengthening of Prosecution Directorate Khyber Pakhtunkhwa. 150 50 Home Strengthening Rule of Law in Malakand (UNDP Assisted) 1338.75 67 Home Development of Emergency Rescue Services (Rescue 1122) in Khyber Pakhtunkhwa. (Phase-II) 974.495 144.699 PCNA – Objective 1 (Million Rs.) Sector Project Total Cost Allocation Acquisition of land for Construction of Judicial Complexes in Law & Justice Selected Districts of Khyber Pakhtunkhwa. 40 40 Construction of Judicial Infrastructure in 10 Selected Districts Law & Justice of Khyber Pakhtunkhwa. 50 10 657.69 30 277.573 10 427.51 0.001 391.233 0.001 400 10 300 300 102.96 30 9.261 4.8 Law & Justice Construction of Judicial Complex Charsadda. Law & Justice Construction of Judicial Complex, Chitral. Law & Justice Local Justice Support Project (WB Assisted). Law & Justice Construction of Judicial Complex, Mardan Directorate of Human Rights and its District-based Resource Centre with integrated facilities for Public Prosecutors, Government Pleaders & Probation Officers, Government of Law & Justice Khyber Pakhtunkhwa. (NAS Assisted) Disaster mitigation and preparedness in Khyber Relief and Reh: Pakhtunkhwa. Roads Road Asset Management System. Social Wel: Gender Reforms Action Plan Khyber Pakhtunkhwa. PCNA – Objective 1 (Million Rs.) Sector Project Sports, Tourism Sports, Tourism Development and Restoration of properties transferred by the Provincial Govt. to the TCKP for the tourists. Capacity Building of Tourist Services Wing, Khyber Pakhtunkhwa. ST&IT Total Cost Allocatio n 60 30 57.654 15 22 14 ST&IT Computerization of Arms Licenses Video Conferencing b/w Commissioners , CM Secretrat, CS/ACS and Cabinet Room 35 20 ST&IT Automation of Public Service Commission. Phase-II 81 25 ST&IT Automation of Home Department. 70 25 ST&IT E-enablement of Special Branch Police. 45.77 23.09 39.91 0.01 Urban Construction of 6 Security Police Posts, 4 on Ring Road & 2 in Development Industrial Estate,Peshawar. PCNA – Objective 3 (Million Rs.) Sector Project Auqaf, Hajj, Improvement of educational institutions for Minorities in Khyber Pakhtunkhwa. Building Total Cost Allocation 17 12 Rehabilitation of Damages due to Floods July 2010 in District Battagram SH. C&W Rest House Banna 26.509 10 E & SE Establishment of 110 Primary Schools (B&G) on need basis 404.9 75.039 E & SE Establishment of 200 Primary Schools (B&G) in Khyber Pakhtunkhwa 960 210 E & SE Assistance to Basic Education Improvement Project for Repair/Rehabilitation of Flood Affected Schools in Khyber Pakhtunkhwa.(Norway Assisted) 450.01 0.01 E & SE Establishment of 100 Govt. Primary Schools (B&G) on need basis in Khyber Pakhtunkhwa (Phase-II) 400 100 PCNA – Objective 3 (Million Rs.) Sector Project Total Cost Allocation E & SE Establishment of 50 Primary and 50 Middle Schools in rented buildings in Urban Areas of Khyber Pakhtunkhwa (including furniture & staff) 130 50 E & SE Provision of Basic facilities through PTCs in 100 existing Primary Schools in Khyber Pakhtunkhwa. 50 50 E & SE DFID Support to Khyber Pakhtunkhwa Education Sector Programme (2nd Tranche). 60% for Budgetary Support, 30% for Construction Component and 10% for Technical Assistance. 4026.522 0.01 E & SE Up gradation of 50 Girls Primary Schools to Middle level in Khyber Pakhtunkhwa. 375 100 E & SE Establishment of Bacha Khan Model School at Salarzai in District Buner. 128.019 50 E & SE Establishment of Dir Model School at Dir Upper. 45 20.116 PCNA – Objective 3 (Million Rs.) Sector Project Total Cost Allocation E & SE Establishment of 50 Primary and 50 Middle Schools in rented buildings in Urban Areas of Khyber Pakhtunkhwa (including furniture & staff) 130 50 E & SE Provision of Basic facilities through PTCs in 100 existing Primary Schools in Khyber Pakhtunkhwa. 50 50 E & SE DFID Support to Khyber Pakhtunkhwa Education Sector Programme (2nd Tranche). 60% for Budgetary Support, 30% for Construction Component and 10% for Technical Assistance. 4026.522 0.01 E & SE Up gradation of 50 Girls Primary Schools to Middle level in Khyber Pakhtunkhwa. 375 100 E & SE Establishment of Bacha Khan Model School at Salarzai in District Buner. 128.019 50 E & SE Establishment of Dir Model School at Dir Upper. 45 20.116 PCNA – Objective 3 (Million Rs.) Sector E & SE Project Reconstruction of buildings of Govt. Middle & High Schools in Khyber Pakhtunkhwa. E & SE Construction of 1000 Additional Classrooms in Primary, Middle and High Schools in Khyber Pakhtunkhwa. (PhaseII) E & SE Reconstruction / Rehabilitation of buildings of Govt. Middle & High Schools in Khyber Pakhtunkhwa. (PhaseII) E & SE Total Cost Allocation 650 10.56 1144 165.424 575 81.286 Reconstruction of Building in Govt. Schools in Khyber Pakhtunkhwa (DFID Assisted), 521.092 0.01 E & SE Construction of 400 Additional Classrooms in Existing Govt. Schools in Khyber Pakhtunkhwa (EU Assisted) 460.01 0.01 E & SE Construction of 300 additional classrooms in Primary, Middle and High Schools in Khyber Pakhtunkwa (Phase III) 379.5 79.5 E & SE Reconstruction of buildings of Government Middle and High Schools in Khyber Pakhtunkhwa (Phase-III), 115 45 PCNA – Objective 3 (Million Rs.) Sector Project E & SE Reconstruction of Govt. Schools damaged due to militancy/bomb blasts in the Province other than Malakand Division. E & SE Provision of Stipends to Secondary Schools Girls students of Khyber Pakhtunkhwa (Phase-IV) (DFID Assisted). E & SE Total Cost Allocation 688.271 180 1000.001 0.001 Completion of leftover works of reconstruction of buildings of GHS Badaber and GHS Aza Khel in District Peshawar. 94.593 38.693 E & SE Reconstruction / Rehabilitation of 1173 Govt. Primary, Middle, High & Higher Secondary Schools Completely / Partially Damaged due to floods 2010 in Khyber Pakhtunkhwa (USAID Assisted). 2040.734 0.02 Energy & Power Development of Renewable energy in Khyber Pakhtunkhwa. (ADB Assisted). 6026.42 500 PCNA – Objective 3 (Million Rs.) Sector Health Project Improvement/Rehabilitation of Women & Children Hospital, Karak Health Establishment of Children & Maternity Hospital Charsadda Health Total Cost Allocation 50.42 50.42 1183.274 200 Establishment of Accidents & Emergency Unit in DHQ Hopsitals of Kohat & D.I. Khan 158.722 76.34 Health Reconstruction / Rehabilitation of Health Facilities Damaged in July-August 2010 Floods (JICA Assisted). 550.955 150 Health Purchase of 7 fully equiped ambulances for Teaching hospitlas of Khyber Pakhtunkhwa 50 50 Health Strengthening of TB Control Programme in Khyber Pakhtunkhwa. 142.22 20 Health Prevention Control of Hepatitis in Khyber Pakhtunkhwa. 360.472 20 Health Health Promoting Safe Motherhood (WFP Assisted) Support to EPI Programme 752.362 20.936 2.662 6.419 PCNA – Objective 3 (Million Rs.) Sector Project Total Cost Allocation Health Prevention and Control Program of Dengue along with other vector related diseases in Khyber Pakhtunkhwa 265.73 85 Health Strengthening of TB Control Programme in Khyber Pakhtunkhwa - Phase-II (KfW Assisted). 944.01 0.001 Health Project for Strengthening Routine Immunization in Khyber Pakhtunkhwa (JICA Assisted). 36.01 0.001 Health Support to National MNCH Programme 39.017 0.001 Health Equipment Basic Health Services Project (KfW Assisted). 780.556 53.741 Health Strengthening of 04 MCH Centres attached to Public Health Schools in Khyber Pakhtunkhwa 9.258 7.258 Health Social Health Protection Initiative for Khyber Pakhtunkhwa (KfW Assisted). 1172 12.948 Higher Education Establishment of Project Management Unit for reorganization of Higher Education. 21 7 PCNA – Objective 3 (Million Rs.) Sector Project Higher Education Provision of Day Care Centers in female Govt. Colleges in Khyber Pakhtunkhwa Industries Upgradation of Govt. Polytechnic Institutes, Bannu & Swat, to the level of College of Technology Industries Law & Justice Re-construction of building for GTVC (Women) D.I.Khan. Construction of Judicial complex Mansehra. Law & Justice Construction of Judicial Complex Haripur. Law & Justice Construction of Additional works inJudicial Complex Peshawar. Law & Justice Addition / Alteration / Strengthening and balance works in Judicial Complex Bannu. Law & Justice Construction of Additional works in Judicial Complex Lakki Marwat. Reg: Dev: Local Development Initiatives in Districts Dir Upper and Lower (Rs 60.00 M each) Total Cost Allocation 18.413 10.036 183.305 29.14 68.769 35 972.98 50 547.519 30 33.5 13.5 345.137 40 50.173 10 120 120 PCNA – Objective 3 (Million Rs.) Sector Reg: Dev: Project Total Cost Allocation Conversion of Electric Street Lights into Solar Energy in 50 40 the Province. Reg: Dev: Reg: Dev: Municipal Services Delivery Project. (USAID Assisted) Establishment of Water and Sanitation Company (WASCo), Peshawar. 8080 1137.92 100 100 R&D Roads Establishment of Urban Policy Unit. (USAID Assisted). Rehabilitation/Repair of Roads damaged in PF-46 District Abbottabad. 929.411 123.253 39.724 30 Roads Rehabilitation/Repair of Roads Damaged in July 2010 in NA-18, District Abbottabad. 43.456 8.456 Roads Rehabilitation/Repair of Pind Gali Beer Road District Abbottabad. 90.399 15 Roads Rehabilitation/Repair of Roads Damaged in July 2010 in PF-44, District Abbottabad. 76.8 1.8 Roads Restoration of Road damaged by flood in District Abbottabad (Phase-II) 32.15 7.15 PCNA – Objective 3 (Million Rs.) Sector Roads Project Restoration of Road damaged by flood in District Abbottabad (Phase-I) Total Cost Allocation 126.161 50 Roads Rehabilitation of Road damaged by flood in District Battagram (Package-II). 117.505 20 Roads Restoration of Road damaged by flood in District Battagram 319.904 30 Roads Restoration and Rehabilitation of Flood Damages in District Kohistan during 2010. 223.95 30 Roads Restoration of Road damaged by flood in District Dir Upper (Phase-II) 253.561 25 Roads Flood Damages Restoration of Roads / Bridges Infrasturcture in District Swat SH: (1) Kalam, Uthror, Gubral road (35-Kms) (2) Kalam, Ushu, Matilthatn, Mahodand road (35-Kms) (3) Tehsil Kalam Internal Roads (6-Kms) 107.6 30 Roads Restoration of Road damaged by flood in District Swat (Kabal Region) 478.64 100 PCNA – Objective 3 (Million Rs.) Sector Project Roads Restoration of Road damaged by flood in District Shangla Roads Restoration of Road damaged by flood in District Nowshera Roads Total Cost Allocation 190.3 30 278.641 27 Restoration of Road damaged by flood in District Lakki Marwat 85.467 25.467 Roads Improvement / Rehabilitation of Swarai - Sarqilla Chowga-Puran road (Km 49.50 to 67.50) 18 Km District Shangla. 578.73 70 Roads Construction of Kanju RCC Bridge (Ayub Bridge) on River Swat at Mingora. 358.824 50 Roads Reconstruction of Bagh Dheri Bridge on River Swat 210.138 50 Roads Construction of Khwazakhela Bridge (415.3m) and Mingora Bridge (48.15m) at District Swat 415.04 70 PCNA – Objective 3 (Million Rs.) Sector Project Roads Feasibility Study / Design and construction of alternate route from Malakand district to down districts. (Swat Express Way) (Phase-I) (Abu Dhabi Dev. Fund). Roads Restoration / Rehabilitation of damages in District Tank Roads DFID Assisted Steel Bridges Project in Crisis Affected Districts of Malakand Division (In kind). Roads Emergency Rural roads Rehabilitation project (JICA Assisted). Roads Total Cost Allocation 9000 0.1 161.97 20 2196.234 100 14694 1 Constn: of Abutments and Launching of NATO/Canadian steel bridges provided to Pak Army for Khyber Pakhtunkhwa. 364 54.58 Social Welfare Establishment of Welfare Home for Orphans at Lakki Marwat 28.55 7.055 Social Welfare Establishment of Senior Citizens Home at Peshawar 10.139 4 PCNA – Objective 3 (Million Rs.) Sector Social Welfare Project Establishment of Senior Citizens Home at Peshawar Social Welfare Reconstruction and establishment of a model Drug Addicts Detoxification and Rehabilitation Centre at old Rang Mala, Hospital, Malakand 42.453 8.452 Social Welfare Establishment of Halfway House for Women at Peshawar 11.776 4 Water Restoration of Flood Protection Works along Tributaries of Panjkora River at Nehag, Karo and Usherai Khwar District Dir Upper Sub Work: Restoration of Flood Protecton Work along Usherai Khawar Tributaries of Panjkora River District Dir Upper. 29.7 14.7 Water Restoration of Flood Damages 2010 of Rod Kohi System in District D.I.Khan. Restoration of protection bund along Tank city District Tank. 107.917 25 27.824 8 Water Total Cost Allocation 10.139 4 PROJECTS UNDER MDTF Economic Revitalization for Khyber Pakhtunkhwa and FATA Project (ERKF- $20 m) – under implementation. Governance Support Project (GSP $6 m + Additional Financing 2.75 m) for Khyber Pakhtunkhwa and FATA- Operationalized Up gradation/Rehabilitation of Road Garhai Kanju, Swat , 10.5 KM (Cost $ 8.0 m) – Under Implementation. -Cont- PROJECTS UNDER MDTF Strengthening Health Services in Crisis Affected Districts (Est. Cost US$ 16 m)-Under Implementation. Southern Area Development Project SADP in district D.I.Khan, Lakki Marwat, Tank (costing $ 18 m) under preparation stage. Five Concept Notes (Judiciary, Prov. Ombudsman Office, Home Deptt., CDD and M&E framework) approved by Provincial Steering Committee. -Cont- PROJECTS UNDER MDTF Concept Note of KP approved by World Bank. Judicial Academy Concept Note of Home Deptt. submitted to World Bank for approval. ISU initiated a consultative process to identify focal points. 10 focal points have been identified till now(Public Health Engineering Deptt, Finance Deptt, Human Rights Deptt, Prov. Ombudsman Secretariat, Sports, Culture, Youth Affairs, tourism, Archaeology & Museum Deptt, Peshawar High Court, Home & Tribal Affairs Deptt, Energy & Power Deptt, and Environment Deptt.) Issues and Challenges Coordination – Effective coordination and follow up amongst all stake holders. Fund Flow – Enhanced and timely flow of funds. PCNA STRATEGY Crisis Drivers Vision: “There is emergence of peace, greater prosperity & tolerance. A transformation is underway where the voices of all people are being heard, the rule of law is deepening & the state is increasing accountable, providing equitable opportunities for better health, education & employment” PCNA Strategic Objectives 3 Programs to be Implemented across 9 Identified Sectors The Way Forward (devised in 4 stages) PCNA Strategic Objectives Strategic Objective 1: Build state responsiveness & effectiveness to restore citizen trust 1.1 Citizens access to avenues influencing Govt. decision making 1.2 Citizens understand their rights & entitlements Desired Outcomes 1.3 Law, Govt Decisions, budget & expenditure are publically available to all 1.4 Govt. developing & implementing policies that improve access to health & education 1.5 Transparency, accountability & improved management of public resources. 1.1.1) Proactive role of elected officials/ community representatives on decision making bodies 1.1.2) Enhancing mechanisms to engage citizens in the decision making process 1.2.1) Number & types of awareness campaigns conducted under MDTF 1.2.2) Percentage of citizens aware of their rights and responsibilities in the major area. 1.2.3) Dissemination of entitlement information by the Govt. 1.3.1) Publication/ dissemination of laws, budget and expenditure 1.3.2) Mass dissemination of information on Govt actions/ interventions 1.4.1) Number of policies approved by legislatures 1.4.2) Level of budget program coherence 1.4.3) Extent & quality of program budget expenditure reporting 1.4.4) Optimal level of Govt. spending against approved budget. 1.5.1) Budget & expenditure published & disseminated 1.5.2) Level of budget program coherence 1.5.3) Public Accounts Committee strengthened scrutinizing budget & expenditure Strategic Indicators PCNA Strategic Objectives } Strategic Objective 2: Employment & Livelihood Opportunities 2.1 An Expanding Private sector is providing local Employment 2.2 Revitalized agriculture & livestock sector providing employment and livelihood Desired Outcomes 2.3 Govt regulatory & legal environment enabling commerce & business 2.4 Producers have increased access to markets for their produces 2.5 Rehabilitated and expanded SME sector providing employment and Livelihoods 2.1.1) Increased number of private sector organizations providing employment 2.1.2) Increase in number of people (MF) employed by private sector 2.2.1 )Agriculture & Livestock Revitalized 2.2.2)New jobs created in Agriculture & Livestock 2.2.3) Increase in number of service providers (Farm & off Farm) 2.3.1) Consultations with chamber of commerce & industries & other relevant stakeholders. 2.3.2) Enabling Laws & regulations by Govt. bodies for fostering conducive environment of commerce and business 2.4.1) Increased number of farm to market access roads 2.4.2) Linkage developed by farm associations with market associations 2.5.1) Number of SMEs supported & rehabilitated 2.5.2) Increased number of jobs created by SMEs 2.5.3) Number of capacity building support initiatives conducted Strategic Indicators PCNA Strategic Objectives Strategic Objective 3: Ensure the Delivery of Basic Services 3.1 Vulnerable groups particularly women/ girls have access to basic services 3.1.1) Increased number of women has access to basic health and mother and child care facilities. 3.1.2 )Number of women / girls has access to basic education 3.1.3 )Number of women / girls has access to WATSAN Facilities. 3.2.1) Agriculture and Livestock Revitalized 3.2.2) Number of jobs created in Agriculture and Livestock 3.2.3)Increase in number of service providers (farm & off farm) 3.2 Govt. seen as primary deliverer of basic services Desired Outcomes 3.3 Local infrastructure restored, constructed to adequate quality standards 3.4 Vulnerable population has access to social safety net. 3.3.1) Number of education institutions Rehabilitated / Reconstructed 3.3.2)Number of health institutions Rehabilitated / Reconstructed 3.3.3)Number of WATSAN facilities Rehabilitated / Reconstructed 3.3.4) Number of Roads Rehabilitated / Reconstructed 3.3.5) Number of Energy facilities Restored/ Reconstructed 3.4.1) Number of safety net /cash transfer and in- kind support provided 3.4.2)Number of education fee/ TVET provisions provided to needy girls/ boys. 3.4.3) Enhance number of health insurance coverage Strategic Indicators PCNA Strategic Objectives Strategic Objective 4: Counter Radicalism & Foster Reconciliation 4.1 Activities have been implemented in areas previously affected by serious conflict 4.2 Communities have access to affordable, legitimate dispute resolution services Desired Outcomes 4.1.1) Increased numbers of activities for counter radicalism. 4.1.2) Increased number of activities for f fostering reconciliation. 4.1.3) Persuasive communications strategies countering radicalism and fostering reconciliation. 4.2.1) Number of Complaints processed by Umbudsman 4.2.2) Number of Mobile Courts Established 4.2.3) Number of Public Facilitation Centers Constructed 4.3 Civil Society oversight of state functions broad & representative 4.3.1) Number of Public Sector and Citizens Dialogues initiated. 4.3.2 ) Number of Community Based Participatory Planning, Budgeting Spending and Auditing Sessions. 4.4 Public works and others funded projects foster collaborations across communities 4.4.1) Number of Community Based Organisations (CBO’s) set up for Public works and other funded projects. 4.4.2) Number of projects executed under CBO’s. 4.5 Opportunities provided for public discourse on peace & conflict related issues 4.5.1) Number of joint dialogue sessions conducted with concerned stakeholders (Public & Private). 4.5.2) Number of initiatives undertaken based on joint dialogue sessions. Strategic Indicators 3 Programs to be Implemented across 9 Identified Sectors Program 1: Livelihoods & Communities Support Program Program 2: Growth & Job Creation Program Program 3: Policy Reforms & Governance Support Programs The Way Forward The Way Forward Stage 1: Mapping & Avoiding Duplication Step 1: Similar Projects being implemented by Govt of KP and Partner Organisations in line with PCNA Strategic Objectives funded other than MDTF. Inputs: ISU, P&D Sections & Govt. Agencies Step 2: Which Strategic Objectives do these projects cover & to what extent? Step 3: Which Strategic Objectives are not covered by these projects? Stage 1: 10 Days Timeline Outputs: Mapping of projects prepared that addresses (including the extent of) particular Strategic Objectives of PCNA already being implemented. The Way Forward Stage 2: Identification & design of Projects to be Implemented under PCNA Inputs: Non addressed or partially addressed Strategic Objectives of PCNA identified through Mapping of Projects in Stage 1 Step 1: Identification of non or partially addressed Strategic Objectives of PCNA. Step 2: Identification of Projects that can be implemented under PCNA considering its Strategic Objectives and 3 Programs Inputs: ISU, P&D Sections & Govt. Agencies Step 3: Preparation of PC-I’s Inputs: Govt. Agencies Stage 2: 04 Weeks Timeline Outputs: Potential Projects Identified and Designed. The Way Forward Stage 3: Identification of GAPS and Approval of Projects to be implemented under PCNA Inputs: Donor & partner organisations Step 1: Identification of gaps in potential Projects Identified & Designed. Inputs: Govt. Agencies Step 2: Mitigation of gaps in potential Projects Identified and Designed. Inputs: ISU Step 3: Projects submitted for approval after mitigation of gaps. Stage 3: 04 Weeks Timeline Outputs: Projects Approved. The Way Forward Inputs: ISU, Directorate of M &E, Donor & partner organisations. Stage 4: Implementation, Monitoring & Evalaution Outputs: Removal of bottlenecks/ impediments & provision of support/ guidance in project implementation & execution Timeline Stage 4: Till Project Completion 30/10/11 Crisis Drivers Vision: “ There is emergence of peace, greater prosperity & tolerance. A transformation is underway where the voices of all people are being heard, the rule of law is deepening & the state is increasing accountable, providing equitable opportunities for better health, education & employment” PCNA Strategic Objectives Strategic Objective 1: Build State Responsiveness & effectiveness to Restore Citizen Trust 1.1 Citizens have access to avenues to influence Govt. decision making 1.2 Citizens understand their rights and entitlements Strategic Objective 2: Employment and Livelihood Opportunities 1.1.1 Proactive role of Elected Officials/CS representatives on decision making bodies 1.1.2 Enhancing Mechanisms to engage citizens in the decision making process 1.2.1 Number and types of awareness campaigns conducted under MDTF 1.2.2 Percentage of citizen aware of their rights and responsibilities in the major area 1.2.3 Dissimilation of entitlement information by the Government. 1.3 Law Govt Decision budget and expenditure are publically available to all 1.3.1 Publication/ dissemination of laws, budget and expenditure 1.3.2 Mass Dissemination of Information on Govt Actions/ interventions 1.4 Govt. developing and implementing policies that improve access to health & education 1.4.1 Number of policies approved by legislatures 1.4.2 Level of budget program coherence 1.4.3 Extent and quality of program budget expenditure reporting 1.4.4 Optimal level of Govt spending against approved budget. 1.5 There is transparency of and accountability for the management of public resources Desired Outcomes 1.5.1 Budget and expenditure published and disseminated 1.5.2 Level of budget program coherence 1.5.3 Public Accounts Committee strengthened scrutinizing budget & expenditure 2.1 An Expanding Private sector is providing local Employment 2.2 Revitalized Agriculture and livestock sector providing employment and livelihood 2.3 Govt regulatory and legal environment enabling commerce and business 2.4 Producers have increasing access to markets for their produces 2.5 Rehabilitated and expanded SME sector providing employment and Livelihoods Desired Outcomes Strategic Objective 3: Ensure the Delivery of Basic Services 2.1.1 Increased Number of private sector organizations providing employed 2.1.2 Increase in number of people (MF) employed by private sector 2.2.1 Number of Agriculture and Livestock Revitalized 2.2.2 Number of jobs created in Agriculture and Livestock 2.2.3 Increase in number of service providers (Farm and Off Farm) 2.3.1 Consultation with the chamber of c commerce & industries and other relevant stakeholders 2.3.2 Enabling laws and regulations by Govt bodies for fostering conducive environment of commerce and business 2.4.1 Increase in number of Farm to market roads 2.4.2 Linkage developed by farm associations with market association 2.5.1 Number of SMEs supported and rehabilitated 2.5.2 Increase in number of jobs created by SMEs 2.5.3 Number of capacity building support initiatives conducted 3.1 Vulnerable groups particularly women/ girls have access to basic services 3.2 Govt seen as primary deliver of basic services 3.3 Local infrastructure resorted, constructed to adequate quality standards 3.4 Vulnerable population has access to social safety net. Desired Outcomes Strategic Objective 4: Counter Radicalism & Foster Reconciliation 3.1.1 Increased number of women has access to basic health and mother and child care facilities. 3.1.2 Number of women / girls has access to basic education 3.1.3 Number of women / girls has access to WATSAN Facilities. 3.2.1 Agriculture and Livestock Revitalized 3.2.2 Number of jobs created in Agriculture and Livestock 3.2.3 Increase in number of service providers (Farm and Non Farm) 3.3.1 Number of education institutions Rehabilitated / Reconstructed 3.3.2 Number of health institutions Rehabilitated / Reconstructed 3.3.3 Number of WATSAN facilities Rehabilitated / Reconstructed 3.3.4 Number of Roads Rehabilitated / Reconstructed 3.3.5 Number of Energy facilities Resorted/ Reconstructed 3.4.1 Number of safety net /cash transfer and in- kind support provided 3.4.2 Number of education fee/ TVET provisions provided to needy girls/ boys. 3.4.3 Enhance number of health insurance coverage Strategic Indicators Strategic Indicators 4.1 Activities have been implemented in areas previously affected by serious conflict 4.2 Communities have access to affordable, legitimate dispute resolution services 4.1.1 Increased number of activities for counter radicalism. 4.1.2 Increased number of activities for fostering reconciliation. 4.1.3 Persuasive communication strategies countering radicalism and foster reconciliation 4.2.1 Number of Complaints processed by Umbudsman 4.2.2 Number of Mobile Courts Established 4.2.3 Number of Public Facilitation Centers Constructed 4.3.1 Number of Public Sector and Citizens Dialogues initiated. 4.3.2 Number of Community Based Participatory Planning, Budgeting Spending and Auditing Sessions. 4.3 Civil Society oversight of state functions broad and representative 4.4 Public works and others funded projects foster collaborations across communities 4.5 opportunities provided for public discourse on peace and conflict related issues 4.4.1 Number of Community Based Organization (CBO’s) set up for Public works and other funded projects. 4.4.2 Number of projects executed under CBO’s. 4.5.1 Number of joint dialogue sessions conducted with concerned stakeholders (Public & Private). 4.5.2 Number of initiatives undertaken based on joint dialogue sessions. Desired Outcomes Strategic Indicators Strategic Indicators 3 Programs to be Implemented across 9 Identified Sectors Program 1: Livelihoods & Communities Support Program Program 2: Growth & Job Creation Program Program 3: Policy Reforms & Governance Support Programs The Way Forward Stage 1: Mapping & Avoiding Duplication Inputs: ISU, P&D Sections & Govt. Agencies Step 1: Similar Projects being implemented by Govt of KP and Partner Organisations in line with PCNA Strategic Objectives funded other than MDTF. Step 2: Which Strategic Objectives do these projects cover & to what extent? Step 3: Which Strategic Objectives are not covered by these projects? Outputs: Mapping of projects prepared that addresses (including the extent of) particular Strategic Objectives of PCNA already being implemented. Stage 2: Identification & design of Projects to be Implemented under PCNA Inputs: Non addressed or partially addressed Strategic Objectives of PCNA identified through Mapping of Projects in Stage 1 Inputs: ISU, P&D Sections & Govt. Agencies Inputs: Govt. Agencies Step 1: Identification of non or partially addressed Strategic Objectives of PCNA. Step 2: Identification of Projects that can be implemented under PCNA considering its Strategic Objectives and 3 Programs Step 3: Preparation of PC-I’s Outputs: Potential Projects Identified and Designed. Stage 3: Identification of GAPS and Approval of Projects to be implemented under PCNA Inputs: Donor and partner organisations Step 1: Identification of gaps in potential Projects Identified and Designed. Inputs: Govt. Agencies Step 2: Mitigation of gaps in potential Projects Identified and Designed. Inputs: ISU Step 3: Projects submitted for approval after mitigation of gaps. Outputs: Projects Approved. Stage 4: Implementation, Monitoring & Evalaution Inputs: ISU, Directorate of M&E Donor and partner organizations Outputs: Removal of Bottlenecks/ Impediments & Provision of Support/ Guidance in Project Implementation & Execution 30/10/11 THANK YOU 44