SMU SE – LMMFC Collaboration Project Task 1 Approach and Process Systems Engineering Program Engineering Management, Information and Systems Department School of Engineering Southern Methodist University March 9, 2006 Problem Statement • Make specific recommendations as the application of LEAN methods in the development of LMMFC organizational processes to satisfy the Level 5 requirements. • Make specific recommendations as the application of other initiatives (such as Six Sigma) in the development of LMMFC organizational processes to satisfy the Level 5 requirements. Task 1 Approach and Process 2 Content 1. SMU Process Flow Chart and Description 2. Excel Spreadsheet with Initiatives Identified and Support Documentation 3. QFD Matrix with Initiatives Identified Task 1 Approach and Process 3 Section 1 SMU Process Flow Chart and Description Task 1 Approach and Process 4 Flow Chart of the SMU Process Identify an initiative that has potential to apply to Maturity Level 5: Optimizing Perform literature survey of initiative – web, books, magazines, conferences, professional organizations, corporate literature Document using the Documentation Tab Format Does initiative relate to a CMMI Level 5: Optimization Practice No Yes Identify the status of initiative: current or emerging Add Results to the CMMI Table and Add Pertinent References No Document Results and Provide Recommendations Yes Literature survey complete Task 1 Approach and Process 5 Select an Initiative • It has potential to apply to Maturity Level 5: Optimizing. – Selection Criteria • May provide incremental and innovative improvement of the organization’s: – Processes and/or – Technologies • May provide guidelines and recommendations for identifying causes of defects and other problems • May provide guidelines and recommendations for defect prevention. Task 1 Approach and Process 6 Document the Initiative • Determine the main category in which the initiative is representative, i.e., quality, management, production, design engineering, reliability, etc. • Describe the central idea of the initiative. • History – Start year – Created by – Companies who have used it successfully Task 1 Approach and Process 7 Document the Initiative (cont.) • List of key elements of initiative – Describe key element – Describe benefits of each key element • Describe how the initiative relates to a specific CMMI Level 5 Goal and Practice. – Specify which CMMI Level 5 Goal and Practice to which it relates. • Document whether the initiative status is current or emerging. • Document the group reference number and reference information. Task 1 Approach and Process 8 Document the Initiative (cont.) • If the information relates to a CMMI Level 5 practice, enter the reference number in the Excel spreadsheet, CMMI Level 5 Initiative Identification Table. • Enter the reference data in the Reference tab data sheet. Task 1 Approach and Process 9 Section 2 CMMI Initiatives Identification Spreadsheet Task 1 Approach and Process 10 Initiatives • The identified initiatives include: – Production/Manufacturing • Lean – Quality • Six Sigma – Engineering • Axiomatic Design – Emerging Technologies • • • • Systematic Innovation Systems Engineering Innovations PHM Applications to Product Development Enterprise Systems Engineering – Enterprise • Intrapreneurship – Business/Technology • Innovation – Tools • Product Development Process Analysis & Optimization Task 1 Approach and Process 11 CMMI Initiatives Idenfication Spreadsheet • The excel spreadsheet includes – Identified initiatives – References – Process flow chart – Documentation completed for each initiative Task 1 Approach and Process 12 Section 3 QFD Spreadsheet Task 1 Approach and Process 13 CMMI ML5 Overview Optimizing Organizational Innovation and Deployment SG1 – Select Improvement SP1.1 – Collect and Analyze Improvement Proposals SP1.2 – Identify and Analyze Innovations SP1.3 – Pilot Improvements SP1.4 – Select Improvements for Deployment SG2 – Deploy Improvements SP2.1 – Plan the Deployment SP2.2 – Manage the Deployment SP2.3 – Measure the Improvement Effects Causal Analysis and Resolution SG1 – Determine Causes of Defects SP1.1 – Select Defects for Analysis SP1.2 – Analyze Causes SG2 – Address Causes of Defects SP2.1 – Implement the Action Proposals SP2.2 – Evaluate the Effect of Changes SP2.3 – Record Data GG3 – Institutionalize a Defined GG3 – Institutionalize a Defined Process Process Task 1 Approach and Process 14 GP2.1 – GP2.10, GP3.1 – GP3.2 GP2.1 - GP2.10, GP3.1 – GP3.2 Flowdown of ML5 Specific Goals and Practices Focus of study is on the Identification of Initiatives, Methods, and Tools and the corresponding Relationships that support the achievement of Goals and Practices for CMMI ML5 Task 1 Approach and Process 15