Marshall Islands March 31-April 11, 2008 8・5 -Field Inspection Items 8.5.1 Visual inspection and verification test of structure and quantity (1)Photovoltaic module (2)Support structure for photovoltaic module (3)Power conditioner (4)Display system e8 / PPA Solar PV Design Implementation O&M (5)Junction box, Interconnection switchboard, MCB 8.5.2 Equipment installation and wiring/connection inspection (1)Equipment installation inspection (2)Wiring/connection verification test 8.5.3 Insulation resistance test (1)Wiring between photovoltaic modules (2)Wiring between various equipment 8.5.4 Open-circuit voltage test/earth resistance test (1)Open-circuit voltage of photovoltaic module (2) Earth resistance when systems are interconnected 1 Marshall Islands March 31-April 11, 2008 8.5.1 -Visual inspection and verification test of structure and quantity (1) Photovoltaic module visual inspection and power output test Item e8 / PPA Solar PV Design Implementation O&M Appearance Inspection details Means of inspection ・Check if there is any damage, cracking or deformation in the photovoltaic module appearance. Visual inspection ・Confirm that photovoltaic modules are appropriately arranged. Power output Result Consistent with Tech. Spec. drawings ・Check against manufacturers’ shop inspection records on behalf of conducting field output tests. 2 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M 8.5.1 -Visual inspection and verification test of structure and quantity (2)Visual inspection of Support structure for photovoltaic module array Item Appearance Installation Wiring Inspection details Means of inspection There is no deformation or strain. Visual inspection There is no peeling of galvanized steel welded to support structure. Visual inspection The support structure is appropriately arranged. Consistent with Tech. Spec. drawings There is no loosening in screws, bolts and fixtures. Visual inspection Bolt tightening is appropriately conducted. Visual inspection There is no loosening in the connections between photovoltaic modules. No loosening is confirmed by touching and visually. Exposed cables behind the photovoltaic module are wired in order. Visual inspection Cables are supported by fixing devices. Visual inspection Earth cables are connected to the array support structure. Visual inspection Result 3 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M 8.5.1 -Visual inspection and verification test of structure and quantity (3) Power conditioner Visual inspection Item Inspection details Means of inspection Appearance There is neither peeling of surface coating nor deformation. Visual inspection Installation There is no loosening in screws, bolts and fixtures. Visual inspection P/N(+/-) are correctly connected at the power conditioner input. Visual inspection, tester R/S/T are correctly connected at the threephase output. Visual inspection, tester Low voltage cable +/- are correctly connected at its input/output. Visual inspection, tester Earth cables are connected. Visual inspection Cables are connected in order. Visual inspection The panel internal is clean. Visual inspection Wiring Result 4 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M 8.5.1 -Visual inspection and verification test of structure and quantity (3) Power conditioner Performance test Item Inspection details Performance Result Remarks Model/type Check the type of power conditioner against Tech. Spec. Acceptable Protective relay test (at shop) Check against shop inspection records on behalf of field relay tests. Check against shop inspection records. Islanding phenomen on detection MCCB(ELCB) is turned off and operation is shutdown in an instance. Acceptable 20 seconds standby after power restoration Performan ce test The power conditioner automatically starts 20 seconds after power restoration. 2 0 Restart on S. Acceptable The time to restoration shall be consistent with Tech. Spec. Regarding output inspection/test of relays, check against manufacturers’ shop inspection records on behalf of conducting field inspection/test. 5 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M 8.5.1 -Visual inspection and verification test of structure and quantity (4)Display system Visual inspection Item Inspection details Means of inspection Appearance There is neither peeling of surface coating nor deformation. Visual inspection Installation There is no loosening in screws, bolts and fixtures. Visual inspection Nameplate There is no defect to or peeling of nameplate. Visual inspection Wiring AC200V control power cables are correctly wired. Visual inspection, tester Low voltage cables are correctly wired and there is conduction. Visual inspection, tester Cables are wired in order. Visual inspection The panel internal is clean. Visual inspection Result LED verification test Item Verification of quantity Inspection details The generated electricity is consistent with the total of the numerical values shown in the power conditioner LCD. Means of inspection Result Visual inspection *Input signals from the secondary cable in the transducer inside the interconnection switchboard to verify the indicated values on the LED screen. *Visually check the numerical values indicated by power conditioner panel LCD or data collection system monitor to verify there is no error in the generated electricity of photovoltaic module and inverter output. 6 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M 8.5.1 -Visual inspection and verification test of structure and quantity (5) Junction box, interconnection switchboard and MCB Visual inspection of junction box-1 Item Inspection details Means of inspection Appearance There is neither peeling of surface coating nor deformation. Visual inspection Installation There is no loosening in screws, bolts and fixtures. Visual inspection P/N(+/-) are correctly connected at the junction box input. Visual inspection, tester P/N(+/-) are correctly connected at the MCCB output. Visual inspection, tester Earth cables are connected. Visual inspection Cables are wired in order. Visual inspection The panel internal is clean. Visual inspection Wiring Result 7 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M 8.5.1 -Visual inspection and verification test of structure and quantity (5) Junction box, interconnection switchboard and MCB Visual inspection of interconnection switchboard Item Inspection details Means of inspection Appearance There is neither peeling of surface coating nor deformation. Visual inspection Installation There is no loosening in screws, bolts and fixtures. Visual inspection U/V/W are correctly connected at the inverter input. Visual inspection, tester U/V/W are correctly connected at the main MCCB output. Visual inspection, tester Earth cables are connected. Visual inspection Cables are wired in order. Visual inspection The panel internal is clean. Visual inspection U/V/W phase indicator shows the positive phase at the inverter input Visual inspection, phase indicator Wiring Result 8 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M 8.5.1 -Visual inspection and verification test of structure and quantity (5) Junction box, interconnection switchboard and MCB Visual inspection of MCB Item Inspection details Means of inspection Appearance There is neither peeling of surface coating nor deformation. Visual inspection Installation There is no loosening in screws, bolts and fixtures. Visual inspection U/V/W are correctly connected at the main MCCB input. Visual inspection, tester U/V/W are correctly connected at the main MCCB output. Visual inspection, tester Earth cables are connected. Visual inspection Cables are wired in order. Visual inspection The panel internal is clean. Visual inspection U/V/W phase indicator shows the positive phase at main MCCB output. Visual inspection, phase indicator wiring Result 9 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M 8.5.2 -Equipment installation and wiring/connection inspection (1), (2) Insulation resistance measurement of cable between junction box and inverter panel Insulation resistance measurement of cable between inverter and interconnection witchboard Insulation resistance measurement of cables between interconnection switchboard, MCB and existing transducers [Test procedure] Measure the insulation resistance of (+,-) polarities and (R,S,T) phases of each cable to ensure that there is no insulation failure. Measure the insulation resistance between each cable and the ground (according to the rules for internal cables). [Acceptance criteria] Measured voltage>600V: Acceptable if measurement using 1000V megger shows 0.4MΩ or igher . Measured voltage>300V: Acceptable if measurement using 500V megger shows 0.4MΩ or higher Measured voltage>150V: Acceptable if measurement using 500V megger shows 0.2MΩ or higher. Measured voltage>150V: Acceptable if measurement using 500V megger shows 0.1MΩ or higher. 10 Marshall Islands March 31-April 11, 2008 8.5.2 -Equipment installation and wiring/connection inspection Measurement of cable insulation resistance Item Insulation resistance (M ) Junction box-1 ~Inverter-1 P(+) 100MΩ or higher N(-) 100MΩ or higher Junction box-2 ~Inverter-2 P(+) 100MΩ or higher N(-) 100MΩ or higher Junction box-3 ~Inverter-3 P(+) 100MΩ or higher N(-) 100MΩ or higher Cable type Result CV10sq-4C Earth cable 1C, spare cable 1C >600V CV10sq-4C Earth cable 1C, spare cable IC >600V CV10sq-4C Earth cable 1C, spare cable IC >600V e8 / PPA Solar PV Design Implementation O&M Inverter-1~Interconnection switchboard R(red) 100MΩ or higher S(black) 100MΩ or higher T(blue) 100MΩ or higher N(white) 100MΩ or higher >300V CV14sq-4C Interconnection switchboard~MCB R(red) 100MΩ or higher S(black) 100MΩ or higher T(blue) 100MΩ or higher N(white) 100MΩ or higher CV100sq-4C >300V MCB~Existing transducer-9 R(red) 100MΩ or higher S(black) 100MΩ or higher T(blue) 100MΩ or higher N(white) 100MΩ or higher >300V CV100sq-4C 11 Marshall Islands March 31-April 11, 2008 8.5.3 -Equipment installation and wiring/connection inspection (1)、(2) Insulation resistance measurement of cables between photovoltaic modules [Test procedure] Measure the insulation resistance of (+,-) polarities and (R, S, T) phases of each cable for one string of photovoltaic module array to verify that there is no insulation failure. Measure the insulation resistance between each cable and the ground (*The insulation resistance of the cable including the photovoltaic module will be measured). [Acceptance criteria] Open-circuit voltage≧300V: Acceptable if measurement using 1000V megger shows 0.4MΩ or higher . e8 / PPA Solar PV Design Implementation O&M Measurement of cable insulation resistance Module No. Insulation resistance (M ) Cable used Result Manufacturer’s standard type (4sq-5C) 1C earth cable, spare cable 2C Acceptable Manufacturer’s standard type (4sq-5C) 1C earth cable, spare cable 2C Acceptable Manufacturer’s standard type (4sq-5C) 1C earth cable, spare cable 2C Acceptable Manufacturer’s standard type (4sq-5C) 1C earth cable, spare cable 2C Acceptable Manufacturer’s standard type (4sq-5C) 1C earth cable, spare cable 2C Acceptable Junction box-1 PV1-1 + 65MΩ or higher PV1-1 - 100MΩ or higher PV1-2 + 100MΩ or higher PV1-2 - 200MΩ or higher PV1-3 + 150MΩ or higher PV1-3 - 200MΩ or higher PV1-4 + 100MΩ or higher PV1-4 - 200MΩ or higher PV1-5 + 50MΩ or higher PV1-5 - 90MΩ or higher Acceptable Acceptable Acceptable Acceptable Acceptable 12 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M 8.5.4 -Open-circuit voltage test/earth resistance test (1)DC Open-circuit voltage of cables between photovoltaic modules The crystalline photovoltaic power generation system consists of 270 panels of 167 W module. Eighteen modules (167W) in series ×fifteen modules in parallel constitute a photovoltaic power generation system. The open-circuit voltage of one module is about 43.1V(at the highest)with an error of ±10%. Accordingly, the nominal voltage of one module accounts for 43.1V×0.9~1.1= 38.79~47.41V. The maximum open-circuit voltage of one circuit consisting of 18 modules will be: 38.8V×18 modules=698.22V (lower limit) 47.4V×18 modules=853.38V (upper limit) [Test procedure] ・Measure the open-circuit voltage of one each string of photovoltaic module array to confirm the polarity of each circuit. ・ Measure the open-circuit voltage of one each string of photovoltaic module array to check if the number of modules in series is correct or not. <If the measured voltage is out of the acceptance criteria, the modules in series might be incorrectly connected.> 13 Marshall Islands March 31-April 11, 2008 8.5.4 -Open-circuit voltage test/earth resistance test (1)DC Open-circuit voltage of cables between photovoltaic modules [Test conditions] Tests shall be conducted during daytime hours on a sunny day. (Solar radiation shall be 0.1kW/m2 or higher.) [Acceptance criteria] e8 / PPA Solar PV Design Implementation O&M Measure the open-circuit voltage of one each string of module array to confirm that it meets the following criteria. Measurement at junction box Module train No. Junction box-1 Polarity (+,-) Acceptance criteria Open-circuit voltage (Voc) 698V~853V Junction box-1 PV1-1 O.K 744.0V Acceptable PV1-2 O.K 740.0V Acceptable PV1-3 O.K 737.0V Acceptable PV1-4 O.K 735.0V Acceptable PV1-5 O.K 734.0V Acceptable 14 Marshall Islands March 31-April 11, 2008 e8 / PPA Solar PV Design Implementation O&M 8.5.4 -Open-circuit voltage test/earth resistance test (2) Earth resistance measurement [Test procedure] Measure the earth resistance. [Acceptance criteria] Earth resistance of 100 or less is acceptable. Earth resistance Item Measured value Result Interconnection point 1.6Ω Acceptable 15