Prevention of Well Control Incidents Buenos Aires, Argentina Wild Well Control, Inc. Is the world’s leading provider of emergency firefighting, well control and related engineering services. Wild Well Control, Inc. Began in 1975 Founded by Joe Bowden, Sr. World Headquarters Houston, Texas Acquired by Superior Energy Services, 2001 (NYSE – SPN) Firefighting & Well Control Well Control Training Accredited by the International Association of Drilling Contractors (IADC) USA Market 2007 Certificates Issued (Thru 6/30) 2006 2005 Total Issued by IADC 7,499 15,821 11,339 – WellCAP PLUS® Program Issued by WWCI Training 3,287 4,253 2,082 – Drilling, Workover & Well Servicing WWCI Percent of USA Total 43% 27% 18% – WellCAP® Program Pressure Control Planning - Well control concerns, engineering or operational Operations - When Driller’s Method or Wait and Weight does not turn out as planned. Engineering Well Control Modeling Well Control Risk Assessment Rig Audits & Crew Training Blowout Contingency Plan Relief Well Planning Three Simultaneous Relief Wells Targets – Three Different Blowing Wells Relief Well #2 Relief Well #3 Relief Well #1 Well Control Jobs & Engineering Projects 2007 2007 2006 2005 2002-04 *Estimated YTD Well Control Jobs 100* 73 110 97 60 Engineering Projects 252* 189 204 187 195 Average Safety Experience PASSPORT Training / Safety Certification 2006 2005 2004 Total Recordable Incident Rate 0.00 0.00 0.00 Number of Lost Workday Cases 0 0 0 Incident Rate of Lost Workday 0.00 0.00 0.00 Safety / Training Certification Program Director of Safety June 2007 – 1.5 Million Hours with no LTA’s Well Control Modeling – Major Clients Anadarko BP - US, Trinidad, Egypt, Brazil BG Group Clayton Williams ConocoPhillips Devon ExxonMobil Newfield Nexen Pogo Premier Repsol YPF Shell Statoil Total Wintershall Well Control Modeling WC Risk Management Well Planning Drilling Operations Special WC Operations The Simulator Two phase time transient “full effect” model. Operating parameters can be changed any time. More realistic than single bubble models. Separator and flare line limits. Choke line friction pressure limit. Well Planning Kick Tolerance Observation Points Kick Circulation Drilling Operations Kick tolerance updates – function of casing point, fracture gradient, mud weight, hole depth, kill rate. Marginal kicks – Expected or actual kicks that are just above or below a kick tolerance line. Timely updates – Once model is set up for a given well or hole section, update can be made in a matter of minutes. Questions? Experience Makes The Difference Tel 281.784.4700 ● Fax 281.784.4750 www.wildwell.com