ATI Campus Plan Template AY 14/15 Overview The ATI emphasizes the importance of establishing effective processes for tracking and documenting ATI-related campus activity. In order to support campus efforts in this area, the ATI has established an ATI Campus Plan Template that will assist campuses with gathering key data to support effective decision-making and prioritization of activities. Campuses may adopt this tool as delivered or adapt it, as appropriate, to meet their specific campus needs. The Campus Plan Template is divided into 5 sections: Task Dashboard: This section is used to list specific activities—both current and planned—on which your campus intends to focus efforts related to Success Indicators in the Detailed Plan section. It is populated with several example rows that should be removed prior to using the template. Notes: This section is used to document additional details (e.g. explanations of factors that impact the assignment of Priority Level) related to Success Indicators in the Detailed Plan section. ATI Systemwide Projects: This section contains a list and description of current ATI projects. Each project includes a unique project number that is referenced in the ‘Related ATI Projects’ column of the Detailed Plan section. ATI Steering Committee Notes: This section is used to record information (e.g. key decisions, next steps) associated with campus ATI Steering Committee meetings. Detailed Plan by Priority Area: This section contains tables for each ATI priority area which are populated with the Goals and Success Indicators from the annual reports as well as the associated systemwide ‘Baseline’ level and a list of related ATI systemwide projects. Appendix A: Status Level Descriptions: This reference section provides a description of how Status Levels are manifested for different Success Indicator types. Instructions regarding how to navigate and utilize this document are provided below. Instructions Completing Success Indicator Rows 1. Populate the Campus Status Level Columns. You may request a PDF of your annual report (s) by emailing the ATI (ati@calstate.edu). 2. Determine how your campus will address the Success Indicator as follows: a. Review the ATI projects referenced in the ‘Related ATI Projects’ column to determine whether your campus can leverage deliverables from these projects b. Use the ATI Risk Assessment/Prioritization Framework to assign a priority level for the Success Indicator and enter that value in the ‘Priority Level’ column 3. Document the disposition for the Success Indicator by selecting 1 or more of the following options: a. If your campus will use a systemwide ATI project to address the Success Indicator, enter the project number(s) for the ATI projects in the ‘Leverage ATI Project’ column. b. If your campus will implement campus-level activities to address the Success Indicator, enter ‘Yes’ in the ‘Include in [current year] Task Dashboard’ column and follow the instructions below for Adding Items to the Task Dashboard. c. If your campus will await the completion of a systemwide ATI project before addressing the Success Indicator, enter ‘Yes’ in the ‘Hold’ column. 4. Document the campus commitment as follows: a. Indicate in the ‘Campus Commitment: Will work on [upcoming academic year]’ field those Success Indicators on which the campus will commit to work and report on for the next reporting year 5. If you have any additional related information regarding the Success Indicator, enter ‘Yes’ in the ‘Notes’ column and enter that information in the Notes section. Page 1 Adding Items to the Task Dashboard 1. Indicate the relationship of the task to overall campus ATI efforts a. In the ‘Priority Area’ column, indicate the ATI priority area associated with this task b. In the ‘Specific Status Indicator(s)’ column, list the unique numbers for all Success Indicators associated with this task 2. Briefly summarize the task (what will be done and by whom) a. In the ‘Task’ column, list the overall goals for this task b. In the ‘Milestones/Metrics’ column, list the key intermediate steps required to complete this task c. In the ‘Assigned to’ column, list the groups/individuals that will be involved in the task d. In the ‘Deliverables’ column, enter the expected outcomes for this task 3. Document priorities/deadlines a. In the ‘Priority Level’ column, select a priority value (see the ATI Risk Assessment/Prioritization Framework for more information regarding determining priority levels) b. In the ‘Due Date’ column, enter the anticipated completion date for the task 4. Maintain current documentation a. In the ‘Updates’ column, enter key changes in status for the task Adding Notes Use this section to provide additional related information about a Success Indicator. For example, if a high-risk area is on-hold due to limited campus capacity or other external factors, the notes section could be used to describe how/why this area was assigned a lower priority. Page 2 Task Dashboard Task # Priority Area(s) Specific Status Indicator(s) Task(s) Milestones/Metrics Assigned to Deliverable(s) Priority Level Due Date Updates List the List the task # priority areas List all related success indicators List all goals for this task List all milestones/metrics for this task Indicate to whom this task was assigned List all deliverables for this task High Medium Low Indicate when this task is due Indicate any updates regarding this task (use this for notes on progress, comments from ATI Steering committee, etc.) 1 1.4, 1.5, 1.6, 2.1, 2.2 Use of Compliance Deputy by web support persons. Roll out tool via our ATI web site. Create training materials. Notify web owners and support persons. Web Services and ATI Web Subcommittee Deputy install provided via ATI web site. High Dec. 2014 Tool is installed and working. Development of website is in progress. Evaluation of training needs is progress. Medium Feb. 2015 Web Training available on web site. Email notification to web owners and support. 2 Page 3 Web 1.1, 1.2, 1.3, 1.7, 1.8, 1.11, 3.5, 3.6, 3.7, 3.8, 3.9, 5.10, 6.1, 6.2, Site inventory and increased notification and tracking Develop an online web site inventory with owners and support persons identified. Increase notification on a monthly or quarterly basis (TBD) to web owners about ATI reports and compliance requirements. Alex Harwood and Web Services On line inventory of web owners and support persons. Email notifications to web owners and support persons Task # 3 Priority Area(s) Web Specific Status Indicator(s) Task(s) 1.15, 1.16, 1.17, 2.8, 3.10, 3.11, 5.3, 7.1, 7.2 Update ATI web site. Milestones/Metrics Move all ATI content to new CMS. Update all content on ATI site. Add additional inventory, meeting agendas and notes, email communications, Compliance Deputy on new site. Assigned to Deliverable(s) Priority Level Due Date Web Services, ATI Web Subcommittee, ATI Steering Committee and other two subcommittees : Procurement and Instructional Material New ATI web site on new CMS with updated and new content High Dec. 2014 4 Web 1.6, 1.11, 3.5, 3.6, 3.7, 3.8, 3.9, 3.10, 5.1, 5.2, 5.3, 5.5, 5.6, 5.9, 5.10 Training Additional training and communication to cover two topics: Manual review of uploaded documents (PDFs and so forth) for ADA compliance & Compliance Deputy ITS Training New training developed and in person and on line training available. High Feb 2015 5 Web 4.1, 4.2, 4.3 Exception process Create an exception process. ATI Web Subcommittee New exception process created, approved and communicated. Medium Feb 2015 6 Instructional Material 1.5, 2.4 Monitoring Textbook Orders Modify existing academic affairs procedure for monitoring textbook orders Instructional Material Subcommittee New procedure for monitoring textbook orders Medium Jan 2015 7 Instructional Material 4.1 Moodle posting of instructional materials Formally document the process by which CETL promotes posting of instructional materials on Moodle Instructional Material Subcommittee Documented process Medium March 2015 8 Instructional Material 4.5 OSD access to Moodle Provide OSD staff with access to Moodle sandbox Instructional Material Subcommittee Moodle sandbox access Medium Nov 2015 Page 4 Updates Moving existing content is in progress. Editing/updating will be available very soon. Draft is being created Task # Priority Area(s) Specific Status Indicator(s) Task(s) Milestones/Metrics Assigned to Deliverable(s) Priority Level Due Date 9 Instructional Material 4.9 EEAAP EEAAP for how to ensure equal access to instructional materials Instructional Material Subcommittee EEAAP Medium March 2015 10 Instructional Material 6.6 Campus plan for tracking course revisions for accessibility support Develop the process Instructional Material Subcommittee process Medium June 2015 11 Instructional Material 8.1 Formal awareness campaign to increase knowledge and responsibilities Campaign development and deployment Instructional Material Subcommittee Awareness Campaign Medium June 2015 12 Procurement 1.1, 1.2, 1.3, 1.4, 1.7, 2.2, 3.2, 3.3, 3.4 Move procurement process from threshold based to impact based New process in place Procurement and ITS Procedure Medium Dec 2014 13 Procurement 1.5 Procedure for competitive procurement bid process New procedure in place Procurement and ITS Procedure Medium April 2015 14 Procurement 2.2, 5.2, 5.3, 6.3 New hire orientation updated to reflect impact based ATI procurement requirements New orientation Procurement Orientation materials Medium Jan 2015 15 Procurement 2.2, 5.2, 5.3, 5.4, 5.6 Impact based procurement process training for ITCs Training developed and delivered Procurement, ITS and ITCs Training materials and training provided Medium Feb 2015 Notes – linked to applicable Success Indicators in the Notes Column This section will contain any documentation that explains why a particular high-risk indicator cannot be immediately addressed. Page 5 Updates completed ATI Steering Committee Notes Meeting Dates Key Decisions Notes ATI Systemwide Projects The section will contain a numbered list with a brief description of current ATI projects. The project number will correspond to the number shown in the related ATI project column. Page 6 ATI Plan by Priority Area Web (7 goals / 69 success indicator) Goal/Success Indicator Median Systemwide Status Level 1-Optimizing 2-Managed 3-Established 4-Defined 5-Initiated 6-Not Started 1. Goal: Web Accessibility Evaluation Process: Identify and repair or replace inaccessible websites, web applications, and digital content. AY 13/14 Campus Campus Status Level Status Level 1-Optimizing 2-Managed 3-Established 4-Defined 5-Initiated 6-Not Started 2 1-Optimizing 2-Managed 3-Established 4-Defined 5-Initiated 6-Not Started 3 2 2 3 3 Campus Commit ment: 14/15 X-Campus commits to work on this Success Indicator x Related ATI Projects Ref ATI project number Priority Level Leverag e ATI Project Include in Task Dashboard Established 1.2. Inventoried all campus administrative websites. Established X Notes Upgrade Compliance Sheriff to latest version 4.2.12.4 along with Compliance Deputy. Expand ATI training to include Compliance Deputy and manual evaluations of attachments. Continue migration to Drupal. Rework processes for review and follow up of website compliance activities. Medium Web-3 Hold High Medium Low Established 1.1. Assigned responsibility for the evaluation process to a body (person(s) or business entity). Page 7 AY 12/13 Medium 2 Medium 2 We intend to review our inventory this coming year. Goal/Success Indicator 1.3. Inventoried all administrative websites developed by contract vendors. 1.4. Established a process to perform regularly scheduled accessibility audits using established criteria to identify websites that need remediation. 1.5. Conducted automated accessibility evaluations on websites and web applications. 1.6. Conducted manual accessibility evaluations on websites and web applications. 1.7. Established a procedure to distribute evaluation results to campus members responsible for website and maintenance. Page 8 Median Systemwide Status Level AY 12/13 AY 13/14 Campus Campus Status Level Status Level Campus Commit ment: 14/15 Related ATI Projects Priority Level Leverag e ATI Project Include in Task Dashboard 4 4 Web-3 Medium 2 2 2 Web-1 High 1 1 1 Web-1 High 1 3 2 Web-1 Medium 1 Hold Notes Defined Defined Established x Web-4 Defined 3 4 x Web-3 4 Medium 2 We intend to improve this area via training. We intend to improve this area with increased notification to website owners. Goal/Success Indicator 1.8. Established a follow-up procedure that tracks remediation or replacement of documented compliance issues. 1.9. Established a procedure to ensure that campus members involved in maintaining websites and web applications, are familiar with the web accessibility evaluation process. 1.10. Established a procedure to ensure that campus members involved in maintaining websites, web application know who to contact for compliance assistance. 1.11. Conducted manual accessibility evaluations on digital content: documents (word processor produced, excel, PowerPoint, PDF). Page 9 Median Systemwide Status Level AY 12/13 AY 13/14 Campus Campus Status Level Status Level Campus Commit ment: 14/15 Related ATI Projects x Priority Level 4 4 Medium 3 3 Medium 2 2 Medium 5 5 Leverag e ATI Project Include in Task Dashboard Hold Notes 2 We intend to improve this area with increased notification to website owners. 2 We intend to increase the university understanding about this through training. Initiated Established Established x IM-3 Medium 4 Defined Goal/Success Indicator 1.12. Conducted manual evaluations on digital content: videos. 1.13. Conducted manual evaluations on digital content: audios. 1.14. Established a procedure to distribute evaluation results to campus members and vendors responsible for digital content maintenance. 1.15. Established a procedure to ensure that campus members involved in maintaining digital content are familiar with the web accessibility evaluation process. 1.16. Established a procedure to ensure that campus members involved in maintaining digital content know who to contact for compliance assistance. Page 10 Median Systemwide Status Level AY 12/13 AY 13/14 Campus Campus Status Level Status Level Campus Commit ment: 14/15 Related ATI Projects IM-3 Priority Level Leverag e ATI Project Include in Task Dashboard 5 5 Medium 5 5 Medium 3 3 Medium 3 3 High 3 3 3 High 3 Initiated Initiated Initiated Defined Established Hold Notes Goal/Success Indicator 1.17. Documentation of the web accessibility evaluation process is archived and can be produced for inspection. Median Systemwide Status Level AY 12/13 AY 13/14 Campus Campus Status Level Status Level 4 Page 11 Related ATI Projects Web-3 Priority Level High Leverag e ATI Project Include in Task Dashboard Hold Notes 3 Defined 1.18. Established a procedure to distribute evaluation results to vendors responsible for website maintenance. 2. Goal: New website/web application and digital content development complies with all Section 508 accessibility guidelines. 4 Campus Commit ment: 14/15 6 Established 5 5 Medium Hold We can consider this but we haven’t added it to our plan as at this time Continue to educate campus on developing web accessible websites. Continue testing websites and web applications for accessibility. Continued migration to a content management system. The new CMS includes an accessibility module to assist web page owners in addressing minimum accessibility standards on their pages. Expand training to include new compliance deputy tools and manual checks of images and videos embedded in documents. Goal/Success Indicator 2.1. Established a process to ensure that new websites and web applications are developed with "designed in" accessibility included. 2.2. Established a procedure to ensure that accessible coding techniques are used to develop new websites and web applications. 2.3. Established a procedure to ensure that campus members involved in the design and development processes are aware of Section 508 guidelines. Median Systemwide Status Level AY 13/14 Campus Campus Status Level Status Level 3 2 Campus Commit ment: 14/15 x Related ATI Projects Web-1 Priority Level Leverag e ATI Project Include in Task Dashboard High 1 High 1 Web-2 Established 3 3 x Web-1 Web-2 Established 2 2 x Web-1 Low Web-2 Established 2.4. Established a procedure to ensure that campus members involved in website design and Managed development know who to contact for compliance assistance. Page 12 AY 12/13 2 2 x Low Hold Notes Goal/Success Indicator 2.5. Developed digital content: documents (word processor produced, excel, PowerPoint, PDF) in accordance with Section 508 accessibility guidelines. 2.6. Developed digital content: videos in accordance with Section 508 accessibility guidelines. 2.7. Developed digital content: audios in accordance with Section 508 accessibility guidelines. Median Systemwide Status Level Page 13 AY 13/14 Campus Campus Status Level Status Level Campus Commit ment: 14/15 Related ATI Projects Priority Level 4 4 x IM-3 Low 3 3 x IM-2 Low Leverag e ATI Project Include in Task Dashboard Hold Notes Defined IM-3 Defined IM-6 5 5 x Low 3 3 x High Defined 2.8. Established a procedure to ensure that campus members involved in digital content Defined development know who to contact for compliance assistance. 2.9. Assigned responsibility for the New Web Development process to a body (person(s) or business entity). AY 12/13 6 3 x We have not yet evaluated this item. Goal/Success Indicator 3. Goal: Updating and maintenance of websites/web applications and digital content comply with Section 508 Accessibility Standards 3.1. Assigned responsibility for the ongoing monitoring process of websites and web applications to a body (person(s) or business entity). 3.2. Established a procedure to verify that any changes made to existing website and web applications comply with 508 accessibility guidelines. 3.3. Established a procedure to ensure that campus members involved in website and/or web application development are familiar with the monitoring process. Page 14 Median Systemwide Status Level Defined AY 12/13 AY 13/14 Campus Campus Status Level Status Level Campus Commit ment: 14/15 Related ATI Projects Priority Level Include in Task Dashboard Hold Notes Plan on updating version of Compliance Sheriff to the newest version that includes compliance deputy. Continued migration of university websites to the content management system. 2 4 x 2 2 x 3 3 x Web-2 Low 3 3 x Web-2 Low Low Established Defined Defined Leverag e ATI Project Goal/Success Indicator 3.4. Established a procedure to ensure that campus members that develop websites, web applications know who to contact for compliance assistance. 3.5. Assigned responsibility for the ongoing monitoring process of digital content to a body (person(s) or business entity) 3.6. Conducted Section 508 evaluations on digital content: documents (word processor produced, excel, PowerPoint, PDF) before the documents are published to the web. 3.7. Conducted Section 508 evaluations on digital content: videos before the videos are published to the web. Page 15 Median Systemwide Status Level AY 12/13 AY 13/14 Campus Campus Status Level Status Level Campus Commit ment: 14/15 Related ATI Projects Priority Level 2 2 x Low 6 6 x Medium Leverag e ATI Project Include in Task Dashboard Hold Notes Established 2 4 Defined 5 5 x Web-1 Medium IM-3 2 4 Initiated 4 4 x Web-1 Medium 2 4 Initiated This year we will assign this responsibility to web owners. This will be documented, communicated and training provided. This year we will assign this responsibility to web owners. This will be documented, communicated and training provided. This year we will assign this responsibility to web owners. This will be documented, communicated and training provided. Goal/Success Indicator 3.8. Conducted Section 508 evaluations on digital content: audios, before the audios are published to the web. 3.9. Established a procedure to ensure that campus members involved in digital content development are familiar with the monitoring process. 3.10. Established a procedure to ensure that campus members that develop digital content know who to contact for compliance assistance. 3.11. Documentation of the web accessibility monitoring process is archived and can be produced for inspection. Page 16 Median Systemwide Status Level AY 12/13 AY 13/14 Campus Campus Status Level Status Level 6 6 Campus Commit ment: 14/15 x Related ATI Projects Web-1 Priority Level Medium Leverag e ATI Project Include in Task Dashboard 2 4 Initiated 4 4 x Medium 2 4 Initiated 4 4 x High 3 4 Defined 3 Defined 3 x Web-1 High 3 Hold Notes This year we will assign this responsibility to web owners. This will be documented, communicated and training provided. This year we intend to reinforce our current practices and improve them with follow up communications. This year we will assign this responsibility to web owners. This will be documented, communicated and training provided. Goal/Success Indicator 4. Goal: Documented noncompliant websites, web applications and digital content must be delivered in an equally effective alternate format and granted an exemption. 4.1. Established a process for granting exemptions. 4.2. Documented process for handling exemptions is part of the campus Web Accessibility Plan. 4.3. Established a procedure to ensure that campus members responsible for website and web application are aware of the process for providing accessible alternate formats. 4.4. Accessible alternate format is in place for all website and web applications exemptions. Page 17 Median Systemwide Status Level Defined Defined AY 12/13 AY 13/14 Campus Campus Status Level Status Level Campus Commit ment: 14/15 Related ATI Projects Priority Level Leverag e ATI Project Include in Task Dashboard Hold Notes Finalize and communicate exemption procedures. 4 4 x 4 4 x Medium 5 5 5 x Medium 5 4 4 x Medium 5 6 6 Initiated Defined Initiated Low No exceptions identified at this time Goal/Success Indicator 4.5. Established a follow-up procedure to remediate non-compliant websites, and web applications. 4.6. Established a procedure to ensure that campus members responsible for website, and web applications, know who to contact for compliance assistance. 4.7. Documentation of the website, and web application, exemptions and alternative accommodations process is archived and can be produced for inspection. 4.8. Accessible alternate format is in place for all digital content exemptions. Page 18 Median Systemwide Status Level AY 12/13 AY 13/14 Campus Campus Status Level Status Level Campus Commit ment: 14/15 Related ATI Projects Priority Level Leverag e ATI Project Include in Task Dashboard Hold Notes 4 4 x Low 5 5 x Low 6 6 Low No exceptions identified at this time 6 6 Low No exceptions identified at this time Defined Established Initiated Initiated Goal/Success Indicator 4.9. Established a procedure to ensure that campus members responsible for digital content are aware of the process for providing accessible alternate formats. 4.10. Established a follow-up procedure to remediate non-compliant digital content. 4.11. Established a procedure to ensure that campus members responsible for digital content know who to contact for compliance assistance. 4.12. Documentation of the digital content exemptions and alternative accommodations process is archived and can be produced for inspection. Page 19 Median Systemwide Status Level AY 12/13 AY 13/14 Campus Campus Status Level Status Level Campus Commit ment: 14/15 Related ATI Projects Priority Level 4 4 x Low 5 5 x Low 5 5 x Low 6 6 Leverag e ATI Project Include in Task Dashboard Hold Notes Initiated Initiated Defined Initiated Low No exceptions identified at this time Goal/Success Indicator Median Systemwide Status Level AY 12/13 AY 13/14 Campus Campus Status Level Status Level 4.13. Assigned responsibility for the exemptions process to a body (person(s) or business entity). 5. Goal: Professional development training has incorporated Section 508 accessibility guidelines into website and web applications development and digital content preparation. Page 20 Established 3 Campus Commit ment: 14/15 6 x 3 x Related ATI Projects Priority Level Low Leverag e ATI Project Include in Task Dashboard Hold Notes We will be finalizing our exception process and that will include assigning responsibility to review requests. Compliance Sheriff training videos and a Moodle course have been created, and will be made available this coming academic year. Training development for Compliance Deputy will begin once testing and configuration are done. Training on Compliance Sheriff and Compliance Deputy will be provided for CSULA users in addition to two existing training: ATI Awareness and Web Author: Manual Accessibility Checks. Goal/Success Indicator 5.1. Assigned responsibility for the training process of web development and web application development to a body (person(s) or business entity). 5.2. Assigned responsibility for the training process of digital content development to a body (person(s) or business entity). 5.3. Established a web based repository for training materials that are available to members of the campus community 5.4. Established and deployed accessible web training program for web developers and designers. 5.5. Established and deployed accessible web training program for web content contributors. Page 21 Median Systemwide Status Level AY 12/13 AY 13/14 Campus Campus Status Level Status Level Campus Commit ment: 14/15 Related ATI Projects Priority Level Leverag e ATI Project Include in Task Dashboard 2 2 x High 4 4 4 x High 4 3 3 x High 3 Established Established 4 Established 3 3 x 3 3 x Established Established High 4 Hold Notes Goal/Success Indicator 5.6. Established and deployed accessible web training program for digital content: (word processor produced, excel, PowerPoint, PDF) publishers. 5.7. Established and deployed accessible web training program for digital content: video publishers. Median Systemwide Status Level Campus Campus Status Level Status Level Campus Commit ment: 14/15 Related ATI Projects Priority Level Leverag e ATI Project Include in Task Dashboard 4 4 x High 4 4 4 x Low 5 5 x Low 2 2 x High 4 2 2 x Medium 2 Defined Initiated 5.9. Training is offered on a regular schedule. Established Page 22 AY 13/14 Established 5.8. Established and deployed accessible web training program for digital content: audio publishers. 5.10. Established a procedure to ensure that campus members are aware of the training process and know who to contact for training assistance. AY 12/13 4 Established Hold Notes Goal/Success Indicator Median Systemwide Status Level 5.11. Documentation of the training sessions and attendance is archived and Established can be produced for inspection. 6. Goal: In general the campus community is aware of Section 508 guidelines to make web based information available to everyone (students, staff, faculty & the general public) regardless of disability. 6.1. Assigned responsibility for the communication process to a body (person(s) or business entity). 6.2. Established an ongoing general campus communication that promotes web accessibility awareness. 6.3. Established a procedure that incorporates electronic content Section 508 guidelines into the orientation process for new faculty. Page 23 Established AY 12/13 AY 13/14 Campus Campus Status Level Status Level Campus Commit ment: 14/15 Related ATI Projects Priority Level Leverag e ATI Project Include in Task Dashboard 2 2 x 3 3 x 3 3 Medium 2 3 3 Medium 2 3 3 Low Notes Low Continue to communicate requirements to campus. Continue ATI Committee meetings. Continue ATI Subcommittee meetings. Established Defined Defined Hold Goal/Success Indicator 6.4. Established a procedure that incorporates electronic content Section 508 guidelines into the orientation process for new staff. 6.5. Established a procedure that incorporates electronic content Section 508 guidelines into the orientation process for students. 6.6. Documentation of the communication process is archived and can be produced for inspection. 7. Goal: Campus governance entities are aware of and kept informed about web accessibility. 7.1. Developed and published a Web Accessibility Plan. 7.2. Established a procedure to update and revise the Web Accessibility Plan as necessary. Page 24 Median Systemwide Status Level AY 12/13 AY 13/14 Campus Campus Status Level Status Level Campus Commit ment: 14/15 Related ATI Projects Priority Level Leverag e ATI Project Include in Task Dashboard 3 3 5 5 x Low 5 5 x Low 4 4 x 4 4 x High 3 x High 3 Hold Notes Low Initiated Not Started Initiated Defined Established 4 Defined Continue ATI Committee meetings. Continue ATI Subcommittee meetings. Goal/Success Indicator Median Systemwide Status Level AY 12/13 AY 13/14 Campus Campus Status Level Status Level Campus Commit ment: 14/15 Related ATI Projects Priority Level 7.3. Established metrics for each of the Web Accessibility Plan areas (evaluation, monitoring, Initiated new development, exemptions & alternatives, training, and communication). 4 4 x Low 7.4. Established a procedure to document the results of the metrics as applied to the web plan areas and to distribute those results to campus governance entities. 4 4 x Low Page 25 Initiated Leverag e ATI Project Include in Task Dashboard Hold Notes Instructional Materials (9 goals/40 success indicators) Goal/Success Indicator Baseline Systemwide Status Level 1-Optimizing 2-Managed 3-Established 4-Defined 5-Initiated 6-Not Started 1. Goal: The campus has implemented a comprehensive plan to ensure the timely adoption of textbooks and other instructional materials. AY 11/12 AY 12/13 Campus Campus Status Level Status Level 1-Optimizing 2-Managed 3-Established 4-Defined 5-Initiated 6-Not Started 1-Optimizing 2-Managed 3-Established 4-Defined 5-Initiated 6-Not Started 2 2 2 2 Established 1.1. Campus has formally documented (e.g. Policy, Resolution or Procedure) a process to ensure the timely adoption of textbooks and other instructional materials. [Commitment] Page 26 Managed Campus Commitme nt: Will work on 13/14? Related ATI Projects Priority X-Campus commits to work on this Success Indicator Reference ATI project number(s) High Medium Low Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator Baseline Systemwide Status Level AY 11/12 AY 12/13 Campus Campus Status Level Status Level Campus Commitme nt: Will work on 13/14? Related ATI Projects 1.2. Campus has developed IM-1 capacity (e.g. established practices, specified staff time, educational/training resources, and/or technology) to achieve compliance with timely adoption. [Ability] IM-4 Priority Level Leverage ATI Project Include in Task Dashboard IM-5 2 3 1.4. Campus has established a process to gather data (e.g. percentage and number) regarding adoption of IM by established campus deadline. [Measurement] (new) (new) 1.5. Campus has established a process to distribute performance reports regarding timely adoptions to campus administration at least annually. [Measurement] (new) (new) Established IM-7 1.3. Removed Page 27 X Medium X Hold Notes Goal/Success Indicator 2. Goal: The campus has implemented a comprehensive plan to ensure that textbooks have been identified for courses with late-hire faculty. Baseline Systemwide Status Level AY 11/12 AY 12/13 Campus Campus Status Level Status Level Established 2.1. All academic units have implemented specific procedures for late hire or adjunct Defined faculty members for the timely adoption of curricular materials. [Ability] 3 3 3 3 (new) (new) 2.2. Removed 2.3. Campus has established a process to gather data (e.g. percentage and number) regarding adoption of IM for late-hire adoptions.[Measurem ent] Page 28 Campus Commitme nt: Will work on 13/14? Related ATI Projects Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator Baseline Systemwide Status Level 2.4. Campus has established a process to distribute performance reports regarding timely, latehire adoptions to campus administration at least annually. 3. Goal: The campus has implemented a comprehensive plan to ensure that students with disabilities are identified and able to request alternate media materials in a timely manner. AY 12/13 Campus Campus Status Level Status Level (new) (new) 3 1 1 1 Managed 3.1. Campus has implemented a system to provide early Managed registration for alternate mediaeligible students. [Ability] Page 29 AY 11/12 Campus Commitme nt: Will work on 13/14? X Related ATI Projects Priority Level Medium Leverage ATI Project Include in Task Dashboard X Hold Notes Goal/Success Indicator Baseline Systemwide Status Level 3.2. Campus has implemented a system to track early registration usage by alternate mediaeligible students (intended to provide alternate media programs with Managed sufficient time to produce alternate media as well as to document student conformance with alternate media submissions procedures). [Measurement] Page 30 1 AY 11/12 AY 12/13 Campus Campus Status Level Status Level 1 Campus Commitme nt: Will work on 13/14? Related ATI Projects Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator Baseline Systemwide Status Level 3.3. Campus has implemented a system that allows alternate media requests to be submitted without appearing in-person Established during regular business hours (e.g. web-based forms, integration with student registration portal). [Ability] 3.4. Campus has implemented a system to track the timeliness Managed of alternate media requests. [Measurement] Page 31 AY 11/12 AY 12/13 Campus Campus Status Level Status Level 2 3 3 3 Campus Commitme nt: Will work on 13/14? Related ATI Projects Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator Baseline Systemwide Status Level 3.5. Campus has developed specific measures of success for early identification of students with disabilities (e.g., percentage of eligible Established students who utilize early registration) and implemented a system to track these measures. [Measurement] Established 4. Goal: The campus has implemented policies and procedures to promote the posting of all required curricular and instructional resources (including printbased and multimedia materials) in a central, accessible electronic location. Page 32 AY 11/12 AY 12/13 Campus Campus Status Level Status Level 1 1 5 5 Campus Commitme nt: Will work on 13/14? Related ATI Projects Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator Baseline Systemwide Status Level AY 11/12 AY 12/13 Campus Campus Status Level Status Level Campus Commitme nt: Will work on 13/14? Related ATI Projects Priority Level Leverage ATI Project Include in Task Dashboard 4.1. Campus has formally documented (e.g., Policy, Resolution or Procedure) a process to promote or require the posting of instructional materials (new) (new) (new) (new) to a central, electronic location (e.g. LMS, lecture capture system, course website). [Commitment] 4.2. Removed 4.3. Campus has established specific guidelines and procedures for submitting course and curricular materials hosted in campus LMS (or other central, electronic product). [Commitment] Page 33 X Medium X Hold Notes Goal/Success Indicator Baseline Systemwide Status Level 4.4. Campus has implemented procedures to accelerate the delivery of alternate media Established materials to improve timeliness (e.g. electronic delivery via campus LMS or FTP). [Ability] 4.5. Campus has implemented a procedure that provides alternate media production staff with timely access to instructional materials within the central electronic location. [Ability] 4.6. Removed Page 34 AY 11/12 AY 12/13 Campus Campus Status Level Status Level 5 4 (new) (new) Campus Commitme nt: Will work on 13/14? X Related ATI Projects Priority Level Medium Leverage ATI Project Include in Task Dashboard X Hold Notes Goal/Success Indicator 4.7. Campus has established a process to review vendor documentation and/or conduct product testing to determine the accessibility support provided by the central, electronic location (e.g. LMS, lecture capture system, course website). [Measurement] 4.8. Campus has established a process to periodically request and review updated vendor documentation and/or conduct updated product testing for the central, electronic location. [Measurement] Page 35 Baseline Systemwide Status Level AY 11/12 AY 12/13 Campus Campus Status Level Status Level (new) (new) (new) (new) Campus Commitme nt: Will work on 13/14? Related ATI Projects Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator Baseline Systemwide Status Level 4.9. Campus has developed an Equally Effective Alternate Access Plan (EEAAP) that addresses how the campus will ensure equal access for individuals with disabilities to IM stored within the central, electronic location. [Measurement] 4.10. Campus has established a process to measure the extent to which IM are posted to the central, electronic location. [Measurement] 5. Goal: The campus has implemented policies and procedures to ensure that accessibility requirements have been incorporated into the adoption process for all multimedia-based instructional resources. Page 36 AY 11/12 AY 12/13 Campus Campus Status Level Status Level Campus Commitme nt: Will work on 13/14? Related ATI Projects SYS-1 (new) (new) (new) (new) 3 3 Established X Priority Level Medium Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 5.1. Campus has developed and implemented accessibility requirements for selecting and adopting multimedia curricular materials (e.g. requirements for captions, transcripts, audio description, and accessible web players). [Commitment] 5.2. Campus has established a strategic process, based on available resources, for prioritizing the remediation of inaccessible multimedia materials. [Commitment] Page 37 Baseline Systemwide Status Level AY 11/12 AY 12/13 Campus Campus Status Level Status Level Campus Commitme nt: Will work on 13/14? Related ATI Projects IM-6 Established 3 3 IM-6 Defined 3 3 Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 5.3. Campus has established a process to inventory existing multimedia content including usage data. [Measurement] Baseline Systemwide Status Level AY 11/12 AY 12/13 Campus Campus Status Level Status Level Campus Commitme nt: Will work on 13/14? Related ATI Projects IM-6 (new) (new) 5.4. Removed 5.5. Removed 5.6. Campus has specified staff for addressing the accessibility of existing and planned multimedia content. [Ability] 5.7. Campus has acquired tools for addressing the accessibility of existing and planned multimedia content. [Ability] Page 38 IM-2 IM-3 (new) (new) IM-2 IM-3 (new) (new) IM-6 Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator Baseline Systemwide Status Level AY 11/12 AY 12/13 Campus Campus Status Level Status Level 5.8. Campus has established work space for addressing the accessibility of existing and planned multimedia content. [Ability] (new) (new) 5.9. Campus has specified staff to coordinate with post-production captioning/transcripti on vendors and/or campus personnel that provide this service. [Measurement] (new) (new) 5.10. Campus has specified staff to coordinate with realtime captioning/ transcription vendors and/or campus personnel that provide this service. [Measurement] (new) (new) Page 39 Campus Commitme nt: Will work on 13/14? Related ATI Projects Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 6. Goal: The campus has implemented policies and procedures to ensure that accessibility requirements have been incorporated into the curricular review process. Baseline Systemwide Status Level AY 11/12 AY 12/13 Campus Campus Status Level Status Level Initiated 6 5 (new) (new) (new) (new) 6.1. Removed 6.2. Campus has established accessibility standards or guidelines for selecting, authoring, and procuring curricular materials (e.g. documents, videos, web/mobile applications). Example: Course Accessibility Checklist. 6.3. Removed 6.4. Campus has established a process to allow for the review of the accessibility of online courses before posting. [Measurement] Page 40 Campus Commitme nt: Will work on 13/14? Related ATI Projects Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 6.5. Campus has established a process for faculty and/or instructional staff to incorporate accessibility at time of course redesign. [Measurement] * 6.6. Campus has established a process to track courses that have been reviewed/ revised for accessibility support. [Measurement] * Success Indicators 6.5/6.6 only address the existence of processes that supports incorporating accessibility into the course design process (6.5) and tracking the courses for which this has occurred (6.6). They are not prescriptive regarding the implementation details (e.g. timing, frequency, or scope of these activities) as these should be determined by the campus. Page 41 Baseline Systemwide Status Level AY 11/12 AY 12/13 Campus Campus Status Level Status Level (new) (new) (new) (new) Campus Commitme nt: Will work on 13/14? X Related ATI Projects Priority Level Medium Leverage ATI Project Include in Task Dashboard X Hold Notes Goal/Success Indicator 7. Goal: The campus has implemented policies and procedures to support faculty in selecting, authoring, and delivering accessible instructional materials. 7.1. Campus has formally documented (through Policy, Resolution or Procedure) the nature of faculty responsibility for selecting and authoring accessible curricular materials. [Commitment] Baseline Systemwide Status Level AY 11/12 AY 12/13 Campus Campus Status Level Status Level Established 4 3 Defined 3 2 Established 4 4 7.2. Removed 7.3. Campus has developed and disseminated examples of accessible curricular materials and practices (e.g. accessible syllabus template, faculty exemplars). [Ability] 7.4. Removed Page 42 Campus Commitme nt: Will work on 13/14? Related ATI Projects Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 7.5. Campus has established a procedure and provided associated tools to allow faculty and/or instructional staff to verify the accessibility of curricular content. [Ability] Baseline Systemwide Status Level AY 11/12 AY 12/13 Campus Campus Status Level Status Level Page 43 Related ATI Projects IM-3 IM-8 (new) (new) (new) (new) 7.6. Removed 7.7. Campus provides access to technology to support faculty creation of accessible instructional materials (e.g. workstations, software, scanners) [Ability] Campus Commitme nt: Will work on 13/14? Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 7.8. Campus provides personnel resources (e.g. instructional designers, lab technicians, and student assistants) necessary to support faculty creation of accessible instructional materials. [Ability] 7.9. Campus has established a process to provide digital copies of course readers to alternate media production staff upon request. [Ability] * 7.10. Campus has established a process to provide digital copies of library electronic reserves to alternate media production staff upon request. [Ability] Page 44 Baseline Systemwide Status Level AY 11/12 AY 12/13 Campus Campus Status Level Status Level (new) Campus Commitme nt: Will work on 13/14? Related ATI Projects (new) IM-4 (new) (new) IM-4 (new) (new) Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator Baseline Systemwide Status Level AY 11/12 AY 12/13 Campus Campus Status Level Status Level * The intent of Success Indicators 7.9 and 7.10 is to eliminate the redundant digitization of instructional materials by alternate media staff by capturing a digital copy of paper-based source materials including course readers (7.9) and library electronic reserves material (7.10) at the time they’re produced. This eliminates the need for alternate media staff to re-scan/digitize this material. 8. Goal: The campus has implemented a broadbased ATI awareness campaign, supported by a comprehensive training infrastructure to increase technological accessibility across the campus. Page 45 Defined 4 3 Campus Commitme nt: Will work on 13/14? Related ATI Projects Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 8.1. Campus has developed a formal awareness campaign to increase knowledge of accessibility issues and responsibilities. [Commitment] Baseline Systemwide Status Level Established AY 11/12 AY 12/13 Campus Campus Status Level Status Level 4 4 Campus Commitme nt: Will work on 13/14? Related ATI Projects SYS-2 8.4. Removed Page 46 (new) (new) Level Leverage ATI Project Include in Task Dashboard X 8.2. Removed 8.3. Campus has developed and disseminated a variety of training materials, both in content and modality (e.g. quick use guides, workshops, FAQ), for selecting, authoring, procuring, and distributing accessible instructional materials. [Ability] Priority SYS-2 Medium X Hold Notes Goal/Success Indicator 8.5. Campus is tracking participation in training activities and usage of training materials for accessible authoring, conversion, and delivery of curricular materials (e.g. number of workshop attendees, number of users who download templates, or watch training videos). [Measurement] Baseline Systemwide Status Level AY 11/12 AY 12/13 Campus Campus Status Level Status Level 4 4 8.7. Campus provides personnel necessary to support the awareness campaign. [Ability] (new) (new) 8.8. Campus provides resources necessary to support the development of awareness campaign. [Ability] (new) (new) Defined 8.6. Removed Page 47 Campus Commitme nt: Will work on 13/14? Related ATI Projects SYS-2 Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator Baseline Systemwide Status Level AY 12/13 Campus Campus Status Level Status Level 8.9. Campus provides personnel necessary to support the training activities. [Ability] (new) (new) 8.10. Campus provides resources necessary to support the development and delivery of training activities. [Ability] (new) (new) 8.11. Campus has integrated accessibility into faculty orientations [Measurement] 9. AY 11/12 Goal: Campus IMAP committee has sufficient breadth, resources, and authority to effectively implement a comprehensive IMAP initiative. Page 48 Campus Commitme nt: Will work on 13/14? Related ATI Projects SYS-2 (new) (new) 5 4 Established Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 9.1. Campus IMAP committee membership consists of stakeholders from all key units (Student Affairs, Academic Senate, Curriculum Committee, Academic Technology, Library) as well as faculty, staff and students. [Commitment] Baseline Systemwide Status Level AY 11/12 AY 12/13 Campus Campus Status Level Status Level (new) (new) (new) (new) 9.2. Removed 9.3. Campus has established a process to review and revise the campus ATI Instructional Materials plan on an annual basis. [Measurement] 9.4. Removed Page 49 Campus Commitme nt: Will work on 13/14? Related ATI Projects Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Procurement (8 goals/37 success indicators) Goal/Success Indicator Baseline Systemwide Status Level 1-Optimizing 2-Managed 3-Established 4-Defined 5-Initiated 6-Not Started 1. Goal: An ATI Electronic and Information Technology E&IT Procurement Plan, documents, forms, and other materials to support 508 procurements at the campus are created and published. 1.1. Developed and published an Accessible ATI E&IT Procurement Plan 1.2. Developed and published a document that defines what products are categorized as Section 508 E&IT procurements Page 50 AY 11/12 Campus Status Level 1-Optimizing 2-Managed 3-Established 4-Defined 5-Initiated 6-Not Started AY 12/13 Campus Commitment: Campus Will work on Status Level 13/14? Related ATI Projects Priority 1-Optimizing 2-Managed 3-Established 4-Defined 5-Initiated 6-Not Started 2 X-Campus commits to work on this Success Indicator Reference High ATI Medium project Low number(s) X HIGH 2 X HIGH 2 X HIGH Level Established 2 Established Established 2 2 Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 1.3. Developed a procedure for procuring E&IT products based on the product/service impact criteria. 1.4. Developed a documented process to determine the level/complexity of 508 evaluation that will be required for new procurements and/or renewals. 1.5. Developed a process for all competitive bid procurements that require an evaluation of Section 508 compliance 1.6. Developed a process for all non-competitive bid procurements that require an evaluation of Section 508 compliance 1.7. Developed a process for all purchase card purchases that require an evaluation of Section 508 compliance Page 51 Baseline Systemwide Status Level AY 11/12 Campus Status Level AY 12/13 Campus Commitment: Campus Will work on Status Level 13/14? Related ATI Projects Priority Level 2 X HIGH 2 X HIGH 5 X 2 2 Established P-1.2. 2 HIGH P-1.3. 2 2 Initiated HIGH P-1.3. 2 2 Established P-1.2. X HIGH Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 1.8. Documented a process used to verify Voluntary Product Accessibility Templates (VPATs) 2. Goal: ATI procurement team is fully staffed with clearly defined roles for processing E&IT procurements. 2.1. Established a group that meets on a regular basis to discuss accessible procurement topics 2.2. Identified contact person(s) and process for E&TI product/service provider, purchase requestors, and staff to ask questions about procurements. Page 52 Baseline Systemwide Status Level AY 11/12 Campus Status Level AY 12/13 Campus Commitment: Campus Will work on Status Level 13/14? 2 Established 2 2 Established 2 1 Established 1 1 Established 1 X Related ATI Projects Priority Level HIGH Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 2.3. Documented in writing who is responsible for each component of the accessible procurement process (e.g., Who does the purchase request? Who interacts with the EIT product/service provider on accessibility questions? Who does the accessibility evaluation of the product?). 3. Goal: A well-documented process has been established and is used for exemptions to E&IT procurements. 3.1. Established a process for approving exemptions. 3.2. Documented the exemption process, posted it on public website, and have communicated process to campus Page 53 Baseline Systemwide Status Level AY 11/12 Campus Status Level AY 12/13 Campus Commitment: Campus Will work on Status Level 13/14? Related ATI Projects Priority Level 1 Established 1 2 X HIGH Established 2 2 HIGH 2 2 Defined 2 X HIGH Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 3.3. Documented a process that ensures that supplementary accommodations can be put in place when exemptions are warranted 3.4. Established a follow-up process for communicating with EIT product/service provider and purchase requesters when a procurement is moved forward without total resolution of the accessibility status of the product. 4. Goal: Equally Effective Access Plans are created for E&IT products that are not fully 508 compliant. 4.1. Documented a process Baseline Systemwide Status Level Defined Defined Defined AY 11/12 Campus Status Level alternate access plan is necessary. Page 54 Campus Commitment: Campus Will work on Status Level 13/14? 2 X 2 X 2 X 2 X Related ATI Projects Level HIGH P-1.3. HIGH SYS-1 LOW 2 2 P-1.1. Defined Priority 2 that outlines when an equally effective AY 12/13 2 Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 4.2. Established a process with roles assigned for all parts of creating an equally effective alternate access plan. 4.3. Established a process that tracks how many equally effective alternate access plans have been created. 4.4. Established a process to ensure that accommodations were provided. 5. Goal: All parties involved in E&IT procurement have been trained, and a continual training program is in place. Baseline Systemwide Status Level Defined AY 11/12 Campus Status Level Initiated where to get more information Page 55 Priority 2 SYS-1 LOW Level P-1.1. X SYS-1 LOW P-1.1. 2 Initiated X 2 X SYS-1 LOW P-1.1. 2 2 X HIGH 2 X HIGH Established 2 orientation training requirements and Related ATI Projects 2 deployed new employee overview of Section 508 Campus Commitment: Campus Will work on Status Level 13/14? 2 5.1. Established and materials that provide AY 12/13 Initiated 2 Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 5.2. Established and deployed training program for purchase requestors and administrative support staff. 5.3. Established and deployed training program for Information Technology Staff. 5.4. Established and deployed training program for Buyers (procurement staff). 5.5. Established and deployed training for all purchase card holders 5.6. Established a plan that provides resources for the Section 508 Compliance officer and ATI Designee or other Designee to participate in professional development and continuing education opportunities. Page 56 Baseline Systemwide Status Level Defined Initiated Established Initiated AY 11/12 Campus Status Level AY 12/13 Campus Commitment: Campus Will work on Status Level 13/14? Related ATI Projects Priority Level 2 X HIGH 2 X HIGH 2 X HIGH 2 X HIGH Leverage ATI Project Include in Task Dashboard Hold Notes 2 2 2 2 6 6 Do not have compliance officer Goal/Success Indicator 5.7. Collected feedback from training (effectiveness, knowledge retention, etc.) 5.8. Established methods for retraining individuals and departments to refresh knowledge of the E&IT procurement process 6. Goal: All individuals on campus involved in the purchasing of goods are knowledgeable about Section 508 in the context of E&IT procurement. Baseline Systemwide Status Level AY 11/12 Campus Status Level AY 12/13 Campus Commitment: Campus Will work on Status Level 13/14? 5 Not Started Page 57 Priority Level X MED X MED 5 2 Initiated 2 3 3 6.1. Removed 6.2. Established process for working collaboratively with vendors during the procurement process to asses and improve the accessibility of their product (i.e. VPAT review process, Accessibility Roadmap). Related ATI Projects 2 2 Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 6.3. Established an ongoing general campus communication that promotes E&IT procurement awareness 7. Goal: Campus has established a continual evaluation process with standard forms and procedures. Feedback from the process along with direction is provided to training, outreach, and other groups involved in E&IT procurements. Baseline Systemwide Status Level Initiated AY 11/12 Campus Status Level AY 12/13 Campus Commitment: Campus Will work on Status Level 13/14? Related ATI Projects Priority Level 4 X MED 4 X MED X MED 4 4 7.1. Removed 7.2. Removed 7.3. Removed 7.4. Established metrics to evaluate the effectiveness of the ATI procurement process and procedures process. Page 58 Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 7.5. Established metrics to evaluate the effectiveness of the Equally Effective Alternate Access process. 7.6. Established metrics to evaluate the effectiveness of campus training process. 7.7. Establish metrics to evaluate the effectiveness of campus outreach process. 8. Goal: Campuses have sufficient experience and expertise in completing E&IT procurements. Baseline Systemwide Status Level AY 11/12 Campus Status Level AY 12/13 Campus Commitment: Campus Will work on Status Level 13/14? Related ATI Projects Priority Level X MED X MED X MED X HIGH X HIGH X HIGH 8.1. Removed 8.2. Removed 8.3. Removed 8.4. Removed 8.5. Total number of E&IT reviews? 8.6. What is the total percentage of EEAAP’s? Page 59 Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 8.7. What is the total number of exemptions/exceptions? Page 60 Baseline Systemwide Status Level AY 11/12 Campus Status Level AY 12/13 Campus Commitment: Campus Will work on Status Level 13/14? X Related ATI Projects Priority Level HIGH Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator Baseline Systemwide Status Level 1-Optimizing 2-Managed 3-Established 4-Defined 5-Initiated 6-Not Started 9. Goal: An ATI Electronic and Information Technology E&IT Procurement Plan, documents, forms, and other materials to support 508 procurements at the campus are created and published. 9.1. Developed and published an Accessible ATI E&IT Procurement Plan 9.2. Developed and published a document that defines what products are categorized as Section 508 E&IT procurements 9.3. Developed a procedure for procuring E&IT products based on the product/service impact criteria. Page 61 Established Established Established AY 11/12 Campus Status Level 1-Optimizing 2-Managed 3-Established 4-Defined 5-Initiated 6-Not Started AY 12/13 Campus Commitment: Campus Will work on Status Level 13/14? Related ATI Projects 1-Optimizing 2-Managed 3-Established 4-Defined 5-Initiated 6-Not Started Reference High ATI Medium project Low number(s) X-Campus commits to work on this Success Indicator Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 9.4. Developed a documented process to determine the level/complexity of 508 evaluation that will be required for new procurements and/or renewals. 9.5. Developed a process for all competitive bid procurements that require an evaluation of Section 508 compliance 9.6. Developed a process for all non-competitive bid procurements that require an evaluation of Section 508 compliance 9.7. Developed a process for all purchase card purchases that require an evaluation of Section 508 compliance 9.8. Documented a process used to verify Voluntary Product Accessibility Templates (VPATs) Page 62 Baseline Systemwide Status Level AY 11/12 Campus Status Level AY 12/13 Campus Commitment: Campus Will work on Status Level 13/14? Related ATI Projects P-1.2. Established P-1.3. P-1.2. Established Initiated Established P-1.3. Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 10. Goal: ATI procurement team is fully staffed with clearly defined roles for processing E&IT procurements. 10.1. Established a group that meets on a regular basis to discuss accessible procurement topics 10.2. Identified contact person(s) and process for E&TI product/service provider, purchase requestors, and staff to ask questions about procurements. Page 63 Baseline Systemwide Status Level Established Established Established AY 11/12 Campus Status Level AY 12/13 Campus Commitment: Campus Will work on Status Level 13/14? Related ATI Projects Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 10.3. Documented in writing who is responsible for each component of the accessible procurement process (e.g., Who does the purchase request? Who interacts with the EIT product/service provider on accessibility questions? Who does the accessibility evaluation of the product?). 11. Goal: A well-documented process has been established and is used for exemptions to E&IT procurements. 11.1. Established a process for approving exemptions. 11.2. Documented the exemption process, posted it on public website, and have communicated process to campus Page 64 Baseline Systemwide Status Level Established Established Defined AY 11/12 Campus Status Level AY 12/13 Campus Commitment: Campus Will work on Status Level 13/14? Related ATI Projects Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 11.3. Documented a process that ensures that supplementary accommodations can be put in place when exemptions are warranted 11.4. Established a follow-up process for communicating with EIT product/service provider and purchase requesters when a procurement is moved forward without total resolution of the accessibility status of the product. 12. Goal: Equally Effective Access Plans are created for E&IT products that are not fully 508 compliant. 12.1. Documented a Baseline Systemwide Status Level effective alternate access plan is necessary. Page 65 Campus Status Level AY 12/13 Campus Commitment: Campus Will work on Status Level 13/14? Related ATI Projects Defined P-1.3. Defined Defined SYS-1 process that outlines when an equally AY 11/12 P-1.1. Defined Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 12.2. Established a process with roles assigned for all parts of creating an equally effective alternate access plan. 12.3. Established a process that tracks how many equally effective alternate access plans have been created. 12.4. Established a process to ensure that accommodations were provided. 13. Goal: All parties involved in E&IT procurement have been trained, and a continual training program is in place. 13.1. Baseline Systemwide Status Level where to get more information Page 66 Related ATI Projects Defined SYS-1 Initiated P-1.1. SYS-1 Initiated Established orientation training requirements and Status Level Campus Commitment: Campus Will work on Status Level 13/14? P-1.1. deployed new employee overview of Section 508 Campus AY 12/13 SYS-1 Established and materials that provide AY 11/12 Initiated P-1.1. Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 13.2. Established and deployed training program for purchase requestors and administrative support staff. 13.3. Established and deployed training program for Information Technology Staff. 13.4. Established and deployed training program for Buyers (procurement staff). 13.5. Established and deployed training for all purchase card holders 13.6. Established a plan that provides resources for the Section 508 Compliance officer and ATI Designee or other Designee to participate in professional development and continuing education opportunities. Page 67 Baseline Systemwide Status Level Defined Initiated Established Initiated AY 11/12 Campus Status Level AY 12/13 Campus Commitment: Campus Will work on Status Level 13/14? Related ATI Projects Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 13.7. Collected feedback from training (effectiveness, knowledge retention, etc.) 13.8. Established methods for retraining individuals and departments to refresh knowledge of the E&IT procurement process 14. Goal: All individuals on campus involved in the purchasing of goods are knowledgeable about Section 508 in the context of E&IT procurement. 14.1. Removed 14.2. Established process for working collaboratively with vendors during the procurement process to asses and improve the accessibility of their product (i.e. VPAT review process, Accessibility Roadmap). Page 68 Baseline Systemwide Status Level Not Started Initiated AY 11/12 Campus Status Level AY 12/13 Campus Commitment: Campus Will work on Status Level 13/14? Related ATI Projects Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 14.3. Established an ongoing general campus communication that promotes E&IT procurement awareness 15. Goal: Campus has established a continual evaluation process with standard forms and procedures. Feedback from the process along with direction is provided to training, outreach, and other groups involved in E&IT procurements. 15.1. Removed 15.2. Removed 15.3. Removed 15.4. Established metrics to evaluate the effectiveness of the ATI procurement process and procedures process. Page 69 Baseline Systemwide Status Level Initiated AY 11/12 Campus Status Level AY 12/13 Campus Commitment: Campus Will work on Status Level 13/14? Related ATI Projects Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 15.5. Established metrics to evaluate the effectiveness of the Equally Effective Alternate Access process. 15.6. Established metrics to evaluate the effectiveness of campus training process. 15.7. Establish metrics to evaluate the effectiveness of campus outreach process. 16. Goal: Campuses have sufficient experience and expertise in completing E&IT procurements. 16.1. Removed 16.2. Removed 16.3. Removed 16.4. Removed 16.5. Total number of E&IT reviews? 16.6. What is the total percentage of EEAAP’s? Page 70 Baseline Systemwide Status Level AY 11/12 Campus Status Level AY 12/13 Campus Commitment: Campus Will work on Status Level 13/14? Related ATI Projects Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Goal/Success Indicator 16.7. What is the total number of exemptions/exceptions? Page 71 Baseline Systemwide Status Level AY 11/12 Campus Status Level AY 12/13 Campus Commitment: Campus Will work on Status Level 13/14? Related ATI Projects Priority Level Leverage ATI Project Include in Task Dashboard Hold Notes Appendix A: Status Level Descriptions Status Levels Description for Procedures Description for Documentation Description for Resources Not Started No action has been taken yet. No documentation has yet been generated. No resources have yet been allocated. Initiated The campus has an ad hoc or developing practice. Procedures, if in place, are generally ad hoc. Documentation is generally absent. Resources have been tentatively identified but not yet allocated. Defined The campus has a common practice. Procedures, if in place, are consistent but informal. Documentation, if present, is in working draft. Resources have been firmly identified but not yet allocated. Established The campus has a standard practice. Procedures are consistent and formal. The campus has a mature practice. Procedures are also in place to track and capture success indicators (milestones and measures of success). The campus has a mature practice. In addition, procedures are in place to conduct regular administrative reviews of success indicators to gauge effectiveness and implement improvements. Documentation is complete and fully reflects the standard practice. Documentation is complete and fully reflects the standard practice. Resources have been both identified and allocated. Documentation is continually revised to reflect the managed practice. Periodic administrative review of documentation is conducted. Resources have been both identified and allocated. Periodic administrative review of resource allocations is conducted Managed Optimized Page 72 Resources have been both identified and allocated.