Rudy Kellar - NAV CA..

advertisement
NAV CANADA UPDATE
Presentation to the ATAC AGM
November 2010
Rudy Kellar
Vice President Operations
Outline
• Safety
• Performance
• Service Updates
–
–
–
–
AIS
NAV AIDs
Weather
Surveillance
• Technology Upgrades
• International Recognition
• Summary
2
Safety
Loss of separation between two aircraft in IFR flight per
100,000 aircraft movements
• One of the lowest IFR to IFR loss records in the world
3
Operating Results
Fiscal 2010 Compared to Budget
($Millions)
"BEFORE RATE STABILIZATION"
Revenue
Customer service charges
Other
Operating Expenses
Salaries and benefits
Non-salary operating expenses
Actual
Budget
1,115
39
1,154
721
212
Variance
1,141
41
1,182
(1)
758
233
(26)
(2)
(28)
(1)
37
21
933
991
58
115
132
247
116
133
249
1
1
2
2
3
5
1
1
2
2
4
(21)
(57)
36
Other Expenses
Interest expense
Depreciation & amortization
Other Income (Loss)
Fair value adjustments on investments
Interest income
Excess of expenses over revenue
(1) In order to align with other Canadian issuers and in anticipation of IFRS, reflects a
change in accounting policy to capitalize (rather than expense) directly attributable
internal labour and travel costs. This has amounted to $50 million for fiscal 2010.
4
RATE STABILIZATION ACCOUNT
Liability
Returnable to Customers
($ millions)
$150
$7
$94
$118
$112
$119
$100
$84
$50
$92
$75
$79
$98
$92
$72
$38
$Asset
Recoverable from Customers
"Notional" Balance of RSA
Add back non-credit portion of ABCP fair
value adjustment
($19)
$4
$1
($20)
($32)
-$50
-$100
($116)
-$150
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
5
Traffic - Weighted Charging Units
FY 2009/2010/2011
100
WEIGHTED CHARGING UNITS (MILLIONS)
90
80
70
60
50
40
30
20
10
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
MONTH
FY 2009
FY 2010
FY 2011
6
FISCAL YEAR-END HEADCOUNT
6,500
6,300
6,124
6,250
6,000
5,692
5,750
5,420
5,500
5,266
5,443
5,416
5,400
5,380
5,346
5,250
5,264
5,189
5,250
5,038
4,941
5,000
4,750
4,500
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
7
CIFER: Status Update 2010
Collaborative Initiatives For Emissions Reductions
• Programs that support
improved efficiency and
reductions in GHG emissions
5.4M
Metric tons of GHG emissions avoided
between 1997-2009
$1.4B
Customer fuel cost savings 1997-2009
8
CIFER: Projected Benefits
Collaborative Initiatives For Emissions Reductions
8.0M
Metric tons of GHG reductions
forecast 2010-2016
$2.9B
13.4M
Projected fuel savings 2010-2016
Metric tons of GHG reductions
over 20 years
$4.3B
Total customer savings 1997-2016
9
AIS Production - 2010
• NAV CANADA Designs
– Procedure Designs – 1025
– Approach Minima Assessments – 167
• 3rd Party Quality Assurance - 143
• Total Annual Design Production – 1335
–
–
–
–
625 Regulatory
167 Unplanned Database changes
100 reworked due to unclear requirements
100 design reiterations due to customer feedback and
new concepts
– 50 ‘what if’ assessments
– 300 new procedures (internal and external customers)
10
Production Increase
• Business case approach for determining
production capacity
– RNAV/RNP/LPV where feasible (Who is equipped
and where?)
– Efficiency benefits
• Capacity will be adjusted using demand
information from:
–
–
–
–
PBN Implementation Plan
FIR Business Plans
ATOCC PBN Coordination Group
Transport CANADA CARAC Working Group (PBN)
11
TP 308 vs Approach Minima
In Mountainous Terrain
• Loose and formal exceptions to TP 308 no longer
allowed
– Results in significantly higher approach minima
• TC open to solutions based on current set of rules
(design criteria)
• Use of FAA TERPS 8260.54A now approved by TC
– Allows combination of GNSS with ILS/LOC designs
– GNSS used in the Missed Approach to provide lower
minima
• Following Airports impacted (Pub Date):
–
–
–
–
Kelowna (January 2011)
Terrace (March 2011)
Penticton (June 2011)
Kamloops (Under Analysis)
12
WAAS Coverage
• WAAS coverage
has increased
• Now captures
more area of:
– Northern
Canada
– East Coast
• Potential for
more LPV
procedures
13
NAVAID Update - ILS
FY 09/10 (replaced)
• Halifax Rwy 14
• St. John’s Rwy 29
• Toronto CAT III Rwy 05
• St. Hubert Rwy 24R
• Kitchener/Waterloo Rwy 26
• Edmonton Intl. Rwy 30 & 02
• Prince Albert Rwy 08
• Prince George Rwy 15
• Vancouver Rwy 26L GP &08R ILS
• Kamloops Rwy 26 TGL
• Campbell River Rwy 11 LOC
Note: LOC (BC) procedures replaced with RNAV
14
NAVAID Update - ILS
FY 10/11 (planned replacement)
• Ottawa Rwy 07
• North Bay Rwy 08
• Iqaluit Rwy 35 (Possible LOC for Rwy 17)
• Lourdes-de-Blanc-Sablon Rwy 05 LOC
• St John Rwy 16
• Prince Rupert Rwy 13
• Calgary Rwy 16 & 34
• Fort Nelson Rwy 03
• Hay River Rwy 31
• Thompson Rwy 05
• Whitehorse Rwy 31L
• Campbell River Rwy 11 GP
• Calgary Rwy 10 (new ILS under discussion)
Note: LOC (BC) procedures replaced with RNAV
15
Weather Cameras
• 64 Replacement and
New Digital Cameras
installed in FY 09/10
• 42 new sites planned
for FY 10/11
17
AWOS/LWIS
• Legacy AWOS replaced at 16
sites in FY09/10
• New AWOS installed at 5
sites:
–
–
–
–
–
Smithers
Stony Rapids
Oshawa (P)
Fredericton
Port Hawkesbury
• 17 Legacy replacements
planned for FY 10/11
• LWIS installations planned
for:
– Arctic Bay
– Dease Lake
18
Wind Turbines
• Wind farm development can impact
aviation safety
• Growth in wind power has the potential
of poking numerous “holes” in primary
radar coverage and impacting ability to
provide associated air traffic services.
• Need to address cumulative impact from
a systems perspective.
• Next generation surveillance will reduce
concern. But we aren’t there yet…
• Working collaboratively with the Wind
Turbine Industry on:
– Process
– Technical solutions
19
Download