ISE4 Alternate Demo Scenario Incorporates suggestions B. Kassel, S. Gordon, & B. Gischner with input from: T. Briggs and S. Moore May 23, 2005 Revised Arrangements Demo Scenario AP 216 Hull Design Agent Initial Arrangement Initial ASSET Arrangement + Requirements (LEAPS) Vulnerability Analysis (LEAPS) Complete Arrangement + Equipment Vulnerability Report Build Yards May 23, 2005 Engineering Analysis ISE4 Future Ship Acquisition Demo Proposal Steel Processing 2 ISE4 Revised Future Ship Acquisition Demo Scenario • Mission Requirements and Initial Arrangements provided by the Navy via ASSET – TWR 841 will be used as input • TWR 841 Model Captured in FORAN to be treated as Concept Design – Send AP216 file to Navy (ASSET) for Analysis • ASSET will pose new mission requirements and generates an initial Arrangement (AP215 Model) – List of Compartments with Requirements plus possibly some minimal Geometry • • Arrangement returned to Design Agent (FORAN) which sets up compartmentation and generates updated AP215 file (Part 21) Demonstrate Initial Electrical System design (KSSI) – Electronic System in Pilot House • Navy selects Diesel Engine which fulfills base requirements and incorporates into ship contract May 23, 2005 ISE4 Future Ship Acquisition Demo Proposal 3 ISE4 Revised Future Ship Acquisition Demo Scenario cont’d. • Two build yards (CAD Systems: ISDP and TRIBON) will be doing a collaborative design and are awarded a preliminary/detailed design contract – TRIBON will design Topside – ISDP will design below Decks • • Shipyards add Diesel to CPC Catalog and receive AP203 file Arrangements Model is transferred to TRIBON (P28) via AP215 exchange – Transfer requires Mediators between Part 28 and Part 21 files • Designs are created in ISDP, and TRIBON – – – – • Arrangements transferred via AP218 to LEAPS and COMMANDS for Analysis COMMANDS creates mesh and sends to Analysis tools (e.g. PATRAN, ABACUS) FEM Analysis performed on revised model of Engine Room Analysis report generated Design Agent sends Arrangements Model to LEAPS for Vulnerability Analysis May 23, 2005 ISE4 Future Ship Acquisition Demo Proposal 4 ISE4 Revised Future Ship Acquisition Demo Scenario cont’d. • • • Extract Structure for Manufacturing (Intergraph) Develop neutral structural manufacturing model (ISPE) Generate yard-specific manufacturing data (EB, Avondale) – Compare EB and Avondale manufacturing outputs • Ship check existing TWR design – Provide scanned shots of Engine Room from Ship Check Data Capture Project – Emphasize synergy between these NSRP funded projects, even though Demo is separate and not part of Ship Check Data Capture May 23, 2005 ISE4 Future Ship Acquisition Demo Proposal 5 Flowchart of Revised New Design Demo Scenario Concept Design (ASSET/LEAPS) Navy Analysis (LEAPS) Preliminary Design (FORAN) Engineering Analysis (COMMANDS) Collaborative Detailed Design (ISDP) (TRIBON) (Electrical – KSSI) Production (Steel Processing) Operations & Maintenance (Ship Check Results) May 23, 2005 ISE4 Future Ship Acquisition Demo Proposal 6 ISE4 Alternate Demo Proposal NAVSEA Proposes Concept Design Alternative Proposals Analyzed Initial Arrangement FORAN Below Decks Arrangement ISDP – Des. 1 Topside Arrangement TRIBON – Des. 2 May 23, 2005 COMMANDS See EAD S LEAPS STEP Description of Selected Model Transferred for Steel Processing Analysis Tools PATRAN ABACUS etc. Results Des. 1 See EAD S Results Des. 2 ISE4 Future Ship Acquisition Demo Proposal 7 Engineering Analysis Demo Scenario AP 203 P21 Vendor AP 209 P28 Shipyard (Add to CPC, CAD) AP 227 P28 (COG, weight, location) Compartmentation AP 215 P28 Analysis AP 209 P28 Equip arrangement Ship Product Model (ISDP) AP 216 P21 AP 218 P28 AP 209 /218 P28 May 23, 2005 CAD CPC Parts Equip arrangement GUID, doc URL Feedback EADS ISE4 Future Ship Acquisition Demo Proposal Note: Feedback loop only for winner (ISDP) Equipment exchange precedes competition 8 Mediators Required 209 218 P28 P28 216 P21 203/ PLM 215 P28 ARM AIM 227 P28 P28 P28 P28 P28 P21 P21 P21 P21 Processing Capability Currently Available May 23, 2005 P28 Lower Priority (Possibly Optional) P28 ISE4 Future Ship Acquisition Demo Proposal Higher Priority (Needed as Soon as Possible) 9 Backup Slides May 23, 2005 ISE4 Future Ship Acquisition Demo Proposal 10 TWR Propulsion Engine (Caterpillar 3512) Model May 23, 2005 ISE4 Future Ship Acquisition Demo Proposal 11 TWR Reduction Gear Model May 23, 2005 ISE4 Future Ship Acquisition Demo Proposal 12 Demo Scenario Issues • Scenario has analysis software used to discriminate among three proposed designs – More realistic than usual Demo Scenarios • • Must find way to work Electrical and ISPE (Steel Processing) more smoothly into Demo Steel Processing should be easily integrated with the Arrangements and Analysis scenarios, but we must determine what can be exchanged from this task May 23, 2005 ISE4 Future Ship Acquisition Demo Proposal 13 Notional Mediators Required AP ARM -> AIM 216 215 Arrangements AIM-ARM ARM-> 209 AIM P21 Eng Analysis Eng Analysis Arrangements 218 Eng Analysis 227 Eng Analysis 209 May 23, 2005 Eng Analysis ?? ISE4 Future Ship Acquisition Demo Proposal 14