EVALUATION OF LULAC NATIONAL EDUCATION SERVICE CENTERS, INC. DEPARTMENT OF EDUCATION UPWARD BOUND PROGRAM San Antonio, Texas Submitted to: LULAC National Educational Service Centers, Inc. 2000 L Street, NW Washington, DC 20036 Prepared by: Elizabeth C. Retamozo, Executive Director NOSOTROS Education Center LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS EXECUTIVE SUMMARY PROGRAM BACKGROUND Funded by the Department of Education, the Upward Bound Program provides fundamental support to participants in their preparation for college entrance. The program provides opportunities for participants to succeed in their precollege performance and ultimately in their higher education pursuits. Program Purpose Upward Bound projects provide academic instruction in mathematics, laboratory sciences, composition, literature, and foreign languages. Tutoring, counseling, mentoring, cultural enrichment, and work-study programs also are supported. The goal of Upward Bound is to increase the rate at which participants complete secondary education and enroll in and graduate from institutions of postsecondary education. Eligible Program Participants Upward Bound serves high school students from low-income families; high school students from families in which neither parent holds a bachelor's degree; and lowincome, first-generation military veterans who are preparing to enter postsecondary education. Students must have completed the 8th grade, be between the ages of 13 and 19 (except veterans), and have a need for academic support in order to pursue a program of postsecondary education. All students must be either from low-income families or be potential first-generation college students. The program requires that twothirds of the participants in a project must be both low-income and potential firstgeneration college students. The remaining one-third must be either low-income or potential first-generation college students. Students are selected based on recommendations from local educators, social workers, clergy, or other interested parties. Page 1 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS Mandatory and Permissible Services All Upward Bound projects MUST provide instruction in math, laboratory science, composition, literature, and foreign language. Other permissible services include: Instruction in reading, writing, study skills, and other subjects necessary for success in education beyond high school Academic, financial, or personal counseling Exposure to academic programs and cultural events Tutorial services and Mentoring Activities Information on postsecondary education opportunities Assistance in completing college entrance and financial aid applications Assistance in preparing for college entrance exams Work study positions to expose participants to careers requiring a postsecondary degree Authority The Upward Bound Program (CFDA Number: 047A) administered by the U.S. Department of Education’s Office of Postsecondary Education (OPE). This grant program is authorized under The Higher Education Opportunity Act (Public Law 110315) (HEOA) was enacted on August 14, 2008. This law reauthorizes and extends the Higher Education Act of 1965, as amended. The Higher Education Act (HEA) provides the statutory authority for most of the programs administered by OPE, as well as for the Federal Student Aid Programs. Grant Award and Project Period In early Spring of 2007, LNESC received notification that it received funding for a new Upward Bound Project (PR/Award Number: P047A070788) with an annual budget of $250,000 for four (4) years ($1 million total) beginning on September 1, 2007 and ending August 31, 2011. Projects will be funded for up to 48 months (four budget periods of 12 months each). Projects will be funded for one year at a time with an option for three (3) additional years, contingent upon the demonstration of substantial Page 2 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS progress each year toward meeting project goals and objectives and the availability of future appropriations. EVALUATION INFORMATION This outcome assessment of LNESC’s Department of Education- San Antonio Upward Bound Project (DE-UBSA) was conducted by the NOSOTROS Education Center (NEC), in November 2008 and January 2009. Data collection occurred onsite at the San Antonio LNESC located at the following address: 6800 Park Ten Suite 113N San Antonio, TX 78213 Data was gathered through on-site interviews and observation of DE-UBSA project staff (Director: Orlando Blancas, Advisor: Eloisa Kirkwood, and Administrative Assistant: Marcos Cortez) and a review of all available documents, forms, and student files. PURPOSE OF EVALUATION The main purpose of this assessment was to conduct both an OUTCOMES-BASED and PROCESS BASED EVALUATION of LNESC’s DE-UBSA to assess the effectiveness of the project in meeting its legislative mandate by the end of each annual grant period and to fully examine the extent to which the project is operating as intended by assessing major programming components and their impact on participants served. This mandate includes collecting and reporting to the Department data related to the following five (5) established Government Performance and Results Act of 1993 (GPRA) key performance indicators for the Upward Bound Program grant competition. GPRA Outcome Objectives Reported to the Department of Education to Assess Effectiveness of the Upward Bound Project (1) Whether the applicant serves the number and % of low-income & potential first generation UB participants agreed to under the approved application; (2) The percentage of all UB participants, who at the time of entrance into the project had an expected high school graduation date during the school year, will have achieved at the proficient level during high school on state Page 3 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS assessments in reading/language arts and math. (3) The percentage of all 9th, 10th, and 11th grade UB project participants served during each school year will continue to participate in the project during the next school year. (4) The percentage of all UB participants, who at the time of entrance into the project had an expected graduation date during the school year, will enroll in a program of postsecondary education by the fall term immediately following the expected graduation date from high school. (5) The percentage of all of all UB participants who enrolled in a program of postsecondary education during the fall term immediately following high school graduation will be enrolled for the fall term of the second academic year. Additionally, this evaluation will provide LNESC with specific recommendations to improve the delivery of services and make ongoing project information and findings available to ensure the dissemination of knowledge gained from this effort during the DE-UBSA grant period. OVERALL FINDINGS FROM THE ANALYSIS OF DATA Performance on GPRA Objectives – Status of Performance Report: GPRA Objective #1: Objective Met. The DE-UBSA Project was funded to serve fifty (50) eligible participants with a minimum of 2/3 or 34 classified as both low income AND potential first-generation students. The remaining 1/3 or 16 must be classified as either low income only OR potential first-generation only. By August 31, 2008, DE-UBSA served fifty (50) eligible participants with 46 or 92% classified as both low income AND potential first-generation students. GPRA Objective #2: Academic Improvement - Not Applicable. This objective is not applicable since DE-UBSA is a newly funded project that could only recruit and serve incoming and current 9th and 10th graders during the 2007-2008 school year. Therefore, this objective will not be applicable until DEPage 4 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS UBSA has its first set of 12th graders (graduating cohort 2010) at the end of the 2009-2010 program year. GPRA Objective #3: Project Retention – Objective Not Met. The DE-UBSA Project recruited and served fifteen (15) incoming 9 th graders (recent 8th grade graduates) and thirty-five (35) current 9th and 10th graders during the 2007-2008 program year. Of the fifty (50) participants that were served in program year 2007-2008, forty (40) returned to be served at the beginning of the new 2008-2009 program year for an overall project retention rate of 80%. However, the GPRA objective is worded differently and excludes the fifteen (15) rising 9th graders as they were not “9th, 10th or 11th graders during the 2007-2008 SCHOOL YEAR. Therefore, the objective takes into account only the thirty-five (35) participants that were in the 9th, 10th or 11th grade during the 2007-2008 school year and not the total fifty (50) that were served by the end of the project year. The resulting retention rate of 9th, 10th, and 11th graders served during the 2007-2008 school year that continued to participate during the next school year (2008-2009) school year was 71.42% (25/35). Only twenty-five (25) of the thirty-five (35) students that were 9th or 10th graders during the 2007-2008 school year continued to participate during the next school year (2008-2009). GPRA Objective #4: Postsecondary Enrollment - Not Applicable. This objective is not applicable since DE-UBSA is a newly funded project that could only recruit and serve incoming and current 9th and 10th graders during the 2007-2008 school year. Therefore, this objective will not be applicable until DEUBSA has its first set of 12th graders (graduating cohort 2010) at the end of the 2009-2010 program year. GPRA Objective #5: Postsecondary Persistence - Not Applicable. This objective is not applicable since DE-UBSA is a newly funded project that could only recruit and serve incoming and current 9 th and 10th graders during the 2007-2008 school year. Therefore, this objective will not be applicable until DEPage 5 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS UBSA has its first set of college students scheduled to return for their 2 nd year of college (graduating cohort 2010) at the end of the 2010-2011 school year. The following table summarizes the illustrates the statistical project performance of the DE-UBSA for PY 2007-2008 as it relates to the Prior Experience Criteria of the Upward Bound Program: PRIOR EXPERIENCE TABLE Prior Experience Criterion (1) (3 points – 1 per year) Whether the applicant serves the number of participants agreed to under the approved application; (2) (3 points – 1 per year) The extent to which project participants have demonstrated improvement in academic skills and competencies as measured by standardized achievement tests and grade point averages; 2007-2008 2008-2009 Approved Actual Approved 50 50 50 75% N/A 75% 85% 71.42% 85% Actual 2009-2010 Approved Actual 50 N/A 75% Academic Improvement: % of all UB participants, who at the time of entrance into the project had an expected high school graduation date during the school year, will have achieved at the proficient level during high school on state assessments in reading/language arts and math. (3) (3 points – 1 per year) The extent to which project participants continue to participate in the Upward Bound Program until they complete their secondary education program; 85% Project Retention: % of 9th, 10th, and 11th grade project participants served during each school year will continue to Page 6 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS participate in the project during the next school year. (4) (3 points – 1 per year) The extent to which participants who complete the project, or were scheduled to complete the project, undertake programs of postsecondary education; and 75% N/A 75% N/A 75% 60% N/A 60% N/A 60% Postsecondary Enrollment: % of all UB participants, who at the time of entrance into the project had an expected graduation date during the school year, will enroll in a program of postsecondary education by the fall term immediately following the expected graduation date from high school. (5) (3 points – 1 per year) The extent to which participants who complete the project, or were scheduled to complete the project, succeed in education beyond high school, including the extent to which they (persist) graduate from postsecondary education programs. N/A Postsecondary Persistence: % of all UB participants who enrolled in a program of postsecondary education during the fall term immediately following high school graduation will be enrolled for the fall term of the second academic year. Prior Experience Points Earned Based on Regulations Maximum of 5 Pts per year 1 out of 2 possible points earned __ out of 2 possible points __ out of 4 possible points Page 7 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS Therefore, DE-UBSA earned one (1) out of the two (2) possible points that it was eligible to earn at the end of the first year of a newly funded project. Please note that “older” or established Upward Bound programs (those that have been around long enough to have seniors and freshmen college students) are eligible to earn up to five (5) points per year for a total of fifteen (15) points by the end of the third year of the funding cycle. PROCESS BASED EVALUATION The LNESC-San Antonio Upward Bound Project funded an external evaluation to fully examine the extent to which the project is operating as intended by assessing major project components and its impact on participants served. The NOSOTROS Education Center (NEC) agreed to provide the project with a Process-Based Evaluation on an annual basis. This evaluation will provide the agency and outside parties with an accurate interpretation of how the project truly operates; assist project staff identify needed interventions and/or change project components to improve the delivery and quality of services; and displays its strengths/weaknesses at the initial site with strategies for replication in other settings. The following chart summarizes the ranking results of the components that were reviewed and evaluated as part of the Process Based Evaluation: Project Component Exemplary Above Average Satisfactory Needs Improvement S/W* 1.) Target School Overview & Relationship 2.) Student Demographics X S X S 3.) Plan to Identify, Recruit & Select Participants 4.) Plan to Assess the Needs of Participants 5.) Plan to Monitor Academic Progress of Participants 6.) Plan to Deliver Services to Participants 7.) Academic Curriculum X S X S X S X S X S 8.) Review of Required Forms, X S Page 8 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS Student Files, & Documentation of Services Provided 9.) Internal Formative & Summative Evaluation Plan 10.) Institutional Support & Commitment 11.) Management & Staffing 12.) Budget Records Accounting System OVERALL RANKING X X N/A X N/A & X X * S = Strength W W = Weakness W S N/A = Not Applicable 1.) Target School Overview & Relationship Findings: The UB project has one (1) target school, Thomas Edison High School, located in San Antonio, Texas. This school was selected to serve as target school due to its low academic achievement rates, high dropout rate, high student to counselor ratio, and low college enrollment rate. According to the Texas Education Agency, the proposed target school had a total student enrollment of 1,707 (93.9% Hispanic, 2.6% African American, 3.0% White, and .4% Other) for the 06-07 academic school year with over 85.9% classified as economically disadvantaged. The neighborhoods surrounding the target schools are home to a high number of low-income families and a high number of residents with low educational attainment levels. The UB project has a very good working relationship with the target school due to the following reasons: Communication with target school principal was established immediately after notification of the UB grant award was received. Project Director (PD) informed the superintendent and school board members of the program and requested their support at a school board meeting held at the beginning of the academic year. Page 9 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS PD revised the original memorandum of understanding to include specific requests for afterschool classroom space, teacher\counselor support, student referrals, designated office space during the school day, and access to student report cards and test scores. UB staff had a constant and consistent presence on the campus of Edison High School. The project staff spent the majority of their time at the target school on Tuesdays, Wednesdays, and Thursdays during the school year. They would spend the mornings meeting with teachers and counselors to either obtain student referrals and\or to discuss UB students’ academic progress. Afternoons would be spent meeting with students individually and then supervising the afterschool UB tutoring component. PD met regularly with the target school principal and his staff to update them on the project activities and services provided to their students and to address any issues or concerns they might have had regarding a particular student. Rating: Above Average Recommendations: PD needs to maintain consistent communication with the target school principal via monthly meetings to formally discuss the project’s progress to date during the school year. PD needs to be with the superintendent and school board members on an annual basis to update them on the project's progress and to ensure their continued support of the program. PD needs to revise the MEMORANDUM OF UNDERSTANDING on an annual basis outlining exactly what is expected from both LNESC and the target school for review, submission, and approval to the legal department of the school district and/or school board. This legal contract signed by both the school board or legal department and the Executive Director of LNESC to include any modifications or additional requests as needed. This will further protect and secure the commitment Page 10 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS of the target school for the UB project regardless of who the principal is for that particular school year. Require that all applicants that have completed the interview process for a paid position with LNESC pass a MANDATORY CRIMINAL BACKGROUND AND DRUG TEST prior to being offered a full time permanent position. Not only will this reassure the target school district (and parents) of LNESC’s commitment to the safety and protection of children, it will also protect the LNESC staff and Board of Directors from any potential liability and lawsuits. The UB staff needs to maintain a consistent and constant presence on the campus of the target school during and after school as outlined on a MONTHLY CALENDAR that is provided to the target school principal, administrators, counselors, and teachers. PD will provide the target school principal and lead counselor with a CUMULATIVE MONTHLY PROJECT SUMMARY REPORT (detailing student demographics), a MONTHLY SERVICE REPORT (detailing the types of services and time provided to student participants), and a STUDENT DIRECTORY listing all UB students from the target school that is generated by the project database. Additionally, the PD will obtain completed PROJECT EVALUATION FORMS from the target school principal and lead counselor on an annual basis. PD staff will provide the target school principal, administrators, counselors, and teachers with an ANNUAL ACTIVITY TIMELINE outlining all projects services and activities for the school year that is updated each semester as needed. 2.) Student Demographics Findings: The UB project served 50 students in program year 07-08. This included 46 or 92% of the students being classified as both low-income and potential first-generation college students, which greatly exceeds the minimum required percentage of 67%. Additionally, 48 or 96% of all the students served were Hispanic with 15 or 30% male Page 11 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS students and d 70% or 35 female students; Fifteen (15) or 30% of the students served were “rising” ninth graders (graduating 8th graders); 17 or 34% were 9th graders and 18 or 36% were 10th graders. 18 or 36% of its students graduating in May 2010; 17 or 34% graduating in May 2011; and 15 or 30% graduating in May 2012. All students served were attending the target school and in the required grade levels at the time of their acceptance into the project. All students served demonstrated an academic need for services as documented in their files via report cards, available test scores, teacher recommendations, writing samples, etc. Additionally, all students served indicated that they were either US citizens or permanent residents on their signed student application. Rating: Above Average Recommendations: The project needs to recruit eligible new students for the new 2008-2009 program year as soon as possible to make up for the students that were served last year (2007-2008) but did not return to UB this year so that they always end up serving fifty (50) active students throughout each year. The project needs to maintain at or above the required minimum percentage (67%) of low income and potential first-generation college students served each year. Additionally, the project needs to continue selecting eligible students attending the target school that demonstrate academic need for project services as indicated on the current VERIFICATION OF ELIGIBILITY & SELECTION FORM. The Project Director needs to work on improving the retention rate of students that return to remain active project participants each school year. This is a concern faced by all UB projects nationwide. Therefore, the project staff need more INSERVICE TRAINING in the areas of STUDENT RETENTION and PARENTAL Page 12 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS INVOLVEMENT – just two of the critical factors that will determine the impact of UB services on students. There are many low cost and/or free Department of Education seminars held each year to provide this UB project staff with the inservice and professional development assistance that is essential to the success of this project. 3.) Plan to Identify, Recruit, & Select Project Participants Findings: With assistance from the Evaluator, the PD has developed a very specific and detailed PLAN OF OPERATION that describes the identification, recruitment, and selection of project participants. It is a sound and thorough plan that also includes the project staff person responsible for the execution of the detailed tasks and activities to ensure that 50 eligible students are served each year. This Plan of Operation provides details of the implementation and execution of major program components that were not explicate in the approved grant narrative. Please note that none of the revisions, modifications, and details listed in the Plan of Operation required prior approval from the DE Program Officer as they did not reflect a change in scope (ex. change in target school, objectives, or budget). Rating: Above Average Recommendations: The Project Director needs to make revisions to this plan as needed and during the project year to ensure its accuracy and to always maintain an updated PLAN OF OPERATION. Additionally, the Project Director must review this document on a consistent regular basis (monthly) with project staff to ensure that it truly reflects the operation of the project. The Project Director should provide the target school principal with an updated Plan of Operation at the beginning of each school year. Page 13 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS The Project Director should provide the assigned DE Program Officer with a copy of the latest Plan of Operation along with the latest version of the project budget at the beginning of each new project year for his/her records and confirm its receipt. 4.) Plan To Assess The Needs of Project Participants: Findings: As detailed in the revised Plan of Operation, the project staff has developed the following set of activities to assess the needs of project participants: The UB Advisor reviews all Annual Needs Assessment Forms, most recent grade reports, grade point average, class standing, and standardized test scores (if applicable) at the beginning of each project year to assess the academic needs of each assigned participant. The UB Advisor establishes Annual Individual Service Plans (ISP) and Academic Progress Plans (APP) from the assessment and evaluation of each assigned participant’s current need for academic assistance; college, career, financial aid information; and other supportive services. The ISP is a “checklist” or menu of services and activities that each student should receive during each year of school as determined by College Board© professionals. The UB Advisor uses this as a guide for each grade level but then customizes each individual student’s set of forms based on an individual review of all collected academic information for each student. The UB Advisor places established Annual Individual Service Plans and Academic Progress Plans for all assigned participants in a binder for the review and approval of the Project Director at the beginning of each school year. The UB Advisor then uses these forms to monitor the academic progress and receipt of services planned for each student during the school year. Rating: Above Average Page 14 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS Recommendations: In addition to any academic records provided by the target school (grade reports, transcripts, TAKS scores, etc.), the UB Project should administer the following national standardized tests at the beginning of each school year to obtain a better assessment on how UB students rank academically when compared to other students: PSAT for all incoming 9th and 10th graders SAT for all incoming 11th and 12th graders Results obtained by these exams (administered by the project) will provide the UB staff with more detailed information regarding each student’s current potential to perform college level work. The data collected for each student should assist the project staff to ensure that each student receives the academic support in the areas of need indicated by these test results. These test results will also be used to evaluate the effective of the project’s academic instruction at the end of the project year. 5.) Plan To Monitor The Academic Progress of Participants: Findings: As detailed in the revised Plan of Operation, the project staff has developed the following set of activities to monitor the academic progress of project participants: The UB Advisor meets individually with their assigned participants at least once every six weeks to update their Academic Progress Plans (APPs) to ensure all participants are enrolled in and successfully progressing through their academic courses. UB Academic Advisor reviews Student Detail Contact Reports generated by the project database weekly and monthly to monitor each participant’s academic progress throughout the year. Rating: Above Average Page 15 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS Recommendations: Although it may be implied, the project’s Plan of Operation does not include the following sentence which should read as the first item under the heading of “The Plan to Monitor the Academic Progress of Participants: “The UB project will obtain report cards from the target school for all project participants every six weeks in order to review each one for academic need and documentation on their Academic Progress Plans for that grading period.” This “monitoring” by project staff should be added to the Plan of Operation and conducted PRIOR to meeting with each student individually to discuss their reports cards and changes on their APP and ISP forms. Additionally, the plan does not mention interacting with the target school counselors or teachers on an “as needed” basis to monitor the academic progress of UB students. This needs to be added to the Plan of Operation as well. 6.) Plan To Deliver Services to All Participants: Findings: The UB Project has a very detailed PLAN OF OPERATION that clearly explains the delivery the following services and activities to its participants throughout the entire year: Academic Component: a. b. c. d. e. Mandatory Student & Parent Orientation Sessions Mandatory Saturday Enrichment Sessions (including college & educational trips) Individual Academic Advising Sessions Monthly Small Group Meetings & Case Management Services Mandatory Afterschool Tutoring Sessions All activities are both allowable and permissible UB Program services (Sec. 645.11) and the evaluator found evidence of all these activities being offered during the project’s first academic component. The assignment of UB students to the mandatory tutoring sessions are explained in detail with clear guidelines as to which must attend and how often. Page 16 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS Summer Component: f. g. h. i. j. Six week non-residential program hosted by Northwest Vista Community College Rising 9-12th grade UB students take Academic Courses on Mondays thru Thursdays based on academic ability in the morning and Elective Courses in the afternoon. Friday Field Trips to educational and cultural sites for eligible UB students based on attendance, academic performance, and behavior during the week. End of Summer Trip for eligible UB students based on attendance, academic performance, and behavior during the six weeks component. Student and Parent Banquet All activities are both allowable and permissible UB Program services (Sec. 645.11) including the mandatory services of instructional courses in math, literature, composition, science and foreign language. The evaluator found evidence of all these services being offered during the project’s first summer component. The Project Director and staff did an excellent job of implementing all UB Program mandatory and permissible services by the end of the project’s first year. The Plan of Operation is very detailed and included information regarding every aspect of the academic and summer component programming. The activities and services described in the Plan of Operation are appropriate and well thought out to meet the academic and social needs of the UB students. Rating: Above Average Recommendations: Project Director needs to update the Plan of Operation document as needed during the project year and then again at the beginning of each program year. Additionally, the Project Director needs to provide the Program Officer with a copy of the latest version of the Plan of Operation and budget on an annual basis for his/her records. Page 17 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS 7.) Academic Curriculum: Findings: Academic Component Curriculum: UB students receive tutoring in their high school English and math courses that are based on the state’s NCLB assessment exam (TAKS). Additional TAKS test preparation is offered during the school year in the morning portions of the Mandatory Saturday Enrichment Sessions. Test preparation in the verbal and math sections of the PSAT and SAT are also offered to UB students that have already passed the TAKS. Summer Component Curriculum: Rising 9-12th grade participants take Academic Courses developed by project instructors and based on the test objectives of the TAKS, THEA, PSAT, and SAT. The THEA is an assessment that all incoming freshmen in Texas must take before they can register for courses at any state sponsored college or university. The incorporation of the PSAT and SAT test objectives will assist UB students performance better on these college entrance exams. Additionally, the project plans to have its high school graduates concurrently enrolled in both college and high school during the spring semester before graduation or received Advanced Placement instruction during the summer component. The curriculum for both the academic and summer components is appropriately linked to the test objectives of the NLCB state assessment which is directly linked to GPRA objective #1 (Academic Improvement), objective #3 (Postsecondary Enrollment), and objective #3 (Postsecondary Persistence). Additionally, the supportive services, workshops, and activities (college, career, and financial aid exploration) are based on curriculum (CollegeED) developed and produced by the College Board. Rating: Above Average Page 18 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS Recommendations: Project Director needs to update the Plan of Operation when the project has its first set of graduating 12th graders to detail the type of academic services and the curriculum that will be provided to them during the summer component. The delivery method of the summer component courses should be modeled after the PROJECT BASED LEARNING METHOD – a comprehensive approach to instruction where students participate in projects and practice an interdisciplinary array of skills from math, language arts, fine arts, geography, science, and technology. Project based learning (PBL) helps make learning relevant and useful to students by establishing connections to life outside the classroom, addressing real world concerns, and developing real world skills. Many of the skills learned through PBL are those desired by today's employer, including the ability to work well with others, make thoughtful decisions, take initiative, and solve complex problems. In the classroom, PBL provides many unique opportunities for teachers to build relationships with students. Teachers may fill the varied roles of coach, facilitator, and co-learner. Finished products, plans, drafts, and prototypes all make excellent "conversation pieces" around which teachers and students can discuss the learning that is taking place. In the school and beyond, PBL also provides opportunities for teachers to build relationships with each other and with those in the larger community. Student work-which includes documentation of the learning process as well as the students' final projects-can be shared with other teachers, parents, mentors, and the business community who all have a stake in the students' education. 8.) Review of Required Forms, Student Files, & Documentation of Services Provided Findings: The UB Project Director and staff have developed or obtained the following required documents and forms: a. b. c. d. New Student Application & Needs Assessment Verification of Eligibility & Selection Individual Service Plan & Academic Progress Plan Order of Forms in Students’ Files Page 19 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS e. f. g. h. Individual Service/Contact Logs Group Service/Contact Logs Academic Component Activity Calendar Summer Component Schedule & Classes An analysis of the active students’ files revealed that 90% were in compliance and in order containing all required UB Program documentation (Sec. 645.43). All files were in an orderly and consistent format making the review a very easy process. The evaluator reviewed the binders containing all the Individual and Group Service/Contact Logs collected during the project year with UB students’ signatures and project staffs’ notes. A cross reference check between the information provided on the paper contact logs and the project database revealed 100% compliance in student signatures, students served, staff providing services, and dates of services provided. The Plan of Operation contains very detailed instructions on when and how project staff are to document all contacts provided to UB students. A copy of the grant proposal was readily available and the project’s objectives (%) were posted in numerous locations within the office. Copies of all stipend records, signature logs, and receipts were reviewed and determined to be in compliance. The project database (Blumen) is being utilized on a daily basis by project staff and is up to date. Additionally, all project staff have received training and a handbook on how to enter student information into the database and run reports. Rating: Above Average Recommendations: The Project Director needs to update these forms during the project year as needed and type in the revised date on all forms to indicate that it is the latest version of the document. The PD needs to create a binder that contains one hard copy of each of the project’s forms and documents in plastic sleeves that is updated with a new hard copy every time a particular form is updated. Page 20 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS The Project Director should upload the latest electronic copy of all project forms, documents, and database entry procedures onto the free Google Documents internet site in order to be easily accessible to all UB staff. 9.) Internal Formative & Summative Evaluation Plan Findings: Project staff followed the Outcomes Based Evaluation plan (summative) as outlined in the grant narrative for GPRA Objective #2 with the exception of the student, parent, and target school qualitative surveys that should have been conducted at the end of the academic component and then again at the end of the summer component. Project staff did not follow an internal (formative) evaluation plan as outlined in the grant narrative to manage the project. The project did not have students evaluate the following services received: Tutoring Academic Enrichment Saturdays Workshops College, Cultural & Educational Field Trips The Project Director did not generate a monthly PROJECT SUMMARY REPORT or CONTACT SUMMARY OVERALL REPORT to document the monitoring of progress towards meeting its objectives. The Project Director did not obtain an end of year evaluation form from its target school principal and/or contact personnel. Rating: Needs Improvement Recommendations: The project needs to develop and administer evaluation instruments or forms to document students, parents, staff (full-time, tutors, teachers), and target school personnel’s level of satisfaction with project services during and/or at the end of the project year. Page 21 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS These qualitative evaluation instruments should be developed and accessible to students, parents, staff (full-time, tutors, teachers) online via free resources such as www.monkeysurvey.com and www.surveygizmo.com. Results can be then quickly and efficiently tabulated electronically, charted, graphed, and reviewed. The project needs to implement the following INTERNAL GOALS (both quantitative and qualitative) based on the activities and services that the project must provide in order to meet their external GPRA objectives: INTERNAL GOALS TO MEET EXTERNAL GPRA OBJECTIVES (1) 70% of UB participants receiving tutoring will demonstrate an overall increase in GPA by the end of each semester as measured by semester report cards. (2) 80% of all UB participants will demonstrate an increase in knowledge of college, career, and financial aid information by the end of the academic component as measured by project-developed pre and post tests. (3) 85% of UB participants, parents, project staff, and target school personnel will rate the project’s academic component services as “Very Favorable” on project-developed surveys at the end of the school year. (4) 70% of UB participants attending the summer component will demonstrate an overall increase in learning as measured by project-developed pre and post tests for each course administered at the end of the summer. (5) 85% of UB participants, parents, and project staff will rate the project’s summer component services as “Very Favorable” on project-developed surveys at the end of the summer. The Project Director needs to generate a monthly PROJECT SUMMARY REPORT and CONTACT SUMMARY OVERALL REPORT from the project database to document the monitoring of progress towards meeting its objectives. Additionally, the Project Director will provide LNESC, the target school principal, and lead contact counselor with a copy of these monthly reports as well. Page 22 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS 10.) Institutional/Agency Support & Commitment Findings: The agency (LNESC) did not monitor the grant on a monthly basis. LNESC did not request any monthly reports from the project database nor request any qualitative data be collected by the project for their own internal review and assessment. LNESC provided the new UB project with critical support during its first year of operation by ensuring that it received monthly in-service training and technical support from experienced TRIO personnel in all areas of program implementation and execution of all required activities and services. There is an established and clear chain of command at the project level. The Project Director has been instructed to contact with different individuals at the LNESC DC level depending on the nature of the request or information required. Therefore, the Project Director has established business relationships with the accounting, human resources, purchasing, IT, etc. housed at the DC office. The project staff is housed in a suite of rooms located on the first floor of a business building. The space is adequate and includes a designated and secure office (Project Director’s) within the suite to store student files and conduct confidential meetings with parents and students. Additionally, there is sufficient cubicle space for the Academic Advisor and the Administrative Assistant and a small student computer lab. The project space is currently adequate at the target school (tutoring) and the host college site (Saturday Enrichment Sessions & Summer Component). Rating: Satisfactory Page 23 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS Recommendations: LNESC needs to request and obtain PROJECT SUMMARY and CONTACT SUMMARY OVERALL reports generated by the project database on a monthly basis. LNESC needs to request and obtain copies of all pre/post test scores and survey results to verify the performance on all internal goals by the end of each project year. LNESC should continue to ensure that the project receive monthly in-service training and technical support from experienced TRIO personnel in all areas of program implementation and execution of all required activities and services. 11.) Management & Staffing: Findings: The Project Director has been on board since the very beginning of the project and is 90% time and effort on the Upward Bound Project and 10% on the Science Corps Program. The other two full-time positions of Academic Advisor and Administrative Assistant have been on board for most of the project year at the 100% approved percentage of time. The project hires part-time Tutors during the academic year and part-time summer instructors during the summer component. Additionally, the project utilizes AmeriCorps volunteers from the University of Texas at San Antonio to serve as Tutors and Activity Assistants as well. There are current job descriptions for the part-time Mentor/Tutors and Instructors but no current job descriptions for any of the full-time staff (Project Director, Academic Advisor, and Administrative Assistant) positions. The Project Director has copies of all the Time & Effort Reports for the project year. There is no record of any regularly scheduled staff meetings occurring on a consistent basis during the project year. There is no formal and consistent work schedule posted for the full-time, part-time or volunteer staff. Page 24 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS Project staff attended a database training session and an Upward Bound program training in January 2008. Additionally, the Project Director attended the Council for Opportunity in Education’s Annual TRIO Conference in Washington, D.C. and attended a preconference workshop for new Upward Bound programs beginning their 2nd year of funding. The project staff have also been receiving consistent and regular technical support and in-service training on a monthly basis from an experience TRIO professional throughout the first year of the program. The Project Director has developed a detailed Plan of Operation that explains program procedures but there is no administrative manual for the project. The key staff (Academic Advisor, Administrative Assistant, and Mentor/Tutors) receives adequate supervision, guidance, and support from the Project Director. The Project Director and key staff demonstrate a basic knowledge of Upward Bound program regulations. The agency does not have a policy requiring criminal background checks and drug screening conducted PRIOR to the hiring of any project staff. Rating: Satisfactory Recommendations: The Project Director should keep utilizing the AmeriCorps volunteers from the University of Texas at San Antonio to serve as Mentor/Tutors and Activity Assistants. In addition to providing the project with extra assistance and support at no cost, this practice also exposes UB students to college students serving as positive role models. The Project Director needs to obtain and/or develop current job descriptions for all of the full-time staff (Project Director, Academic Advisor, and Administrative Assistant) positions immediately. Each full-time staff member should have signed copy of his/her job description in their personnel file. The Project Director needs to conduct a weekly scheduled staff meeting on a consistent day and time. Additionally, the Project Director needs to develop an agenda for each scheduled meeting and require that the Administrative Assistant Page 25 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS take minutes during each meeting. These minutes need to be approved by the Project Director for immediate distribution to the rest of the project staff within 24 hours of the completed staff meeting. The Administrative Assistant needs to maintain a folder containing a hard copy of the agendas and minutes of each weekly scheduled staff meeting. The Project Director needs to develop a formal and consistent work schedule for all project staff immediately and monitor their adherence to it. The Project Director needs to develop an administrative manual for the project that includes the following components: 1.) Project Plan of Operation; 2.) Project Database Procedures; 3.) Agency’s Operating Manual. The Project Director and key staff need to receive additional TRIO in-service training and technical support to improve upon their basic knowledge of program regulations. The agency needs to implement a policy requiring that all applicants pass a criminal background test and drug screen as part of the application process. This protects both the youth served by the project and the agency as well. 12.) Budget Records & Accounting System: Findings: The Project Director has a copy of the original approved budget but does not have the official revised budget for the current year. The Project Director does not maintain an accounting system independent of the agency. The agency has implemented a policy that allows project funds to be distributed only twice a month (the 1st and the 15th). The agency has implemented a policy prohibiting the purchase and use of work cell phones. The agency does not provide the project with petty cash funds. Rating: Needs Improvement Page 26 LNESC – Department of Education’s Upward Bound Project SAN ANTONIO, TEXAS Recommendations: The Project Director needs to obtain the official revised budget for the current year that includes carryover amounts from the previous year. This is critical to plan out services and activities for both the academic year and summer component. The Project Director needs to maintain an accounting system (like Quickbooks) independent of the agency. This internal system needs to be updated daily as needed and then reconciled monthly with the report generated by the agency’s accounting system. The agency needs to reconsider its current policy regarding the use of work cell phones issued to UB staff. In addition to being an allowable and approved cost, it is a critical tool to communicate effectively with students and their parents. It is also a standard safety procedure nowadays for programming staff to carry a work cell phone during all the field trips the projects must take during the year. Additionally, the agency will also have a way to always communicate with UB staff immediately and not have to wait until they return to the office to receive their messages. The agency needs to have a more flexible and reasonable policy that provides the project with funds more often than just twice a month. This policy at times prevents the project from providing their students with specific services and activities. It is common practice for agencies that sponsor programs serving at risk youth to release funds as often as twice a week in order to ensure their needs and services are met in a timely manner. There are instances when a small amount of office supplies are needed for a student, parent, or staff activity or training sessions and the deadline to request these funds has passed. This petty cash fund can be tracked and monitored via debit cards with a set amount funds deposited that will require the submission of receipts documenting allowable purchases in order to be replenished on a monthly basis. Page 27