How Headquarters, Department of the Army (HQDA) conducts the Program Objective Memorandum (POM) Eric Roos IV-1 Agenda IV-2 What is the “programming” or the “POM?” Guidance Program Analysis & Evaluation Directorate (PAED) Timeline Management Decision Packages (MDEPs) Players and Processes Challenges Databases What comes after the POM? Programming or “the POM” Programming is the projection of the activities and the resources that will be required to accomplish the Army’s mission for the next five years. Programming Challenge is to Identify: The right level of resources The right program prioritization The right amount of risk The right program tradeoffs IV-3 Multiple Year Impacts of PPBE (POM 17-21 PPBE Cycle Example) Planning extends 15 + years into the future (FY 17 – FY32 and beyond) Programming looks at 5 years into the future (FY 17 – FY21) Budgeting looks 1 year into the future (FY 17) Congress reviews / enacts the closest year into the future (FY 16) Execution covers the current year and several prior years (FY 11 – FY15) Execution FY 11 12 13 14 Congress 15 16 17 Budget Year 18 19 20 Planning 21 22 23 24 25 26 27 28 29 30 31 Program & Budget PPBE is the process through which the Army takes a long term perspective of its needs and prioritizes operational requirements within given fiscal constraints IV-4 32 + The Army Plan (TAP) National Strategy The Army Plan (TAP) aligns and nests the Army’s planning documents with joint guidance and capabilities, using a Title 10 lens QDR The Army Plan (TAP) Section I Army Vision Section II Section III Section IV Section V Strategy Priorities 2015 - 2025 Army Strategic Guidance Army Planning Guidance Army Program Guidance Memorandum Army Campaign Plan DCS G-3/5/7 DCS G-3/5/7 DCS G-3/5/7 DCS G-8 (PA&E) DCS G-3/5/7 As Needed Biannual Annual Annual Annual • The intent of the AV is to set the strategic priorities for the Army as an institution to drive future change. • Focused on how the Army will transform over a 10year period to support higher-level strategic guidance • Informs the other TAP sections and the Army’s strategic communications to external audiences. IV-5 • Nests Army guidance within National, OSD and Joint directives • Provides Army leaders’ provides strategic objectives, milestones and decision points to achieve AV goals • Principal expression of Army institutional strategy • Links requirements to the ASPG • Prioritizes Army capabilities and resources allocation into tiers for the 5-year Program Objective Memorandum (POM) and the Planning, Programming, Budgeting, and Execution System (PPBES) Programming • Provides the initial guidance for Army POM and BES development. • Links strategic guidance and operational capabilities with programming guidance and instructions for the development of the POM • Identifies detailed objectives a by Program Evaluation Group • Establish and monitor priorities and initiatives from the SECARMY and CSA • Directs, synchronizes and integrates HQDA planning, preparation and execution of Army activities across DOTMLPF & Title 10 activities • Informed by POM decisions; helps inform future POMs 30 PPBE Documents and Products Legend Planning National Security Strategy (NSS) – annually, with President’s Budget President OSD CJCS HQDA National Defense Strategy (NDS) – quadrennially, with President’s Budget Congress National Military Strategy (NMS) – biennially, 15 February, even Fiscal Year Quadrennial Defense Review (QDR) – quadrennially, with President’s Budget The Army Plan (TAP) – Army Vision (AV) (as required) Army Strategic Plan (ASP) (April bi-annual) Army Planning Guidance (APG) (July) Army Program Guidance Memorandum (APGM) (January) Army Campaign Plan (ACP) (October) (Programming Phase) Total Army Analysis (TAA) – December Research, Development & Acquisition Plan (RDAP) – annually, March Army Modernization Plan – annually, April Defense Planning Guidance (DPG) – annually, April (Note: formerly DPPG – Defense Planning and Programming Guidance) Programming and Budgeting Chairman’s Program Recommendation (CPR) – annually, April Technical Guidance Memorandum (TGM) – annually, April Fiscal Guidance (FG) – annually, April Program Objective Memorandum/Budget Estimate Submission (POM/BES) – annually, August Chairman’s Program Assessment (CPA) – annually, October Resource Management Decision (RMD) – annually, September-November Major Budget Issue (MBI) – annually, December President’s Budget (PB) – annually, First Monday in February Congressional Review and Enactment Execution IV-6 NOTE: All Dates Are Approximate Congressional Review Authorization Appropriation Signs into Law Execution Assessment by September 30 Continuous Key Army PPBE Organizations ASA (FM&C) PPBE Proponent Policy Executive Director Army National Military Cemeteries Director Small Business Programs The Army Auditor General Military Deputy for Budget ------------- Army Budget Office Budgeting and Execution ASA Installations, Energy & Environment The Inspector General Administrative Assistant to SECARMY Army Secretariat Chief of Public Affairs Deputy Under Secretary of the Army ASA Acquisition, Logistics & Technology ASA Financial Management & Comptroller ASA Manpower & Reserve Affairs ASA Civil Works Chief, Legislative Liaison USA General Counsel Director Army Staff DCS G-1 DCS G-2 DCS G-4 DCS G-3/5/7 DCS G-8 ACS Installation Management Army Staff IV-7 SECARMY CSA VCSA Chief of Engineers Sergeant Major of the Army Assistant G-3/5/7 Planning Director PA&E Programming ASPG, APPG, ACP APGM Chief Information Officer/G-6 Chief of Chaplains Provost Marshal General Chief, National Guard Bureau Chief, Army Reserve The Judge Advocate General The Surgeon General Resource Formulation Guide Purpose: Document the processes and procedures used to formulate, justify, and execute the POM/BES Actions required of HQDA and ACOM in their interface with the Headquarters Consolidate previously issued guidance documents Provide new guidance and explanations for previously undocumented processes Contents: Nine volumes (five published to date) Vol 2 – Plan, Program, Budget, and Execution A – Decision Making B – Training Course Vol 3 – Integrated Program and Budget Data Call Instructions Vol 5 – Preparation of the Program/Budget Review and President’s Budget Exhibits Vol 7 – Budget Execution Vol 9 – Automation Products and Procedures Note: The current RFG is available on the PPBE Portal and the PPB BOS Portal IV-8 Command Program Guidance Memorandum (CPGM) New Initiative beginning POM FY 17-21 Provides detailed programming guidance to commands on civilian manpower and for reprogramming of dollars. Supplements APGM with the intended audience being command resource managers. CPGM includes: Annex A. Base Memorandum - signed by Army Senior Leader Annex B. General Guidance Annex C. Command Schedule 8 reprogramming request Annex D. Commander’s Program Assessment IV-9 Technical Guidance Memorandum Training (TT) PEG. (1) Fund all OPTEMPO in the Base Program. Any deployment offsets, number, and type (BCT/CAB), require approval by the PPBC. (2) internally fund the National Science Center (MDEP: MUlL) at not-less-than the PB13 Lock position levels. PEG ($K) FY14 FY15 FY16 FY17 FY18 FY14-18 TT 1,734 1,756 1,776 1,685 1,715 8,666 (6) Organizing (OO) PEG Bills. The 18 April SRG directed the OO PEG to address the following program bills. Fully fund full-time equivalent (FTE) for HQDA and HQDA field operating agencies (FOA) civilians. Use issue code: OO_SH001. PEG ($K) OO FY14 94,065 FY15 96,824 FY16 96,333 FY17 95,984 FY18 97,631 FY14-18 480,837 (1) Each PEG/integrator will program competing requirements based on the following end strength levels by component: Component AC ARNG USAR IV-10 FY14 524,100 358,200 205,000 FY15 512,800 357,200 205,000 FY16 502,100 355,200 205,000 FY17 490,000 353,200 205,000 FY18 490,000 350,200 205,000 Tentative FY18-22 POM / BES Timeline FY 16 Sep-15 Key Dates Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 FY 17 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 FY 17 PB Submitted FY 16 Begins FY 18-22 OSD and OMB Initial OSD TOA Guidance Oct-16 Nov-16 Dec-16 J an-17 15 May 1 June (COA 2) (COA 1) POM 18-22 POM 18-22 to OSD To OSD Revised OSD TOA Guidance FY 18-22 OSD Program Review Program Budget RMD RMD FY 18-22 OSD / OMB Budget Review / Hearings Feb-17 FY 18 PB Submitted FY 17 Begins PB Budget Lock OMB Passback 3-Star Programmers SRG #1 SRG #2 SRG #3 SRG #4 Forces Readiness CMD POM Review Approval Programming FY 18-22 TGM 1.0 TOA Guidance CGPM RFG Draft APGM TGM 2.0 Rev. TOA Guidance Final POM Draft Offsite APGM DMAGs Capital Invest Small Grp TGM 5.0 Close Out TGM 3.0 TGM 4.0 Resource POM Trades Approval Preparation for FY 18-22 POM Build FY 18-22 Program Review FY 18-22 POM Build PB 17 closeout DB Rollout ARF Update MDEP Updates MDEP Reviews / Weapon System Reviews ARF Mapping Complete CDRs Program Assessments Resource Trade Deliberations • • • • FTE Under-Execution Look RDA - OMA Under-Execution Look Civilian Affordability Review Appn Sponsor Look PEG Req / Funding Update CMD CMD CMD Sched 8 Sched 8 Req Data Call Reviews Update POM Docs - EXSUM POM Brief POM DB Update J-Books to OSD J-Books to Congress BES to OSD Preparation for FY 18-22 BES Build Budgeting FY 18-22 FY 18-22 BES Build FY 18-22 Budget Review / Hearings PB Rollout FY 18-22 OCO Request • AWCF update • APPN sponsor review IV-11 Sep-15 Oct-15 CY 15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 CY 16 Aug-16 Sep-16 All Dates Approximate – Annual POM/BES Schedule Varies Year-to-Year based on OSD Guidance Oct-16 Nov-16 Dec-16 AsJan-17 Feb-17 CY 17 As of 5AUG15 10 What is an MDEP? ~450 “buckets” of resources that collectively house al Army requirements • Examples of “buckets” are • • Institutions: War College, West Point, Jails, Museums • Units: Divisions and brigades • Functions: Civil Support, basic training, base functions (e.g. logistics, utilities, housing maintenance) IV-12 Example of MDEP IV-13 Management Decision Package Role of the MDEP Manager Build program and justifies requirements: Know history and environment of MDEP Review and prioritize requirements within existing resources and IAW current fiscal environment Identify what cannot be done within the funding currently in the program Articulate the impacts and risks Articulate actions required to live within current top line Understands and coordinates all MDEP issues from planning through execution; dollars and manpower IV-14 Program functionals Appropriation sponsors Program integrators Manpower and force structure managers Program and performance managers Stays involved and quickly responds to all MDEP issues in order to influence decisions PPBE Decision Committees Program Evaluation Groups Build, integrate, and help defend program Program and Budget Assessment Team Serves as a “working-level” forum between the PEGs and the PPBC CoC (Equivalent) Council of Colonels Takes care of most of the Army’s resourcing decisions at a lower level Reviews and approves or rejects all Schedules 8, Concept Plans, and changes to resources within its authority. Represent PPBC members Formulates and coordinates issues for PPBC Planning, Program, and Budget Committee (PPBC) Senior Review Group (SRG) Senior Leaders of the Department of the Army IV-15 Joint Chairs (Asst G3, DPA&E, DAB) Evaluate PEG output against guidance Recommend POM/BES decisions Co-Chaired by USA VCSA Recommends final decisions on TAP, POM/BES Formulates issues for the Senior Leaders of Department of the Army Make final resourcing decision for the Army. PPBE Decision Committees / Processes PPBE DECISION Committees Long-term (POM/FYDP) focus • Informative • Consensus Building • One Army Story Budget Requirements Programs (BRP) Near-term (Execution) focus • Analysis challenged • Alternatives developed • Solution formed Program Budget Assessment Team (PBAT) Then Support POM Development Throughout Programming Phase IV-16 PEG Executives / Appropriation Sponsors (PE/AS) • CoC Represents PPBC members. Responsible for coordinating matters that come before the PPBC Planning, Programming, & Budgeting Committee (PPBC) • First executive level decision and advisory role • Maintains overall discipline of PPBE • Oversees PPBE schedule COL BRP • Gatekeepers for issues with resourcing implications • Package proposals, frame issues, and coordinate matters that go before the 2Star and Senior BRP 2-Star BRP • Coordinating, executive-advisory role • Maintain overall discipline of resourcing process • Ensure resourcing decisions align with Army priorities • Recommend POM/BES solutions to 3Star BRP Senior Review Group • Resolves resource allocation issues • Monitors staff Implementation of SA/CSA decisions • Makes recommendation, prioritization, resource allocation to SA/CSA Secretary of the Army Chief of Staff of the Army • Senior Army leadership forum • Approves prioritization of Army Programs • Selects resource allocation alternatives • Approves TAP, POM/BES 3-Star BRP Reviewed Week Prior • Resolves resource allocation issues • Recommend final decisions on The Army Plan, POM/BES • Formulate issues for Senior Leaders of the Department of the Army SECARMY makes final resourcing decisions Additional analysis when needed Develop and Submit Initial Program Objective Memorandum (POM) • Entry point for the decision process • Reviews and recommends approval or disapproval of Schedule 8 changes, concept plans, and requirements changes Additional analysis when needed Program Evaluation Groups (PEGs) Program Evaluation Groups (PEG) Program Evaluation Groups (PEGs) Manning (MM) • ASA(M&RA) • G-1 Training (TT) • ASA(M&RA) • G-3/5/7 Organizing (OO) Program Integrators • CIO/G-6 • ARNG • USAR • G-2 • OTSG* • COE* • ASA(M&RA) • AASA Equipping (EE) • ASA(ALT) • G-8 Sustaining (SS) • ASA(ALT) • G-4 Installations (II) • ASA(I&E) • ACSIM Unassigned (UU) IV-17 * Unofficial integrators • Six Program Evaluation Groups (PEGs) are used to support PPBE UU “PEG” is used for executive-level programs, unassigned funds, and wedges not assigned to other PEGs • Secretariat & functional proponent co-chairs each PEG (except OO PEG) • ARNG, OCAR, CIO/G-6 and G-2 serve as Program Integrators within each PEG • PEGs, assisted by the Program integrators, Work with PA&E on drafting Section III of The Army Plan (TAP) Administer Management Decision Packages (MDEP) Set the scope, quantity, priority, and nature of requirements Construct program performance measures and define metrics Build the initial POM Help defend programs during the review process Track programs during execution Typical Program Evaluation Group (PEG) II PEG Exec* ASA(I&E)* G8 PAE ARNG PAE CIO/G6 (as required) ASA(M&RA)/G1 (as required) IV-18 MDEP Manager (briefer) II PEG Analyst (non-voting) G3 - CIR ASA (FM&C) USAR PAE Program Evaluation Groups Role of the Program Integrators Representatives from the ARNG, AR, CIO/G6, and G2 serve as program integrators to the PEGs. Program Integrators provide technical assistance and monitor actions to integrate priorities and statutory, defense, and Army requirements for their respective areas of responsibility into the Army’s overall program. IV-19 Installations Strategic Objectives • Maintain Army Readiness through delivery of resilience-enhancing Soldier and Family programs, quality housing, and safe and secure installations • Balance facility and installation services requirements, at the right quantity and quality to meet critical mission needs • Secure access to energy, water, and land resources; develop and sustain Partnerships to provide more efficient and economical delivery of services; and minimize environmental restrictions to maintain the capability, availability, and accessibility of land and natural resource sin support of training and readiness. • Modernize, operate, maintain and defend the Army Network enabling institutional, strategic, and tactical missions across the full range of military operations through an effective, secure and efficient global network that supports strategic and tactical Joint Environments. Our end state is to reflect sustainable installations that support our future Army with the required land, facilities, network and infrastructure to achieve our missions. IV-20 20 Program and Budget Assessment Team (PBAT) PEG PBAT CoC PPBC SRG Senior Leaders DA Program Budget Assessment Team Co-Chairs G8 PA&E Program Development Division ASA (FM&C) Budget Formulation Division G3 FM Program Budget Guidance Division G1 P&R Resource Development Division Other Members PEG Administrators PA&E PEG Points of Contact Program Integrators Other Advisors (e.g. OTSG, COE - As needed) Appropriation Sponsors (As Needed) Serves as a “working-level” forum between the PEGs and the PPBC CoC Takes care of most of the Army’s resourcing decisions at a lower level Reviews and approves or rejects all Schedules 8, Concept Plans, and changes to resources within its authority. IV-21 Council of Colonels (CoC)/Planning Program and Budget Committee (PPBC) PEG PBAT CoC PPBC SRG Senior Leaders DA Planning Programming Budget Committee Co-Chairs Assistant G-3/5/7 (Co-Chair for Planning) Director PA&E (Co-Chair for Programming) Director of the Army Budget (Co-Chair for Budgeting) Secretariat ASA(ALT) ASA(CW) ASA(IE&E) ASA(M&RA) AASA CIO/G6 Army Staff G-1 G-2 G-4 ACSIM COE TSG CAR DARNG Advisory and support personnel may also attend, as required. IV-22 DAB, DPA&E and Asst. G-3/5/7 are Co-Chairs Serves the PPBE process in both a coordinating and executive-advisory role Represents all ARSTAFF and Secretariat Maintains overall discipline of the PPBE process Ensure program/budget adjustments remain consistent Army policy and priorities Unresolved PPBC issues are passed to the SRG PPBC Co-Chairs PEG PBAT CoC PPBC SRG Senior Leaders DA Co-Chairs on the Planning, Program Budget Committee (PPBC) Director of the Army Budget (DAB) for budgeting and execution Director, Program Analysis & Evaluation for programming MG John G. Ferrari Assistant G-3/5/7 for planning Mr. Peter B. Bechtel IV-23 MG Thomas A. Horlander Senior Review Group (SRG) PEG PBAT CoC Secretariat PPBC Senior Review Group Co-Chairs Under Secretary of the Army Vice Chief of Staff of the Army Army Staff ASA(FM&C) (also Executive Secretary) ASA(ALT) ASA(CW) ASA(I&E) ASA(M&RA) CIO/G6 General Counsel G-1 G-2 G-3/5/7 G-4 G-8 ACSIM CAR DARNG COE TSG Advisory and support personnel may also attend, as required. Senior Leaders DA SRG Commands FORSCOM TRADOC AMC Serves as a senior level forum to resolve resource allocation and other PPBE-related issues Represents all ARSTAFF and Secretariat PPBC co-chairs advise/ensure continuity between committees Includes representative from Army Commands (FORSCOM, TRADOC, AMC) Functional advisors as needed Formulates issues for the Senior Leaders HQDA IV-24 Senior Leaders of the Department of the Army PEG PBAT CoC PPBC SRG Senior Leaders DA Set policy and approve guidance and priorities Have veto authority on all resourcing decisions Make final resourcing decisions for the Army By law the SA has final decision authority Senior Leaders of the Department of the Army Honorable John McHugh: Secretary of the Army (SA) GEN Mark A. Milley: Chief of Staff, Army (CSA) Eric K. Fanning (Acting): Under Secretary of the Army (USA) Gen. Daniel B. Allyn: Vice Chief of Staff, Army (VCSA) LTG Gary H. Cheek: Director of the Army Staff (DAS) SGM Army Daniel A. Dailey: Sergeant Major of the Army (SMA) IV-25 POM Development and Adjudication Process Overview POM INPUT USA/VCSA Senior Leader Guidance The Army Plan Army Command, ASCC, DRU Requirements Combatant CDR Input / IPL PEGs Equipping ASA(ALT) G-8 (FD) Installations ASA(IE&E) ACSIM Manning ASA(M&RA) G-1 Organizing ASA(M&RA) SAAA Sustaining ASA(ALT) G-4 IV-26 Training ASA(M&RA) G-3 Secretary of the Army Chief of Staff of the Army Final Resourcing Decisions Program Integrators ARNG USAR G-2 CIO/G-6 Army PPBE Decision Forums Senior Review Group • Resolves resource allocation issues • Monitors staff Implementation of SA/CSA decisions • Makes recommendation, prioritization, resource allocation to SA/CSA PEG Executive Planning, Programming & Appropriation Budgeting Committee (PPBC) Program/Budget Sponsors ---------Action Team (PBAT) Council of Colonels • First executive level decision & advisory role • Coordinate • Represent PPBC matters that • Maintain discipline of PPBE members come before the • Coordinate matters • Oversees PPBE schedule PE/AS, CoC / that come before the PPBC PPBC Equiv. Army Resource Framework IV-27 The purpose of the ARF is to align Army capabilities and functions across all elements of the Army Program using an established hierarchy. The ARF provides senior leaders a programmatic a holistic view of how resources are aligned to achieve Army goals and objectives The intent is to use common definitions to facilitate Staff and Senior Leader defense of the POM to OSD. ARF Development is focusing attention back to MDEP packaging and presentation for internal Army POM Development Readiness Operate the Force 2.1.1 Forward Presence Missions 2.1.2 Homeland Defense 2.1.3 Joint and International Programs 2.1.4 Cyber-Network Operations 2.1.5 Military and Civilian Personnel Support 2.1.6 Operations & Activities (Army) Train the Force 2.2.1 Operational Training Ground Direct OPTEMPO 2.2.2 Operational Training Air (FHP) Direct OPTEMPO 2.2.3 Operational Training Indirect OPTEMPO 2.2.4 Institutional Training 2.2.5 Training Support Systems 2.2.6 Training Ammunition Sustain the Force 2.3.1 Depot Maintenance 2.3.2 Core Logistics Sustainment 2.3.3 2.3.4 2.3.5 2.3.6 Sustainment Systems Technical Support (SSTS) Second Destination Transportation (SDT) Strategic Wartime Equipment (APS, WRSI) Ammunition Readiness Installation and Enterprise Services 2.4.1 Housing (AFHO & Unaccompanied) 2.4.2 Family, Community, and Soldier Programs 2.4.3 Garrison 2.4.4 Logistic Operations 2.4.5 Information Technology Services Management 2.4.6 Security 2.4.7 Facility Operations 2.4.8 Facility Sustainment IV-28 Capital Investments Man the Force 1.1.1 AC Manpower 1.1.2 RC Manpower 1.1.3 RC Full Time Support (FTS) {AGR / MILTECH} 1.1.4 Recruiting and Retention Service HQS & Obligations Forces Army Resource Framework Structure Installation Infrastructure 3.1.1 Military Construction (MCA, MCAR, MCNG) 3.1.2 Restoration and Modernization (RM) 3.1.3 Army Family Housing Construction (AFHC) 3.1.4 Base Realignment and Construction (BRAC) 3.1.5 Environmental Management Equipment Acquisition and Disposal 3.2.1 Science & Technology 3.2.2 Major Investments 3.2.3 Major Investment Enablers 3.2.4 Minor Investment Enablers 3.2.5 Modernization,Test, and Studies 3.2.6 Disposal and Demilitarization Service Headquarters 4.1.1 Army HQS (HQDA, USAR, FOA) 4.1.2 ARNG HQS External and Directed Army Obligations 4.2.1 Non-Discretionary Obligations 4.2.2 Directed Discretionary Obligations Issue Flow Resource Issue Develops Long-term (POM/FYDP) focus Exec for Programming Exec for Budgeting G1 / G3 (FM) Near-term (Execution) focus PBAT Meets Tuesdays COL BRP PE/AS or CoC Meets Mondays Recycle Issues back to PBAT when necessary Meets Wednesdays Additional analysis when needed 2-Star BRP Meets Wednesdays Additional analysis When needed PPBC Meets Thursdays Reviewed Week Prior Reviewed Week Prior 3-Star BRP Meets Fridays SRG or Small Group IV-29 Army Senior Leaders SECARMY makes final resourcing decisions for the Army Additional analysis when needed Installation PEG POM 18-22 Intent What We Are Trying To Accomplish We want to get the requirements right so we can articulate risk Align Installation PEG Programs to the Appropriate Level given Senior Leader priorities, risk and available resources for all Army programs Ensure Army Senior Leaders understand impacts of Strategic Decisions on Installation PEG Programs IV-30 30 ACSIM Co-Executive • Be knowledgeable about program deliverables; what does your program buy for the Army? How does it support the Army’s priorities? • Be able to articulate your program drivers! What statutes and policies drive your program? What is the basis for your program’s requirements (i.e. population served, square footage, case load, number of exercises, etc.) • Provide the RVT with recommended Courses of Action – not unresolved issues or problems • Clearly articulate what you cannot do within current funding in your program/MDEP What is the risk/impact to the Army? What law/policy/statue relief do you need to reduce requirements to live within funding? • Plan ahead – IV-31 5 business days prior to brief – R-Builder lock Begin working on your requirements methodology early. The RDR team is available to assist you with methodology development. Clearly articulate your MDEP requirements and identify the risks/impacts and mitigation required to live within the current funding level 31 Programming / Budgeting (Army Cost Drivers) Manpower ~50% End Strength Force Structure Achieving Balance Readiness ~30% Training IV-32 Sustainment Investments ~20% Installations Equipment Facilities PPBE Process – The Basics Step 2: Requirements Determination / Levels What’s acceptable? Automobile Housing Entertainment IV-33 MDEP / Service Name & No. and/or Program: _________________________________________________________ Risk/Impact Slide Using the colored matrix and risk type/impact definitions as reference, annotate the table with Impact/Probability values for each risk type at each given funded level; explain the impacts on the right. If your levels of risk are at different percentage points other than those listed, please indicate in Health/ Critical Funding Level Impacts: your write-up. Funded Level Life/ Safety Readines s Cost Statutory Other Critical I/P I/P I/P I/P I/P 90% of critical I/P I/P I/P I/P I/P 80% I/P I/P I/P I/P I/P 70% I/P I/P I/P I/P I/P 90% Impacts: I/P Example: 3/2 4 Risk Impact 3 4– Catastrophic 3 – Critical 2 – Moderate Risk 1 – Negligible Assessment Key Extremely High High Moderate IV-34 Low 80% Impacts: 2 1 1 2 3 Risk Probability 70% Impacts: 4 4 – Likely to Occur Immediately (P > .9) 3 – Probably will Occur in Time (.5 ≤P ≤.9) 2 – Possible to Occur in Time (.1 ≤ P < .5) 1 – Unlikely to Occur (P < .1) How Changes are Viewed by Army External Stakeholders (OSD, OMB, and Congress) This Not This Smooth Growth Uneven Spike 16 14 12 10 8 6 4 2 0 16 14 12 10 8 6 4 2 0 FY 2016 FY 2017 FY 2018 FY 2016 Steady Decrease FY 2018 Uneven Reduction 16 14 12 10 8 6 4 2 0 16 14 12 10 8 6 4 2 0 FY 2016 IV-35 FY 2017 FY 2017 FY 2018 FY 2016 FY 2017 FY 2018 Data Systems Interaction Flow Chart Defense Programming Database (DPD) The Defense Programming Database (DPD) is the OSD system which contains various budget and program data for query, comparison and analysis. ePROBE is a collection of applications and databases used throughout the PPBE cycle. PPB BOS Data Warehouse and COIs provide a suite of tools for analysis and export of this data Program Resource Collection Process (PRCP) Force File PROBE Database [GOLD] IV-36 eProbe CMD Programming G8 PA&E/PDD CMD Requirement changes / Schedules 8 (BO1,R, 4,9) Structure and Manpower Allocation System (SAMAS) G3 Manpower Authorization (BO4) Requirements (BO9) Workyears(FTE) (BO6) Integrated Resource Management Information System (IRMIS) Database [FMDB102] IRMIS Civilian Pay Module ASA (FM&C) Civilian Costing (BO5) The CIS tailors Service budget submissions to meet OMB requirements Contains data for both funding and manpower, civilian and military Manages POM and RMD controls for Service implementation and technical adjustments. IRMIS is a collection of applications and databases used throughout the PPBE cycle. PB/OP-32 for object class distribution ARC for APPN/BA controls IRMIS uses the resource validation tables from PROBE. IRMIS Resource Formulation System (RFS) ASA(FM&C) Funding (BO1) ARMY G8 PA&E/PDD Req.(BO8,7,R) and Funding (BO1) Comptroller Information System (CIS) OSD Budget Codes (OCO, OP32) Program Budget Guidance (PBG) eProbe PEG Programming In conjunction with PB and appropriation OSD FYDP Update OMB MAX Database The PRCP allows all Service and Defense TOA be aligned to the same format. Aligns TOA to OSDPE, BLI/SAG/project, OCO v Base Exhibits C/O/M/P/R/RF-1, OP8, PB-22 and PB/OP-32, (object class) OCO Requests review by OSD and OMB In conjunction with POM/BES and PB OMB Source of APPN requests in the PB to Congress Planning, Programming, Budgeting, and Execution The Transition Phase Transition from Programming to Budgeting Normal battle hand off between PA&E and ABO OSD / OMB POM/BES Jan – Aug Program Budget Review Sep – Nov Congress President’s Budget Congressional Marks Feb – Sep FY 2018 BES Build: Jun – Aug 16 / President’s Budget Build: Nov 16 – Jan 17 IV-37 Acronym List • • • • • • • • • • • • • • • • • • • • • • • • • • • IV-38 ABO = Army Budget Office ACM = Army Cost Management Portal APPG = Army Planning Priorities Guidance ASA(F&MC) = Assistant Secretary of the Army for Finance and Management Comptroller BES = Budget Estimate Submission BRP = Budget Requirements and Programming CPP = Cost & Performance Portal DASA-CE = Deputy Assistant Secretary of the Army for Cost and Economics DGC = Deputy Garrison Commander GFEBS = General Fund Enterprise Business System II PEG = Installations Program Evaluation Group ISR = Installation Status Report MDEP = Management Decision Evaluation Package OACSIM = Office of the Assistant Chief of Staff for Installation Management OD = Operations Directorate PBR = Program Budget Review POM/BES = Program Objective Memorandum/Budget Estimate Submission PPBC = Planning Programming Budget Committee PPBE = Planning, Programming, Budgeting and Execution RD = Resources Directorate RMD = Resource Management Decision RVT = Requirements Validation Team SNaP = Select and Native Programming SRG = Senior Review Group SSC = Standard Service Costing TAP = The Army Plan TOA = Total Obligating Authority