ancillary services, electric vehicles & prospects of v2g operations

advertisement
SUMMER INTERNSHIP REPORT
A Study of the Proposed Ancillary Services
In Indian Power Sector and the Prospects of using
Electric Vehicles in Providing Ancillary Services
UNDER THE GUIDANCE OF
Ms. Vardah Saghir, Senior Fellow, CAMPS, NPTI
&
Mr. Saurabh Gupta, Manager, AF Mercados EMI
At
AF Mercados Energy Markets International, Gurgaon
Submitted By
SAARTHAK KHURANA
ROLL. NO. – 72
MBA – POWER MANAGEMENT
(Under the Ministry of Power, Govt. of India)
Affiliated to
MAHARSHI DAYANAND UNIVERSITY, ROHTAK
AUGUST, 2013
DECLARATION
I, Saarthak Khurana, Roll no. 72 / Semester III / Class of 2012-14 of the MBA (Power
Management) Programme of the National Power Training Institute, Faridabad hereby declare that
the Summer Training Report entitled “A STUDY OF THE PROPOSED ANCILLARY SERVICES
IN INDIAN POWER SECTOR AND THE PROSPECTS OF USING ELECTRIC VEHICLES IN
PROVIDING ANCILLARY SERVICES” is an original work and the same has not been submitted to
any other Institute for the award of any other degree.
A Seminar presentation of the Training Report was made on ………………….. and the suggestions
as approved by the faculty were duly incorporated.
Presentation In-Charge
Signature of the candidate
(Faculty)
Counter signed
Director/Principal of the Institute
Acknowledgement
I am having great pleasure in presenting this report on ‘The Study of the Proposed Ancillary
Services in Indian Power Sector and the Prospects of using Electric Vehicles in Providing
Ancillary Services’. I take this opportunity to express my sincere gratitude to all those who have
helped me in this project and contributed to make this a success.
I would like to express my sincere gratitude to Mr. Saurabh Gupta, Manager and Mr. Vikas
Gaba, Associate Director, AF Mercados EMI for giving me an opportunity to work under their
guidance and a rare chance to work in a prestigious research project on an upcoming subject.
I would like to express my heartiest thanks to Mr. Anish De, CEO, AF Mercados EMI for giving
me a chance to work at their esteemed organization, and providing me with the necessary
resources, ideas and facilitating me in this project.
I express my heartfelt regards to, Mr.S.K.Chaudhary, Principal Director, CAMPS-NPTI, and Mrs
Manju Mam, Director, CAMPS-NPTI whose guidance was of invaluable help for me. I am also
thankful to my internal project guide Ms Vardah Saghir, Senior Fellow, NPTI for her support
towards completion of my project.
I also extend my thanks to all the faculties in CAMPS (NPTI), for their support and guidance in my
project.
Saarthak Khurana
Executive Summary
The current Indian Power Sector is broadly governed by the Indian Electricity Act of 2003. The
basic premise of this act is to design competition in every sphere of the power sector. Trading is
a very important part of a competition driven deregulated power market. For efficient trading in a
deregulated power market, it is important that the energy spot market remains a valid model of
the underlying physical power system during each market interval. This includes quality of
supply and system security issues. This provides a valuable perspective on the role of ancillary
services in the deregulated power markets. Ancillary services can be defined as those services
that are necessary to ensure the system integrity and stability that provide for services not
included in the energy spot market and that would not be provided on the basis of energy prices
alone. The Indian power system should be operated in a safe, secure and reliable manner. In
order to fulfill this obligation the state power pools should control technical characteristics of the
system, such as frequency and voltage through ancillary services agreements.
The RISO/SISO should determine the ancillary services requirements on a regional grid basis
and load zone basis using demand forecasts for the time frame for which the ancillary services
are to be procured. As per the CERC staff paper, Frequency Support Ancillary Services (FSAS)
envisage harnessing of the generation resources on pan India basis to achieve economy and
efficiency. Similarly, Voltage Control Ancillary Service (VCAS) is proposed on the reactive
compensation required node-wise. Black Start Ancillary Service (BSAS) is also proposed, which
needs to be implemented in a coordinated manner. It is proposed that the system operator,
namely National Load Despatch Centre (NLDC) should be the nodal agency for implementation
of the ancillary services as NLDC monitors the real-time grid conditions on the round the clock
basis.
These services can be provided by using grid connected electric vehicles. Besides this in order to
meet future transportation needs, control climate change, address health issues related to
emissions, and phase out dependence on oil, today's propulsion technologies have to be replaced
by more efficient and environmentally friendly alternatives. Electric vehicles are such a
technology that can aid the transition. A couple of countries like Germany, Denmark, and
Sweden have already decided to switch electricity production from fossil fuel to renewable
sources, thus further improving sustainability of electric cars when compared with internal
combustion engine vehicles.
The electric propulsion systems are being developed for a wide range of medium- and heavyduty vehicle sizes and applications, including transit buses offer several advantages such as:





Increased efficiency, potentially lowering fuel cost
Better acceleration, allowing quick merging into heavy traffic
Decreased emissions
Quieter operation
Grid Support Operations
Grid connected vehicles can support the grid in a number of ways. Depending on the vehicle and
the needs of the driver, the grid support services would be available whenever the vehicle is
plugged in -- typically at the vehicle driver's home or place of work.
List of Figures
Figure 1 -
Schematic of charging operation of NiMH Batteries
Figure 2 -
Schematic of charging operation of Li-Ion Batteries
Figure 3 -
Comparative analysis of battery types
Figure 4 -
SAE charging configuration and rating terminology
Figure 5 -
Series hybrid design structure
Figure 6 -
Parallel hybrid design structure
Figure 7 -
NEMM 2020 structure
List of abbreviations
FCAS
-
Frequency Control Ancillary Service
NCAS
-
Network Control Ancillary Service
VCAS
-
Voltage Control Ancillary Service
SRAS
-
System Restart Ancillary Service
CERC
-
Central Electricity Regulatory Commission
NLDC
-
National Load Dispatch Centre
RISO
-
Regional Independent System Operator
SISO
-
State Independent System Operator
RLDC
-
Regional Load Dispatch Centre
SLDC
-
State Load Dispatch Centre
Li-Ion
-
Lithium Ion
NiMH
-
Nickel Metal Hydride
SAE
-
Society of Automotive Engineers
EV
-
Electric Vehicle
HEV
-
Hybrid Electric Vehicle
BEV
-
Battery Electric Vehicle
PHEV
-
Plug-in Hybrid Electric Vehicle
V2G
-
Vehicle to Grid
Table of Contents
Heading
Page No.
Chapter 1
Introduction
1
Objective
2
Research Methodology
2
Chapter 2
Introduction to Ancillary Services
3
Types of Ancillary Services
5
Standards and Provisions of Ancillary Services
7
Ancillary Services in Indian Power Sector
8
Frequency Control Ancillary Services
10
Voltage Control Ancillary Services & Black Start Ancillary Services
15
Nodal Agency
18
Market Surveillance
18
Issues
19
Chapter 3
Introduction to Electric Vehicles
23
Evolution & Current Indian Scenario of EV
24
Battery Technology
26
Charging Technology
37
Drive-train Technology
41
Advantages of EV Technology
43
Govt Policies & Market Prospects of EVs
45
Chapter 4
Introduction to V2G technology
51
V2G and Power Markets
54
Power Capacity of V2G
57
Revenue vs. Cost of V2G
59
Chapter 5
Findings and Conclusion
63
Chapter 1
1.1 Introduction
Ancillary Services have always been an integral part of the electricity industry. They were and
are always needed when electricity is to be transferred reliably and delivered with satisfactory
quality. In India also, ancillary services have grown along with the grid. They have traditionally
been a part of grid operation and are mostly mandatory. Reforms in Indian electricity sector
along with evolution of electricity markets have led to a paradigm shift and electricity is now
seen as a tradable commodity, rather than just an infrastructural requirement. In a ‘market
oriented electricity industry’, commercial mechanisms need to be in place for procurement of
various services and to have prompt response from the entities. As a result ancillary services also
should be separated from basic system services and remunerated appropriately. This gains
additional strength from the fact that a structured ancillary service market would complement
reliability of the power system.
The Central Electricity Regulatory Commission after detailed consultation with various system
operators and load dispatch centres decided that ancillary services market was needed to aid the
current Indian Power Scenario. CERC issued a staff paper on the Introduction of Ancillary
Services Market in Indian Power Scenario that invited suggestions from all stakeholders. The
primary providers of most ancillary services are generating stations. But the Indian Scenario is
unique compared to the world as it runs a fairly high power deficit of almost 8-9%. Thus a new
and more innovative approach is needed to address the issue of ancillary services market.
One such innovative idea is to use grid connected electric vehicles to provide ancillary services.
This has been made possible by the ongoing implementation of smart grids in the country. It
envisages that fleets of electric vehicles connected to the smart grid can be used not only to
provide ancillary services but will also mitigate issues pertaining to high pollution in cities and
would help reduce the dependence on oil imports for fuel thus rendering a great service to the
nation. In the recent past, researches have been conducted in the developed countries to explore
the possibilities of vehicle to grid (V2G) operations for load management and grid support. This
report aims to study the suggested Ancillary Services Market in India, the technological and
market prospects of electric vehicles and combining the knowledge to create an understanding of
V2G operations whereby Electric Vehicles are used to provide Ancillary Services
1.2 Objective
The objective of this report is to study the proposed Ancillary Services Market in the Indian
Power Scenario. It is aimed at also developing an understanding of the technical and commercial
aspects of electric vehicles and thereby exploring the technical possibility of using electric
vehicles to provide the proposed ancillary services.
The prospect of using of Electric Vehicles is named possible by the ongoing implementation of
smart grids. Smart Grids can enable the use of smart grid connected loads and sources which can
absorb or inject power as per requirements relatively quickly and permit the distributed storage
strategy of vehicle to grid operations by Electric Vehicles.
1.3 Research Methodology
The research methodology employed is primarily of secondary research. As the field of bidirectional power transfer in electric vehicles is an ongoing subject of research in leading
universities of developed nations, the report utilizes information published in various scientific
journals, government regulations and legislations and research papers. Various documents from
leading government agencies were consulted for the formulation of this report.
Chapter 2
2.1 Introduction to Ancillary Services
The electricity sector has been change which has been reshaping the industry. A significant
feature of this change is to allow for increased competition which was the cornerstone of the
Electricity Act of 2003. It promotes competition among in almost all sections of the industry and
tries to create market conditions in the industry. These market conditions significantly help
reduce cost of energy production and distribution, minimize inefficiencies, optimize manpower
use and increase customer choice.
In this unbundled environment, important issues are also related to the type and level of services
that should be included in system operation. In order to maintain the safe and reliable operation
of the system, the system operator needs to its disposal various services. Therefore, it is
important to quantify which system services should be provided by generators and which should
be delivered by the transmission entity. Electrical power systems are designed and constructed to
produce and deliver electricity at nominal voltage levels, waveform purity, phase balance and
frequency. These are important attributes to the quality of supply of electricity delivered to the
market participants at their respective connection points and to the integrity of the power system
as a whole. Deviations from defined standards may result in economic losses to market
participants, and or may jeopardize the security of the whole power system.
Trading is a very important part of a competition driven deregulated power market. For efficient
trading in a deregulated power market, it is important that the energy spot market remains a valid
model of the underlying physical power system during each market interval. This includes
quality of supply and system security issues. This provides a valuable perspective on the role of
ancillary services in the deregulated power markets. Ancillary services can be defined as those
services that provide for services not included in the energy spot market and that would not be
provided on the basis of energy prices alone.
Ancillary services can be defined as a set of activities undertaken by generators, consumers and
network service providers and coordinated by the system operator that have the following
objectives:

Implement the outcomes of commercial transactions, to the extent that these lie within
acceptable operating boundaries. That is, ensure that electrical energy production and
consumption by participants match the quantities specified by the outcomes of spot
markets.

Maintain availability and quality of supply at levels sufficient to validate the assumption
of commodity like behavior in the main commercial markets. This can be achieved by
keeping the physical behavior of the electricity industry within acceptable operating
boundaries defined by planning studies in conjunction with operator experience.
In a competitive power market, there are energy market and different ancillary service markets.
To ensure the electricity energy to be delivered reliably and the system to be operated securely,
various ancillary services are needed. There are different types of ancillary services such as
voltage support, regulation, etc. The real power generating capacity related ancillary services,
including regulation down reserve (RDR), regulation up reserve (RUR), spinning reserve (SR),
non-spinning reserve (NSR) and replacement reserve (RR), are particularly important.
Regulation is the load following capability under automatic generation control (AGC). SR is a
type of operating reserve, which is a resource capacity synchronized to the system that is
unloaded, is able to respond immediately to serve load, and is fully available within ten minutes.
NSR differs from SR in that NSR is not synchronized to the system. RR is a resource capacity
non synchronized to the system, which is able to serve load normally within thirty or sixty
minutes. Reserves can be provided by generating units or interruptible load in some cases. When
provided by generating units, the amount of reserve that can be supplied depends on the ramping
rate, unit capacity and current dispatched output. Energy and ancillary services are unbundled in
a competitive market, and can be provided separately by different market participants.
2.2 Types of Ancillary Services
Ancillary services can be divided into the following three categories that are described in more
detail below:

Related to spot market implementation, short-term energy-balance and power system
frequency. These will be labeled Frequency Control Ancillary Services (FCAS).

Related to aspects of quality of supply other than frequency (primarily voltage magnitude
and system security). These will be labeled Network Control Ancillary Services (NCAS).

Related to system restoration or re-start following major blackouts. These will be labeled
System Restoration Ancillary Services (SRAS).
Spot-market implementation involves ensuring that participating generators and loads achieve
their energy targets specified in the market solution for the current spot market interval.
The Indian power system should be operated in a safe, secure and reliable manner. In order to
fulfill this obligation the state power pools should control technical characteristics of the system,
such as frequency and voltage through ancillary services agreements. The RISO/SISO should
determine the ancillary services requirements on a regional grid basis and load zone basis using
demand forecasts for the time frame for which the ancillary services are to be procured. All users
of the system should be provided the following ancillary services.

Automatic Generation Control: The ability of a generating unit to respond to signals from
the SISO/power pool in order to correct the system frequency within specified period and
prevent overloading of network elements. The power pool should determine the total
amount of AGC capacity required through studies that identify the amount of regulation
required to meet control performance criteria and also by considering the likely variation
in load over the period. This is the regulation response required to accommodate normal
variations in demand and generation.

Governor Control: There should be inherent ability of a generating unit’s governor to
correct the system frequency within a specified time frame. Provision of this service is a
requirement of all generators connected to the system. All generating units are supposed
to inform the power pool about the status of the unit's governor control.

Contingency Reserve: The generating units should be able to increase the energy output
from unloaded condition in response to transmission facility contingencies on the
transmission system within specified time. The power pool should determine the total
amount of contingency reserve capacity required to meet control performance criteria.
This requirement is a function of the larger generation units and load blocks on the
system as well as the combined demand. In most instances, the larger generation and load
blocks on the system will be constant, and so the contingency reserve requirement
becomes a simple function of demand.

Reactive Power: The ability of a generator to control system voltage by the generation or
absorption of reactive power should be known. Provision of this service is a requirement
for all generators connected to the system. The power pool should conduct technical
studies based on the quantities, characteristics and locations of forecasted demand to
determine the quantities and locations of reactive support required to maintain voltage
levels and reactive power margins within limit.

System Restart: The good response of a generator to self-start and supply the
transmission system after a complete system failure is desirable. The power pool should
prepare an emergency restoration plan. The power pool should determine the quantities
and locations of self-start generating units that are required in order to provide system
restart service. This determination should be based on contingency studies performed in
the preparation of the emergency restoration plan. Such studies should, at a minimum,
take into account the range of reasonable initiating disturbances, the magnitude, extent
and likelihood of the outage. It should monitor the status of generation after the initialing
disturbance and the system demand level at the time of the disturbance
2.3 Standards and Provisions of Ancillary Services
The System Operators should establish the standards for ancillary services. The ancillary
services standards should, at a minimum, comply with the system appropriately. The RISO/SISO
may change its ancillary services standards as needed to account for variations in system
conditions, real time dispatch constraints, contingencies, voltage stability transient stability and
dynamic stability requirements, and other conditions. The periodic review of the operation of the
transmission system should be done to determine whether the ancillary services standards should
be revised.
Payments to service providers for ancillary services can be categorized as following.

Availability Payments: Due for every trading period in which the contracted generating
unit is available to provide the service.

Usage Payments: Due, on a per event basis, for each time the particular service is used.

Payment for Reactive Power: Every generating unit should be able to provide a minimum
amount of reactive power to the power pool which allows for dispatch instructions
directing the generating unit to operate at any point within a band of specified power
factor. In the event when the power pool requires reactive power from a generating unit
outside this band, such that it limits the real power output of that unit, the power pool
should compensate the generating unit for its lost opportunity cost.
2.4 Ancillary Services in Indian Power Sector
Ancillary Services are support services which are required for improving and enhancing the
reliability and security of the electrical power system. Ancillary Services are an indispensible
part of the electricity industry. World over these services have evolved based on the prevailing
structure of electric supply system and operational practices in the country. In India also,
ancillary services have grown along with the grid. They have traditionally been a part of grid
operation and mostly mandatory.
In vertically integrated utilities the responsibility of generation, transmission and distribution
was with one organization. Ancillary services were therefore an integral part of electrical supply
and not dealt with separately. However, since the liberalization of the electricity supply industry,
the resources required for reliable operation have been treated as an ancillary service that the
system operator has to obtain from other industry participants. In a deregulated power system the
system operator often has no direct control over individual power stations and has to purchase
these services from other service providers. The design of Ancillary Services market should be
such that it complements system reliability.
Ancillary Services are defined, under Regulation (2) (1) (b) of the CERC (Indian Electricity Grid
Code), Regulations, 2010 (IEGC) as follows:
“in relation to power system (or grid) operation, the services necessary to support the power
system (or grid) operation in maintaining power quality, reliability and security of the grid, e.g.
active power support for load following, reactive power support, black start, etc;”
One of the objectives of the IEGC, as given in Regulation 1.2 is the “Facilitation for functioning
of power markets and ancillary services by defining a common basis of operation of the ISTS,
applicable to all the Users of the ISTS”.
The IEGC, under Regulation 2.3.2 (g) also made operation of Ancillary Services as an exclusive
function of Regional Load Dispatch Centres (RLDCs).
Regulation 8 of the Central Electricity Regulatory Commission (Power Market Regulations)
Regulations, 2010, provides for the introduction of new products in Indian Electricity Market in
the future, including Ancillary Services Contract. The Regulation 8 is reproduced below:
“Notwithstanding anything contrary contained in these Regulations, no person shall enter into
or transact in any of the following types of contracts unless the same has been permitted to be so
launched or introduced by the Commission in terms of notification issued in this behalf (i) Derivatives Contracts
(ii) Ancillary Services Contracts
(iii) Capacity Contracts”
Regulation 11 (1) (b) of the Central Electricity Regulatory Commission (Unscheduled
Interchange Charges and Related Matters) Regulations, 2009 provides for utilization of the
amount left in the UI pool account fund towards providing ancillary services. The
Regulation is reproduced below:
“(1) The amount left in the UI pool account fund after final settlement of claims of Unscheduled
Interchange charges of the generating station and the beneficiaries shall be transferred to a
separate fund as may be specified by the Commission and shall be utilized, with the prior
approval of the Commission for either or both of the following activities:
(a) …….
(b)Providing ancillary services including but not limited to ‘load generation balancing’ during
low grid frequency as identified by the Regional Load Dispatch Centre, in accordance with the
procedure prepared by it, to ensure grid security and safety:”
There are basically three main types of Ancillary Services, viz. real power support services or
Frequency Support Ancillary Services (FSAS)/ Load following, Voltage or reactive power
support services and Black start support services. To start with, as per CERC’s staff paper,
Ancillary Services could be introduced for improving the reliability and security of the grid.
However, given the power deficient situation in the country, it would be desirable that to start
with the ancillary services be simple to implement.
2.5 Frequency Support Ancillary Services (as per CERC proposal)
FSAS would be the service offered through bids by a generating station or any other authorized
entity on behalf of the generating station to make itself available for dispatch and get dispatched/
scheduled by the nodal agency to support the system frequency. Hence, the focus of introducing
Frequency Support Ancillary Service (FSAS) would be to maintain the frequency within the
band specified in the IEGC.
It is seen that there is some surplus generation capacity lying unutilized at some point of time but
at the same time load shedding is being carried out by the utilities. Similarly, there is captive
generation capacity available with industrial users like steel industries, sugar industries, etc.
which are lying un-utilized and could be harnessed to supply to the inter- State grid at the time of
utter need to maintain grid security. There is, therefore, a need for a mechanism such as
Frequency Support Ancillary Services (FSAS) to utilize these undespatched/ surplus capacities
to enhance the power supply to the grid, when required, to maintain grid security.
To start with, the generators having surplus capacity, (i.e. either un-requisitioned surplus
capacity by the beneficiaries of that capacity or generators who could not find buyers for that
capacity or surplus captive capacity) may be enabled to bid into the power exchange for
enhancing grid security when their services are sought by the system operator.
FSAS, at present in the Indian context, aims to stabilize the grid frequency by maximizing
unutilized generation and minimizing load shedding, under certain conditions, for ensuring grid
safety and security. Gradually as this market grows and imbalances are better handled with
improved system security and reliability, this market could phase out the UI Mechanism. It is
however pertinent to mention that introduction of ancillary services may not automatically mean
a good frequency profile.
Integration of renewable energy in the grid is one of the biggest thrust areas. The installed
generation capacity of renewable generators is expected to grow manifold in the coming years.
Considering the high variability and unpredictability of generation from renewable, the FSAS
would serve to stabilize the frequency for increased integration of renewable sources into the
grid. Frequency Support Ancillary Service (FSAS) can be used to complement the diurnal
changes in renewable generation. FSAS can thus also be used as a mechanism to facilitate
renewable integration by reducing the impact of their variation.
Eligibility Criteria
All the sellers and regional entities which are part of the scheduling and deviation settlement
mechanism for real and reactive power with voice and data telemetry facilities in accordance
with the regulations framed by the Central Commission and Central Electricity Authority to be
eligible to participate in the ancillary market. No Objection Certificate (NOC)/ Standing
Clearance issued by the concerned SLDC/RLDC for participation in the day ahead market in the
power exchanges to be considered valid for participation in the ancillary services market subject
to the condition that the capacity cleared for day ahead transaction in power exchanges for any
participant plus the capacity cleared for FSAS shall not exceed the total capacity for which
SLDC clearance has been obtained. Further the un-requisitioned surplus from the inter-State
Generating Stations (ISGSs) whose tariff is determined by the Commission should mandatorily
bid in the FSAS.
Market Platform
The implementation of FSAS would be facilitated through bidding in the Power Exchanges. A
separate product could be constituted for this purpose, comprising of sellers interested in
participating in the Ancillary Service market. Competitive bidding process would be followed
for procurement of FSAS. The Commission may by an order provide an overall ceiling for
charges for services rendered through power exchanges including service charges for any
subordinate service providers. The market participants would be free to bid in any of the Power
Exchanges for providing ancillary services. The power exchanges and members of the user group
to enter into ancillary services contract.
Bidding and Price Discovery
The window for receiving bids in Frequency Support Ancillary Service market to be opened after
closure and clearance of the day-ahead market (DAM) in the power exchanges. The bids to be
invited on a day ahead basis for which the window would be open for submitting bids considered
for dispatch next day.
The participants in FSAS market to submit time-block-wise bid quantum and price along with
the location, for the next day in the power exchanges. Bids to be placed for standard time blocks
of 2 hours, to facilitate stacking of the bids by the nodal agency. The window for receiving bids
in FSAS to remain open for 2 hours after the opening of the window for the FSAS. The power
exchanges to provide information to the nodal agency.
The ISGSs having un-requisitioned surpluses shall also bid for the FSAS. The combined stack of
bids would be prepared by the nodal agency based on the bids received on the power exchanges.
The revenue earned over and above the fuel cost by such ISGSs for providing FSAS to be shared
in the ratio of 1:1 with the beneficiaries of the ISGS.
The nodal agency would be responsible for preparing combined bid area-wise, time-block-wise
stack of the bids received from all the power exchanges. The stack to be prepared on the
principle of merit order of bids.
The prices payable to the providers of FSAS would be based on the principle of “pay-as bid” and
the amount payable would be for the dispatched quantum at the bid price of the participant.
Based on the estimated additional generation requirement in the system as identified by the nodal
agency and merit order stack, bids to be dispatched under FSAS would be identified.
Dispatch of FSAS bids in real time
If the frequency remains 0.05 Hz below the lower operating frequency range as specified in the
IEGC for two consecutive time-blocks, the nodal agency to give instructions to the FSAS
provider to dispatch in the third time block for dispatching generation from the fifth time block.
The principle of ensuring merit order in dispatch of FSAS bids to be discounted in case of real
time congestion in the network. If dispatch of a lower cost stacked bid is likely to further stress
an already congested corridor, then that bid would be skipped and the next bid in the stack would
be considered for dispatch provided it also does not aggravate the condition of congestion in the
network.
The limit of the Available Transfer Capability (ATC) across the control area would also be
followed while dispatching the bids.
If the frequency remains at 50.0 Hz for two consecutive time blocks, after kicking-in of the
FSAS, the nodal agency to give instructions for withdrawal of FSAS. The generation dispatched
under FSAS would be given a dispatch certainty for 8 time blocks (i.e. 2 hours). In case
withdrawal instructions are given by the nodal agency before the completion of 2 hours, 50% of
the bid price to be paid to the seller for the period falling short of 2 hours. Further, in case a
seller, whose power has been scheduled, fails to provide the committed generation in real-time
then the seller would be liable to pay 1.5 times the bid price or the applicable UI rate whichever
is higher.
Scheduling of Frequency Support Ancillary Services (FSAS)
Once the dispatch decision is taken, scheduling request under FSAS to be routed through Power
Exchanges. The quantum of bids dispatched to be directly incorporated in the schedule of
respective FSAS providers. The dispatched bid quantum under FSAS to be booked to the
overdrawing regional entities in proportion of their overdrawal.
The scheduling and delivery of contracts on the power exchange to be in accordance with
Central Electricity Regulatory Commission (Open access in inter State Transmission)
Regulations, 2008, Central Electricity Regulatory Commission (Power Market) Regulations,
2010, and Central Electricity Regulatory Commission (Indian Electricity Grid Code)
Regulations, 2010 and as amended from time to time.
Accounting and Settlement of Frequency Support Ancillary Services (FSAS)
The power dispatched under FSAS to be incorporated into the schedule of the overdrawing
entities by the respective LDC. The payment to bidders would be through the power exchange
from the overdrawing entities in proportion of the quantum of overdrawal.
Payment to the bidders under FSAS to be on the basis of the scheduled quantum after accounting
for under-injection. No commitment charges payable to the bidders for making itself available in
the FSAS market.
The upper limit of UI rate without additional UI rate, as specified by the Commission from time
to time to be the ceiling price for the scheduled bids. The highest UI rate (i.e. the rate for a
frequency of 49.5 Hz at present and as modified from time to time, not counting the additional
UI rate) is linked to the variable cost of the costliest generation (which is generation mostly
based on liquid fuel). The logic is that when frequency goes below 49.90 Hz., the States would
be incentivized to use the liquid fuel based generation, whether their own generation or their
share from Central Generating Stations, since that would be cheaper than drawing unscheduled
power through the UI mechanism. One would like to question that since the choice for
requisitioning this generation is already with the States, they could do that themselves. The
reason is that the Regional Load Dispatch Centre is the apex body in real time grid operation in
the region, is the quickest to respond for maintaining frequency, as compared to the States who
have to follow the process of procurement of short-term power.
The energy dispatched under FSAS would be deemed to be delivered at the Regional periphery.
The under injection by the FSAS provider to be treated as per the CERC Unscheduled
Interchange Regulations. Any over injection by the FSAS provider shall not be paid for.
2.6 Voltage Control Ancillary Services & Black Start Services (as per CERC
proposal)
The Electricity Act 2003 entrusts the responsibility of transmission system planning on the CEA
and the CTU. While the CEA forms perspective plans, the CTU fine tunes them over a shorter
period in coordination with the CEA amongst others. While planning for the grid, the CEA and
CTU, use system studies for ensuring a proper voltage profile at various points in the grid.
However, the planning is done in anticipation of generators and loads coming up at various
points in the grid. Due to variations between the anticipated and the actual for generation and
load, the reactive power requirements change. The reactive power requirements also change as
more and more elements get added to the grid.
Since voltage is a local phenomenon and not a global phenomenon like frequency, the
requirement of capacitor and/or reactor at a various nodes (sub-station or switchyard of
generating station) may need to be changed. Therefore, we feel that the provision of reactive
power, which may require a change in location, could be allowed under reactive power support
ancillary services. There is already a commercial mechanism in the IEGC under Regulation 6.6
of the IEGC Regulations, w.r.t. voltage reference at the interchange point, which incentivizes
maintaining a proper voltage profile at all interchange points between control areas in the grid.
However, in case it is observed by the system operator that there is a critically low voltage in the
grid at one or more such interconnection points persisting during a season, the system operator
may requisition voltage support ancillary services from any service provider, who may bid the
same through the power exchange. Given that mobile substations, installed in trailers, which
allow flexibility for quick installation to restore supply, are gaining popularity, we feel that
mobile reactors or capacitors would be a big advantage and also result in reduction in cost, since
they could easily be moved from one sub-station to another, as per requirement. But to start with,
the mobile reactive compensation would be provided by the government owned transmission
companies only.
Presently, Part II “Grid Connectivity Standards applicable to the Generating Units” in the Central
Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007
mandate hydro generating stations for providing black start facility. Incentives may be provided
to all the flexible generators who would provide black start facility when such services are
sought by the system operator.
Execution of Voltage Control Ancillary Services (VCAS)
The price bids for providing VCAS on nodal basis for the generating units other than those
providing active power and scheduled by Load Despatch Centre, to be submitted in the power
exchanges. Power exchanges to furnish the stack of node-wise bids for VCAS to the nodal
agency based on which the nodal agency would prepare combined node-wise stack.
The payment to be made on “pay as bid” on the actual node-wise reactive support subject to the
maximum ceiling rate of reactive energy as provided in the IEGC as amended from time to time.
The providers of VCAS to be paid as specified in Regulation 6.6 of the Central Electricity
Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010 as amended from time
to time.
The mobile VCAS may be provided by the Government owned transmission companies. The
despatch and withdrawal of node-wise voltage support instruction for VCAS to be as per the
IEGC. The payment to be made to the supporting entity by booking against the reactive energy
drawing utility.
Execution of Black Start Ancillary Services (BSAS)
The generators capable of providing start up power to mandatorily provide the Black Start
Services as per the instructions of the load despatchers.
BSAS to be paid as when the same is required by the nodal agency. The generators capable of
providing start up power to mandatorily provide the Black Start Services as per the instructions
of the load despatchers.
The generators to be paid for one day capacity charges to such generators on the day of
providing the BSS, as determined by the Commission. The energy charges to be paid at twice the
energy charges determined by the Commission for the volume of energy supplied during the
restoration process.
Other flexible generators providing BSAS to be paid fixed and energy charges on the normative
figure to be specified separately.
2.7 Nodal Agency
Frequency Support Ancillary Services (FSAS) envisage harnessing of the generation resources
on pan India basis to achieve economy and efficiency. Similarly, Voltage Control Ancillary
Service (VCAS) is proposed on the reactive compensation required node-wise. Black Start
Ancillary Service (BSAS) is also proposed, which needs to be implemented in a coordinated
manner. It is proposed that the system operator, namely National Load Despatch Centre (NLDC)
should be the nodal agency for implementation of the ancillary services as NLDC monitors the
real-time grid conditions on the round the clock basis.
Section 27 (2) of the Electricity Act provides as under:
“Provided further that no Regional Load Despatch Centre shall engage in the business of
generation of electricity or trading in electricity in electricity.”
Operation of the Frequency Support Ancillary Services (FSAS), however, does not qualify as
trading of electricity as the mechanism would work similar to the Day Ahead Market (DAM) in
power exchanges. Role of the system operator will be limited to preparing combined merit order
stack based on the stacks of bids received from all the Power Exchanges and the despatch
decision shall be routed through the Power exchanges. The system operator will, therefore, not
be involved in trading.
2.8 Market Surveillance
Market surveillance would be a pre-requisite for successful implementation of the ancillary
services market. Hence, a Market Surveillance Committee may be constituted comprising of the
representatives from NLDC, RLDCs, RPCs, Power Exchanges and traders.
The sum of short term contracts and bid quantum in FSAS market not to be greater than the
standard clearance or NOC issued by the appropriate Load Despatch Centre. A penalty may be
imposed in cases of persistent under-injection by a participant in FSAS.
2.9 Issues
Based on the experience of implementation of various regulatory interventions the staff of the
Commission have tried to identify the likely challenges in implementation of the Ancillary
Services as outlined above. Some of the implementation challenges identified and pros and cons
on the issues are discussed below.

Need for Ancillary Service: Concerns have been raised by NLDC at regular intervals
before the Central Commission regarding grid in-discipline by the States, followed by
incidences of grid collapses twice in two days. Strong corrective measures are being
taken up so that such an event does not recur in future. Among other things, it is
understood that there are proposals to enhance powers of the regulators in terms of
enforcing grid discipline. It has been reported that system has achieved stable grid
frequency since the twin grid failures owing to efforts made by various agencies. In view
of this, one of the questions that arises is as to whether there is a need to introduce
Ancillary Services at this stage for better grid security and stability.
The argument on the other side is that the Ancillary Services primarily aim at improving
the reliability of System Operation. Further, ancillary services may also be seen as one of
the mechanisms which could be developed to replace UI mechanism in a long run.
Moreover, development of Ancillary market has not emerged from the incidences of grid
failure but is already imbibed in the statutory provisions as discussed above. NLDC has
filed a number of petitions in the past regarding grid indiscipline by grid participants to
the Central Commission which severely affected grid stability and security. Since the
objective of Ancillary Services is to facilitate a framework for ensuring grid security,
introduction of such services should not therefore depend on frequency of grid
indiscipline.

Payment Risk: There have been instances of default in payment of UI charges by the
overdrawing entities in the past and cases are still pending in the High Courts. As many
buyers of FSAS would be the same entities who are defaulting under UI mechanism, it
would be necessary to ensure that these players pay for overdrawl. Since the
transactions/payment would be routed through power exchanges, the power exchanges
would inherit the risk of default in payment by buyers. It would require a mechanism to
ensure that the buyers pay for overdrawl and secure power exchanges from such huge
financial obligation/risk.
CERC Power Market Regulations provide for the establishment of a Clearing House. A
possible solution could be considered by routing all trades by market participants through
the clearing house irrespective of the participation in the Power Exchanges or Bilateral
Market. Thus, some form of payment security mechanisms may be evolved for handling
the payment risk through the Clearing house.

Linkage to the UI Ceiling Rate: It has been proposed to keep upper limit of UI rate,
without additional UI rate, as specified by the Commission to be the ceiling price for
scheduled bids. This may be seen as in conflict with the philosophy of doing away with
UI mechanism in future. It may be contended that the link with UI mechanism may
encourage the players to benefit by resorting to similar gaming tactics under FSAS if the
prices are close to UI rate.
While one would be open to other proposals, it has been proposed to link the ceiling rate
with UI rate to start with. Going forward, the ceiling prices may be de-linked or changed
according to changing UI mechanism or indexed against a new reference in future.

Possible Breach of PPAs: One would like to contend whether we should identify
flexible generation plants before implementation of Ancillary Service. It has been
considered that hydro stations, especially pumped storage hydro stations, open cycle gas
stations and partly load coal stations would have the capability to provide Ancillary
Services in 30 minutes. It is possible that the generators may get lured by the high cost of
dispatch under FSAS. This may result into in a situation where some generators try to
breach the contracts/PPAs in order to supply power under FSAS. As only existing
generators would ramp up and supply power as FSAS, it would be necessary to ensure
that such plants do not give preference to FSAS at the cost of their PPAs. Similarly, there
would be upcoming generators who would not have identified beneficiaries. Such
generators may try to indulge in gaming to get better price for their power.
One probable solution against breach of PPAs could be to mandatorily obtain a
declaration from the providers of the Ancillary Services (generators) regarding the unrequisitioned surplus capacity being committed under Ancillary Services in an affidavit
submitted to Power Exchange where they participate.

Load management by utilities: Under the UI mechanism, once intimated, the
overdrawing entities have an option to shed load to reduce their overdrawl. However, it
may be contended by some stakeholders that in case of FSAS, high cost power shall be
imposed on them which could have been avoided through load shedding. It has already
been proposed that charges for the ancillary services would be payable only by the
overdrawing entities. Utilities may choose not to overdraw and in such an event there
might not be any occasion to incur the cost on this account. Thus, there is no imposition
of additional burden as apprehended. Further, at a future date, the Commission may
consider introducing “Demand Response” as a separate product.

Market Design: In the initial stage of Ancillary Service, market design based on
Sequential Auction is proposed in which Energy Market would be cleared first and bid
for balance unsold quantity of power can be made in Ancillary Service market.
Experience from International market suggests that sometime this market design leads to
problems of economic withholding and price reversal. As such, different market designs
like Simultaneous or Simultaneous Co-optimization Auction of Energy and Ancillary
Service are prevalent in the advanced markets. With introduction of different products
like 10 minute and 30 minute Ancillary service, these new market designs can be tried in
India.

Commitment Charge: Under the proposed FSAS mechanism, the generators may
assume risk in terms of cost incurred in bidding everyday for supplying power under
FSAS. A generator does not get surety of dispatch even if it gets clearance for the next
day as its despatch is first dependent on lowering of frequency and secondly on its
position in merit order.
There is a view that on account of the uncertainty in the despatch of generation through
the Ancillary Service Market, there may a requirement to pay a commitment charge to
provide sufficient incentive to attract generators to this market. However, the generator
has the freedom to sell in the short term bilateral market subsequent to submission of his
bid for the ancillary services. In such a case, the generator may intimate the Power
Exchange and his bid would be treated as withdrawn. Thus the ancillary services provide
an additional avenue for sale of power to the generators. Another option could be that the
service provider be allowed to bid in two parts. While Capacity charge (which may
include Start up cost) may be paid as commitment charge, energy charge can be paid for
actual Ancillary Service Energy provided during system operation.

Forecasting: For optimum decision making for procurement of Ancillary Services, it is
necessary that the system operator provides load generation balance forecasting on daily
basis. In the Indian power System where Decentralized System operation has been
adopted, providing such forecasting is a challenging job for system operator in view of
the fact that it would depend on correct inputs from State Load Despatch Centers.
However in view of increasing Renewable participation in Indian Grid, it is required that
Load Forecasting capabilities at all level are improved to avoid uneconomic decisions in
procurement of Ancillary Power.
Chapter 3
3.1 Introduction to Electric Vehicles
Electric vehicles (EV) are vehicles that use one or more electric motors or traction motors for
propulsion. On a worldwide scale, 26% of primary energy is consumed for transport purposes,
and 23% of greenhouse gas emissions is energy-related. Street traffic represents a share of 74%
in the transport sector worldwide (IPCC data from 2007). In the near future, street traffic is
expected to grow enormously world over, particularly in the fast developing Asian countries.
In order to meet future transportation needs, control climate change, address health issues related
to emissions, and phase out dependence on oil, today's propulsion technologies have to be
replaced by more efficient and environmentally friendly alternatives.
Electric vehicles are such a technology that can aid the transition. A couple of countries like
Germany, Denmark, and Sweden have already decided to switch electricity production from
fossil fuel to renewable sources, thus further improving sustainability of electric cars when
compared with internal combustion engine vehicles.
Electric vehicles can be primarily classified into the following classes

Battery electric vehicles

Hybrid electric vehicles

Plug-in hybrid electric vehicles

Fuel cell electric vehicles
The basic components of an electric vehicle can be divided into the electric battery, the electric
motor, a motor controller and a power source which can be a fossil fuel engine, or grid electricity
or both. The technical design of a pure battery electric vehicle is much simpler in comparison to
a conventional fossil fuel powered internal combustion engine vehicle since no starting, exhaust
or lubrication system is needed. Also mostly there is no need for a gearbox either, and
sometimes, even a cooling system isn’t needed.
The battery charges with grid supplied electricity when plugged in via a charging device or it can
also receive charge during braking through recuperation. The battery charger is a critical device
since its efficiency can vary heavily between 60% and 97%, thus wasting only 3% to up to 40%
of the grid electricity as heat. The motor controller supplies the electric motor with variable
power depending on the load situation. The electric motor converts the electric energy into
mechanical energy and, this is used with a drive train, to create torque for turning the wheels for
driving.
3.2 Evolution and Current Indian Scenario for xEV
The history of EVs in India goes back to 1996 when the first electric three wheelers were
launched by Scooters India Ltd and were known as Vikram SAFA. They ran on a 72 volt lead
acid battery system. In 2000 BHEL designed an 18 seater electric bus which used an AC
induction motor and 96 volt lead acid battery packs. Mahindra and Mahindra Ltd also invested in
electric 3 wheelers in 1999 and also created a company MEML in 2001 for making electric
vehicles but it closed down due to the lack of demand of electric vehicles.
REVA, Bangalore in 2001 launce the REVA electric car which was designed by an American
company – Amerigon and used advanced battery management system. Mahindra and Mahindra
Ltd that redesigned the REVA to launch it as E2O.
Recently Hero Cycles collaborated with Ultra Motors (UK) to launch a range of electric bikes
under the brand Hero Electric. Other companies such as Electrotherm India, TVS Motor etc are
also manufacturing electric two wheeler vehicles. These bikes are generally charged at home so
don’t need special adapter. Batteries motors and other kits are imported from other countries and
assembled in plants here.
Department of Heavy Industries is the nodal Dept for automotive sector and has involved in
funding of research, design and development of electric vehicle systems in the country. Recently
MNRE also incentivized the purchase of electric vehicles through its Alternate Fuels for Surface
Transport Program (AFSTP). It had an outlay of 95 crores incentivizing OEMs who were
providing atleast one year service and setting up 15 service stations across the country. Also the
Centre for Science and Industrial Research is involved in research on lithium batteries for
electric vehicles. State governments like those of Delhi are providing demand side subsidies in
addition to VAT and road tax waiver.
But overall the desired results have not been achieved. The high cost of EVs, lack of
infrastructure and consumer mindset has hampered the demand. High battery costs and lack of
proper charging infrastructure remain the biggest stumbling blocks in the way of mass
production and adoption.
3.3 Battery technology
A battery is composed of a positive electrode (holding a higher potential) and a negative
electrode (holding a lower potential) with an ion-conductive but electrically insulating electrolyte
in between. During charging, the positive electrode is the anode with the reduction reaction, and
the negative electrode is the cathode with the oxidation reaction. During discharge, the reaction
is reversed, and so the positive and negative electrodes become cathode and anode electrodes,
respectively. The energy storage technologies being used in most electric vehicle systems are
rechargeable batteries. The energy storage units in the form of batteries can be recharged from
the engine or fuel cell or from the electric grid. In the case of plug-in hybrids, the vehicles can
use both common fossil fuels and grid electricity. One of the attractive features of the plug-in
hybrid vehicle is that it allows the use of grid supplied electricity generated using energy sources
other than the normal coal or gas such as wind or solar power.
The electrical energy storage batteries must be sized in such a way that they store sufficient
energy (kWh) and provide adequate peak power (kW) for the vehicle to have a specified
performance and acceleration. It should also have the capability to meet the needs of appropriate
driving cycles. For vehicle designs intended to have high all-electric range, the energy storage
unit must store sufficient energy to satisfy the range requirement in real-world driving
conditions. Also, the battery must meet appropriate cycle and calendar life requirements. These
requirements vary significantly depending on the vehicle’s driveline being designed, but they are
generally not too hard to determine once the vehicle performance parameters have been defined.
It is much more difficult to establish storage unit requirements for the weight, volume, and cost
of the energy storage units. There are clear upper limits on the characteristics which would
preclude the successful design and sale of the vehicles. The battery is sized to meet the specified
range and performance of the vehicle. The weight and volume of the battery can be calculated
from the energy consumption (Wh/km) of the vehicle and the energy density (Wh/kg, Wh/L) of
the battery discharged over the appropriate test cycle (power versus time).
In most cases for the battery powered vehicle, the battery sized by range can meet the power
(kW) requirement for a specified acceleration performance, gradeability, and top cruising speed
of the vehicle. The batteries in this application are regularly deep discharged and recharged using
grid electricity. Hence, cycle life for deep discharges is a key consideration and it is essential that
the battery meets a specified minimum requirement.
In the case of the charge sustaining hybrid-electric vehicle using either an engine or fuel cell as
the primary energy converter and a battery for energy storage, the energy storage unit is sized by
the peak power from the unit during vehicle acceleration. In most cases for the charge sustaining
hybrid vehicle designs, the energy stored in the battery is considerably greater than that needed
to permit the vehicle to meet appropriate driving cycles. However, the additional energy stored
permits the battery to operated over a relatively narrow state-of-charge range (often 5%–10% at
most), which greatly extends the battery cycle and calendar life. In principle, determination of
the weight and volume of the battery for a charge sustaining hybrid depends only on the pulse
power density (W/kg, W/L) of the battery. However, for a particular battery technology, it is not
as simple as it might appear to determine the appropriate power density value, because one
should consider efficiency in making this determination.
Specification of the energy storage requirement is critical to the design and practicality of
powertrain systems using ultracapacitors. The Wh requirement is highly dependent on the
strategy used to control the discharge/charge of the ultracapacitor in the hybrid-electric
powertrain. Storage specifications in the range of 75–150 Wh seem reasonable for mild hybrid
vehicles. The corresponding weight of the ultracapacitor units would be 15–30 kg with peak
power between 18–36 kW. The round-trip efficiency of the units at these powers would be 90%–
95%. The ultracapacitors would be periodically deep discharged when required to meet the
driving conditions, but would operate at shallower depths of discharge much of the time. The
cycle life requirement for the ultracapacitors in the mild hybrids would be in excess of 500 000
cycles.
Sizing the energy storage unit for plug-in hybrids is more complex than for either battery
powered or charge sustaining hybrids. This is the case because of the uncertainty regarding the
required all-electric range of the vehicles or even what is meant in detail by the term all electric
range. In simplest terms, all-electric range means that the hybrid vehicle can operate as a battery
powered vehicle for a specified distance without ever operating the engine or fuel cell. In this
case, the power of the electric drive system would be the same as that of the vehicle if it had
been a pure EV and the energy storage requirement (kWh) would be calculated from the energy
consumption (Wh/km) and the specified all-electric range. Hence, for large all-electric range, the
battery would likely be sized by the energy requirement and for short all-electric range; the
battery would be sized by the power requirement.
To further complicate the issue of battery optimization for plug-in hybrids, the concept of all
electric range can be interpreted to be mean that most of the driving is done using the battery and
assist from the engine or fuel cell would occur infrequently only when the power demand is high
and/or the vehicle speed exceeds a specified value.
The result would be that most of the energy to power the vehicle would be provided by the
battery and effective fuel economy could be very high (100 mpg or higher). In this way, the
power demand from the electric driveline (electric motor and battery) would be less than that for
the vehicle to operate as a pure EV. The energy consumption (Wh/km) would also likely be
reduced. Hence, both the energy and power requirements of the battery would be less demanding
resulting in a smaller, less costly battery for the same effective all-electric range.
In the case of plug-in hybrids, the battery will be recharged both from the engine or fuel cell and
from the wall-plug. The attractiveness of the plug-in hybrid is that a significant fraction of the
energy to power the vehicle will be grid electricity generated using energy other than petroleum.
Hence, for plug-in hybrids, battery cycle life becomes an important issue. The battery will be
recharged from a low state-of-charge (after deep discharges) more often than for the battery
powered EV. As a result, the battery cycle life requirement for plug-in hybrids will be more
demanding than for the pure EV. A minimum of 2000–3000 cycles will be required. Hence, both
in terms of power and cycle life, the plug-in hybrid application is more demanding for the battery
than the EV application.
Extensive research efforts and investments are being put in to the advanced battery technologies
that are suitable for EVs the world over. The U.S. government has been strongly supporting its
R&D activities in advanced batteries through the Department of Energy. Nearly $2 billion grants
have been given to accelerate the manufacturing and development of the next generation of U.S.
batteries and EVs. European Commission and government organizations in Europe and Japanese
Ministry of Economy, Trade and Industry (METI) are also actively supporting the R&D
activities in advanced batteries. Companies like BYD, Lishen, and Chunlan have obtained strong
subsidy supports from the Chinese government for the research and manufacture of advanced
batteries and electric vehicles.
In January 2013, the Indian government revealed information about its plan to spend 230 billion
rupees ($4.2 billion) to help stimulate a domestic market for electric vehicles. Indian Prime
Minister Manmohan Singh announced that government and manufacturers would equally split
the costs in order to create a domestic industry of low-carbon transport using Electric Vehicles.
Prime Minister Manmohan Singh also launched a national electric vehicle plan which is aimed to
help accelerate consumer adoption and domestic manufacturing of low carbon transport vehicles
in India. The National Electric Mobility Mission Plan (NEMMP) aims to improve national
energy security, along with increasing domestic manufacturing and tackle the environmental
impacts of the automotive industry.
Battery types
1. Lead Acid batteries – Originally, most electric vehicles have used lead-acid batteries. This is
due to the maturity in technology, very high availability, and considerably low cost. These
batteries have an environmental impact through their construction, use, disposal or recycling.
But the positive side is that the battery recycling rates are quite high thus reducing the
ultimate environmental cost of the batteries. Deep-cycle lead batteries have up to 70-75%
efficiency, but are relatively expensive and also have a shorter life than the life of the vehicle
itself, and generally need replacement every 3 years.
Lead-acid batteries in EV applications end up being a significant portion of the final vehicle
mass due to their high weight. They have very lower energy density compared to fossil fuels.
But the electric vehicles have relatively lighter drive trains when compared to conventional
vehicles so the low charge density is compensated to some degree. Recent advances in
battery efficiency, capacity, materials, safety, toxicity and durability are likely to allow these
superior characteristics to be applied in new designs. Lead-acid batteries powered the initial
modern EVs such as the original versions of the EV1 and the RAV4EV and the Indian
REVA.
2. Nickel-metal hydride battery technology has matured over the years. NiMH batteries less
efficient (60–70%) in charging and discharging compared to lead-acid batteries, but they
boast an energy density of 30–80 Wh/kg, which is far higher than lead-acid battery. The
active material in the negative electrode is metal hydride (MH), a special type of
intermetallic alloy that is capable of chemically absorbing and desorbing hydrogen. The most
widely used MH in NiMH today is the AB5 alloy with a CaCu5 crystal structure, where A is
a mixture of La, Ce, Pr, and Nd, and B is composed of Ni, Co, Mn, and Al. The active
material in the positive electrode is Ni(OH)2, which is the same chemical used in the Ni–Fe
and Ni–Cd rechargeable batteries.
Figure 1
The most commonly used active material in the negative electrode is graphite. During
charging, Li ions, driven by the potential difference supplied by the charging unit, intercalate
into the interlayer region of graphite. The arrangement of Li+ in graphite is coordinated by
the surface–electrolyte–interface (SEI) layer, which is formed during the initial activation
process. The active material in the positive electrode is a Li-containing metal oxide, which is
similar to Ni(OH)2 in the NiMH battery but replaces the hydrogen with lithium. During
charging, the Li+ (similar to the H+ in NiMH) hops onto the surface, moves through the
electrolyte, and finally arrives at the negative electrode. The oxidation state of the host metal
will increase and return electrons to the outside circuitry. During discharge, the process is
reversed.
3. Lithium-ion batteries, dominate the most recent group of EVs in development. The
traditional
lithium-ion
chemistry involves
a
lithium
cobalt
oxide cathode and
a
graphite anode. This yields cells with an impressive 200+ Wh/kg energy density and good
power density, and 80 to 90% charge/discharge efficiency. The downsides of traditional
lithium-ion batteries include short cycle lives (hundreds to a few thousand charge cycles) and
significant degradation with age. The cathode is also somewhat toxic. Also, traditional
lithium-ion batteries can pose a fire safety risk if punctured or charged improperly. The
maturity of this technology is moderate.
Figure 2
The most commonly used active material in the negative electrode is graphite. During
charging, Li ions, driven by the potential difference supplied by the charging unit, intercalate
into the interlayer region of graphite. The arrangement of Li+ in graphite is coordinated by
the surface–electrolyte–interface (SEI) layer, which is formed during the initial activation
process. The active material in the positive electrode is a Li-containing metal oxide, which is
similar to Ni(OH)2 in the NiMH battery but replaces the hydrogen with lithium. During
charging, the Li+ (similar to the H+ in NiMH) hops onto the surface, moves through the
electrolyte, and finally arrives at the negative electrode. The oxidation state of the host metal
wil increase and return electrons to the outside circuitry. During discharge, the process is
reversed. Li ions now move from the intercalation sites in the negative electrode to the
electrolyte and then to the original site in the LiMO2 crystal. The commonly used electrolyte
is a mixture of organic carbonates such as ethylene carbonate, dimethyl carbonate, and
diethyl carbonate containing hexafluorophosphate (LiPF6). The separator is a multilayer
structure from PP, which provides oxidation resistance, and PE, which provides a high-speed
shutdown in the case of a short.
Most new EVs are utilizing new variations on lithium-ion chemistry that sacrifice energy and
power density to provide fire resistance, environmental friendliness, very rapid charges (as
low as a few minutes), and very long lifespans. These variants (phosphates, titanates, spinels,
etc.) have been shown to have a much longer lifetime, and a very large number of charge
cycles.
Figure 3
Aluminum Air Batteries (New Technology)
An aluminum-air battery uses an aluminum plate as the anode, and ambient air as the cathode,
with the aluminum slowly being sacrificed as its molecules combine with oxygen to give off
energy.
The basic chemical equation is:
4Al + 3O2 + 6H2O → 4Al(OH)3 + energy
That is, four aluminum atoms, three oxygen molecules, and six water molecules combine to
produce four molecules of hydrated aluminum oxide plus energy. Water serves as a base for the
electrolyte through which ions pass to give off the energy that powers the vehicle's electric
motor.
Historically, aluminum-air batteries have been confined to military applications because of the
need to remove the aluminum oxide and replace the aluminum anode plates.
Israeli startup Phinergy thinks its aluminum-air energy storage device is a battery that could store
enough energy to offer up to 1,000 miles of real-world range. Phinergy says its patented cathode
material allows oxygen from ambient air to enter the cell freely, while blocking contamination
from carbon dioxide in the air--historically a cause of failure in aluminum-air cells. Each
aluminum plate, has enough energy capacity to power the car for roughly 20 miles, and the
demonstrated test car had 50 of those plates. The entire battery, weighs 55 pounds (25 kilograms)
giving it an energy density more than 100 times that of today's conventional lithium-ion pack.
It is also developing zinc-air batteries, which can be recharged electrically and do not sacrifice
their metal electrode as the aluminum-air cells do.
Battery Swapping
Tesla Motors - Tesla Motors unveiled a new option allowing a quick swap of battery packs in its
Model S cars.
Tesla CEO Elon Musk demonstrated the new battery swap process at Tesla's design studio in
Hawthorne, Calif. USA. The swap process took around 90 seconds compared to almost 4
minutes it took in filling the tank of a conventional sedan. The battery-swap option allows
drivers on long trips to pay for a quick change rather than wait for a recharge.
"The cost of pack swap will be equivalent to the cost of gasoline," Musk said. "That is what we
are going to make sure happens at the end of the day, except that obviously it will be more
convenient. It will take 90 seconds and not four or five minutes."
Tesla plans to offer the battery swap option at a number of locations around the United States,
including the supercharger stations the automaker is adding over the next few years.
The battery swap will first be offered later this year supercharger stations in California. It will
cost Tesla $500,000 to put the new technology into each recharging location. "We will start off
with the really fast, high-traffic corridors, because the assumption here is that if you want a pack
swap, time is of the essence," said Musk. "So we will start off on the I-5 corridor in California
and the Boston-DC route on the East Coast and they will be co-located with the Superchargers."
Tesla has not finalized how much it will cost to put in a new battery, they expects to charge
customers somewhere in the range of $60 to $80. The price will vary around the country and will
be comparable to the price of about 15 gallons of gasoline where the battery swap takes place.
After a battery swap, Model S owners will have the option of either keeping the loaner battery or
getting their original battery pack back. It's a small price that should not stop Tesla owners from
using the service on long drives. It gives electric car owners a speedy option to eliminate range
anxiety. Instead of building in a 30- or 40-minute break to recharge every 260 miles on a road
trip, Tesla owners can theoretically get a battery swap in 90 seconds and it would make long
drives in an electric car much more reasonable.
In the long run, Musk notes, everyone should build their own EVs and the market for credits will
dry out. Tesla is working with utilities in California to help stabilize the electric grid at the
charge stations. These racks of batteries from people’s cars will be part of that, so it’s at least
possible that the investment in “SuperSwapping” will net out smaller than it appears given
contracts with utility companies.
Better Place was a venture-backed international company that developed and sold batterycharging and battery-switching services for electric cars. It was formally based in Palo Alto,
California, but the bulk of its planning and operations were steered from Israel, where both its
founder Shai Agassi and its chief investors resided.
Israel was also the location of the company's first large-scale commercial pilot for batteryswitching services. The company opened its first functional charging station the first week of
December 2008 at Cinema City in Pi-Glilot near Tel Aviv.The first customer deliveries of
Renault Fluence Z.E. electric cars enabled with battery switching technology began in Israel in
the second quarter of 2012,and by mid September 2012, there were 21 operational battery-swap
stations open to the public in Israel.
Better Place implemented a business model wherein customers entered into subscriptions to
purchase driving distance similar to the mobile telephone industry from which customers
contract for minutes of airtime. The initial cost of an electric vehicle might also have been
subsidized by the ongoing per-distance revenue contract just as mobile handset purchases are
subsidized by per-minute mobile service contracts. Better Place's goal was to enable electric cars
to sell for $5,000 less than the price of the average gasoline car sold in the United States, or the
impact of electric cars would be minimal.
The Better Place approach was to enable manufacturing and sales of different electric cars
separately from their standardized batteries in the same way that petrol cars are sold separately
from their fuel. Petrol is not purchased upfront, but is bought a few times a month when the fuel
tank needs filling. Similarly, the Better Place monthly payment would cover electric "fuel" costs
including battery, daily charging and battery swaps. Better Place was to allow customers to pay
incrementally for battery costs including electric power, battery life, degradation, warranty
problems, maintenance, capital cost, quality, technology advancement and anything else related
to the battery. The per-distance fees would cover battery pack leasing, charging and swap
infrastructure, purchasing sustainable electricity, profits, and the cost of investor capital.
The Better Place electric car charging infrastructure network was based on a smart grid software
platform using Intel Atom processors and Microsoft .NET software, or comparable vendors. This
platform was first of its kind in the world and was to enable Better Place to manage the charging
of hundreds of thousands of electric cars simultaneously by automatically time-shifting
recharging away from peak demand hours of the day, preventing overload of the electrical grid
of the host country. Better Place would be able to provide electricity for millions of electric cars
without adding a single electricity generator or transmission line by using smart software that
oversaw and managed the recharging of electric cars connected with Better Place.
After implementing the first modern commercial deployment of the battery swapping model in
Israel and Denmark, Better Place filed for bankruptcy in Israel in May 2013. The company's
financial difficulties were caused by the high investment required to develop the charging and
swapping infrastructure, about US$850 million in private capital, and a market penetration
significantly lower than originally predicted by the company.
3.4 Charging Technology
For the PHEV and EV markets to expand, developing charging infrastructure is a priority. This
effort allows for charging at multiple locations, including at home and at public stations, and
helps reduce consumer range anxiety.
The design, manufacture, and operation of EV and PHEV charging systems and their
infrastructure have given rise to several key standards that end-users should be aware of. Safety
is the most important factor that is driving the adoption of these standards. Among the agencies
involved in developing these standards are: the National Fire Protection Agency (NFPA), the
Society of Automotive Engineers (SAE), and Underwriters Laboratories (UL).
Electric Vehicle Supply Equipment (EVSE) is designed to safely deliver electrical power to
charge an electric vehicle. While there are emerging and legacy charging technologies, most
current EVSE utilizes conductive charging.
Inductive Charging – In the 1990's electric vehicles used inductive charging. An inductive
charger uses mutual inductance to transfer electrical energy from the source to the vehicle. This
works much the way a transformer works. In this system an insulated paddle containing an
electrically energized primary coil is brought close to a secondary coil within the vehicle. The
magnetic field of the primary coil then induces a charge in the secondary coil.
Wireless Charging – Charging EV wirelessly is a new technology. J2954 is an emerging
standard. Currently Plugless Power sells a system where the primary coil is located on the
ground and secondary coil is attached to the underside of the EV. To charge the EV is parked
over the coil.
Conductive Charging – A conductive charger has a direct metal-to-metal electrical connection
(typically through an insulated wire/cord set) between the source and the charging circuitry. The
circuitry and its controls may be housed within the vehicle or external to it. SAE has adopted
J1772 as the conductive charging standard. All new EVs are compatible with this standard.
Conductive charging equipment is classified by the maximum amount of power in kilowatts
provided to the battery. There are several levels of charging equipment. In North America, the
standards are:

AC Level 1, which is a 120-volt (V) alternating current (AC) plug. A full charge at Level
1 can take between 8 and 20 hours, depending on the battery capacity of the vehicle.
Charging rate is approximately 1 kW.
AC Level 1 supplies 120V single phase power at up to 12 Amps (with a normal NEMA515 120 V grounded receptacle) or 16 Amps (with a NEMA 5-20R 120V grounded
receptacle). A portable “cord set” with built in EVSE is plugged in into a wall receptacle
using a standard three prong plug and into the electric vehicle using the standard J1772
EV connector. This allows the convenience of charging anywhere that has a standard
home receptacle, but is slower than level 2. For example, a Nissan Leaf with its battery
charge totally depleted would take about twenty hours to completely recharge.

AC Level 2, which is a 240-volt AC plug and requires installation of home charging
equipment. Level 2 charging can take between 3 and 8 hours, again depending on the
battery capacity of the vehicle. Charging rates fall within a range of 3 kW to 20 kW.
AC Level 2 supplies 208-240V single phase power at up to 80 Amps. Most EVs today
charge at about 3.3 kW with 6.6 kW models available in 2013. Level 2 equipment allows
faster charging than the Level 1 equipment. For example, a Nissan Leaf with its battery
charge totally depleted would take about seven hours to completely recharge at 3.3 kW.

Direct Current (DC) fast charging, which is as high as 600 V, enables charging along
heavy traffic corridors and at public stations. A DC fast charge can take less than 30
minutes to charge a battery to most of its capacity.
The CHAdeMO DC Quick Charging Standard is a DC Quick Charging Standard (also
called Fast Charging) originating in Japan. The charger is located outside the EV and
feeds DC current to the car’s battery pack through a standard cable and connector (JARI).
The EV sends a command for the desired charge rate using a CAN bus communication
protocol to the charger. Some Nissan and Mitsubishi cars have been equipped to use this
charging method in addition to Level 2. This charge method is much faster than AC L1
or L2, offering a 80% charge in as little as 30 minutes.
It is expected that most PHEV and EV owners will recharge their vehicles overnight at home.
Level 1 and Level 2 charging equipment will be the primary option for home charging. Vehicle
manufacturers have already developed stations for home charging. For example, according to
Nissan, in order to “pre-wire” a home charging dock for the Leaf EV, a 220/240 V 40-amp
dedicated circuit is required.
In order to shift electrical load to off- peak hours Hawaiian Electric encourages EV owners to
program their vehicles to start charging after 9 pm. By avoiding charging during peak load times
they avoid the need to add new “peaking” generation. Also, in conjunction with the Time of Use
rates, the Hawaiian Electric Company is to install devices to temporarily pause charging in
response to grid emergencies. Both of these programs are important to increasing our capability
to utilize greater amounts of renewable energy
Public charging stations will make PHEVs and EVs more convenient, help allay range anxiety,
and increase these vehicles’ useful range. Public charging stations use Level 2 or DC fast
charging, and are located in high-density locations, such as shopping centers, parking lots, and
garages
Asian and European countries are evolving charging standards that seek to harmonize with but
may not be identical to these standards. Discussions towards broader international standards are
ongoing. The Society of Automotive Engineers (SAE) J1772 Standard in North America is at the
forefront of efforts to standardize charging. All major vehicle and charging system
manufacturers support this standard, which should eliminate drivers’ concerns about whether
their vehicle is compatible with the infrastructure. The Underwriters Laboratories verified the
safety and durability of the SAE J1772 connector in 2009. The SAE J1772 Standard, which was
adapted on January 14, 2010, is for electrical connections for electric vehicles, and details the
physical and electric characteristics of both the charge system and coupler.
This Standard defines a five-pin configuration for the connector used for Level 1 and Level 2
charging. The connector is designed to survive more than 10,000 connection and disconnection
cycles. Level 3 configurations are currently under development, as is a Direct Current fast
charging configuration.
Manufacturers are already introducing charging stations that are compliant with current
standards. For instance, Coulomb Technologies of the United States retails commercial and
residential charging stations that are compliant with the J1772 Standard.
Figure 4
3.5 Drive Train Technologies
SERIES HYBRID: In this configuration, the power plant provides power to the electric
motor(s), which drives the wheels. There is no mechanical connection between the power plant
and the wheels. An advantage of this configuration is the ability to set the power plant to operate
at its maximum efficiency.
[2]
Systems using this configuration are also known as Range
Extended Electric Vehicles (REEV). Vehicles in this configuration are driven only by electric
traction where electric motors have very high power to weight ratios and thus offer sufficient
torque over a wide speed range. Also with the use of electric motors only for traction, the need
for a multiple speed gearbox and transmission is eliminated which reduces the weight of the
vehicle substantially. As the internal combustion engine is not directly used in powering the
drive train, it allows the designers to use different types of engines such as micro turbines or
rotary Atkinson engine which can be more fuel efficient than conventional internal combustion
engines. The system includes an all electric motor powered traction system, an engine to run the
generator, a generator to produce electricity and a battery bank to store electricity for driving the
electric traction motors. It may have a regenerative braking system in which as soon as the brake
pedal is pressed, the motor becomes a generator and produces electricity over the distance that it
takes the vehicle to stop utilizing its inertia. Super-capacitors are generally used in this operation
to support in charging of the battery through regenerative braking In case of plug in hybrids, the
battery bank can be charged using external electric supply and the internal combustion engine
can be made to kick in only after the state of charge in the battery falls to a certain predetermined
level due to usage. This can help cut emissions further.
SERIES
HYBRID
STRUCTURE
Figure 5
DESIGN
PARALLEL HYBRID: This configuration has two power paths. The wheels can be driven by
the power plant, the electric motor(s), or both. An advantage of this configuration is the
combined power due to the electric motor and power plant driving the wheels simultaneously. [2]
If the two power sources are joined at an axis in parallel, the speeds at this axis must be identical
and the torque from each source gets added together. Two power sources may be added to the
same shaft with the electric motor lying between the engine and transmission, and the torques
add up. Parallel hybrids can make do with a smaller battery pack rely more on regenerative
braking and the internal combustion engine which can also act as a generator for supplemental
recharging. They are more efficient on highway driving compared to urban stop-and-go
conditions or city driving. A type of parallel hybrid is the power split or series parallel hybrid in
which they utilize power-split devices. The main principle behind this system is the decoupling
of the power supplied by the engine from the power demanded by the driver. Thus it allows the
engine to run at optimal speed and the supplementary power can be provided by the electric
motor. This is very useful in cases when engines have high efficiencies at low rpm which can
support cruising and when the acceleration power is needed, it can be supplied by the electric
motor.
PARALLEL
HYBRID
DESIGN
STRUCTURE
Figure 6
SERIES – PARALLEL DESIGN STRUCTURE
3.6 Advantages of Electric Vehicle Technology
Electric vehicles typically combine an energy storage device, a power plant (only for hybrid and
plug in hybrid), and an electric propulsion system. Energy storage devices are most often
batteries, but other possibilities include ultracapacitors and fly-wheels. Power plant options
include internal combustion engines, gas turbines, and fuel cells. The efficiency of a hybrid
system depends on a number of factors, such as the combination of subsystems, how the
subsystems are integrated, and the control strategy employed.
Electric propulsion systems are being developed for a wide range of medium- and heavy-duty
vehicle sizes and applications, including transit buses. Electric propulsion systems offer several
advantages to transit agencies:
• Increased efficiency, potentially lowering fuel cost
• Better acceleration, allowing quick merging into heavy traffic
• Decreased emissions
• Quieter operation.
Sources of Efficiency and Emissions Reductions
Whenever a power system transfers energy from one form to another – such as a hybrid’s
conversion of mechanical energy into electricity and then back again – the system will
experience a decrease in energy efficiency. Hybrid electric vehicles offset those losses in a
number of ways which, when combined, produce a significant net gain in efficiency and related
emissions reductions.
These aspects of the EV system are able to save so much energy that the vehicle as a whole
overcomes these initial conversion losses. There are four primary sources of efficiency and
emissions reduction found in hybrids:
• Smaller Engine Size: Most traditionally “direct drive” vehicle engines are sized to provide
enough power for relatively infrequent, fast accelerations. In the more frequent cruising mode,
these engines are much larger than they need to be. By adding an electric motor to deliver partial
or complete power during accelerations, an EV can be equipped with a smaller, more efficient
combustion engine while providing acceleration performance equal to its conventional
counterpart.
• Regenerative Braking: Regenerative braking recovers energy normally lost as heat during
braking, and stores it in the batteries for later use by the electric motor. Therefore, the enginepowered generator is used to produce electric energy only when regenerative braking does not
provide a full charge.
• Power-On-Demand: EVs can temporarily shut off the combustion engine during idle or
coasting modes, when the electric motor alone can provide sufficient power to keep the vehicle’s
systems running without burning petroleum fuel.
• Constant Engine Speeds and Power Output: In a hybrid application, the diesel engine can be
designed to operate more consistently at its optimum engine speed, power output and operating
temperature to increase fuel efficiency and reduce emissions. In a series hybrid this is done by
providing power only to the electric generator rather than to the wheels directly. In a parallel
hybrid, the diesel engine only powers the wheels directly when it is operating and optimum
speeds. This at relatively constant, optimum performance level also improves the performance of
emissions control technologies.
3.7 Govt Policies and Market Prospects
Electric Vehicles are considerably costly upfront as compared to conventional vehicles. This has
meant that they have had very low market penetration even though they have existed for a few
decades now. But govt incentives and policies are now favoring the use of Electric Vehicles the
world over thus changing the market scenario.
Government Incentives for EV/PHEV in USA
The fleet of plug-in electric vehicles in the United States is the largest in the world. Since 2008
over 1,16,000 plug-in electric cars have been sold in the United States which are highway
capable. The U.S. was the world's leader in plug-in electric car sales in 2012, with a 46% share
of global sales.
Under the American Federal Government, The Energy Improvement and Extension Act of 2008,
and the American Clean Energy and Security Act of 2009 (ACES) granted tax credits for new
qualified plug-in electric drive motor vehicles as an incentive to boost the sales of such vehicles.
The tax credit offered for a new plug-in electric vehicles is worth $2,500. In addition to that,
$417 is offered for each kilowatt-hour of battery capacity over 4 kwh (the portion of the credit
determined by battery capacity cannot exceed $5,000). Therefore, the total amount of the credit
allowed for a new PEV is $7,500 in USA.
In accordance to the American Recovery and Reinvestment Act 2009, the U.S. Department of
Energy announced the release of up to $2 billion in federal funding for two competitive
solicitations that would be competitively awarded and would be cost-shared agreements for the
manufacture of batteries based on advanced technologies and related drive train components. It
also announced $400 million of funding for ‘transportation electrification demonstration and
deployment projects’.
The American Clean Energy and Security Act (ACES), calls for all electric utilities to, “develop
a plan to support the use of plug-in electric drive vehicles, including heavy-duty hybrid electric
vehicles”. It also provides for “smart grid integration,” allowing for efficient, effective delivery
of electricity which not only accommodates the additional demands of plug-in electric vehicles
but also offers grid support services like ancillary services when needed using funding from
department of energy in developing appropriate smart grids.
The new qualified plug-in electric vehicle credit phases out for a PEV manufacturer over the
one-year period beginning with the second calendar quarter after the calendar quarter in which at
least 200,000 qualifying vehicles (cumulative sales after December 31, 2009) from that
manufacturer have been sold for use in the United States. Qualifying PEVs are eligible for 50%
of the credit if acquired in the first two quarters of the phase-out period, and 25% of the credit if
bought in the third or fourth quarter of the phase-out period.
The American Recovery and Reinvestment Act of 2009 also offered a tax credit for plug-in
electric drive conversion kits. The credit given was worth 10% of the cost of converting a vehicle
to a qualified plug-in electric vehicle and in service after February 17, 2009. The maximum
amount of the credit is $4,000. This availability of credit was withdrawn on all conversions
taking place post December 31, 2011.
The American government also pledged US$2.4 billion in the form of federal grants in order to
support the development of next-generation of electric cars and advanced batteries. It also
pledged another US$115 million for the installation of charging infrastructure for electric
vehicles in 16 different metropolitan areas throughout the country. United States had 5,678
charging stations across the country with 16,256 public charging points as of March 2013. In his
State of the Union address in 2011, President Barack Obama set a target for the U.S. to have 1
million electric vehicles on the road by 2015.
A very large volume of funding for fleet buses is provided under the Diesel Emissions Reduction
Act which is a part of the Energy Policy Act of 2005. It offers grants and loans for changing
conventional diesel buses to an alternative less polluting fuel type of modify them to comply
with stringent emission standards. The Environmental Protection Agency submitted a report on
the success of DERA implementation in August 2009, where it credits DERA program of
reducing emission of 46,000 tons of nitrogen oxide and 2,200 tons of fine respirable particulate
matter. This emission reduction translated into a public health benefit up to $1.4 billion and
saved almost 3.2 million US gallons of fuel in 2008 which meant a saving of $8 million. The
report said that more than of 14,000 diesel engine powered fleet vehicles were made cleaner
under DERA.
Government Incentives for EV/PHEV in UK
The British Government actively supports plug in electric vehicles as a mechanism for reducing
emissions in cities. The support for these vehicles comes under different schemes. The first is in
the form of purchase incentives whereby it offers grants under plug-in car grants for passenger
vehicles and plug-in van grants for vans and similar vehicles in commercial operations.
The Plug-in Car Grant program was initiated on 1 January 2011 and is applicable throughout the
U.K. The programme is aimed at reducing the up-front cost of eligible plug-in electric cars. This
is done by providing a 25% grant of the cost of new plug-in electric cars. The funding per car is
capped at GB£5,000. Private as well as business fleet buyers can avail this grant. The grant
programme allows consumers to buy an eligible plug-in electric car discounted at the point of
purchase and the subsidy is claimed by the manufacturer afterwards.
The Plug-In Van Grant was created by extending the Plug-In Car Grant in February 2012. PlugIn Electric Van buyers can receive 20% grant on the value of their purchase. The grant per
vehicle is capped at GB£8,000. To be eligible for the grant, vans have to meet certain
performance based criteria to ensure safety, range, and ultra-low tailpipe emissions. Business and
private customers both can receive the discount at the point of purchase.
In November 2009, a new scheme called "Plugged-in-Places" was announced. It dedicated a sum
of £30 million to investigate the viability of providing electric supply for plug-in vehicles. The
programme funding is between six cities and it aims at encouraging local government and private
businesses to participate and bid for funds. The programme aims to install vehicle recharging
points across the UK. The programme offers match-funding to the investments by a consortium
of businesses and public sector partners to undertake the installation of plug-in electric vehicle
recharging infrastructure in prime locations across the UK. As of now 8 Plugged-In Places have
been created in UK.
The London Congestion Charge is completely waived for Plug-In Battery Electric Vehicle and a
discount is given to Plug-In Hybrid Electric vehicles. The original Greener Vehicle Discount was
replaced by the Ultra Low Emission Discount (ULED) scheme that came into force on 1 July
2013. The ULED enforces more stringent emission standards that limited the free access to the
congestion charge zone and currently there are no internal combustion-only vehicles that meet
the new stringent emission criteria. The measure is designed to limit the growing number of
diesel vehicles on London's roads. This encourages the sale and use of Plug-In Electric Vehicles.
Government Incentives for EV/PHEV in Norway
Norway has the highest number of per capita plug-in electric vehicles in the world. The
government of Norway has made very significant contribution in ensuring this. All electric cars
in Norway are exempted from all non-recurring vehicle fees. The plug-in electric vehicles are
also exempted from paying sales tax, annual road tax, all public parking fees, and toll payments.
Electric vehicles are also free to use the bus lanes. These incentives are to stay in effect till 2018
or until the 50,000 EV target is achieved.
Norwegian tax system levies higher taxes to heavier vehicles, that is why heavier plug-in hybrids
are more expensive than similar conventional cars due to the extra weight of the battery pack and
its additional electric components. But from 1 July 2013, the existing weight allowance for
conventional hybrids and plug-in hybrids of 10% has been increased to 15% for PHEVs to make
them competitively priced even on being heavier.
Mere tax exemptions for electric vehicles in Norway amount to almost USD $11,000. This is
almost equal to a USD $1,400 exemption every year over the car’s eight year life span. Along
with this, the cars in Oslo also toll exemption worth another USD $1,400 a year and free parking
worth more than USD $5000. Coupled with this are other additional financial incentives worth
USD $400. And other non financial incentives include the refight to drive in bus lanes. The
overall benefit of owning and electric car in Oslo is almost to the tune of USD $8,200 per car per
year.
Government Incentives for EV/PHEV in Japan
The Japanese government initiated its incentive program for cleaner vehicles way back in 1996
under the Clean Vehicles Introduction Project. The project continued up till 2003 and provided a
purchase subsidy of up to 50% of the incremental cost of the clean energy vehicle over the
conventional vehicle. In 2009, the Green Vehicle Purchasing Promotion Measure was introduced
that implemented tax deductions and exemptions for efficient and environmentally friendly
vehicles defined by a given set of criterion.
The new next generation vehicles, such as electric and fuel cell vehicles, plug-in hybrids etc. are
exempted from acquisition tax as well as tonnage tax. Other fuel efficient and low emission
passenger cars, are given tax exemptions from 50 to 75% depending on the compliance of the
new vehicle as compared to established fuel efficiency standards. Acquisition tax on used vehicle
is reduced by 1.6% to 2.7% which amounts to almost 150,000 yen to 300,000 yen. Electric and
fuel cell vehicles receive a 2.7% reduction while plug-in hybrids get a 2.4% reduction. The next
generation electric vehicles including fuel cell vehicles are also given a 50% exemption from the
annual automobile tax.
Subsidies given for the purchase of new environmentally friendly vehicles without scrapping of a
used car are 50,000 yen to 1,00,000yen. But if the consumer is scrapping a vehicle that is 13 year
old or more, the subsidies are raised to 1,25,000 yen to 2,50,000 yen. The subsidy for larger
vehicles like buses and trucks which meet emission criteria ranges between 2,00,000 yen to
9,00,000 yen, but just like cars, if the customer scraps a 13 years or older similar vehicle, then
the subsidies are raised to 4,00,000 yen to 18,00,000 yen.
Government Incentives for EV/PHEV in India
The government of India in 2012 launched the National Electric Mobility Mission Plan 2020. It
aims to ‘encourage reliable, affordable and efficient EVs that meet consumer performance and
price expectations through government-industry collaboration for promotion and development of
indigenous manufacturing capabilities, required infrastructure, consumer awareness and
technology; thereby helping India to emerge as a leader in EV 2&4 wheeler market in the world
by 2020, with total EV sales of 6-7 million units thus enabling Indian automotive industry to
achieve global EV manufacturing leadership and contributing towards national fuel security.’
To expedite decision making in the industry, the govt has set up National Council for Electric
Mobility which will have ministers of various academia and will be chaired by the Minister for
Heavy Industry. To aid the council, there will be a 25 member National Board of Electric
Mobility comprising of secretaries of various stakeholder ministries. National Automotive Board
is to be set up which will have domain and technical experts and it will be the nodal agency for
all ongoing and new government initiatives for the automobile sector.
Figure 7
Chapter 4
4.1 Introduction to Vehicle to Grid (V2G) Technology
PHEVs have within them the energy source and power electronics capable of producing
electricity that can be converted to 50-60Hz AC which is same as the one power homes and
offices. When electricity flows from cars to power lines, it is called "vehicle to grid" power, or
V2G. Cars pack a lot of power: one typical electric-drive vehicle can produce 10kW, the average
draw of 10 houses.
Most American passenger vehicles are, on average, parked and idle for about 23 hours each day.
During this time, they create no value for the user, and there exists an associated cost because
they need to be stored – parked – while not in use. With the advent of PHEVs, there is the
prospect that idle vehicles can create value to their owners while parked. By connecting these
PHEVs to the electric power grid, a large scale, dispatchable electric power generating resource
is created. The potential exists for the economic value generated to offset the costs of electric
vehicles.
Types of Energy Services Vehicles Could Offer - Grid connected vehicles can support the grid
in a number of ways. Depending on the vehicle and the needs of the driver, the grid support
services would be available whenever the vehicle is plugged in -- typically at the vehicle driver's
home or place of work.
Peak power sales - Grid-connected vehicles could be aggregated by an energy services
company to provide power into existing markets. The most likely is the same-day/hour
ahead market.
Spinning reserves - The Independent System Operator (ISO) is required to maintain
sufficient reserve generating capacity spinning and synchronized with the grid, ready for
immediate power generation. EVs can provide equally-fast power on demand, with the
added benefit of little or no 'spinning' or idling losses.
Base load power - Base load power involves contracting to provide power for extended
periods. This energy could be sold directly to a business that owns the parking space
(such as an employee's place of work). Hybrid or fuel cell vehicles for which the grid
interconnection also includes a source of fuel are the most viable here.
Peak power as a form of direct load control (DLC) - Utility companies have forms of
direct load control (DLC) in which they pay their customers for the right to interrupt
power to certain loads when system demand is high. For example, in California, these are
typically targeted at residential air conditioning systems. In a similar fashion, a utility
could contract with a vehicle owner or system aggregator to be able to directly control
power delivered by connected vehicles – the system-effect of which is the same as
directly shutting off loads.
Peak power to reduce demand charges - One of the simplest forms of service is to
locally control the vehicle power output in a way to reduce the peak power demand of a
business. By having fast response power capacity on the customer side of the meter, the
peaks of a business’ power demand can be provided by connected vehicles. This will
reduce the demand charge the business pays to the electric utility. If the demand charge is
based on kVA rather than kW, then the connected vehicles can also function to supply the
businesses reactive power needs, and hence reduce the kVA seen by the utility. Demand
charges typically range from $5 to $15 per kW (peak 15 min average power) per month
in the US cities.
Reactive power - Utility companies must provide reactive power (VARs) to meet the
non-unity power- factor loads of its customers and to maintain overall system stability.
Large numbers of vehicles with inverter connections to the power grid offer the potential
for localized production of VARs to meet the needs of the distribution utility.
Other value created - There are numerous other values created by distributed generation
or storage but are not as directly quantifiable as those above. These include:
Deferral of transmission distribution and capacity investment – By getting
more energy delivered into regions where the distribution grid has reached its
capacity, it will be possible to defer costly upgrades to the system.
Potential emissions reduction – Energy stored in electric vehicles has the
potential for reducing local emissions. For hybrid vehicles, local emissions will
have to be evaluated to determine whether there are any benefits compared to fuel
used by central power plants.
Potential for cogeneration – In the case of fuel cell or hybrid vehicles, power
generation will also produce waste heat. It may be possible to capture this heat for
beneficial purposes, but this will entail adding a heat transfer loop into the
interface between the vehicle and the grid.
Reduction of transmission losses – Since power can be delivered at or near the
point of end-use, losses associated with delivering the power are nearly zero.
Battery Electric Vehicles – Battery powered electric vehicles are different from plug in hybrid
or fuel cell vehicles as they don't generate electricity. They are instead a distributed storage
medium that time-shifts the generation and consumption of electrical energy, providing, for
example, peak power, reliability, distributed storage, and reactive power. There are associated
losses and battery costs that must be factored in for any economic analysis.
When considered only for daily peak or base-load power, the economics may not be favorable to
battery storage because the resulting battery wear-out costs per kWh are too high.
There are two areas in which the economic viability needs to be explored.
-First, other energy services, including hour-ahead, spinning reserves, and others can
have high values, above their cost in battery wear-out.
-Second, batteries for electric vehicles have two general types of wear out.
These are degradation due to use (cycling) and degradation due to calendar time. There is some
evidence that suggests that calendar life may prove to be the life limiting factor for some EV
batteries and not necessarily the cycling time. If this is the case, the incremental cost of
additional cycling within the calendar life may be small or even zero.
Some of the value-generating services that could be offered by electric and hybrid vehicles don't
require significant energy transfer. For example, peak power sold as spinning reserves to the ISO
or dispatchable power to the distribution company may be activated only a few times per year.
Reactive power or grid support services would not require any net energy flow from the vehicle.
4.2 V2G and Power markets
Electricity is grouped in several different markets with correspondingly different control
regimes. Here we discuss four of them—baseload power, peak power, spinning reserves, and
regulation—which differ in control method, response time, duration of the power dispatch,
contract terms, and price. We focus particularly on spinning reserves and regulation, which must
deliver power within minutes or seconds of a request.
All these electricity resources are controlled in real-time by either an integrated electric utility or
an Independent System Operator.
Baseload power
Baseload power is provided round-the-clock. In India this typically comes from coal-fired plants
that have low costs per kWh. Baseload power is typically sold via long term contracts for steady
production at a relatively low per kW price. V2G has been studied across multiple markets of US
which have a similar structure, showing that EVs cannot provide baseload power at a
competitive price. This is because baseload power hits the weaknesses of EVs—limited energy
storage, short device lifetimes, and high energy costs per kWh—while not exploiting their
strengths—quick response time, low standby costs, and low capital cost per kW.
Peak power
Peak power is generated or purchased at times of day when high levels of power consumption
are expected—for example, on hot summer afternoons. Peak power is typically generated by
power plants that can be switched on for shorter periods, such as gas turbines. Since peak power
is typically needed only a few hundred hours per year, it is economically sensible to draw on
generators that are low in capital cost, even if each kWh generated is more expensive. Our
studies have shown that V2G peak power may be economic under some circumstances. The
required duration of peaking units can be 3–5 h, which for V2G is possible but difficult due to
on-board storage limitations. Vehicles could overcome this energy-storage limit if power was
drawn sequentially from a series of vehicles.
Spinning reserves
Spinning reserves refers to additional generating capacity that can provide power quickly, say
within 10 min, upon request from the grid operator. Generators providing spinning reserves run
at low or partial speed and thus are already synchronized to the grid. Spinning reserves are the
fastest response, and thus most valuable, type of operating reserves; operating reserves are “extra
generation available to serve load in case there is an unplanned event such as loss of generation.”
The provision of spinning reserves is practically absent in India currently due to the high cost of
implementation, the perpetual deficit, the high fuel costs and also lack of sufficient evacuation
infrastructure. Spinning reserves globally are paid for by the amount of time they are available
and ready. For example, a 1MWgenerator kept “spinning” and ready during a 24-h period would
be sold as 1MW-day, even though no energy was actually produced. If the spinning reserve is
called, the generator is paid an additional amount for the energy that is actually delivered (e.g.,
based on the market-clearing price of electricity at that time).
The capacity of power available for 1 h has the unit MW-h (meaning 1MW of capacity is
available for 1 h) and should not be confused with MWh, an energy unit that means 1MW is
flowing for 1 h. These contract arrangements are favorable for EVs, since they are paid as
“spinning” for many hours, just for being plugged in, while they incur relatively short periods of
generating power. Contracts for spinning reserves limit the number and duration of calls, with 20
calls per year and 1 h per call typical maxima. As spinning reserves dispatch time lengthens,
from the typical call of 10 min to the longest contract requirement, 2 h, fueled vehicles (PHEVs)
gain advantage over battery vehicles because they generally have more energy storage capacity
and/or can be refueled quickly for driving if occasionally depleted by V2G.
Spinning reserves, along with regulation are forms of electric power referred to as “ancillary
services” or A/S. Ancillary services account for 5–10% of electricity cost, or about $ 12 billion
per year in the U.S., with 80% of that cost going to regulation.
Regulation
Regulation, also referred to as automatic generation control (AGC) or frequency control, is used
to fine-tune the frequency and voltage of the grid by matching generation to load demand.
Regulation must be under direct real-time control of the grid operator, with the generating unit
capable of receiving signals from the grid operator’s computer and responding within a minute or
less by increasing or decreasing the output of the generator. Depending on the electricity market
and grid operator, regulation may overlap or be supplemented by slower adjustments, including
“balancing service” (intra hour and hourly) and/or “load following.”
Some markets split regulation into two elements: one for the ability to increase power generation
from a baseline level, and the other to decrease from a baseline. These are commonly referred to
as “regulation up” and “regulation down”, respectively. For example, if load exceeds generation,
voltage and frequency drop, indicating that “regulation up” is needed. A generator can contract
to provide either regulation up, or regulation down, or both over the same contract period, since
the two will never be requested at the same time.
Markets vary in allowed combinations of up and down, for example, PJM Interconnect requires
contracts for an equal amount of regulation up and down together, whereas California
Independent System Operator (CAISO) is more typical in allowing contracts for just one, or for
asymmetrical amounts (e.g., 1MW up and 2MW down).
Regulation is controlled automatically, by a direct connection from the grid operator (thus the
synonym “automatic generation control”). Compared to spinning reserves, it is called far more
often (say 400 times per day), requires faster response (less than a minute), and is required to
continue running for shorter durations (typically a few minutes at a time).
The actual energy dispatched for regulation is some fraction of the total power available and
contracted for. We shall show that this ratio is important to the economics of V2G, so we define
the “dispatch to contract” ratio as
where Rd–c is the dispatch to contract ratio (dimensionless), Edisp the total energy dispatched
over the contract period(MWh), Pcontr the contracted capacity (MW), and tcontr is the duration
of the contract. Rd–c is calculated separately for regulation up or down.
4.3 Power capacity of V2G
Three independent factors limit V2G power:
(1) The current-carrying capacity of the wires and other circuitry connecting the vehicle through
the building to the grid
(2) The stored energy in the vehicle, divided by the time it is used
(3) The rated maximum power of the vehicle’s power electronics.
The lowest of these three limits is the maximum power capability of the V2G configuration. We
develop here analysis for factors 1 and 2, since they are generally much lower than 3.
Power limited by line
Vehicle-internal circuits for full-function electric vehicles are typically upwards of 100kW. For
comparison, average home maximum power capacity is typically 20–50kW, with an average
draw closer to 1-2 kW in urban environments. To calculate the building-wiring maximum, one
needs only the voltage and rated ampere capacity of the line:
where Pline is power limit imposed by the line in watts (here usually expressed in kW), V the
line voltage, and A is the maximum rated current in amperes. For example, home wiring at 240V
AC, and a typical 50A circuit rating for a large-current appliance such as an electric range, the
power at the appliance is 50A×240V so it yields a line capacity of 12kW maximum for this
circuit. Based on typical home circuits, some would be limited to 10kW, others to 15kW as the
Pline limit. For a commercial building, or a residential building after a home electrical service
upgrade (at additional capital cost), the limit could be 25kW or higher.
On the vehicle side, most existing (pre-V2G) battery vehicle chargers use the National Electrical
Code (NEC) “Level 2” standard of 6.6kW. The first automotive power electronics unit designed
for V2G and in production, by AC Propulsion, provides 80A in either direction, thus, 19.2kW at
a residence (240 V). This V2G unit has been used in one prototype plugin hybrid and several
battery electric vehicles for various studies in US.
Power limited by vehicle’s stored energy
The previous section analyzed V2G power as limited by the line capacity. The other limit on
V2G power is the energy stored on-board divided by the time it is drawn. More specifically, this
limit is the onboard energy storage less energy used and needed for planned travel, times the
efficiency of converting stored energy to grid power, all divided by the duration of time the
energy is dispatched. This is calculated as
where Pvehicle is maximum power from V2G in kW, Es the stored energy available as DC kWh
to the inverter, dd the distance driven in miles since the energy storage was full, drb the distance
in miles of the range buffer required by the driver, ηveh the vehicle driving efficiency in
miles/kWh, ηinv the electrical conversion efficiency of the DC to AC inverter (dimensionless),
and tdisp is time the vehicle’s stored energy is dispatched in hours.
In a specific application, dd would depend on the driving pattern, the vehicle type (e.g., battery
EVs may be recharged at work), and the driver’s strategies for being prepared to sell power.
The fuel cell vehicle, or hybrid in motor-generator mode, can provide only regulation up (power
flows from vehicle to grid), not regulation down (power from grid to vehicle), so it has no
analogy to the battery EV’s recharge during regulation down. Power capacity of V2G is
determined by the lower of the two limits, Pline or Pvehicle.
4.4 Revenue versus cost of V2G
The economic value of V2G is the revenue minus the cost.
Revenue equations
The formulas for calculating revenue depend on the market that the V2G power is sold into. For
markets that pay only for energy, such as peak power and baseload power, revenue is simply the
product of price and energy dispatched. This can also be expanded, since energy is P* t,
where r is the total revenue in any national currency, pel the market rate of electricity in
Rs/kWh, Pdisp the power dispatched in kW (for peak power Pdisp is equal to P, the power
available for V2G), and tdisp is the total time the power is dispatched in hours.
On an annual basis, peak power revenue is computed by summing up the revenue for only those
hours that the market rate (pel) is higher than the cost of energy from V2G.
For spinning reserves and regulation services the revenue derives from two sources: a “capacity
payment” and an “energy payment.” The capacity payment is for the maximum capacity
contracted for the time duration (regardless of whether used or not). For V2G, capacity is paid
only if vehicles are parked and available (e.g., plugged-in, enough fuel or charge, and contract
for this hour has been confirmed). The energy payment is for the actual kWh produced; this term
is equivalent to what the equation helps calculate as revenue from either spinning reserves or
regulation services, with the first term being the capacity payment and the second term the
energy payment.
where pcap is the capacity price in Rs/kW-h, pel is the electricity price in $/kWh, P is the
contracted capacity available (the lower of Pvehicle and Pline), tplug is the time in hours the EV is
plugged in and available, and Edisp is the energy dispatched in kWh.
For spinning reserves, Edisp can be calculated as the sum of dispatches,
where Ndisp is the number of dispatches, Pdisp the power of each (presumably equal to the
vehicle capacity P), and tdisp is the duration of each dispatch in hours. A typical spinning
reserves contract sets a maximum of 20 dispatches per year and a typical dispatch is 10 min long,
so the total Edisp will be rather small.
For regulation services, there can be 400 dispatches per day, varying in power (Pdisp). In
production, these would likely be metered as net energy over the metered time period. To
estimate revenue we approximate the sum of Pdisp by using the average dispatch to contract ratio
(Rd–c) defined by first equation, and rearrange the earlier equations to get
Thus, for forecasting regulation services revenue we substitute the outcome from the above
equation in the earlier equations to get.
Cost equations
The cost of V2G is computed from purchased energy, wear, and capital cost. The energy and
wear for V2G are those incurred above energy and wear for the primary function of the vehicle,
transportation. Similarly, the capital cost is that of additional equipment needed for V2G but not
for driving. Assuming an annual basis, the general formula for cost is
where c is the total cost per year, cen the cost per energy unit produced (calculated below), Edisp
the electric energy dispatched in the year, and cac is the annualized capital cost.
For spinning reserves we would use in the above equation the values of Edisp computed by
For regulation, substituting values of Edisp computed by
Thus the total annual cost to provide regulation is
where cen is the per kWh cost to produce electricity. The equation for cen includes a purchased
energy term and an equipment degradation term
where cpe is the purchased energy cost, and cd is the cost of equipment degradation (wear) due
to the extra use for V2G, in Rs/kWh of delivered electricity. The purchased energy cost cpe is the
cost of electricity, hydrogen, natural gas, or gasoline, expressed in the native fuel cost units (e.g.,
Rs/kg Natural Gas), and ηconv is the efficiency of the vehicle’s conversion of fuel to electricity
(or conversion of electricity through storage back to electricity). The units of ηconv are units of
electricity per unit of purchased fuel. Thus equations computed cen, the cost of delivering a unit
of electricity, is expressed in Rs/kWh regardless of the vehicle’s fuel.
Degradation cost, cd, is calculated as wear for V2G due to extra running time on a hybrid engine
or fuel cell, or extra cycling of a battery. Shallow cycling has less impact on battery lifetime than
the more commonly reported deep cycling.
As the vehicle fleet moves to electric drive (hybrid, battery, and fuel cell vehicles), an
opportunity opens for “vehicle-to-grid” (V2G) power. V2G only makes sense if the vehicle and
power market are matched. For example, V2G appears to be unsuitable for baseload power—the
constant round-the clock electricity supply—because baseload power can be provided more
cheaply by large generators, as it is today. Rather, V2G’s greatest near-term promise is for quickresponse, high-value electric services. These quick-response electric services are purchased to
balance constant fluctuations in load and to adapt to unexpected equipment failures.
The results suggest that the engineering rationale and economic motivation for V2G power are
compelling. The societal advantages of developing V2G include an additional revenue stream for
cleaner vehicles, increased stability and reliability of the electric grid, lower electric system
costs, and eventually, inexpensive storage and backup for renewable electricity.
Chapter 5
Findings and Conclusion
The power sector in India is a fast maturing one and ancillary services are currently provided
mandatorily by different sections of the industry like the generating companies. But it has been
observed that the ancillary services are of great importance and need to be taken separately. As
per the Indian Electricity Act of 2003, competition is to be promoted in every sphere of the
sector and the proposed staff paper by CERC on Ancillary Services Market aims to do the same.
The three types of ancillary services that are slated to be opened to market operation are –
Frequency Control Ancillary Service, Network Control Ancillary Service and System Restart
Ancillary Services.
It has been studied that grid connected electric vehicles are capable of providing aforementioned
ancillary services. The electric vehicles industry is fast growing with rising adoption in the
developed country markets. Not only do they provide a relatively cheaper cost of operation, they
also offer other benefits like reduced emissions in cities and also reduce the dependency of oil. It
was found that the biggest barrier to large scale adoption of electric vehicles was two-fold.
The first was a very high upfront cost. Electric vehicles cost considerably more than their
conventionally powered counter parts. The second is the lack of charging infrastructure in public
places which limits the electric range of the vehicles. To tackle the first problem, the
governments of the world are providing heavy subsidies and incentives. Countries like Norway
provide incentives that can amount up to $8200 per car per year. For the second hurdle, an
increasingly large charging base is being developed in public places in the developed nations.
Also plug-in hybrid electric vehicles have successfully extended the range of the vehicles by
using petrol or natural gas as a secondary fuel thereby reducing the psychological fear of range
limitation people had in their mind linked to electric vehicles.
It has been shown in various researches across the world that vehicle to grid operations are a
feasible possibility as modern electric vehicles can be equipped with bidirectional inverters that
can not only use energy from grid to charge themselves but also supply energy back to the grid if
demanded. This has been made possible with the use of smart grids that can communicate with
such distributed storage infrastructure.
In a country like India where normal generating stations face multiple challenges such as fuel
supply and environmental clearances, Electric Vehicles can become a suitable alternative in
providing short term power in the form of ancillary services. The Government of India
introduced the National Electric Mobility Mission in 2012 that aims to facilitate the adoption of
electric vehicles by providing incentives and subsidies at both the customer end and the
manufacturers end.
This opportunity can be utilized to create infrastructure in the form of large parking stations
which provide grid connectivity in the form of charging connections to the electric vehicles. it
can provide a win-win situation for all players where the vehicle owners and the parking station
can offer their vehicles and infrastructure to provide ancillary services to the grid, the system
operators and power sector benefits from the increased grid reliability and the reduced
dependence on oil because of the use of electric vehicles also helps reduce pollution in cities and
curb the large outflow of foreign exchange in the form of payments for oil imports.
As the Indian markets are still developing and highly price sensitive, the use of this technology
can be promoted by first adoption by government bodies themselves in the form of public
transport fleets. That has advantages in itself as the parking infrastructure and the parking and
driving durations are much more certain in that case rather than that of private vehicles. Also it
has been learnt from the example of adoption of CNG vehicles in Delhi that once the technology
is demonstrated to be functional, economical and successful by use in public transport, the mass
adoption increases manifold.
It will be ideal if government agencies took the lead and switched their bus fleets from
convention gas or diesel powered vehicles to smart, grid connected electric vehicles and also
increase the pace of implementation of smart grids. Thereby not only unleashing the technical
and financial potential of using electric vehicles to provide ancillary services but also offering
the citizens cleaner air in cities and reducing the burden on the nation’s forex reserves.
Future Study
Electric vehicles can also be used to mitigate the variability issues with renewable energy
sources such as wind and solar. These renewable sources of energy cannot be perfectly estimated
or predicted thereby creating variability issues. A recent order on accurate scheduling for
renewable energy sources also ran into difficulties due to the inability to perfectly schedule the
production through such renewable sources.
Electric vehicle fleets can be connected to the renewable energy generating stations and can
absorb power during over generation and supply back during under generating thereby offering a
great deal of stability and reliability in scheduling power from such sources of renewable energy.
A future study to understand the technical and commercial requirements, the feasibility and
impacts of such an implementation can be conducted.
References
1. CERC, April 2013, Staff Paper on Introduction of ancillary services in Indian Power
Market
2. O. P. Rahi * et al. / (IJITR) International Journal Of Innovative Technology And
Research, Ancillary Services in Restructured Environment of Power System.
3. Helmers
and
Marx
Environmental
Sciences
Europe
2012,
24:14
http://www.enveurope.com/content/24/1/14
4. National Electric Mobility Mission Plan 2020, Dept of Heavy Industry, Ministry of
Heavy Industries and Public Entrp., Govt Of India
5. Jim Francfort, AVTA, US Dept of Energy
6. Andrew F. Burke, “Batteries and Ultracapacitors for Electric, Hybrid, and Fuel Cell
Vehicles”
7. Kwo Young, Caisheng Wang, Le Yi Wang, and Kai Strunz, “Electric Vehicle Battery
Technologies"
8. AC Propulsion, White paper on V2G, 2012
9. Julie Solomon et. al, AC Propulsion Inc., Development and Evaluation of a Plug-in HEV
with
10. Vehicle-to-Grid Power Flow
11. Willett Kempton, Jasna Tomic, University of Delaware, Journal of Power Sources,
Vehicle-to-grid power fundamentals.
12. Bloomberg website - http://www.bloomberg.com/video/phinergy-develops-car-poweredby-air-water-gnqHSx2DSHey~l7dzepeBg.html
13. Green Car Website - http://www.greencarreports.com/news/1083111_phinergy-1000mile-aluminum-air-battery-on-the-road-in-2017
14. cnbc website - http://www.nbcnews.com/business/tesla-offer-quick-swap-battery-optionlong-drives-6C10411716
15. Forbes website - http://www.forbes.com/sites/markrogowsky/2013/06/21/6-reasonsteslas-battery-swapping-could-take-it-to-a-better-place/
16. Forbes Website - http://www.forbes.com/sites/markrogowsky/2013/06/21/6-reasonsteslas-battery-swapping-could-take-it-to-a-better-place/
17. IEHEV website - http://www.ieahev.org/about-the-technologies/charging-standards/
18. Howard
Community
College,
https://en.wikiversity.org/wiki/Electric_Cars/Howard_Community_College/Fall2011/550
_ecars
19. International Energy Agency – Global EV outlook
20. http://www.bloomberg.com/news/2013-03-12/gm-s-chevy-volt-outsold-nissan-leaf-lastyear-bnef-says.html
21. Library
of
Congress,
USA
–
(http://thomas.loc.gov/cgibin/bdquery/z?d111:HR02454:@@@L&summ2=m&)
22. IRS – (http://www.irs.gov/irb/2009-48_IRB/ar09.html)
23. US DoE (http://www.afdc.energy.gov/fuels/stations_counts.html)
24. US Govt. – DERA
25. EPA – Report to Congress, Highlights of DERA, 2008
26. UK Govt, Plug-in Car Grant (https://www.gov.uk/government/publications/plug-in-cargrant)
27. UK Govt, Plug-in Van Grant (https://www.gov.uk/government/publications/plug-in-vangrant)
28. Reuters, March 2013 (http://www.reuters.com/article/2013/03/13/us-cars-norwayidUSBRE92C0K020130313)
29. Fact Sheet - Japanese Government Incentives For The Purchase Of Environmentally
Friendly Vehicles
30. Japan Automobile Manufacturers Association, The Motor Industry of Japan, 2010