Sultanate of Oman Ministry of Transport & Communications FULL FITOUT PROJECT FOR THE MAIN OFFICE OMAN BROADBAND COMPANY TENDER DOCUMENTS MARCH 2015 1 TABLE OF CONTENTS Particulars Page No. TABLE OF CONTENTS………………………………………………..………. 2 LIST OF ABBREVIATIONS…………………………………………………….. 3 INVITATION TO TENDER……………………………………………………… 4 INSTRUCTIONS TO TENDERERS…………………………………….……... 5 THE APPROACH TO TECHNICAL PROPOSAL …………………….……... 8 THE APPROACH TO FINANCIAL PROPOSAL …………………….……... 11 TENDERER’S SELECTION PROCESS……………………………………... 13 OTHER TERMS AND CONDITIONS …………………………………….…… 13 TENDER EVALAUTIONS ………………………………………………..……. 15 SCOPE OF WORK……………………………………………………….…..… 19 PRELIMINARY WORKS ………………………………………………….…... 22 TERMS OF AGREEMENT………………………………………………..……. 35 FORM OF AGREEMENT………………………………………………….…... 35 FORM OF TENDER……………………………………………………….…… 37 APPENDIX “A” TO FORM OF AGREEMENT……………………………… 38 APPENDIX “B” TO FORM OF AGREEMENT…………………….………. 40 FORM OF TENDER BOND…………………………………………………... 41 FORM OF PERFORMANCE BOND………………………………………….. 42 FORM OF ADVANCE PAYMENT BOND…………………………………... 43 MATERIAL APPROVAL SHEET (MAS)……………………………………. 44 LIST OF PERSONAL………………………………………………………….. 46 FORMAT OF C.V FOR MEMBERS OF THE CONTRACTOR……………... 47 LIST OF OMANI PERSONAL IN THE COMPANY………………………… 48 LIST OF EXPATRIATES IN THE COMPANY………………………………. 49 SALARY COMPARISION BETWEEN OMANI & EXPATRIATE…………. 50 LIST OF PRODUCTS………………………………………………………….. 51 SCHEDULE OF REMUNERATION………………………………………….. 52 TENDERER’S ENCLOSURES………………………………………………... 53 2 LIST OF ABBREVIATIONS AHU AIR HANDLING UNITS CEO CHIEF EXECUTIVE OFFICER CV CURRICULUM VITAE GM GENERAL MANAGER HR HUMAN RESOURCES HSE HEALTH, SAFETY, ENVIRONMENT HVAC HEAT, VENTILATION, AIR-CONDITIONING OBC OMAN BROADBAND COMPAY MOTC MINISTRY OF TRANSPORT& COMMUNICATIONS QHSE QUALITY, HEALTH, SAFETY, ENVIRONMENT IT INFORMATION TECHNOLOGY MEP MECHANICAL, ELECTRICAL, PLUMBING D&B DESIGN& BUILD FFO FULL FITOUT 3 INVITATION TO TENDER Tenderers are invited by the Ministry of Transport and Communications through the Internal Tender Committee, from suitably experienced Contractors registered with the Tender Board for: “FULL FITOUT PROJECT FOR THE MAIN OFFICE OF OMAN BROADBAND COMPANY SAOC” All as described in and in accordance with the terms of the Tender Documents. The Tenders and all supporting documents should be submitted in an envelope sealed with red wax and endorsed as follows: TENDER NO. -------------“FULL FITOUT PROJECT FOR THE MAIN OFFICE OF OMAN BROADBAND COMPANYSAOC” The envelope should be delivered on the date and time as specified in the advertised invitation of this tender and shall be addressed to:H.E. The Chairman Internal Tender Committee Ministry of Transport and Communications P.O. Box 684, Ruwi Postal Code 100 Sultanate of Oman The exterior of the envelope should bear no indication or marking which may reveal the identity of the Tenderer. The Tender Board is not bound to accept the lowest Tender and reserves the right to reject any or all tenders without assigning any reason. 4 INSTRUCTIONS TO TENDERERS 1. Proposals shall be clearly marked: "FULL FITOUT PROJECT FOR THE MAIN OFFICE OF OMAN BROADBAND COMPANY” and must include the tender number as it appears in the official announcement. 2. Proposals shall be submitted in a sealed envelope and should contain no external indication as to the Bidder’s Identity. Any opening of parcel or envelope containing the invitation to submit proposal for custom or security reasons shall be made good before delivery to the Internal Tender Committee. 3. Bidders shall submit one Original (clearly marked) and two copies (clearly marked) of the proposal. The exterior of the envelopes should bear no indication or marking which may reveal the identity of the Tenderer. 4. Any doubt or obscurity should be addressed in writing to the Chairman of the Internal Tender Committee in writing no later than Seven (7) days before the date fixed for the submission of Proposals. MOTC will arrange a site visit after the date of the Tender Notice to view the site and for any clarification needed by the Tenderer. 5. Proposals shall be submitted no later than the time and date fixed for the submission of Proposals. Any proposal received after the time and date fixed shall be rejected whatever the cause of delay. 6. MOTC reserves the right to ask the bidders individually for clarification of their bids, including the breakdown of unit rates. This request for clarification and all responses shall be in writing, but no change in the price or substance of the proposal shall be sought, offered, or permitted, except in instances where arithmetical errors are discovered during the process. 7. The bidders should be registered in the Tender Board. 8. The Tender Bond to a value not less (1) % of the Total Tender Value, obtained from locally registered insurance company or bank shall be submitted with the Tender and this shall remain valid for ninety (90) days from the date specified for opening of Tenders and will be returned when a Tender has been accepted by the Internal Tender Committee/Employer (after a satisfactory Performance Bond has been provided by the successful Tenderer in the case of the accepted Tender). The wording of the Tender Bond shall be as per the 5 prescribed Form of Tender Bond included in the Prime Document. If the Tenderer submit an alternative tender, the (1) % percent Tender Bond shall be calculated based on the highest Tender Value. Tenders without such bond shall be rejected. 9. The Tender Bond will be forfeited: a. If a Tenderer withdraws his Tender during the period of tender validity specified in the Tender Documents; or b. In the case of a successful Tenderer, if the Tenderer fails: c. To sign the Contract; and/or d. To furnish the performance Bond. The Tenderer’s Proposal submission 10. The proposal shall be submitted in two envelopes: one envelope containing the “Technical Proposal” and the other envelope containing the “Financial Proposal”. 11. The Technical Proposal shall contain all the required documents requested in the Tender Document excluding any submission of a financial nature. All submissions of the financial nature shall comprise the Tenderer’s Financial Proposal. 12. The original set of the Tender Document and the Tenderer’s Technical Proposal, shall be enclosed in an inner envelope marked “Original’’ and the other two (2) sets in an another inner envelope marked “Copy”. Both of these envelopes shall be placed in an outer envelope marked “Original and Copy of the Proposals” sealed with red wax and shall bear the Project name, Tender number and addressed to the Internal Tender Committee. 13. Similarly the original Financial Proposal shall be sealed in an inner envelope marked “Original” and the other two sets marked “Copy”. Both of these envelopes shall be placed in an outer strong envelope marked “Original and Copy of Financial Proposal” sealed with red wax and shall bear the project name, tender number and addressed to the Internal Tender Committee. 14. The exterior of the sealed envelope of the Technical Proposal and Financial Proposal must not reveal the identity of the Tenderer. 6 15. The sealed envelope of the Technical Proposal and Financial Proposal shall be delivered, as specified in the Tender Notice, or at such other time and date as may be notified in any circular letter or addendum issued in accordance with clause (9, i) mentioned below. 16. The submission proposal must be sealed and delivered and the Tenderer is responsible for ensuring that any opening of parcels containing Tender Documents, Technical Proposal and Financial Proposal for security or customs purposes is made good before delivery to the Internal Tender Committee. The Internal Tender Committee will assume no responsibility for the misplacement of any submission proposal. 17. Any submission proposal received by the Internal Tender Committee after the deadline for submission of Tenders prescribed in the Tender Document will be rejected whatever the reason for the delay. It is the sole responsibility of the Tenderer to ensure that his submission proposal is deposited before expiry of the period of Tender. 18. The Employer may, at its discretion, extend the deadline for submission of proposals by amending the Tender Document. In such case all rights and obligations of the Employer and Tenderers previously subject to the deadline will thereafter be subject to the deadline as extended. 19. The Tenderer must visit the site an obtain for himself, at his own expense, all information needed in the study. All costs and charges for such site visits shall be borne the tenderers. Tenderers must examine the site and its surroundings and they must satisfy themselves as to the nature of works and buildings in the vicinity of the proposed works, the nature of the existing roads or other means of communications, the access to and from the site of works and must make their own inquiries as to work yard sites and such other additional areas they may require for temporary occupation for executing, completing the works in conformity with the Tender Documents. Tenderers and any of their employees or Agents will be granted permission by the Employer to enter upon his premises and lands for the purpose of such inspection, but only upon the express condition that such persons, firms or 7 companies will release and indemnify the Employer and his employees and agents from and against all liability in respect thereof. Tenderers will be responsible for personal injury (whether fatal or otherwise) loss or damage to property and any other loss or damage costs and expenses, however caused (whether by act or neglect of the Employer or his employees or Agents or not) which but for the exercise of such permission would not have arisen. THE APPROACH TO TECHNICAL PROPOSAL Technical Proposal approaches The Technical Proposal should provide for a full description of the proposed approach, work program, methodology, including details of key personnel and resources that would be dedicated for this project. The submission’s documents must be blinded together (no loose parts and booklets) and shall be presented in the following sequence: Company profile The company profile should (include but not limited to registration documents, financial standing and information, staff strength, (Quality, Safety, ISO Certificates, Details about set up in Oman,..), company profiles & catalogs, Testimonials and appreciations, etc. Methodology and Work Plan It should contain the Tenderer’s design philosophy, vision, quality standards, approach and work plan, and detailed work schedule on daily / weekly basis to show the Tenderer’s plan for carrying the required work and all activities and to meet the Project program. Also it should contain the organization chart and the intended work group interaction and the interaction and interface between the specialized subcontractors with the Main Contractor with the process of Main Contractor’s monitoring processes for all the sub-contractor. The Tenderer’s has to show the time interaction between the Fit out works, Furniture procurement and installation, IT site work, 8 cabling and installations, and the Tenderers’ plan of interfaces between these components. Experience in similar projects (Including but not limited to, list of similar projects in Oman with narrative details, photos, cost, time for each project attached with the Client performance certificate...). Special consideration will be given to experience in Corporate Fit Out experience. Clients’ performance references are expected to be attached to each project’s data sheet with selected photos. This will enhance the evaluation scoring for these projects. Project Key Staff, CVs to be submitted which shall include but not limited to qualifications, experience of similar works etc. (CVs format attached). In addition to the above, your submissions should cover but not limited to the followings: 1. The proposed design in the form of plans, sketches, 3D renderings submitted in soft (digital) and hard copy print outs that give a clear idea of the design concept and final detailed design for the whole office layout especially critical areas such as the RECEPTION, WAITING ROOMS, OPEN OFFICE SPACE, ENCLOSED OFFICE CUBICLES, CONFERENCE ROOM (Conference Rooms shall be equipped with latest technology - HD smart display etc..), GM OFFICES, TYPICAL MANAGER OFFICE, BREAKOUT AREA,.. etc. 2. Material Board for all the samples of the proposed materials, IT component, fabric, coatings, flooring, false-ceiling, lighting fixture, curtains, blinds etc.. Along with the catalogs and data sheet for each item proposed including its origin. 3. The Tenderer shall submit a detailed catalogue cut sheet for each item priced and/or where options are available, all options should be fully explained with cut sheets available for each. 4. A presentation of the fit out for the proposed design in power point format along with presentation Boards (A1 Size) for the layout plans and the 3D rendering full fit out project. This presentation will be conducted by the 9 Tenderer in front of MOTC’s Jury committee for evaluation of the “Full fit out project Quality”, material board and selected furniture. The Tenderers will be informed about the time and venue of this presentation session which should not exceed one hour for each tender (30 minutes Tender’s presentation plus 30 minutes for Jury clarifications and discussion). In principle, the presentation shall cover all sub items of item 2 “Methodology & Work Plan” of the Principal Evaluation Criteria mentioned under Clause (1.b) of this document. 5. Full relevant documents indicating previous experience in similar full fit out project and build projects of similar nature and complexity. 6. Valid Company registration certificates. 7. Proposed detailed program of works covering the complete scope of works and methodology of execution that would be adopted (see item no. (1, b) above). 8. CV’s of key project personnel with relevant experience who would be assigned for this project. 9. Organizational structure and brief history and background of the Company, location, size etc. 10. Value additions such as “Environmental” policies, HSE policies and ecofriendly initiatives taken up by the Company if any to be cited. 11. Confirmation on site visit with their submission without fail. MOTC will arrange a site visit after the tender notice date for any queries and further clarifications needed by the Tenderer. THE APPROACH TO FINANCIAL PROPOSAL 10 Financial Offer Proposal 1. Estimation Cost of the Construction Stage: This estimation is not final and will be adjusted and finalized in a BOQ format after completing the detailed design drawings and specification considering the Outline Specification and the Consultant Recommendations. 2. Schedule of Rates: This Schedule will be the basis for preparing the detailed BOQ and provide a foundation for any later additional and conflict settlement. Thus, the final Interior Design & Partitioning Works Contract Amount, Outlines Specification/ Scope of Work must be considered in Cost Estimation. The Schedule of Rates must include all main work items such as porcelain, raised floors, false ceilings, etc. and may be used or not depending on the Final Approved Interior Design by OBC. Preamble to Schedule of Rates 1. The Schedule of Rates are for the purpose of giving breakup of the Contract Sum and assessing interim payments as per the Conditions of the Contract. 2. The Schedule of Rates shall be prepared by the Tenderers in an Excel Sheet Form. Tenderers shall quote Unit Rates against a document that is intended to cover all likely activities that might form part of the work according to the Tender Documents and their suggested design’s elements, materials and items expected to achieve a complete work. 3. The said Schedule of Rates shall be adjusted later after a complete and comprehensive Interior Design approved by OBC and will be used together with Schedule, Preliminaries and Day Works Bills for the purpose of Interim Payments / assessing Variation Orders. 4. This Schedule of Rates shall form a part of the Tenderer’s offer. The rates inserted in this Schedule shall include all materials, labor, plant, direct and indirect overheads and profits necessary for the Contractor to carry out the respective items of work at the unit rate inserted. 5. The rates in the said Schedule must reflect real, reasonable and common market’s prices. 6. The Scope of Work for all the items of the Schedule of Rates shall be that in the OBC’s Requirements given in the Tender Documents. 11 7. The Schedule of Rates shall also cover, in addition to major work items such as raised floors, ceilings, finishing items, list of staff, types of labor and plant hire rates upon which a Contractor has listed Hourly Rates for the purpose of pricing work carried out under instructed Day Work. Schedule of Rates Format S/N Description Unit 1 Supply, install and fix porcelain floor as M2 Unit Rate per Outline Specifications 1 Supply, install and fix raised floor as M2 per Outline Specifications … …. … TENDERER’S SELECTION PROCESS 12 … 1. The client will evaluate and shortlist submissions applying a series of weightings to each of the selection criteria and compare the relative efficiency and cost of the quotation. 2. Prime consideration would be given to the Full fit out project concept that would be found most striking and different from the other proposals especially those that provide unique solutions that would become a trendsetter. 3. Due consideration would be given to the relevant experience of the Company in the field of Corporate full Fit out. All companies would need to have a minimum of 3 years’ experience in this field. 4. Schedule of implementation. Submission to clearly demonstrate how to meet the Client requirements for fully operational temporary office set up objective as detailed above. OTHER TERMS AND CONDITIONS 1. The price quoted should include all the costs required to complete the project as a whole and to the optimum satisfaction of the Employer. No extra charges will be entertained. 2. The work shall be completed within 60 (Sixty) days from the date of commencement of the contract. If there are any deviations, the same to be duly justified with reasons and a realistic time frame for project completion. 3. The successful contractor shall comply with all requirements of Facilities Building Management and ensure that all works are carried out in a manner that day to day functioning of the existing occupants is not hindered in any manner whatsoever. 4. Sufficient protection to be made wherever required ensuring the same and complying with health and safety standards. 5. The Tenderer should be aware that the contract includes provisions for penalties for delay in handover of the project completed, construction and for lack of professional performance by the contractor. 6. The quotation and the Tender Bond shall remain valid for a period not less than (90) days from the date of submission. 7. The Tenderer shall not sub-contract any portion of the work to another firm or company without the approval of the Employer. 13 8. The Contractor has to cooperate and coordinate his work with the “Branding” sub-contractor appointed by the Employer. 9. Each workstation shall support the ability to conceal electrical and communications wiring to prevent accidental contact or disconnection through both vertical and horizontal cable routings. 10. All furniture must be warranted to be free from defects in material and workmanship on all manufactured items. We expect that any items that are delivered with a defect will be replaced immediately or within a timely manner. All defects will be noted on the date of arrival by the Project Management team. 11. All warranties for important equipment shall be provided in the Employer’s name and handed over to the Employer on the issue of completion certificate. 12. This specification does not include specific detail on installation standards and techniques. It is the expectation that the works will be executed in a professional manner, suitable for a safe working environment and in accordance with Manufacturer’s Specifications and the Local Authorities requirements. 13. The Tenderer shall submit a detailed schedule that will show the required time to finalize the order with the Employer (include meetings with the Employer to review options and verify the full fit out project/selection), the milestones for delivery and installations. This will also require coordination and cooperation with the Employer full fit out project team. 14. The Tenderer must provide a list of references for comparable projects. The Employer reserves the right to contact any or all clients listed in the table, as reference checks, during the evaluation process. Reference information should provide, at a minimum – company name, address, telephone number, fax or email information, contact person, and brief description of project, including date of installation. TENDER EVALAUTIONS INSTRUCTIONS TO EVALUATION CRITERIA 14 OBC is seeking to attain "value for money" outcomes from this tender process. In determining value for money, OBC will have regard for both the quality of Services offered as well as price. Accordingly, the lowest price Tender may not necessarily be selected. OBC reserves the right to appoint one or more providers to perform the requirements of this FITOUT. In assessing the Tenders, OBC’s project manager or representative will have regard to, but are not necessarily limited to the following criteria: (a) Mandatory (Inability to satisfy mandatory criteria will result in no further consideration being given to the Tender. (i) Service delivery capability (ii) Previous experience and referrals (b) Key Criteria (Failure to achieve a satisfactory assessment of all key criteria, these may be weighted, will result in the company being removed from the tender. (i) Ability to complete fit outs in more than one location AND demonstrate this through existing or recently completed projects (ii) Time/resource allocation (iii) Financial standing of the Tenderer (iv) Insurance, risk transferal and indemnities; (v) Occupational health and safety policies. (c) Only Tenderers meeting all Mandatory criteria AND meeting most Key Criteria will have their financial proposals considered. Technical responses will be scored and any responders who cannot meet 80% of the total marks available will not have their financial proposals considered. (d) Financial proposals for all qualifying Tenderers will be evaluated. (e) OBC reserves the right at its sole discretion to reject any and all Tenders at any time. (f) Whilst it is not a mandatory requirement of these Conditions, the Tenderer should be aware that a willingness to undertake other minor, additional duties will be considered favorably in the Tender evaluation process. 15 (h) Tenderers should also note that the scope of this Tender includes any follow on works for the TEMPORARY OFFICE which may be required straight after awarding of the tender. (i) OBC reserves the right to delay or terminate the Tender process at any time, any timings provided are for guidance only and OBC will not be held liable for any cost incurred by bidders howsoever incurred due to any delays or cancellations. 16 TENDER EVALUATION CRITERIA The Tenderer shall structure the Technical Proposal under the following headings. Any failure to provide information will affect the evaluation of the Tender. The Tenderer is to note that the Technical Proposal of all Tenderers will be assessed and only Tenderers who are short-listed thereafter will have their Financial Proposal considered. 1) Technical : Maximum Score 70% Organization a) Technical and organizational ability b) Management and administrative structure 15% c) Compliance with Omanisation policy of Ministry of Manpower Experience and resources a) Experience on similar projects b) Construction plant and labour resources 35% Performance Record a) Construct and complete works satisfactorily b) Work accurately to drawings and specifications c) Meet target dates d) Co-ordinate with sub-contractors 15% Policy Strategy a) Financing b) Management and administration c) Construction d) Co-ordination with sub-contractors e) Deploying of labour f) Quality assurance g) Execution of specialised work 2) Financial : Maximum Score 30% Total Score – 100% 17 5% Award of Contract Though the cost will be a key element of consideration in the award process, the Employer reserves the right to award the contract to the bidder whose proposal is deemed to be the most comprehensive and in line with the Employer requirement and not necessarily the lowest priced bid. The Employer reserves the right to accept or reject any quotations/proposals and to cancel the bidding process and reject all quotations at any time prior to the award of contract. 18 SCOPE OF WORKS Objective: The Contractor undertakes the fit-out in the area outlined in the layout plan at OBC leased office space located on the Knowledge Oasis Muscat – Facility Building, 5th & 6th Floor. The requirements as set out below in this Scope of Works required to be implemented for the new OBC office which include but not limited to the following: 1. Preliminary works (e.g. dismantling works, cleaning, etc.); 2. Interior construction and finishing works: floors, ceilings, partitions, doors, fixtures, fittings, etc.; 3. Mechanical: HVAC ducts and other works; 4. MEP work might be required; 5. Electrical: lighting, power, and other works; 6. All required equipments like but not limited to: a. PA System with 4 channels and channel selectors and volume control b. CCTV System c. Access Control System d. Video Door Phone e. Structural cabling f. Meeting room recording system and playback like HD/DVD player g. Overhead projector h. Display screen i. Meeting room booking screen 7. Obtain all necessary permits, licenses, insurance, etc. necessary for the execution of the works; 8. Snagging, testing and hand over to OBC. 19 PROJECTS PHASES The project works should be connected into three phases Phase One Temporary Office Set Up The proposal should accommodate for the moving of between 30 to 35 people of current OBC staff to the temporary office in the same building (Knowledge Oasis Muscat – KOM Facility Building, Floor 5) within one month from the contract commencement day, this phase should provide full operational office in order for OBC staff to start operation immediately upon occupying the temporary office including flooring, false celling, the work stations, IT passive infrastructure, HVAC, electrical bathrooms and pantry and telephone system, OBC suggest to setup the 5th floor of the facility building as a temporary office and work can be started in 6th floor, once 5th floor completed then OBC staff will be shifted to 6th floor and work can start in 5th floor. If contractor can suggest something else it is also welcomed. Phase Two This phase shall concurrently run with construction of phase 1 effective from the contract commencement day, the temporary office setup to be arranged by the contractor and it should be operational till completion of phase one and handing over to OBC then staff will be moved to the permanent office in 6th floor and the work will start in the temporary office in 5th floor Phase Three This phase will start after shifting all OBC staff from the temporary office to the next level and it must follow the same standard and procedure of the work as in the other floor. 20 Local Statutory Legislation All of the works, equipment and materials shall be supplied and installed to comply with all local legislation including approved codes of practice, good standards of workmanship and manufacturers recommendations. Training & Documentation The Contractor shall provide all the necessary training for appropriate OBC staff that will operate the systems supplied and installed by the Contractors under this Scope of Works, plus original copies of full technical literature, details of service personnel and any planned maintenance together with a manufacturers and Contractors warranty and guarantee for at least one (1) year from the date of acceptance. Full commissioning data for all services shall be included and handed over to OBC as part of the acceptance requirement. 21 PRELIMINARY WORKS Objective The is the minimum requirement by OBC to create high standard office premises in accordance with OBC guidelines, specifications and proposed fit-out plan. In some cases preliminary works may be required such as a Technical Due Diligence (TDD), dismantling (e.g. existing partitions, existing suspended ceiling, cabling, etc.), cleaning, material & garbage removal, if applicable and this will be shown during the site visit, but it is open to the contractor to suggest a higher standard and state of the art system and fit out to fulfil OBC requirements. DESIGN Fit-Out / Floor Plans The design for the Fit-Out / Floor plan will be provided by OBC to show partitioning, furniture layout and associated electronic systems that are required for the office as detailed bellow, if no details shown then contractor has to provide the full technical details with data sheets and the layout design of the proposed system. 22 OUTLINE SPEICFICATIONS Space Requirements SN Details QTY Floor Wall Ceiling 1. CEO Office 1 2. VP’s 5 3. GM’s 13 4. Managers 41 5. Sections Head 6 6. Consultants 5 7. Staff Office 141 Comments With toilet Open space with workstation 8. BOD meeting room 1 9. CEO meeting room 1 10. NOC 1 11. OBC 1 3 1 Meeting Room 12. Discussion Rooms 13. Large Reception Area 14. Pantry 2 15. Store 2 23 FLOORS Porcelain Tiles Supply and install 600x600mm porcelain tiles Wooden Parquet Install Oak parquet flooring/ humidity of the wood 9%±2% /plank floor: thickness: 20/22mm width: 100-190mm length: 900-2000mm Raised Floor System Supply and install a metallic floor bearing structure with respective floor panels (subject to premises) with one of the following finishes: Carpeting adhered to the full surface of the access floor panel for use in a Snap-on stringer or freestanding system. The carpet is to be fitted after the partitions have been erected. The color is to be determined by OBC. High pressure laminate 1.5mm thick adhered to the full surface of the access floor panel for use in a Snap-on or freestanding system. The laminate shall be beveled along its edge and shall not crack or split or come away from the edge of the panel. Static control vinyl 2mm thick fully flexible antistatic or static conductive 600x600mm viyl tiles adhered to the full surface of the access floor panel for use in a Snap-on or freestanding system. The vinyl shall be beveled along its edge. Skirting & Profiles Supply and install skirting and profiles to match the partition work. WALLS & PARTIIONS Timber Panel Cherry wood thickness 15mm with polished face fixed up 3mm foam layer including cutting carves and stainless steel strips. Gypsum Partitions Supply and install high standard partitions comprising of a single (e.g. 12.5 cm internal partition) or double (e.g. 15cm outer wall, meeting room wall, etc.) Gypsum 24 board on steel studs to form the layout in accordance with agreed drawing. The partitions are to be slab to slab as per fit-out plan. All non-glass partitions must have Rockwool (or similar) sound insulating material infill to full height. They must satisfy the most demanding fire, thermal and acoustic performance requirements. Glass Partitions Supply and install glassed 42dB acoustic internal partitions with acoustic blankets or ceiling baffles above the suspended ceiling (e.g. toughened clear glass partitions with a manifestation film pattern at approximately 1.7m height as a safety precaution to prevent staff from walking into the glass). Work to include all finishes, bottom and top rail details, etc. Place blinds in between glass sheets of meeting room partitions (e.g. dark roller blinds or adjustable horizontal bladed venetian blinds for privacy and presentations). Concrete Block or Masonry Partition Walls Build concrete block or masonry partition walls if requested in the fit-out plan and it will be mentioned in later stage if required. CEILINGS Suspended Ceiling/Plasterboard Ceiling Install and/or modify the suspended ceiling at appropriate height for window openings and normal office use with exposed white steel grid and 600 x 600mm acoustic ceiling tiles for accommodating the ventilation ductwork, and other building systems (e.g. sprinkler system, lighting, etc.) for each office and usable area in accordance with the fit-out plan. Bulkhead with timber Mahogany panel. DOORS Supply and install doors (full height, with or without glass) of a quality suitable for high class offices. The door fittings and handles are to be made of metal. Each door to be lockable from either side with a minimum three keys provided for each lock. It can one of the following types: Solid timber / Door Blank / Glazed Toughened / Fire Rated Door / Fire Rates Steel Door. 25 PAINT WORKS All walls to be skimmed and emulsion paint finished. The colour is to be determined by OBC. HVAC DUCT The building owner will provide air conditioning capable of delivering a space temperature of 21ºC (with sufficient ceiling units for each office cell and work area). Whilst 23ºC is comfortable and accepted by most people in an office environment it is advisable to be able to achieve 21ºC should the need arise. As the air conditioning equipment ages and becomes less efficient the extra capacity will enable 23ºC to be maintained. The fit-out Contractor will need to calculate the cooling load that is required and supply and install the duct and required fans as well as the control unit with latest technology to suit OBC requirements. ELECTRICAL Lighting & Luminaries (fittings) Supply and install 600 x 600 recessed light fittings (or similar), non-reflective energy saving units, to provide adequate light at desk height throughout (a minimum of 400 lux at desk level). Switching to be separated for each office and useable area in accordance with the fit-out plan. Where there is insufficient suspended ceiling to install adequate lighting, additional down lighting is to be provided by low voltage spotlights. The main routes and Communications Room (Comms Room) is to have energy saving lighting units capable of providing a minimum light at bench level of 500 Lux. SECURITY CCTV Supply and install sufficient CCTV cameras as per the fit-out plan to cover the required area as per the plan. Also cameras to be mounted to monitor the fire escape door(s) from the adjoining premises. All cameras are to be mounted so as to be obvious to visitors. Connect all cameras to a flat screen monitor, position will be determine on later stage. All cameras to be connected to an NVR if it is an IP Cameras and to a DVR if it is an 26 analog cameras with a 25 FPs as an HD recording. All cameras to be monitored and control either locally or remotely. Access Control and time attendance System Supply and install a video door entry system to the main entrance door with handset and color display screen on the reception desk. Provide for remote inner door release via videophone and electronic lock as shown on the fit-out plan. Provide self-closer on entrance door so that it automatically closes and locks. Supply and install a network access control system with a card reader, finger print or pin code compatible with the building security system, and link to the electronic locks on all entrance doors to allow staff access to the premises. Provide each staff member an access control Card, the access cards must only display the staff members photograph and name and OBC Logo. Electronic locks to fire escape door(s) and main entrance door(s) must automatically release when the fire alarm is activated. The Access Control Readers in the Office and Server Room must be connected to a backup battery (minimum 4 hours of backup power) capable of providing power to the system when the primary source of power is unavailable. Intruder Alarm System Supply and install an intruder alarm system with PIR sensors located to cover the main reception area, CEO Office , Server Room and any other location which my need to be connected which will be identify in later stage, fire escape door and reception. Connect to siren alarm located in reception area of the OBC office. Supply and fit control panel in Server Room having key pad for on/off control plus display identifying zone in case of alarm activation in the reception area. Supply and fit second siren in main building security control room together with necessary signage indicating alarm is for OBC’s office or as agreed with building security. The alarm system must have a 24 hour backup battery capable of providing power to the system when the primary source of power is unavailable. Temperature Control Install the temperature Control as per instruction of the OBC in the server room. 27 Communications/IT Room (Comms Room) The Communications Room will be located in the position as shown on the fit-out plan and will contain a 19” 42U Server Rack (minimum 90cm x 90cm), a UPS unit, a security computer with monitor, communications equipment, etc. Comms Room is to be chilled by two (2) split air-conditioning along with central AC as a redundancy 24 hours per day, 365 days per year and will have an anti-static floor, lockable fire proof door and a work bench as described below. Install an Access Control System, an Intruder Alarm and CCTV Camera. All structural cabling for voice/data will be brought back, terminated and connected to the patch panels located inside the Server Rack located in the Comms Room. Data Cabinet/Server Rack The Contractor will supply, mount and test a 19” 42U Data Cabinet/Server Rack (minimum 90cm x 90cm) together with an UPS unit in the Comms Room, terminating the power, voice and data connections as specified. The Contractor is expected to liaise and co-operate with OBC appointed IT specialists on how to make the connections. 36 AMP, 13 AMP power socket outlets are to be provided in the Communications Room in the numbers and location, which will be shown on the detailed layout drawing. Sockets are to be positioned in a trunking on all walls 1.2m above floor level, above workbench height, unless otherwise specified. 28 Network Operation Center (NOC) The NOC minted to be the main operation room for OBC monitoring and fault management system, the NOC design must meet the minimum requirements for the network operation center which must include but not limited to (wall mounted LED Screen of at least 55 inch, the QTY will be define by OBC, interactive E-Board location, lighting system must meet the NOC requirements as it will be 24/7 operation, including the chiller AC, there will be a requirement to install a suitable split unit AC as a redundancy, it is very important that the contractor suggest the stat of the art design and system that might be required to be install in the NOC. UPS The Contractor will supply and install an UPS unit in the Comms room as well the Network Operation Center ( NOC ) (according to OBC specifications; e.g. SinglePhase 220V, 50HZ, 10-15 kVA, 20 – 30 minutes). The Contractor will supply a UPS from a list of OBC preferred suppliers. The Contractor will supply a maintenance free ten year battery for the UPS which should give 5-7 years of reliable service. The UPS must ensure that full integrity of critical systems is maintained even in the event of mains power failure (e.g. computers, etc.). Instructions will be provided by the OBC. Clean Earth The Contractor will provide an isolated and insulated clean earth circuit from the main electrical distribution board of the building to the Comms Room. The cable is to be PVC sheathed in copper cable. It should be terminated to the main earth connection at the main electrical distribution board of the building, and onto an isolated copper strip within the dedicated distribution board in the Comms Room, or onto a isolated and insulated copper strip, at a point adjacent to the distribution board. All UPS earth circuits within this room will be terminated to this copper bar. 29 Air Conditioning The Comms Room is to be connected to the main building ventilation and normal airconditioning system and is not to have any ventilation of any form. An independent air conditioning system shall be installed in the Comms Room with sufficient capacity to manage the heat load installed. 2 (two) wall mounted split air-conditioning units are to be provided and installed in the Comms Room and NOC where each capable of operating 24 hours per day, 365 days per year. The units will be used alternately for chilling the room and are to be controllable by remote handsets. Units are to be supplied from a local supplier, ensuring that maintenance and spare parts are available locally. Units to be selfstarting in the event of tripping out due to mains failure. Each unit should be sized to maintain 21ºC+/-1ºC and run at a maximum of 50% load under normal conditions. This will provide redundancy for maintenance and failure of one unit. The AC units must be able to withstand low temperatures in locations where very low temperatures are experienced during the winter months (10ºC or less). Voice & Data Structural Cabling The Contractor will install a radial voice and data distribution network from the Comms Room to the RJ45 sockets as indicated on the floor layout plan. Cable installation will be distributed from patch panels located inside the Server Rack in the Comms Room, via PVC conduit to each point located on the floor plan, and voice and data cabling will be identical. Each cable will be identified at each end by sequential numbering which will be appropriately marked (1, 2, 3, etc.) The cable used will be Unscreened Twisted Pair (UTP), CAT6e or CAT7, cable. The cable used must be clearly stamped as CAT 6e or 7 on the outer sheath. Termination is to be double RJ45 sockets immediately adjacent to the 4 power sockets located in the working area (at respective workstations) in compliance with the layout drawings. Connectivity with conductor colour code being consistent on each socket and each cable will be identified at each end by sequential numbering which will be appropriately marked. Sufficient spare cable will be allowed on each circuit at OBC supplied Sever Rack, in the Comms Room, to allow connections to be made to the patch panels by the 30 Contractor, in accordance with drawings supplied by OBC. The Contractor will install RJ45 CAT6e or 7 patch panels inside the telecommunication rack and then terminate cabling at the RJ45 jacks on the patch panels. All required RJ45 sockets used in the office work area, RJ45 CAT 6e patch panels, industry standard (19“ 42U high) Sever Rack and CAT 6e cable are to be supplied by the Contractor. The Contractor will make all connections of the UPS, voice and data structural cabling, in accordance with OBC IT Department instructions and specifications. Cabling Acceptance Test The Contractor will test each cable connection between RJ45 jacks on patch panel and RJ45 socket installed in the working area. All CAT6e UTP links must be tested in accordance with EIA/TIA568-B and test sheets identifying each circuit and test results must be produced at the end of the contract. Printed results should confirm correct connectivity, resistance, integrity and, the length of each circuit. Performed tests should also confirm absence of shorts, grounding, and external voltage. A complete set of test certificates are to be provided to the OBC’s Project Manager, prior to practical completion being signed off. Power & Data Circuit Small Power Distribution Provide a suitable distribution board, located in the Comms Room, with adequate circuit breakers to protect each circuit. The drawing indicates the location of each set of floor boxes. Each grouping is to provide four power sockets (one socket is to be connected to the UPS, clearly marked or of different colour e.g. red) and two RJ45 data sockets. Additionally, power points are to be provided in the corridor areas for fax, printer, photocopier and vacuum cleaner any other small power requirement in the area. In the Comms Room a minimum of 10 power points are to be provided in specific locations. The Contractor will supply and install small power points to agreed positions on the partition walls, as per the fit-out plan. 31 The Contractor will supply power cable floor boxes, busbar modules, wiring ducts, cable trays, cable trunks and other accessories necessary for the power distribution network. Small Power Requirement Each workstation must have 4 power sockets (one socket is to be connected to the UPS, clearly marked or of different colour e.g. red) and 2 RJ45 outlets as indicated on the fit-out plan. TV Aerial Point Provide a TV aerial point in the position marked on the drawing in the Meeting Room(s) connected to a suitable Arial to receive a clear and strong signal suitable for analogue and digital TV signals that are unobstructed and free from distortion and interference. FIRE & EMERGENCY Supply and install sufficient fire detection, smoke detection, sounders and emergency lighting in compliance with local regulations. Emergency lighting must provide immediate secondary lighting when the power supply to the normal lighting fails e.g. due to a fire. The minimum backup duration of emergency lighting as specified by regulations is generally between 1 and 3 hours. Supply and install the international “pictogram” style fire exit signs, identifying the main means of escape. These are to be suspended from the ceiling and to be illuminated where required to comply with state and local legislation. Supply and install a sprinkler system in accordance with state and local regulations. No sprinkler system to be installed in the Comms room. Supply the necessary firefighting/safety equipment (e.g. fire extinguishers) for the premises. An evacuation plan (for both fire and bomb incidents) should be clearly displayed in both English and Arabic, detailing escape routes and assembly points. Prepare Security, Health and Safety (HSE) and Fire Evacuation Plans. To be handed over on completion. 32 KITCHEN Install kitchen base unit(s) with cupboards, drawers and work tops to agreed quality and colour. The wall units must match the base units. Supply and install under counter industrial class dishwasher and refrigerator. Install power socket outlets for fridge, dishwasher, toaster, microwave oven, kettle and two spare. Install wall tiles, as necessary, between the base and wall units. Low level power socket to be positioned for water chiller. Positions and specific detail to be agreed with OBC. The utilities and sewerage for the kitchen must be installed in accordance with the technical specifications of the building owner. If a sanitary pump for sewerage discharge is to be installed it must be done in accordance with the technical specifications of the building owner. LOOSE FURNITURE Supply, deliver and put in final place readymade furniture which can be made of one of three classes: 1) VIP Class 2) Medium Class 3) Normal Class Vanity Unit Supply, deliver and install vanity unit consists of but not limited to corain top, plywood in white, drawer with heavy duty drawer runner and stainless steel accessories. GENERAL Other Systems All other systems that have been mentioned above and technical specifications are note written, it is the main contractor responsibility to submit the technical data sheet and technical specification for OBC approval. Window Blinds Vertical window blinds to be installed to all external windows (e.g. roller blinds with electrical controls). Type and colour to be agreed with the OBC. 33 Storage Room Provide and erect steel shelving in the store room on three walls (ensure clear door swing). Shelves to be 35 cm deep and clear space between each large enough for large A4 lever arch file storage. Top shelf to be no higher than 1.8m. 34 TERMS OF AGREEMENT 1. 2. The agreement and terms executed between the Government of the Sultanate of Oman and the Contractor shall be in accordance with the following: (i) Standard Documents for Building and Civil Engineering Works, Sept.1999, 4th Edition (ii) Tender Documents (this document) (iii) Any amendments negotiated and mutually agreed upon In case of any conflict between this Tender Documents and the Standard Document, the requirements as called for in the Tender Documents shall prevail. FORM OF AGREEMENT THIS AGREEMENT made the ................................................ day of ......................2015 BETWEEN THE MINISTRY OF TRANSPORT AND COMMUNICATIONS, P.O. BOX 684, Postal Code 100, Muscat, Sultanate of Oman (hereinafter called the "Employer") of the one part and................. .................................................... of.......................................... (hereinafter called "the Contractor") of the other part. WHEREAS the Employer is desirous that certain Works should be executed viz: ‘ FULL FITOUT PROJECT FOR OMAN BROADBAND COMPANY (OBC)’ and has accepted a Tender by the Contractor as summarized at Appendix B “Summary of Contract Value” for the execution, completion and maintenance of such Works NOW THIS AGREEMENT WITNESSETH as follows: 1. In this Agreement, words and expressions shall have the same meanings as are respectively assigned to them in the Standard Conditions of Contract hereinafter referred to. 2. The following documents shall be deemed to form and be read and construed as part of this Agreement viz: The said Tender 35 The Standard Conditions of Contract The Specification The Schedule of Remunerations The Drawings Instructions to Tenderers The Letter of Acceptance ………………………….. ………………………….. 3. In consideration of the payments to be made by the Employer to the Contractor as hereinafter mentioned the Contractor hereby covenants with the Employer to execute, complete and maintain the Works in conformity in all respects with the provisions of the Contract. 4. The Employer hereby covenants to pay the Contractor in consideration of the execution, completion and maintenance of the Works the Contract Price at the times and in the manner prescribed by the Contract and by the percentage of work executed. IN WITNESS whereof the parties hereto have hereunder set their respective hands and seals on the day and year first above written. Signed by a duly authorized Signatory for and on behalf of the Government of the Sultanate of Oman ………………………………………… Witness ...................................................................... Witness ...................................................................... Signed by a duly authorized Signatory for and on behalf of the Contractor ……………………………………………. Witness ....................................................................... Ratified in accordance with the Sultani Decree No. 48/76 as amended ................................................................................... MINISTER RESPONSIBLE FOR FINANCE AFFAIRS MINISTRY OF FINANCE 36 FORM OF TENDER (Notes: The Appendix forms part of the Tender. Tenderers are required to fill up all the blank spaces in this Form of Tender and Appendix). To: H. E. The Chairman of Internal Tender Committee, Ministry of Transport and Communications, P.O. Box 684, Ruwi, P.C. 100, Sultanate of Oman Gentlemen, 1. Having examined the Instructions to Tenderers, Description and Scope of Services and Remuneration Schedule, Standard Form of Agreement and Standard Conditions of Contract for the above named services, We, the undersigned, offer to execute and complete the whole of the said services in conformity with the said Instructions to Tenderers, Description and Scope of Services and Remuneration Schedule, for the sum of(R.O:………………………….……....……………………........................................... ..........................................................................................………………….......………..) or such other sum as may be ascertained in accordance with the said Conditions. 2. We undertake if our Tender is accepted to commence the Works within seven (7) days of receipt of the Employer’s order to commence, and to complete and deliver the whole of the services comprised in the Contract within (60) days for the Services calculated from the last day of the aforesaid period in which the services are to be commenced. 3. If our Tender is accepted we will obtain the guarantee of a locally registered Insurance Company or Bank (as required in the Sultanate of Oman Standard Documents for Building and Civil Engineering Works, Sept.1999, 4th Edition) to be jointly and severally bound with us in the sum of (5) per cent of the Contract Value for the due performance of the Contract under the terms of a Performance Bond to be approved by you. 4. We agree to abide by this Tender for period of (30) days from the date fixed for receiving the same and it shall remain binding up to us and may be accepted at any time before the expiration of that period. 5. In the event of our Tender being accepted and until a formal Agreement is prepared and executed this Tender, together with your written acceptance thereof, shall constitute a binding obligation upon us. 6. We understand that you are not bound to accept the lowest or any Tender you may receive. 7. We acknowledge receipt of the following circular letters/addenda Reference number Date .............................................................. ................................................. .............................................................. ................................................. and confirm we have taken account thereof in our Tender. 37 APPENDIX “A” TO FORM OF AGREEMENT CLAUSE 1. Ruling Language : 5 (1) (a) The language in which the Contract Documents have been drafted. 2. Amount of Performance Bond or Guarantee : 10 5% of the Contract Value 3. Minimum Amount of Third Party Insurance : 23 (2) R.O. 22,000.000 4. Period for Fit Out work and Commencement from Engineer’s order to commence : 41 (7) days 6. Time for completion : 43 (60) days 7. Amount of Penalties for Delay : 47 (1) R.O. 100/= per day with maximum limit of 10% of the Contract Value. 8. Period of Maintenance : 49 (1) 365days. 9. Quantities : 55 Lump Sum 10. Percentage for Adjustment of P.C. sums contained within provisional sums : 59 (4) (c) (10%) Percent 11. Advance Payment : 60 (2) 10% of the Contract Value excluding Sums for Contingencies 12. Recovery of Advance : 60 (2) 10% of the Total Interim Certificate Value up to the amount of the Advance. 13. Payment for Materials at Site : 60 (4) (b) Not applicable 14. Minimum Amount of Monthly Interim Certificate : 60 (4) Not applicable 15. Time within which payment is to be made after Certificate : 60 (5) (a) 60 days 16. Percentage of Retention Money : 60 (7) 10% of the Gross Interim Certificate. 38 17. Limit of Retention Money : 60 (7) 10% of Contract Value. 18. Payment of Retention Money : 60 (8) 5% of contract value 19. Interest for delay of payment : 60 (9) 7% per Annum 20. Cash flow : 60 (13) Yearly Cash Flow : 2015 2016 Percentage of Contract Value : 95% 5% Dated this ................................................. day of ...................................... 201 ….................. Signature ............................................ in capacity of ...........................................…................ Duly authorized to sign Tenders for and on behalf of .............................................................. ...........................................................................................................................................……. (IN BLOCK CAPITALS) Address ........................................................... ....................................................................... Witness ...................................................... …………...........................................…….. ........................................................................ Occupation ................................................. 39 APPENDIX “B” TO FORM OF AGREEMENT SUMMARY OF CONTRACT VALUE Item No. Description Amount 1. Furniture Cost (Supply& Install &Maintain) …………/…. 2. IT System Cost (Supply& Install &Maintain) …………/…. 3. Fit Out Works (Supply& Install &Maintain ) …………/…. 4. Civil Defense/ ROP approval, Taking over, Testing & Commissioning, As Built drawings submission. 5. Other costs not related to 1, 2,3,4 above Details as………………………………………………………………………………………… …………/…. …………/…. Sub-total …………/…. Contingencies (10 % Sub-total Excluding Sub-total) …………/…. TOTAL CONTRACT VALUE (R.O.) …………/…. 40 FORM OF TENDER BOND H.E. The Chairman Internal Tender Committee Ministry of Transport and Communications P.O. Box 684, Ruwi Postal Code 100 Sultanate of Oman Tender Bond No. ________ By this bond we...................................................................................................................... .................................................................................................................................................... whose address is..................................................................................................................... .................................................................................................................................................... hereby guarantee Messrs............................................................................................................ of ............................................................................................................................................... ................................................................................................................................................... and hold at your disposal the sum of R.O.............................................................................. ................................................................................................................................................ being one percent (1 %) of the Tender Value from .......................... until ....................... a total period of ninety (90) calendar days. This bond shall be free of interest and payable in cash on your first written demand in the event of the Tenderer either withdrawing his Tender within a period of ninety (90) calendar days from the date for the receipt of Tenders or failing to provide a Performance Bond within ten (10) working days of acceptance of the Tender whichever date is earlier without any reference to or contestation on behalf of the Contractor. This bond should be returned to us upon its expiry or upon fulfillment of our undertaking whichever is the earlier. Authorized Signatories (To be issued by a locally registered bank) 41 FORM OF PERFORMANCE BOND Ministry of Finance P.O. Box 684, Muscat Postal Code 100 Sultanate of Oman Performance Bond No._________ Whereas............................................................................................................................. .... (hereinafter called the Contractor) has been awarded a Contract dated............................. ....................................for construction completion and maintenance of.............................. ........................................................................................................................................................... . …............................................ for the value of R.O. .......................................................................... (Rials Omani ........................................................................................................................) by this bond we ................................................................................................................................. whose address is ................................................................................................................................ are held and firmly bound unto the Government of the Sultanate of Oman represented by the Ministry of Finance, Muscat in the sum of R.O ……………………................................... ....................................................................................................................................................... ........................................................................................................ being five percent (5 %) of the Contract Value. We agree to make unconditional payment under this bond on your first written demand without any reference to or contestation on behalf of the Contractor provided the claim is received by us on or before ................................................................................................................................ The Guarantee will be effective from ............................................... and shall be valid up to ............................................ after which date our liability shall automatically cease. 42 This Guarantee should be returned to us upon its expiry or upon fulfillment of our undertaking whichever is the earlier. Authorized Signatories (To be issued by a locally registered bank) FORM OF ADVANCE PAYMENT BOND Ministry of Finance P.O. Box 684, Muscat Postal Code 100 Sultanate of Oman Advance Payment Bond No. _______ Whereas ................................................................................................ (hereinafter called the Contractor) has been awarded a Contract dated.................................................. ……. ……. …… .....................................................for construction completion and maintenance of.............. ……. … ................................................................................................................................................……. .................................................... for the value of R.O........................................................... (Rials Omani ............................................................................................................ ) and in consideration of your making an advance payment of R.O. ................................................. to the Contractor being .....10..... % of the Contract Value, by this bond, we …………………………………………….. ………………………………………………………….............................................................…… whose address is ...................................................……. …............................................................ guarantee to pay you a sum not........ exceeding R.O. ......................................................................... on your first written demand without reference to or contestation on behalf of the Contractor. It is understood that our liability towards you will be progressively reduced by the amount repaid to you by the Contractor as contained in the Certificates and Payments against the said advance payment. This bond will be effective from ...................................... shall be valid until .........................., or until the amount of the advance payment is fully recovered, whichever is later. This bond should be returned to us upon its expiry or upon fulfillment of our undertaking whichever is the earlier. Authorized Signatories 43 (To be issued by a locally registered bank) MATERIAL APPROVAL SHEET (MAS) PROJECT CONTRACT NO. CONTRACTOR : : : M.A.S. NO. : MATERIAL DESCRIPTION/ITEM : BOQ REF. : SPECIFICATION REF. : DRAWING REF. : MANUFACTURER (LOCAL ONLY) : SUPPLIER (GCC OR FOREIGN) : TIME REQUIRED AT SITE : B.S. REF. : SAMPLE ATTACHED : Yes [ ] No. [ ] CERTIFICATE ATTACHED : Yes [ ] No. [ ] ASSURANCE OF DELIVERY ON TIME : Yes [ ] No. [ ] REMARKS : ………………………………………………………. ………………………………………………………. SIGNATURE________________________ DATE______________________ ENGINEER: _________________________________________________________________________________ Above information given by the Contractor Correct Required information 1: Yes [ ] No [ ] 1.__________________________________________________________ 2.__________________________________________________________ 3.__________________________________________________________ Material: Recommended [ ] Rejected [ ] Recommended with comments: __________________________________ (IN CASE PRODUCE RECOMMENDED IS NON-OMANI GIVE REASONS) We confirm that there is no local manufacturer available for the Proposed product, and no alternative local product can meet the requirement for the duty conditions in Oman. 44 SIGNATURE:___________________ DATE:_________________ STAMP:________________________ EMPLOYER : _________________________________________________________________________________ Material Approved [ Material Approval with Comments: ] Rejected: [ ] 1._____________________________________________________________ 2._____________________________________________________________ 3._____________________________________________________________ SIGNATURE:_________________ DATE:___________________ STAMP:______________________ Note: The material is approved in general only. This approval will not relieve the contract from his responsibility and obligation to fulfill contract for any error/defects/incorrect settings or improper installation. ** This will only be considered if local manufacturer for the specification alternative product is not available. 45 LIST OF PERSONNEL PROPOSED TEAM TO BE ENGAGED ON THIS PROJECT The Contractor shall give below details of the personnel he proposes to engage on the Contract, together with the planned Organizational Structure. No. Name Qualification Position in the Team 46 Field of Experience & No. of Years Type of Activity FORMAT OF CURRICULUM VITAE FOR MEMBERS OF THE CONTRACTOR Name ___________________________________________________________________ Profession ____________________________________________________________________ Years with Firm ______________________ Nationality _______________________ Proposed Position on Team _____________________________________________ Key Qualifications (Under this heading, give outline of staff member’s experience and training most pertinent to assigned work on proposed team. Describe degree of responsibility held by staff member on relevant previous assignments, and give dates and locations. Use up to half-a-page.) __________________________________________________________________ Education (Under this heading, summarize college/university and other specialized education of staff member, giving names of schools, dates attended, and Degrees obtained. Use up to a quarter page. ___________________________________________________________________ Experience Record (Under this heading, list all positions held by staff member since graduation, giving dates, name of employing organization, title of position held, and location of assignments. For experience in last ten years, also give types of activities performed and Client references, where appropriate. Use up to three-quarters of a page.) ___________________________________________________________________ Language (Indicate proficiency in speaking, reading and writing of each language by ‘excellent’, ‘good’, ‘fair’ or ‘poor’.) ___________________________________________________________________ (Signature of Staff Member) Date: __________ 47 LIST OF OMANI PERSONAL IN THE COMPANY A. Tenderer shall list below all Omani Employees who are employed in the Company. Serial No. Name of Employee Job Category NB: Tenderer shall provide additional sheets if required. 48 Rate/month (R.O.) LIST OF EXPATRIATES IN THE COMPANY B. Tenderer shall list below all Expatriate Employees who are employed in the company. Serial No. Name of Employee Job Category NB: Tenderer shall provide additional sheets if required. 49 Rate/month (R.O.) SALARY COMPARISION BETWEEN OMANI & EXPATRIATE PERSONNEL C. Tenderer shall list below the Salary Comparison between Omani and Expatriate Employees who are employed in the Company. Serial No. Job Category Rate/month (R.O.) Omani NB: Tenderer shall provide additional sheets if required. Initials of Signatory to Tender 50 Rate/month (R.O.) Expatriate LIST OF PRODUCTS LIST OF ALL PRODUCTS AND MATERIALS TO BE USED IN THE PROJECT The Tenderer must list below all products and materials to be used in the project. If the material/product is made in Oman, give the name of the manufacturer. If the material/product is foreign, indicate whether it will be obtained from local market or from foreign market and give your reasons for not using Omani materials or product. Foreign Name of Omani Material/Product Sr.No. Material/Product Material/Product: Manufacturer(s) Local Market NB. Provide additional sheets if required. 51 Foreign Market Reasons for not using Omani Materials/Product s SCHEDULE OF REMUNERATION NO DESCRIPTION Duration 1 Fit Out Works (Supply& Install & Maintain ) 2 Partition Works Furniture Cost (Supply& Install & Maintain ) 3 IT System & Communication Cost (Supply& Install & Maintain) 4 Civil Defense/ ROP approval, Taking over, Testing & Commissioning, As Built drawings submission, 5 Provisional Sum Amount in Words Amount R.O. Bz. Sub Total 10% Contingency of Subtotal (Excluding Provisional Sum) Grand Total Total Tender Value Carried to the Form of Tender R.O……………………….. In Words, the Total of our Tender for the above said Services is Rial Omani (………………………………………………………………………………………………………………………………………………………… ……………………………………..) Name of Tenderer: Date: Signature & Stamp of Authorized Signatory 52 TENDERER’S ENCLOSURES The Tenderer shall properly bind in after this page the supporting documents required by the Instructions to Tenderers. All documentations shall be endorsed with Tenderer’s official company stamp. Where any Tenderer does not comply with this instruction, or if any supporting documents are not submitted, the Tender will be rejected. 53