Internal Product Development SAP Best Practices Baseline package SAP Best Practices Scenario Overview – 1 Purpose and Benefits: Purpose The business process encompasses all steps necessary to setup and process a project to develop a new product. Furthermore, the scenario is supported by the main cost object controlling functions required, such as preliminary costing and period-end closing. Benefits Project structuring Simplified preliminary costing for complex projects Revision levels ensure data consistency Key process flows covered Document Management (Easy Document Management) Assign a document (KPR) to the material masters of the finished product Project Management Create a project based on a template Product Data Management with Engineering CM Create a change number for the design project Display the BOM of the new product Redisplay the BOM (effects of change number) BOM status management Assign revision level to the material master of the new product Product Cost Controlling Material cost estimate for the new product before and after BOM changes (effects of change on price is shown) Material calculation Project Closing Record development (engineering) activities Closing and Settlement of project Scenario Overview – 2 SAP Applications Required: Required SAP enhancement package 4 for SAP ERP 6.0 Company roles involved in process flows Project Manager Product Cost Controller Engineering Specialist Employee (Professional User) Enterprise Controller Asset Accountant Scenario Overview – 3 Detailed Process Description: Internal Product Development This scenario supports companies in designing new products. SAP Product Lifecycle Management provides the project management functions to collect all costs and documents for product development. The project provides a central structure for cost collection and documentation management. Transparent BOM handling and product data management functions help to turn the product specification into an engineering BOM that can be copied to create the production BOM. All project activities are recorded. The internal design department sets up a design proposal for the new product, which serves as the basis for the product specification. The new material master and material BOM are created in the backend system. Later, the production scheduler creates routing as a basis for production and calculation of the product. To check the price level specified from the marketing department for the new product, the product cost controller calculates material costs using the BOM and routing. Since the estimated price exceeds the specified price limit, a component of the new product BOM is exchanged for a less expensive component using change management. The design department issues an engineering change master to collect and document all changes according the specification document. Following a second costing run (cost estimate), the price meets the budget. Now the development status of the new product can be fixed by assigning a revision level. At the end of the scenario, the internal design department records the activities it executed during the project, and finally closes the project. The manufacturer creates a production BOM (by copying the engineering BOM (usage type 2) to the production BOM (usage type 1). QM in production, credit management and plant- and company closing. Process Flow Diagram Design Request for a New Product Receive Design Request from Your Internal Marketing Department Receive Specification from Internal Marketing Dep. and Create Doc. Info. Record Create a Design Project Approve Working Hours Generate Settlement Rule Transfer Recorded Data to Controlling Create Engineering Change Master (ECM) for CAD drawing Assign Revision Level to Header Material of New Product Create New Engineering Change Master Product Design Process CAD Interface Create Material BOM (155.37) Update Doc.Using CAD Document & assign to Header Material of New Product Create Document Info Record Complete Project technically Project settlement to CO-PA Close completed project Release Project Create Material Master for Header Material Link Document Info Record to Header Material and Release Document Product Cost Controller Engineering Specialist Project Manager Marketi ng Dept. Internal Product Development Create Routing (155.39) Lock Engineering Change Master Activate Change Number Create Cost Estimate with Quantity Structure Assign Revision Level Lock Engineering Change Master Record Working Hours Activate Change Number Create Production BOM from Engineering BOM Change BOM and Display BOM Product Cost Estimate too High Reference and Simulation Costing (187) Make BOM Costing Relevant Proceed Standard Cost Calculation (154) Enterprise Controller Cost Estimate Period-End Closing “General” (181) BOM = Bill of Material, DM = Document Management Process Flow Diagram Assets Accountant Enterprise Controller Project Manager Employee (Professional User) Project Management Record Working Hours (Optional) Direct Activity Allocation Approve Working Hours Complete Project Technically (Optional) Generate Settlement Rule Actual Settlement of Project to Profitability Analysis (CO-PA) Maintain a Settlement Rule Transfer Recorded Data to Controlling (Optional) Create Asset Actual Settlement of Project to Asset Management Close Completed Project Period-End Closing for Plant (181) Legend <Function> Symbol Description Usage Comments Band: Identifies a user role, such as Accounts Payable Clerk or Sales Representative. This band can also identify an organization unit or group, rather than a specific role. Role band contains tasks common to that role. Symbol Diagram Connection The other process flow symbols in this table go into these rows. You have as many rows as required to cover all of the roles in the scenario. Hardcopy / Document External to SAP External Events: Contains events that start or end the scenario, or influence the course of events in the scenario. Business Activity / Event Flow line (solid): Line indicates the normal sequence of steps and direction of flow in the scenario. Flow line (dashed): Line indicates flow to infrequentlyused or conditional tasks in a scenario. Line can also lead to documents involved in the process flow. Connects two tasks in a scenario process or a non-step event Business Activity / Event: Identifies an action that either leads into or out of the scenario, or an outside Process that happens during the scenario Does not correspond to a task step in the document Unit Process: Identifies a task that is covered in a step-by-step manner in the scenario Corresponds to a task step in the document SubProcess Reference Proces s Decisio n Usage Comments To next / From last Diagram: Leads to the next / previous page of the Diagram Flow chart continues on the next / previous page Hardcopy / Document: Identifies a printed document, report, or form Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines Financial Actuals: Indicates a financial posting document Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines Budget Planning: Indicates a budget planning document Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines Manual Process: Covers a task that is manually done Does not generally correspond to a task step in a document; instead, it is used to reflect a task that is manually performed, such as unloading a truck in the warehouse, which affects the process flow. Existing Version / Data: This block covers data that feeds in from an external process Does not generally correspond to a task step in a document; instead, this shape reflects data coming from an external source; this step does not have any incoming flow lines System Pass / Fail Decision: This block covers an automatic decision made by the software Does not generally correspond to a task step in the document; instead it is used to reflect an automatic decision by the system that is made after a step has been executed. Financial Actuals Budget Planning Manual Proces s Unit Process Process Reference Description Process Reference: If the scenario references another scenario in total, put the scenario number and name here. Sub-Process Reference: If the scenario references another scenario in part, put the scenario number, name, and the step numbers from that scenario here Process Decision: Identifies a decision / branching point, signifying a choice to be made by the end user. Lines represent different choices emerging from different parts of the diamond. Corresponds to a task step in the document Corresponds to a task step in the document Does not usually correspond to a task step in the document; Reflects a choice to be made after step execution Existing Version / Data System Pass/F ail Decisio n